Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Fast Operation Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

Process intensification of biomass fast pyrolysis through autothermal operation of a fluidized bed reactor

Heat transfer is the bottleneck to fast pyrolysis of biomass. Although the enthalpy for pyrolysis of biomass is relatively small operation at temperatures around 500 °C constrains heat carrier selection to inert gases and granular media that can sustain only modest thermal fluxes in practical pyrolysis systems. With heat transfer controlling the rate of pyrolysis, reactor capacity only scales as the square of reactor diameter and does not benefit from economies of scale in building larger reactors. We have eliminated this heat transfer bottleneck by replacing it with partial oxidation of pyrolysis products to provide the enthalpy for pyrolysis in a fluidized bed reactor, a process that can be described as autothermal pyrolysis. Here, the oxygen-to-biomass equivalence ratio depends upon the kind of biomass being pyrolyzed and the level of parasitic heat losses from the reactor, but under conditions that simulate adiabatic operation, equivalence ratios are around 0.10, compared to 0.20 or higher for autothermal gasifiers. At this low equivalence ratio, there was no significant loss in bio-oil yield when operating the reactor autothermally (64.8 wt%) as compared to conventional pyrolysis (64.4 wt%). Carbon balances indicate that less valuable pyrolysis products (char and aqueous, bio-oil light ends) are consumed via partial oxidative reactions to provide the enthalpy for pyrolysis. While the carbon yields of char and bio-oil light ends decreased by 25.0% and 21.3%, respectively, the most valuable pyrolysis product (bio-oil heavy ends) only decreased 8.0%.

09 BIOMASS FUELS↗

Ubiquitous Power Electronics in Future Power Systems: Recommendations to fully utilize fast control capabilities

Power electronics is becoming ubiquitous in power systems because the rapid growth of variable renewable generation such as wind and solar, responsive load, electric vehicles, energy storage, as well as DC transmission. As a result, a high percentage of electricity will be generated, transmitted or consumed by power electronics in the future power system. Such a high penetration of power electronics is changing power system operation landscapes and dynamic characteristics. Two major kinds of impact are reduced system mechanical inertia by inverter-based resources displacing conventional generation and active participation of many distributed energy resources through inverters. This has caused significant reliability challenges for power system operation. The mitigation approach so far has mostly focused on accommodating power electronics inverters as passive devices or creating synthetic inertias to make inverter-based generation behaving as conventional generators. However, the high-speed control capabilities of power electronics present new opportunities for achieving an optimal performance beyond conventional power systems. A lower-inertia system can be more responsive for improving reliability, and distributed small resources can be more adaptive and scalable for better flexibility and resilience. Power electronic inverters are capable of multiple fast control functions. To fully utilized the ubiquitous power electronics in power systems requires technology advancements in the following areas: data and communications to capture the new dynamic behaviors introduced by power electronics; modeling and simulation to understand the behaviors of power electronics and its interactions with other components in the context of power systems; control and optimization methods for fully utilizing the capabilities of power electronics for a new paradigm of performance beyond the traditional inertia-heavy system; and significant upgrades in power electronics hardware to cater to the new control capabilities. If properly controlled and optimized, power electronics can help transform the power system to be responsive, adaptive, and scalable.

Huang, Zhenyu↗

The study of capability natural uranium as fuel cycle input for long life gas cooled fast reactors with helium as coolant

The objective of the present research is to assess the feasibility design of small long-life Gas Cooled Fast Reactor with helium as coolant. GCFR included in the Generation-IV reactor systems are being developed to provide sustainable energy resources that meet future energy demand in a reliable, safe, and proliferation-resistant manner. This reactor can be operated without enrichment and reprocessing forever, once it starts. To obtain the capability of consuming natural uranium as fuel cycle input modified CANDLE burn-up scheme was adopted in this system with different core design. This study has compared the core with three designs of core reactors with the same thermal power 600 MWth. The fuel composition each design was arranged by divided core into several parts of equal volume axially i.e. 6, 8 and 10 parts related to material burn-up history. The fresh natural uranium is initially put in region 1, after one cycle of 10 years of burn-up it is shifted to region 2 and the region 1 is filled by fresh natural uranium fuel. This concept is basically applied to all regions, i.e. shifted the core of the region (i) into region (i+1) region after the end of 10 years burn-up cycle. The calculation results shows that for the burn-up strategy on “Region-8” and “Region-10” core designs, after the reactors start-up the operation furthermore they only needs natural uranium supply to the next life operation until one period of refueling (10 years).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Achievement in Beam Power Records for the NOvA Target System

We began updating the NOvA target system for 1-Mega Watt (1-MW) beam operation in 2017. Major changes include maintaining the quality of neutrino beams with reliable instrumentation, reducing instantaneous beam heating on the target, increasing cooling power to handle the high power beam, and controlling tritium water production rate. We successfully achieved a onehour beam power report of 1.018 MW in Summer 2024. This achievement marks an important milestone for Fermilab, demonstrating the capability of the accelerator complex to handle highintensity proton beams at a fast repetition rate. We are now prepared to proceed with a new accelerator upgrade plan, known as the Accelerator Complex Evolution - Main Injector Ramp and Targetry R&D (ACE-MIRT) to support future operates at beam power exceeding 2 MW for the Long Baseline Neutrino Facility (LBNF) and Deep Underground Neutrino Experiment (DUNE). We present the improvement of the target system to exceed the beam power 1-MW.

Yonehara, Katsuya [Fermilab] (ORCID:00000002544041↗

Fast Responding Voltage Regulator and Dynamic VAR Compensator

The objectives of this project were to develop a dynamic VAR compensator (DVC) for voltage regulation through VAR support to demonstrate the ability to achieve greater levels of voltage control on electricity distribution networks, and faster response compared to existing grid technology. The goal of the project was to develop a prototype Fast Dynamic VAR Compensator (Fast DVC) hardware device, and this was achieved. In addition to developing the dynamic VAR compensator device, Varentec in partnership with researchers at North Carolina State University (NCSU) successfully met the objectives to model the potential positive impact of such DVCs on representative power networks. This modeling activity validated the ability of distributed dynamic VAR compensators to provide fast voltage regulation and reactive power control required to respond to grid disturbances under high penetration of fluctuating and intermittent distributed energy resources (DERs) through extensive simulation studies. Specifically the following tasks were set to be accomplished: 1) Development of dynamic VAR compensator to support dynamic voltage variations on the grid through VAR control 2) Extensive testing of the DVC in the lab environment 3) Present the operational DVC device to the DOE at Varentec’s lab 4) Formulation of a detailed specification sheet, unit assembly document, test setup document, unit bring-up plan, and test plan 5) Extensive simulations of the DVC in a system with high PV penetration. Understanding the operation with many DVC on a single distribution system 6) Creation and submittal of quarterly and final reports conveying the design documents, unit performance data, modeling simulation charts and diagrams, and summary explanations of the satisfaction of program goals. This report details the various efforts that led to the development of the Fast DVC as well as the modeling & simulation results. The report begins with the introduction in Section II which outlines the problems associated with increasing penetration of renewable resources on the grid and what are the challenges in solving these issues. Section III provides a brief summary of the initial concepts that were explored before the final Fast DVC prototype was developed. Section IV and V present the hardware, controls, communication, and mechanical architecture and features of the Fast DVC. Section VI presents the procedure for assembling the Fast DVC. The test plan and lab setup are expounded in Section VII and VIII. Section IX presents the results from testing the Fast DVC in the lab, several results are presented along with some pictures of the developed unit. Section X details the pilot demonstration activities. Finally, section XI showcases the efforts associated with the simulation and modeling of the Fast DVC in various scenarios with DERs and its impact in all these scenarios.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A fast recursive algorithm for molecular dynamics simulation

The present recursive algorithm for solving molecular systems' dynamical equations of motion employs internal variable models that reduce such simulations' computation time by an order of magnitude, relative to Cartesian models. Extensive use is made of spatial operator methods recently developed for analysis and simulation of the dynamics of multibody systems. A factor-of-450 speedup over the conventional O(N-cubed) algorithm is demonstrated for the case of a polypeptide molecule with 400 residues.

Jain, A.↗

A Fast and Scalable Genetic Algorithm-Based Approach for Planning of Microgrids in Distribution Networks: Preprint

As a result of climate change, extreme weather events are occurring more frequently and with increasing impact. This trend poses a significant challenge for distribution utilities and system operators to ensure that there is uninterrupted power supply to critical loads in their networks; thus, the level of proactive preparation of the distribution system to be able to handle severe impacts of extreme weather events represents the system's resilience. One method that distribution systems use to prepare for extreme events is to form multiple microgrids and thereby isolate themselves from the grid supply by using local generation as much as possible to supply critical loads. But partitioning an existing system into multiple feasible islands capable of supporting critical loads is still challenging for distribution systems - first, because of the size of the graph partitioning problem and, second, because of the difficulty in properly formulating the desired attributes of such islands or microgrids. Therefore, this paper presents a genetic algorithmbased approach that facilitates incorporating multiple objectives for grid partitioning by formulating two types of problems - node allocation and edge elimination - and it considers multiple topological and resilience-enhancing objectives. The performance of the proposed genetic algorithm-based approach is numerically evaluated on multiple test systems as well as on a real distribution feeder in Colorado, USA.

edge elimination↗

Development Of A Compact Photo-injector With RF-focusing Lens For Short Pulse Electron Source Application

For development of compact ultrafast electron source system, we are currently designing a short-pulse RF-gun with RF focusing structure by means of a series of comprehensive modeling analysis processes. EM design of a 2.5 cell resonant cavity with input coupler, acceleration dynamics of photo-emitted electron bunch, EM design of RF-lens with input coupler, and phasespace analysis of focused electron bunch are systematically examined with multi-physics simulators. All the features of the 2.856 GHz cavity geometry were precisely engineered for acceleration energies ranging from 100 keV to 500 keV (safety limited) to be powered by our 5 MW S-band klystron. The klystron (Thales TH2163) and modulator system (ScandiNova K1 turnkey system) were successfully installed and tested. Performance tests of the klystron system show peak output power > 5 MW, as per operation specifications. At the quasi-relativistic energies, the electron source is capable of generating 100fC -- 1 pC electron bunch with pulse duration close to 30 fs -- 1 ps and transverse size of a few hundred microns. PIC simulations have shown that the electron bunch undergoes fast RF acceleration, rapidly reaching the desired energies, which can be controlled by tuning RF injection phase and input driving power. It has been shown that it is possible to also focus/compress the bunch longitudinally using a RF-lens, which would allow us to control the temporal resolution of the system as well. While our primary analysis has been performed on a 2.5 cell design, we are also looking into half-cell (single cavity) design that is expected to provide the same range of beam energy with a simple configuration.

Grabenhofer, Alexander↗

Analysis of metabolomics datasets with high-performance computing and metabolite atlases

Even with the widespread use of liquid chromatography mass spectrometry (LC/MS) based metabolomics, there are still a number of challenges facing this promising technique. Many, diverse experimental workflows exist; yet there is a lack of infrastructure and systems for tracking and sharing of information. Here, we describe the Metabolite Atlas framework and interface that provides highly-efficient, web-based access to raw mass spectrometry data in concert with assertions about chemicals detected to help address some of these challenges. This integration, by design, enables experimentalists to explore their raw data, specify and refine features annotations such that they can be leveraged for future experiments. Fast queries of the data through the web using SciDB, a parallelized database for high performance computing, make this process operate quickly. Furthermore, by using scripting containers, such as IPython or Jupyter, to analyze the data, scientists can utilize a wide variety of freely available graphing, statistics, and information management resources. In addition, the interfaces facilitate integration with systems biology tools to ultimately link metabolomics data with biological models.

59 BASIC BIOLOGICAL SCIENCES↗

Experimental Determination of PV Inverter Response to Grid Phase Shift Events: Preprint

With the continued growth of renewable energy resources which interface to the electric grid via inverters, the understanding of such devices becomes ever more important to the safe and reliable operation of the bulk power system. This work investigates the specific response of a utility-scale PV inverter to grid voltage phase shift-type disturbances which sometimes occur during grid fault events. The role of the PV inverter's phase-locked-loop (PLL) is identified as important to modeling the response. Switching-level simulations of a utility-scale PV inverter with a modeled PLL show a characteristic response when phase shift disturbances require the PLL to track what appear as fast frequency changes. Additionally, in this work a full-scale laboratory testing was carried out using the Opal real time (RT) OP5142 real time simulator and a large grid simulator to create phase shift disturbances with a high degree of repeatability. A photovoltaic (PV) inverter was connected to a grid simulator, and phase shifts were instantaneously implemented on the simulated grid, the results of the currents were then obtained. The experimental results obtained were validated with simulation results obtained from MATLAB/Simulink.

24 POWER TRANSMISSION AND DISTRIBUTION↗

DeepM&Mnet: Inferring the electroconvection multiphysics fields based on operator approximation by neural networks

Electroconvection is a multiphysics problem involving coupling of the flow field with the electric field as well as the cation and anion concentration fields. Here, we use electroconvection as a benchmark problem to put forward a new data assimilation framework, the DeepM&Mnet, for simulating multiphysics and multiscale problems at speeds much faster than standard numerical methods using pre-trained neural networks. We first pre-train DeepONets that can predict independently each field, given general inputs from the rest of the fields of the coupled system. DeepONets can approximate nonlinear operators and are composed of two sub-networks, a branch net for the input fields and a trunk net for the locations of the output field. DeepONets, which are extremely fast, are used as building blocks in the DeepM&Mnet and form constraints for the multiphysics solution along with some sparse available measurements of any of the fields. We demonstrate the new methodology and document the accuracy of each individual DeepONet, and subsequently we present two different DeepM&Mnet architectures that infer accurately and efficiently 2D electroconvection fields for unseen electric potentials. Furthermore, the DeepM&Mnet framework is general and can be applied for building any complex multiphysics and multiscale models based on very few measurements using pre-trained DeepONets in a “plug-and-play” mode.

97 MATHEMATICS AND COMPUTING↗

FPGA-Based Spill Regulation System for the Muon Delivery Ring at Fermilab

The Muon to Electron Experiment (Mu2e) requires a uniform beam profile from the Muon Delivery Ring to meet their experimental needs. A specialized Spill Regulation System (SRS) has been developed to help achieve consistent spill uniformity. The system is based on a custom-designed carrier board featuring an Arria 10 SoC, capable of executing real-time feedback control. The FPGA processes beam pulses of approximately 200 ns every 1.695 $μ$s, allowing for continuous monitoring of the extracted spill intensity through fast bunch integration. The system directly controls three quadrupole magnets, which work in conjunction with sextupole magnets to achieve third-order resonant extraction. Furthermore, the board interfaces with Fermilab's Accelerator Control Network (ACNET), enabling operators to modify spill regulation settings in real-time via the control network while providing diagnostic waveforms. These waveforms help operators monitor the process and fine-tune the feedback mechanisms. This paper presents an overview of the board's architecture and its initial progress toward regulating beam extraction. This initial version of the regulation system aims to evaluate baseline performance to inform future system improvements.

Berlioz, J. R. [Fermilab]↗

SAS4A/SASSYS-1 Validation with the EBR-II Tests SHRT-17 and SHRT-45R

The EBR-II sodium-cooled fast reactor supported a wide range of fast reactor research activities. The final fifteen years of operations at EBR-II were used for experiments and tests to demonstrate the importance of passive safety in liquid metal reactors and the capability of such systems to provide strong passive responses during off-normal conditions. The Shutdown Heat Removal Test program at EBR-II provided test data supporting the validation of computer codes for design, licensing, and operation of LMRs, among other objectives. The program included nearly sixty tests, most of which were protected and unprotected loss of flow and loss of heat sink tests run at various initial powers and flow rates.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

FPGA-Based Spill Regulation System for the Muon Delivery Ring at Fermilab

The Muon to Electron Experiment (\acrshort{Mu2e}) requires a uniform beam profile from the Muon Delivery Ring to meet their experimental needs. A specialized Spill Regulation System (\acrshort{SRS}) has been developed to help achieve consistent spill uniformity. The system is based on a custom-designed carrier board featuring an Arria 10 SoC, capable of executing real-time feedback control. The FPGA processes beam pulses of approximately 200 ns every 1.695 microseconds, allowing for continuous monitoring of the extracted spill intensity through fast bunch integration. The system directly controls three quadrupole magnets, which work in conjunction with sextupole magnets to achieve third-order resonant extraction. Furthermore, the board interfaces with Fermilab s Accelerator Control Network (ACNET), enabling operators to modify spill regulation settings in real-time via the control network while providing diagnostic waveforms. These waveforms help operators monitor the process and fine-tune the feedback mechanisms. This paper presents an overview of the board's architecture and its initial progress toward regulating beam extraction. This initial version of the regulation system aims to evaluate baseline performance to inform future system improvements.

Berlioz, Jose Rene [Fermilab]↗

Effect of timed secondary-air injection on automotive emissions

A single cylinder of an automotive V-8 engine was fitted with an electronically timed system for the pulsed injection of secondary air. A straight-tube exhaust minimized any mixing other than that produced by secondary-air pulsing. The device was operated over a range of engine loads and speeds. Effects attributable to secondary-air pulsing were found, but emission levels were generally no better than using the engine's own injection system. Under nontypical fast-idle, no-load conditions, emission levels were reduced by roughly a factor of 2.

Coffin, K. P.↗

Plasma diagnostics package. Volume 2: Spacelab 2 section, part A

This volume (2), which consists of two parts (A and B), of the Plasma Diagnostics Package (PDP) Final Science Report contains a summary of all of the data reduction and scientific analyses which were performed using PDP data obtained on STS-51F as a part of the Spacelab 2 (SL-2) payload. This work was performed during the period of launch, July 29, l985, through June 30, l988. During this period the primary data reduction effort consisted of processing summary plots of the data received by 12 of the 14 instruments located on the PDP and submitting these data to the National Space Science Data Center (NSSDC). The scientific analyses during the performance period consisted of follow-up studies of shuttle orbiter environment and orbiter/ionosphere interactions and various plasma particle and wave studies which dealt with data taken when the PDP was on the Remote Manipulator System (RMS) arm and when the PDP was in free flight. Of particular interest during the RMS operations and free flight were the orbiter wake studies and joint studies of beam/plasma interactions with the SL-2 Fast Pulse Electron Generator (FPEG) of the Vehicle Charging and Potential Investigation (VCAP). Internal reports, published papers and presentations which involve PDP/SL-2 data are listed in Sections 3 and 4. A PDP/SL-2 scientific results meeting was held at the University of Iowa on June 10, l986. This meeting was attended by most of the PDP and VCAP investigators and provided a forum for discussing and comparing the various results, particularly with regard to the PDP free flight.

Pickett, Jolene S.↗

Realizing "2001: A Space Odyssey": Piloted Spherical Torus Nuclear Fusion Propulsion

A conceptual vehicle design enabling fast, piloted outer solar system travel was created predicated on a small aspect ratio spherical torus nuclear fusion reactor. The initial requirements were satisfied by the vehicle concept, which could deliver a 172 mt crew payload from Earth to Jupiter rendezvous in 118 days, with an initial mass in low Earth orbit of 1,690 mt. Engineering conceptual design, analysis, and assessment was performed on all major systems including artificial gravity payload, central truss, nuclear fusion reactor, power conversion, magnetic nozzle, fast wave plasma heating, tankage, fuel pellet injector, startup/re-start fission reactor and battery bank, refrigeration, reaction control, communications, mission design, and space operations. Detailed fusion reactor design included analysis of plasma characteristics, power balance/utilization, first wall, toroidal field coils, heat transfer, and neutron/x-ray radiation. Technical comparisons are made between the vehicle concept and the interplanetary spacecraft depicted in the motion picture 2001: A Space Odyssey.

Williams, Craig H.↗

Development of a Tender-Energy Microprobe for Geosciences at NSLS and NSLS-II

This funding is to develop a new Synchrotron user facility for microbeam X-ray absorption spectroscopy (XAS) and quantitative X-ray fluorescence (XRF) imaging, at the National Synchrotron Light Source (NSLS) and NSLS-II. It includes design, purchase of components, and construction of the microprobe endstation and controls. Initial development, commissioning, and application is ongoing at NSLS Beamline X15B, with planned transition in 2014-15 to the NSLS-II TES (Tender-Energy Spatially Resolved X-ray Absorption Spectroscopy) beamline. It is optimized for the “tender” energy range of 1-5 keV, reaching up to 8 keV. Thus it uniquely covers the K absorption edges of critical elements Mg, Al, Si, P, S, Cl, and Ca, and can reach up to Co. A stable, high-flux microbeam focus, user-tunable from ~50 to ~5 microns, has been achieved using two-stage achromatic focusing. Existing beamline optics collimate, monochromate, and macro-focus the X-ray beam to ~1 mm at a secondary source aperture (SSA). Beam from the SSA is then re-focused by a pair of mirrors in KB geometry to the microbeam scale. Size of the microbeam is tunable, at the expense of flux, by adjusting the size of the SSA as a virtual source. The new experimental endstation consists of 1) a sample chamber operable as a radiation enclosure with helium atmosphere to facilitate measurements in this energy range, 2) the KB microfocusing optics, 3) a sample-positioning stage for raster-scanning and positioning the sample, 4) X-ray fluorescence detectors, an existing Ge detector for low-signal sensitivity and a new Si detector for high count rates, 5) an optical camera for viewing samples and locating target locations, 6) beam intensity monitors and diagnostics, and 7) controls and data acquisition system. An important aspect of this project is the added capability for fast, on-the-fly scanning of the monochromator (energy), required for fast XAS and advanced XAS imaging. This instrument will be available for initial PI and Co-I measurements, and for General Users to apply for beamtime to use, at NSLS X15B for the remaining operation of NSLS, to September 30, 2014. Phase two of this project will transition this facility, both the primary optics and the endstation, to NSLS-II after NSLS ceases operation. While this transition itself is beyond the scope of the current grant, preparation and planning for it is included.

58 GEOSCIENCES↗