Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FEET”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

Updated Noise Dose Range of NASA’s X-59 Aircraft Estimated from Propagation Simulations

A follow-on study to Doebler and Loubeau, “The noise dose range of the X-59 estimated from propagation simulations,” JASA 150(4), A208 (2021); doi:10.1121/10.0008134 is described. In the previous work, propagation simulations of NASA’s X-59 sonic thump were conducted using two near-field pressure solutions from NASA’s Cart3D computational fluid dynamics (CFD) code. The near-fields were propagated through realistic atmospheric profiles from the Climate Forecast System Version 2 database across the USA, and Perceived Level statistics of the thumps were presented. The current work repeats the previous analyses, instead using near-field CFD solutions from NASA’s Fully Unstructured Navier-Stokes (FUN3D) code for the same aircraft conditions (Mach 1.4 at 53,200 feet and Mach 1.3 at 43,000 feet), which achieve the minimum and maximum cruise loudness. NASA and contractors in the X-59 development and community noise testing project mutually agreed upon using FUN3D for generating near-field pressures. Sonic thump loudness statistics using the FUN3D near-fields are similar to those of Cart3D. The min loudness condition is about 1 dB (PL) greater when using the FUN3D solution, and the max loudness condition results are nearly identical. Understanding the X-59’s dose range for various flight and atmospheric conditions is important for planning X-59 community noise surveys.

X-59↗

Digital Twin Technology for Aviation

As technology progresses, so have the tools for data visualization. This project presents a digital twin model of the San Francisco airport displaying a 10-minute window of historical flight data, visualizing the trajectory data of airplanes and vehicles in three dimensions. Multiple different cameras where implemented to fully utilize the 3D visualization. This is a 100:1 feet scale model created in Autodesk Maya, using the airport center as the origin and recalculating all coordinates accordingly featuring the airport, some surrounding buildings, and the bay. For this project, six different models of airplanes were modeled at a 50:1 feet scale with texturing to mimic real-world aircraft models along with certain airlines. The animation is driven through archived data captured from NASA’s Sherlock Open-Data Portal, cleaned of noisy data points, processed into useable data formats, and implemented into a Maya ASCII file of animation paths with the corresponding previously-stated airplane models attached all using Java based conversion program.

Aleksander Schade↗

Functional Task Tests in Partial Gravity During Parabolic Flight

BACKGROUND Understanding how critical mission tasks are performed in partial gravity such as on the moon or Mars is necessary to define effective and comprehensive countermeasure strategies for preserving crew performance during exploration missions. We studied the performance of tasks such as standing, walking, and jumping during the partial gravity phases of parabolic flight. We hypothesized that the acute effects of partial gravity on vestibular, proprioceptive, and sensorimotor functions would negatively impact performance. METHODS Twelve subjects were tested over three flights of 30 parabolas each, including 10 parabolas at 0.25g, 10 parabolas at 0.5g, and 10 parabolas at 0.75g. Subjects also performed tests in 1g between parabolas. During the sit-to-stand with obstacle walk task, subjects rose from a seated position and walked as quickly as possible straight ahead towards a cone (4 m distance), walked around the cone making a 180° left turn, returned, and sat in the chair. On the way to and from the cone, subjects stepped over a 30 cm high obstacle. For the recovery from fall task, subjects lay prone for the pull-up phase and initial 10 sec of the parabola. Then they were asked to rise as quickly as possible and maintain a quiet stance for 10 sec. The tandem rail balance task involved standing with both feet on a 4.5 cm wide rail. The time ended when subjects either stepped off the rail or grabbed on to support straps. The jump down task started with the subjects standing on a 30 cm high platform, then the subjects were instructed to step off the platform, land with both feet simultaneously, and settle in a quiet stance. The cone of stability task involved subjects leaning about the ankles as far as they could in the anterior, posterior, and lateral directions without unfolding their arms or taking a step. The center of pressure distance between endpoints was calculated. Data were collected using inertial measurement units (Opal V2, APDM, Portland, OR) worn on the head and trunk, heart rate monitors (RS800CX, Polar, Kempele, Finland), and a force plate (Bertec, Columbus, OH). RESULTS Gravity level had a significant effect on performance, with the greatest changes from 1g tending to be at the 0.25g level (Table 1). Lower gravity levels were associated with increased times to complete the sit-to-stand obstacle walk task and the recovery from fall task, decreased change in heart rate during the recovery from fall task, decreased rail balance times, and increased cone of stability distance in the anterior-posterior direction. Table 1. Functional task performance at different gravity levels during parabolic flight. Measure0.25g0.5g0.75g1gp-valueSit-to-stand with obstacle walk time (sec)9.8 ±1.4*7.2 ±0.76.9 ±0.8*7.4 ±0.9<0.001Recovery from fall time to settle (sec)5.3 ± 0.9*4.6 ± 0.84.2 ± 0.64.3 ± 0.70.002Recovery from fall change in heart rate (bpm)6.0 ± 7.3*11.2 ± 6.5*14.9 ± 4.915.9 ± 6.5<0.001Rail balance with eyes open time (sec)2.7 ±0.8*4.8 ±2.16.6 ±4.78.4 ±6.70.031Rail balance with eyes closed time (sec)1.6 ±0.4*2.1 ±0.42.4 ±0.62.6 ±0.8<0.001Jump down time to settle (sec)2.1 ± 0.41.9 ± 0.42.0 ± 0.31.8 ± 0.30.328Cone of stability –anterior-posterior (cm)20.8 ±2.7*18.8 ±2.218.6 ±1.717.9 ±2.00.039Cone of stability –lateral (cm)26.8 ±6.624.4 ±2.123.0 ±2.123.8 ±2.30.215p-value: one-way repeated measures analysis of variance; *Significant pairwise difference from 1g (p<0.05). DISCUSSION These data suggest that there is a dose-response relationship between gravity level and functional task performance. The largest changes in performance were expected at the lowest gravity level (0.25g) because subjects would no longer be able to use the gravitational reference for the perception of upright. Understanding the extent of performance deficits informs the risks and design of countermeasures for exploration spaceflight missions. ACKNOWLEDGEMENT This work is supported by NASA’s Human Research Program Human Health Countermeasures Element.

T R Macaulay↗

Interim Measure Report South Water Pump Station Potential Release Location 213 – Location of Concern 2 Kennedy Space Center, Florida

This report presents a summary of the polychlorinated biphenyl (PCB) interim measure (IM) activities that occurred in December 2022 and March 2023 at Location of Concern (LOC) 2 – Electrical Equipment Area associated with the South Water Pump Station (SWPS) Potential Release Location (PRL) 213, located at the John F. Kennedy Space Center (KSC), Florida. The SWPS site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. Assessment activities have previously been performed at six SWPS LOCs identified during a Solid Waste Management Unit assessment in 2013. Based on the data collected during these assessments, it was determined that IM activities would be completed at one of the LOCs, LOC 2 – Electrical Equipment Area, and an IM Work Plan was prepared and approved. In 2019, demolition of the SWPS buildings and structures was completed, allowing for additional assessment at LOC 2, and it was determined that soil excavation to remove PCB-impacted soils was no longer required for LOC 2. The IM activities conducted following demolition are presented in this report and include shallow soil sample collection, conducted in December 2022, and monitoring well installation and groundwater sampling, both conducted in March 2023. AECOM Technical Services, Inc. (AECOM) personnel collected two soil samples from two boring locations, SWPS-SB0005 and SWPS-SB0018. The samples were collected at 0 to 0.5 feet below land surface (bls). AECOM also conducted oversight of one monitoring well installation, SWPS-MW0001 screened from 4 to 14 feet bls, and then subsequently collected one groundwater sample from SWPS-MW0001. The samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. There were no detections of PCBs in soil or groundwater during the reporting period.

Chadwick Sloan Lee↗

Ultrapure Water System at JSC for High Purity Cleaning of Flight Hardware, Astromaterial Handling Tools and Solar Wind Samples

Use of Ultrapure Water (UPW) for cleaning of astromaterial sample handling tools and containers was driven by the discontinuation of Freon 113 as a cleaning solvent, due to environmental concerns. Freon 113, recycled using distillation, was very effective at removing organic residues from sample handling hardware. The initial switch to high purity water for astromaterial tool cleaning was modeled after efforts at White Sands Test Facility (WSTF) and current semiconductor UPW production practices in the early 1990s. JSC curation’s first system was comprised of ion exchange polishing cylinders, 55 gallon PVDF-lined storage tank, a few tens of feet of PVDF piping, UV and particle filtration, and this system supported cleaning for lunar, meteorite and Cosmic Dust collectors lab operations. By 2000 a major expansion and upgrade was providing UPW of quality E-1 (ASTM D5127-90) or better at 10 gpm for cleaning of the Genesis solar wind payload for flight, in addition to sample handling tools for other astromaterials. This expansion included a 1000 gallon storage tank and several hundred feet of PVDF piping located in B. 31 and 31N. An extra reverse osmosis process unit was added to incoming water in 2005. Subsequently several major components were replaced, and in anticipation of adding new labs, an enlarged UPW system was designed in 2018 and completed in 2019. This system produces grade E1.1 UPW at 15 gpm in a continuous 1100 ft. loop with 5000 gal. storage tank, supplying 8 laboratories.

Ultrapure water↗

Wilson Corners, Solid Waste Management Unit 001(SWMU 01) 2023 Annual Long-Term Monitoring Report

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2023 at Wilson Corners, Solid Waste Management Unit 001, at Kennedy Space Center (KSC), Florida. Annual LTM of groundwater is being conducted at the site. Based on results from groundwater sampling activities performed during the 2019 through 2020 LTM reporting period and the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified and the installation of an air sparge (AS) system to treat the area of the High Concentration Plume was recommended. The AS System was installed in late 2022 and early 2023. System start-up activities were initiated in April 2023. Following system startup, several site wells required retrofitting to equip wellheads for withstanding the air pressure released from air sparge wells during system operation. Some site wells also required repair or abandonment, and replacement. Survey of location and top-of-casing of newly installed monitoring wells was combined with scheduled AS system survey activities and was completed in January 2024. The activities presented in this report include the February and April 2023 LTM monitoring well installations; March and April 2023 LTM and performance monitoring well water level gauging and sampling; November 2023 LTM well retrofits and repairs; a summary of December 2023 LTM well abandonments and installations (complete site well abandonment activities will be presented under a separate cover); and January 2024 LTM well survey. During the March and April 2023 sampling events, the low-flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds. In March 2023, groundwater flow for the site was generally to the west was generally consistent with historical observations at the site. The Low Concentration Plume (LCP) continues to extend both horizontally and vertically beyond the terminal depth of the current monitoring well network. Data, inclusive of the 2023 LTM and baseline performance monitoring sampling events, indicate that the LCP encompasses an estimated 19.5 acres, compared to the 2021 LCP footprint, inclusive of the 2020 and 2021 DPT sampling events of 20.7 acres. The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet below land surface (bls). The results from the three vertical extent monitoring wells screened below 48 feet bls that were sampled during the 2023 LTM indicate that groundwater vinyl chloride concentrations in these three wells are greater than the GCTL. As presented in the 2021 Long-Term Monitoring Report (NASA 2022), the KSCRT agreed to delay deeper investigations in this area to prevent the creation of additional pathways for vertical migration. Based on groundwater sampling activities performed in 2023, recommendations are to perform the next annual LTM sampling event, scheduled for April 2024 and to conduct quarterly performance monitoring of the AS System. The current selection of monitoring wells in the recommended 2024 LTM plan will provide an adequate data set for monitoring groundwater plume behavior; however, the LTM monitoring well network will be evaluated and refined based on 2024 LTM and year one performance monitoring data.

King Linnea↗

Structural Integrity of Single Shell Tanks at Hanford - 9491

The 149 Single Shell Tanks at the Hanford Site were constructed between the 1940’s and the 1960’s. Many of the tanks are either known or suspected to have leaked in the past. While the free liquids have been removed from the tanks, they still contain significant waste volumes. Recently, the tank farm operations contractor established a Single Shell Tank Integrity Program. Structural integrity is one aspect of the program. The structural analysis of the Single Shell Tanks has several challenging factors. There are several tank sizes and configurations that need to be analyzed. Tank capacities range from fifty-five thousand gallons to one-million gallons. The smallest tank type is approximately twenty feet in diameter, and the three other tank types are all seventy-five feet in diameter. Within each tank type there are varying concrete strengths, types of steel, tank floor arrangements, in-tank hardware, riser sizes and locations, and other appurtenances that need to be addressed. Furthermore, soil properties vary throughout the tank farms. The Pacific Northwest National Laboratory has been conducting preliminary structural analyses of the various single shell tank types to address these parameters. The preliminary analyses will assess which aspects of the tanks will require further detailed analysis. Evaluation criteria to which the tanks will be analyzed are also being developed for the Single Shell Tank Integrity Program. This information will be reviewed by the Single Shell Tank Integrity Expert Panel that has been formed to issue recommendations to the DOE and to the tank farm operations contractor regarding Single Shell Tank Integrity. This paper provides a summary of the preliminary analysis of the single shell tanks, a summary of the recommendations for the detailed analyses, and the proposed evaluation criteria by which the tanks will be judged.

54 ENVIRONMENTAL SCIENCES↗

H-CANYON AIR EXHAUST TUNNEL INSPECTION VEHICLE DEVELOPMENT

The H-Canyon at Savannah River Site is a large concrete structure designed for chemical separation processes of radioactive material. The facility requires a large ventilation system to maintain negative pressure in process areas for radioactive contamination control and personnel protection. The ventilation exhaust is directed through a concrete tunnel under the facility which is approximately five feet wide and 8 feet tall that leads to a sand filter and stack. Acidic vapors in the exhaust have had a degrading effect on the surface of the concrete tunnels. Some areas have been inspected; however, the condition of other areas is unknown. Experience from historical inspections with remote controlled vehicles will be discussed along with the current challenge of inspecting levels below available access points. The area of interest in the exhaust tunnel must be accessed through a 14 X 14 inch concrete plug in the floor of the hot gang valve corridor. The purpose for the inspection is to determine the condition of the inside of the air tunnel and establish if there are any structural concerns. Various landmarks, pipe hangers and exposed rebar are used as reference points for the structural engineers when evaluating the current integrity of the air tunnel.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Photovoltaic module mounting system

A solar array mounting system having unique installation, load distribution, and grounding features, and which is adaptable for mounting solar panels having no external frame. The solar array mounting system includes flexible, pedestal-style feet and structural links connected in a grid formation on the mounting surface. The photovoltaic modules are secured in place via the use of attachment clamps that grip the edge of the typically glass substrate. The panel mounting clamps are then held in place by tilt brackets and/or mid-link brackets that provide fixation for the clamps and align the solar panels at a tilt to the horizontal mounting surface. The tilt brackets are held in place atop the flexible feet and connected link members thus creating a complete mounting structure.

14 SOLAR ENERGY↗

Matched Index of Refraction Flow Facility

What's 27 feet long, 10 feet tall and full of mineral oil (3000 gallons' worth)? If you said INL's Matched Index of Refraction facility, give yourself a gold star. Scientists use computers to model the inner workings of nuclear reactors, and MIR helps validate those models. INL's Hugh McIlroy explains in this video. You can learn more about INL energy research at the lab's facebook site http://www.facebook.com/idahonationallaboratory.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Photovoltaic module mounting system

A solar array mounting system having unique installation, load distribution, and grounding features, and which is adaptable for mounting solar panels having no external frame. The solar array mounting system includes flexible, pedestal-style feet and structural links connected in a grid formation on the mounting surface. The photovoltaic modules are secured in place via the use of attachment clamps that grip the edge of the typically glass substrate. The panel mounting clamps are then held in place by tilt brackets and/or mid-link brackets that provide fixation for the clamps and align the solar panels at a tilt to the horizontal mounting surface. The tilt brackets are held in place atop the flexible feet and connected link members thus creating a complete mounting structure.

14 SOLAR ENERGY↗

Photovoltaic assemblies and methods for transporting

A PV assembly including framework, PV laminate(s), and a stiffening device. The framework includes a perimeter frame at least 10 feet in length and at least 5 feet in width. The PV laminate(s) are assembled to the perimeter frame to define a receiving zone having a depth of not more than 8 inches. The stiffening device is associated with the framework and is configured to provide a first state and a second state. In the first state, an entirety of the stiffening device is maintained within the receiving zone. In the second state, at least a portion of the stiffening device projects from the receiving zone. The stiffening device enhances a stiffness of the PV assembly in a plane of the perimeter frame, and can include rods defining truss structures.

42 ENGINEERING↗

Central Nevada Test Area, Nevada Fact Sheet

The Central Nevada Test Area (CNTA) is in the Hot Creek Valley of south-central Nevada, approximately 70 miles northeast of Tonopah. The CNTA consists of three parcels totaling 2,560 acres. The parcels are spaced approximately 3 miles apart along a roughly north-south line. The total acreage is currently withdrawn from all forms of appropriation associated with mining laws and leasing. The U.S. Atomic Energy Commission, a predecessor agency of the U.S. Department of Energy (DOE), acquired the CNTA in the early 1960s to develop alternative sites to the Nevada National Security Site (formerly known as the Nevada Test Site) for underground nuclear testing. Three emplacement boreholes (UC-1, UC-3, and UC-4) were drilled on the three parcels at the CNTA for underground nuclear testing. The initial underground nuclear test at CNTA, Faultless, was conducted in borehole UC-1 at a depth of 3,199 feet below ground surface on January 19, 1968. The yield of the Faultless test was estimated to be 0.2 to 1 megaton. Its purpose was to evaluate the environmental and structural effects that might be expected if subsequent, higher-yield underground nuclear tests were conducted in this vicinity. The test resulted in a down-dropped fault block visible at land surface. In addition, seismic results supported the indication that the site was not favorable for larger detonations. The nuclear detonation created a cavity with a radius of approximately 328 feet. The Faultless test did not release any radioactivity at the surface, and no additional tests were conducted at the CNTA.

54 ENVIRONMENTAL SCIENCES↗

Photovoltaic assemblies and methods for transporting

A PV assembly including framework, PV laminate(s), and a stiffening device. The framework includes a perimeter frame at least 10 feet in length and at least 5 feet in width. The PV laminate(s) are assembled to the perimeter frame to define a receiving zone having a depth of not more than 8 inches. The stiffening device is associated with the framework and is configured to provide a first state and a second state. In the first state, an entirety of the stiffening device is maintained within the receiving zone. In the second state, at least a portion of the stiffening device projects from the receiving zone. The stiffening device enhances a stiffness of the PV assembly in a plane of the perimeter frame, and can include rods defining truss structures.

14 SOLAR ENERGY↗

Stratigraphy of the cambo-ordovician succession in Illnois

The Upper Cambrian through Lower Ordovician succession (Sauk II-III sequences) in the Illinois Basin covers the entire state of Illinois and most of the states of Indiana and Kentucky. To determine lateral and vertical lithologic variations of the rocks within the Cambro-Ordovician deposits that could serve as reservoir or seal for CO2 storage, detailed subsurface stratigraphic evaluation of the succession in Illinois was conducted. The Cambro-Ordovician succession in the Illinois Basin consists of mixed carbonate-siliciclastic deposits. Its thickness ranges from nearly 800 feet in the extreme northwest to nearly 8000 feet in the Reelfoot Rift in the extreme southeastern part of the state. In northern and central Illinois, the Cambro-Ordovician rocks are classified as the Cambrian Knox and the Ordovician Prairie du Chien Groups, which consist of alternating dolomite and siliciclastic units. In the southern and deeper part of the Illinois Basin, the Cambro-Ordovician deposits consist chiefly of fine to coarsely crystalline dolomite capped by the Middle Ordovician Everton Formation. Detailed facies analysis indicates that the carbonate units consist mainly of mudstone to grainstone facies (fossiliferous/oolitic limestone and dolomite) with relics of bioclasts, ooids, intraclasts and peloids recording deposition on a shallow marine ramp setting. The dominant lithology of the Knox and the overlying Prairie du Chien Group is fine to coarsely crystalline, dense dolomite. However, porous and permeable vugular or fractured/cavernous dolomite intervals that grade to dense fine to coarsely crystalline dolomite are present within the dolomite units. Several hundred barrels of fluid were lost in some of these porous intervals during drilling, indicating high permeability. The sandstone intervals are porous and permeable and are texturally and compositionally mature. The permeable sandstone and porous dolomite intervals are laterally extensive and could serve as important reservoirs to store natural gas, CO2 or hazardous waste material. Results of this study show that the Cambro-Ordovician Knox Group in the Illinois Basin and adjacent Midwestern regions may be an attractive target for CO2 sequestration because these rocks are 1) laterally extensive, 2) consist of some porous and permeable dolomite and sandstone intervals, and 3) contain abundant impermeable shale and carbonate seals.

Lasemi, Yaghoob↗

Building America Top Innovations 2012: Advanced Framing Systems and Packages

This Building America Top Innovations profile describes Building America research showing advanced 2x6, 24-inch on-center framing, single top plates, open headers, and 2-stud corners reduced board feet of lumber by more than 1,000 feet, cut energy use by 13%, and cut material and labor costs by more than $1,000 on a typical home.

advanced framing↗

Optimizing Geothermal Drilling: Oil and Gas Technology Transfer

There is a significant amount of financial risk associated with geothermal drilling; however, there are opportunities to improve upon current practices and technologies used. The scope of this drilling operational study included 21 geothermal wells and 21 oil and gas wells. The goal was to determine a 'perfect well' using historical data to compare the best oil and gas well to the best geothermal well. Unfortunately, limitations encountered in the study included missing data (bit records, mud information, etc.), poor data collection, and difficult to ascertain handwriting. An online software database was used to format drilling data to IADC coded daily drilling reports and generate analysis figures. Six major issues have been found in geothermal drilling operations. These problems include lost circulation, rig/equipment selection, cementing, penetration rate, drilling program, and time management. As a result of these issues, geothermal drilling averages 56.4 days longer than drilling comparable oil and gas wells in the wells in this study. Roughly $13.9 million would be lost due to non-productive time in the 21 geothermal wells and only $1.3 million in the oil and gas wells, assuming a cost of $50,000 per day. Comparable events such as drilling the same sized hole, tripping in/out, cementing, and running the same size casing took substantially less time in the oil and gas wells. Geothermal wells were drilled using older and/or less advanced technology to depths less than 10,000 feet, while oil and gas wells reached 12,500 feet faster with purpose built rigs. A new approach is now underway that will optimize drilling programs throughout the drilling industry. It is the use of Mechanical Specific Energy (MSE) as a tool to realize efficient drilling processes. However, a work-flow must also be established in order for there to be an efficient drilling program. Potential improvements for current geothermal operations are: the use of electronic records, real time services, and official glossary terms to describe rig operations, and advanced drilling rigs/technology.

15 GEOTHERMAL ENERGY↗

Optimizing Geothermal Drilling: Oil and Gas Technology Transfer

There is a significant amount of financial risk associated with geothermal drilling. This study of drilling operations seeks opportunities to improve upon current practices and technologies. The scope of this study included analyzing 21 geothermal wells and 21 oil and gas wells. The goal was to determine a 'Perfect Well' using historical data to compare the best oil and gas well to the best geothermal well. Unfortunately, limitations encountered in the study included missing data (bit records, mud information, etc.) and poor data collection practices An online software database was used to format drilling data to IADC coded daily drilling reports and generate figures for analysis. Six major issues have been found in geothermal drilling operations. These problems include lost circulation, rig/ equipment selection, cementing, penetration rate, drilling program, and time management. As a result of these issues, geothermal drilling averaged 56.4 days longer than drilling comparable oil and gas wells in the wells in this study. Roughly $13.9 million was spent on non-productive time in the 21 geothermal wells, compared with only $1.3 million in the oil and gas wells, assuming a cost of $50,000 per day. Comparable events such as drilling the same sized hole, tripping in/out, cementing, and running the same size casing took substantially less time in the oil and gas wells. Geothermal wells were drilled using older and/or less advanced technology to depths less than 10,000 feet, while oil and gas wells reached 12,500 feet faster with purpose built rigs. A new approach is now underway that will optimize drilling programs throughout the drilling industry using Mechanical Specific Energy (MSE) as a tool to realize efficient drilling processes. Potential improvements for current geothermal operations are: the use of electronic records, real time services, and official glossary terms to describe rig operations, and advanced drilling rigs/technology.

15 GEOTHERMAL ENERGY↗