Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ErAs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

Calibration and Commissioning of the LSST

Understanding the nature of dark energy and dark matter remains one of the fundamental questions in physics today; impacting our understanding of particle physics, cosmology, and possibly theories of gravity. Given the scale and complexity of the next generation of cosmology experiments (e.g., the Rubin Observatory, the Euclid satellite mission, and the Roman space telescope) we are entering an era where statistical noise no longer determines the accuracy to which we can measure cosmological parameters. Our ability to control and correct for systematics will ultimately determine the scientific impact of these experiments. This award addressed the challenge of how we determine what limits the accuracy of our cosmological measures, what techniques are appropriate for measuring and calibrating the properties of galaxies to best constrain cosmological models, how to develop statistical techniques that are insensitive to systematic errors, and how to optimize survey strategies in order to minimize systematics while maximizing the speed at which an experiment can achieve its science objectives. In this final technical report for award DE-SC0011635 we describe a set of open-source frameworks that simulate the characteristics and properties of current and planned cosmology surveys and the application of these frameworks to the development of new methodologies for estimating the properties and distances to galaxies that are robust to noisy and incomplete data.

79 ASTRONOMY AND ASTROPHYSICS↗

MOSCATO Development and Integration in Fiscal Year 2022

During FY21, we conducted ongoing development work for the MOSCATO (Molten Salt Chemistry and Transport) solver. The code development work primarily consisted of transitioning capabilities from the original version of the solver, which was written in OpenFOAM, into Nek5000. In doing so, a fast, highly parallelizable solver was created that is capable of complex chemistry and corrosion simulations for engineering-scale molten salt systems. The Nek5000 version of MOSCATO is now fully featured and capable of higher-fidelity simulations than were previously possible. Demonstration cases including a thermal convection loop have been simulated to test these new capabilities. We built upon the work for FY22 and improved the code from several different perspectives. First, we improved the user interface by adding a new component to the official Nek5000 input file (.par). This new part contains documents parameters like, salt properties (density, viscosity, Cp, thermal conductivity), diffusion coefficients, standard potential, etc. Second, we built a conversion script to extract salt properties from the MSTDB-TP salt database and write to MOSCATO input file. Third, we migrated the code to NekRS, which is the GPU branch of Nek5000 and suitable for next generation supercomputers. Verification and Validation (V&V) work was also continued in FY22. Two tasks were performed. The first V&V task involved the validation of the Poisson-Nernst-Planck equation solver and Butler-Volmer electrode kinetics, by comparing with numerical and experimental data about thermoelectric cells. The second task involved the comparisons to corrosion results from a thermal convection loop run during the MSRE era. Satisfactory agreement was obtained from both tasks.

Yuan, Haomin↗

Effect of duration of 120 oC baking on the performance on superconducting radio frequency niobium cavities

Over the last decade much attention was given in increasing the quality factor of superconducting radio frequency (SRF) cavities by impurity doping. Prior to the era of doping, the final cavity processing technique to achieve the high accelerating gradient includes the ?in situ? low temperature baking of SRF cavities at temperature ~ 120 oC for several hours. Here, we present the results of a series of measurements on 1.3 GHz TESLA shape single-cell cavities with successive low temperature baking at 120 oC up to 96 hours. The experimental data were analyzed with available theory of superconductivity to elucidate the effect of the duration of low temperature baking on the superconducting properties of cavity materials as well as the rf performance. In addition, the rf loss related to the trapping of residual magnetic field refereed as flux trapping sensitivity was measured with respect to the duration of 120 oC bake.

Khanal, B. D.↗

Mechanisms Engineering Test Loop (METL) Operations and Testing Report (FY2022)

This report documents the operations, testing, maintenance, and improvements that were performed at the Mechanisms Engineering Test Loop (METL) during FY2022. The METL facility had a very successful fourth year of operations and went through some new experiences such as taking the facility from its frozen state in October 2021 and thawing the facility and also recovering from an oxide plug in one of the cold trap lines. After the facility was fully thawed, the METL staff maintained the facility in a continuous molten state – either flowing sodium or a static flow condition. METL facility continued supporting the Gear Test Assembly (GTA) testing and hosted its first 28” test vessel experiment, called the Thermal Hydraulic Experimental Test Article (THETA) which was inserted into Test Vessel 4. Work to accommodate two additional experiments, a gripper test article (GrTA) and a flow sensor test article (F-STAr) continued as they are expected to make their debut in FY2023. In addition, the steam piping for the B308 scrubber unit was replaced with stainless steel piping and controls and new parts for the scrubber were purchased – such as a new pump, new storage tank, and new blower and motor. These components will ultimately replace the existing scrubber components when those 1970’s era require replacement.

42 ENGINEERING↗

LH CO 2 MENT Colorado Project (Final Report)

The objective of Electricore’s pre-FEED project “LH CO 2 MENT COLORADO PROJECT” is to accelerate the implementation of a 1.5 million tonnes per year (TPY), and first-of-a-kind (FOAK) at world scale, Svante VeloxoTherm™ carbon capture plant. This project represents a quantum leap to a large-scale facility that will launch Svante’s carbon capture technology into the next era of accomplishments and market acceptance. By completing the Front-End Loading (FEL) Feasibility Study Report (FEL-2) for a fit-for-purpose design at the HOLCIM cement plant, located near Florence Colorado, USA, this technology can be proven as the future of large-scale deployment for carbon capture and storage. This carbon capture plant was designed with the goal of reaching a target of near Net Zero Emissions by capturing 90% of the carbon dioxide (CO 2 ) emissions from the HOLCIM cement plant and from the boiler which produces steam required to regenerate the adsorbent. Additionally, this project will be leveraging a renewable Power Purchase Agreement (PPA) using solar energy to acquire power at the target price of 0.04 $/kWh or less. In its current configuration CO 2 emissions from the HOLCIM cement plant is around 700 – 800 kg/ton of clinker produced. The proposed new carbon capture plant will allow a reduction of CO 2 emissions to about 100 kg/ton of clinker produced. The scope of work consists of the process design and capital & operating cost estimation (Class IV) for a total plant capacity of 4,750 TPD of pipeline grade CO 2 . The Svante VeloxoTherm™ technology is comprised of a Rotary Adsorption Machine (RAM) for intensified Thermal Swing Adsorption (TSA) using Structured Adsorbent Beds (SABs) and related Balance of Plant (BOP), including CO 2 compression. A business case (financial analysis) evaluation has been undertaken for the Owner’s management review. Recommendations on how best to proceed to the next stage of the project have been conveyed and are documented within this report. This analysis has relied on a detailed and comprehensive Project Financial Model, evaluating the Total Project IRR (after tax, unlevered, and including all forecast 45Q PTCs and 100% tax efficiency) – the project financial analysis (as opposed to standard TEA analysis) only considered a 12 year plant economic lifetime as a result of 45Q being the sole driver considered at this stage. The Total Project IRR was evaluated across a large number of potential scenarios. The evaluation demonstrated that if the 45Q PTD is increased to $85/MT for sequestration, there are a large number of feasible scenarios which demonstrate economic returns.

01 COAL, LIGNITE, AND PEAT↗

Theoretical tools for neutrino scattering: interplay between lattice QCD, EFTs, nuclear physics, phenomenology, and neutrino event generators

Neutrino physics is entering a precision era in which measurements of neutrino oscillations, astrophysical neutrinos from supernovae and other sources, and coherent neutrino scattering will provide insight on the nature of neutrino masses, the presence of CP violation, and perhaps more exotic new physics in the neutrino sector. Maximizing the discovery potential of increasingly precise neutrino experiments will require an improved theoretical understanding of neutrino-nucleus cross sections over a wide range of energies that uses a combination of lattice QCD, nuclear effective theories, phenomenological models, and neutrino event generators to make reliable theory predictions for experimentally relevant nuclei.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

EB Vs PAM Vs VAR for Uranium Alloys

Questions were raised during the February ’97 PDP Meeting at LLNL as to the advisability of funding three separate melting development programs (Advanced Vacuum Arc Remelt (VAR), Plasma Arc Melting (PAM) and Electron Beam Melting (EB)) through PDP in this era of shrinking research funds. The main issues seemed to be: 1) Have we evaluated the potentials of the three processes sufficiently to eliminate any of them out of hand and 2) Have any of these processes to date produced results which show clear advantages over the other two. The feeling at the meeting toward the latter seemed to be that all three processes required further development before they would be accepted by the complex as the standard. As far as evaluating potential for process improvements, however, we at Livermore did go through somewhat of a trade study in 1993 when we proposed the EB route. It seemed to us that even with the elimination of the skull caster via a VIM/VAR/VAR route, the problem of recycle limitations in the VIM step due to excessive carbon pick-up limited the potential for a great improvement in material utilization using this method. A single-step, cold hearth route looked to be the preferable choice. Both EB and PAM are used commercially as cold hearth processes, and both have been used for the production of refractory and specialty metals; EB since the mid 1950’s and PAM since the mid 1980’s. Both seem to have found their individual niches with some applications being suited to EB and others to PAM. Both can be adapted to continuous casting techniques and both are capable of imparting the high heat fluxes necessary to melt refractory metals. The major differences appear to be that for most applications, the EB process is capable of producing a purer product, while PAM results in less loss of volatile components. There exists an abundance of information in the open literature on the results of processing via both routes on various materials. The attached 1984 paper gives a good explanation of electron beam melting and plasma melting, and, I believe, a fair assessment of the advantages and limitations of both processes.

36 MATERIALS SCIENCE↗

Evaluation of Building 23-620, Los Alamos Scientific Laboratory J-3 Office, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE) National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to demolish Building 23-620, the Los Alamos Scientific Laboratory (LASL) J-3 Office Building (Nevada State Historic Preservation Office [SHPO] Resource No. B15283) at the Nevada National Security Site (NNSS) in Nye County, Nevada. The NNSA/NFO is implementing a long-term project to modernize the town of Mercury for future mission needs. The project is considered an undertaking subject to review under Title 54 of United States Code (USC) § 306108, commonly known as Section 106 of the National Historic Preservation Act, Title 54 USC § 300101, et seq., and its implementing regulations, Title 36 of the Code of Federal Regulations (36 CFR) Part 800. In 2018, Desert Research Institute (DRI) completed an architectural survey of the town of Mercury. This effort resulted in the identification, recordation, and evaluation of the Mercury Historic District (MHD, SHPO Resource No. D230), including the identification of its contributing elements (Reno et al. 2018). The MHD was recommended eligible for listing in the National Register of Historic Places (NRHP, National Register) under the Secretary of the Interior’s (SOI) Significance Criteria A and C, as defined in 36 CFR Part 60.4, as a significant concentration of buildings and structures with a direct and important association with Cold War-era nuclear testing from 1951 through 1992. It has not been evaluated under Criteria B and D to date. As part of a larger modernization program for Mercury, the NNSA/NFO and the SHPO executed the 2018 Programmatic Agreement between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer regarding Modernization and Operational Maintenance of the Nevada National Security Site, at Mercury in Nye County, Nevada (Mercury PA). The Mercury PA includes streamlined Section 106 procedures for undertakings in the MHD based on contributing element categories. Building 23-620 is identified in Appendix C of the Mercury PA as a Category I contributing element, indicating that it might be individually eligible for the NRHP. It is a historic property for the purposes of Section 106 compliance and subject to the stipulations of the Mercury PA. Per Stipulation VI of the Mercury PA, when the Area of Potential Effect (APE) for an undertaking includes Category I elements, the NNSA/NFO must evaluate the Category I elements for individual NRHP eligibility under all of the SOI Significance Criteria prior to initiating any activity that may affect the elements. The purpose of this report is to evaluate Building 23-620 as a potential individually eligible historic property in fulfillment of Stipulation VI of the Mercury PA. The evaluation detailed herein concludes that Building 23-620 is not individually eligible for listing in the NRHP. Although it retains aspects of integrity and continues to contribute to the MHD, it is not individually significant under any of the SOI Significance Criteria.

54 ENVIRONMENTAL SCIENCES↗

Computational Requirements in Clean Energy and Manufacturing: Summary report of the virtual workshop held on June 28-29, 2021

On June 28–29, 2021, the US Department of Energy’s (DOE’s) Advanced Scientific Computing Research (ASCR) program in the Office of Science convened a workshop with the Energy Efficiency and Renew able Energy (EERE) program offices to assess the future need for advanced computing resources in the areas of clean energy and advanced manufacturing. In part, this discussion served as an update to earlier workshops and townhalls. ASCR is guided by DOE mission needs as it develops research programs, computers, and networks at the leading edge of technologies. As the exascale computing era dawns, technology changes are creating new opportunities for those who must use high-performance computing (HPC) and data systems effectively. The ASCR computing facilities are augmenting their strategy to adapt to changing science needs and emerging technologies and to leverage the utility of exascale computing across the federal government.

97 MATHEMATICS AND COMPUTING↗

Meson Spectroscopy at CLAS and CLAS12: an overview of selected results

Hadron spectroscopy is a valuable tool to experimentally investigate the low-energy, non-perturbative QCD regime, corresponding to the dominant manifestation of the strong force in Nature, in terms of hadrons that constitute the bulk of the visible mass of the Universe. In particular, the measurement of the mesons spectrum, searching for exotic states not compatible with the Quark Model, would provide access to the gluonic degrees of freedom that bind particles together. A broad program to study meson spectroscopy in the light quark sector started at Jefferson Laboratory during the previous 6-GeV period. The CLAS experiment in Hall B used a Bremmstrahlung tagged photon beam impinging on a proton target to provide the first measurement of many photoproduction reactions. Currently, in the 12-GeV era, the MesonEx experiment continues this physics effort, exploiting the larger beam energy and intensity. MesonEx employs low-Q2 electron scattering as a technique to produce an intense and highly energetic quasi-real photon beam. In the experiment, the low-angle scattered electron is measured in a dedicated detector, the Forward Tagger, in coincidence with final state hadrons measured in the CLAS12 spectrometer. In this talk, after discussing some selected results from the CLAS program, I'll present the ongoing MesonEx experiment, showing some preliminary results.

Celentano, Andrea↗

Fermilab’s Muon Campus: Status, Experiments, and Future

The Fermilab Muon Campus, repurposed Tevatron-era Antiproton Source facilities, is currently the home to the g-2 and Mu2e muon experiments. Collecting data since 2017, the g-2 experiment is wrapping up a final run before the Muon Campus transitions to Mu2e operation. Currently in the commissioning process, the Mu2e experiment is expected to begin calibration and data collection in fiscal year 2024. A majority of the Muon Campus is shared between the two experiments, however the modes of operation for each are significantly different. An 8 GeV primary proton beam strikes a target to produce a 3.1 GeV/c secondary muon beam for g-2, while the Mu2e experiment uses the Delivery Ring, formerly the Antiproton Accumulator Ring, for a pulsed, resonantly extracted, 8 kW, 8 GeV proton beam incident on a target in the experiment's target hall to produce a muon beam for the experiment. The design and current state of the Muon Campus and the current and future plans of the g-2 and Mu2e experiments, including the transition between operating modes, will be presented.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Argonne Leadership Computing Facility: 2021 Operational Assessment Report

This Operational Assessment Report describes how the Argonne Leadership Computing Facility (ALCF) met or exceeded every one of its goals for calendar year (CY) 2021 as an advanced scientific computing center. In CY 2021, the ALCF operated its production resource, Theta, an Intel-based Cray XC40 system (11.7-petaflops) augmented with 24 NVIDIA DGX A100-based nodes (3.9-petaflops) that supports diverse workloads, integrating data analytics with artificial intelligence (AI) training and learning in a single platform. In 2021, we began deploying Polaris, our newest 40- petaflops system, and augmented this powerful testbed system with an additional 28 nodes to support the integration of real-time experiments and HPC resources. We also deployed our two largest storage systems yet, named Grand and Eagle, that will bring new services to our users and will power data-driven research for years to come. Last year, Theta delivered a total of 20.8 million node-hours to 16 Innovative and Novel Computational Impact on Theory and Experiment (INCITE) projects and 7.2 million node-hours to ASCR Leadership Computing Challenge (ALCC) projects (32 awarded during the 2020–2021 ALCC year and 17 awarded during the 2021–2022 ALCC year), as well as substantial support to Director’s Discretionary (DD) projects (5.5 million node-hours). As Table ES.1 shows, Theta performed exceptionally well in terms of overall availability (95.1 percent), scheduled availability (99.4 percent), and utilization (98.1 percent; Table 2.1). As of the submission date of this document, ALCF’s user community has published 249 papers in high-quality, peer-reviewed journals and technical proceedings. At the 2021 International Conference for High Performance Computing, Networking, Storage and Analysis (SC’21), Argonne researchers won two HPCwire Readers’ Choice Awards and were part of a Gordon Bell Prize finalist team recognized for developing an AI-enabled, multi-resolution simulation framework for studying complex biomolecular machines. Their framework was used to observe the SARS-CoV-2 replication-transcription machinery in action, by directly integrating experimental data. ALCF also provided a comprehensive program of high-performance computing (HPC) support services to help our community make productive use of the facility’s diverse and growing collection of resources. We are now entering the exascale era, with exascale machines being planned for national laboratories across the country, including Aurora at Argonne National Laboratory (Argonne) in 2023. ALCF researchers have been leading and guiding numerous strategic activities that will push the boundaries of what’s possible in computational science and engineering and allow us to deliver science on day one.

97 MATHEMATICS AND COMPUTING↗

Integrated Research Infrastructure Architecture Blueprint Activity (Final Report 2023)

The complexity of scientific pursuits is increasing rapidly with aspects that require dynamic integration of experiment, observation, theory, modeling, simulation, visualization, machine learning (ML), artificial intelligence (AI), and analysis. Research projects across the Department of Energy (DOE) are increasingly data and compute intensive. Innovative research teams are accelerating the pace of discovery by using high-performance computational and data tools in their research workflows and leveraging multiple research infrastructures. Additionally, several recent high-level U.S. government reports underscore the necessity of a new advanced computing ecosystem for international competitiveness and national security. International competitors are moving forward with major research infrastructure integration efforts that seek to capture a competitive advantage in the global innovation race. Owing to its unparalleled constellation of world-class experimental and observational facilities and high-performance and extreme-scale computational, data, and networking infrastructure, DOE is positioned to be a global leader in this new era of integrated science. However, this new integration paradigm will demand continuing evolution to ensure the U.S. remains a global leader in research and innovation. The DOE Office of Science (SC) has seized on the strategic importance of integration and has adopted a vision for Integrated Research Infrastructure (IRI): To empower researchers to meld DOE’s world-class research tools, infrastructure, and user facilities seamlessly and securely in novel ways to radically accelerate discovery and innovation. To respond to the evolving computational requirements of research and the competitive international innovation landscape, experimental facilities could be connected with high performance computing resources for near real-time analysis, and resources should be provided for merging enormous and diverse data for AI/ML techniques and analysis.

97 MATHEMATICS AND COMPUTING↗

Attend debut of new film on the Lab’s first director

The NSRC’s much-anticipated documentary, Oppenheimer: Science, Mission, Legacy, will premiere for Lab staff later this summer at the NSSB auditorium, and then be made available online. Speakers at the premiere will include film creator and primary producer Dave Tietmeyer (Multimedia Services, CEA-MP), Senior Historian Alan Carr (WRS-NSCMS), and NSRC Director Brye Steeves (WRS-DO). The film was entirely produced by the NSRC and Laboratory staff and will commemorate former director J. Robert Oppenheimer and his endeavors. Much of the material and several scenes featured in the film are based on collections from the Manhattan Project era and interviews with today’s Lab staff and Oppenheimer experts.

99 GENERAL AND MISCELLANEOUS↗

Automation and Quality Control for CMS Outer Tracker Module Assembly at Fermilab’s SiDet

Automation and quality control techniques for 2S and PS sensor modules for the CMS Outer Tracker for the HL-LHC era have been developed at the Silicon Detector facility at Fermilab. Examples include a laser scanning procedure to check manufacturing specifications for the 2S sensor modules, and an automated gluing process to accurately assemble PS sensor modules. Processes were verified and documented for the production stage of the Outer Tracker.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Forward Pixel Detector for the Phase 2 Upgrade of CMS And Module Testing at UIC

High-Luminosity Large Hadron Collider (HL-LHC) upgrade aims to increase performance. In order to efficiently handle the larger particle flux and increased radiation, an upgrade is planned for the inner Tracker of the Compact Muon Solenoid (CMS) detector, which is located at the innermost part of the CMS. To efficiently reconstruct and track particles, the existing pixel tracker will be upgraded with novel sensors, readout chips, and front-end electronics designed to handle increased data rates. These improvements will allow the detector to track particles more precisely. In the United States, we are working on assembling new sensor modules to be inserted into disks, referred to as TFPX, for installation in the CMS detector for the HL-LHC era. We are currently testing the prototype of TFPX modules to ensure the upgrade is carried out in the best way possible. The University of Ilinois Chicago has been tasked with testing the final versions of the TFPX sensor modules before they are sent to CERN to be installed into the CMS detector. This work is supported by NSF.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

STOCHASTIC OPTIMAL POWER FLOW FOR REAL-TIME MANAGEMENT OF DISTRIBUTED RENEWABLE GENERATION AND DEMAND RESPONSE (Final Report)

To meet the grand challenge of a sustainable energy future, there has been a surge of interest in renewable energy. Today, the uncertainty associated with renewable resources is handled by using operating reserves. The high penetration of renewable resources, however, introduces difficult-to-control dynamics and challenges for power system operation. Decision support tools are necessary at the bulk system operational level to recognize and efficiently utilize renewable resources and distributed demand response products in concert with traditional grid resources. It is envisaged that responsive load can potentially have very significant cost advantages over either spinning or non-spinning ramping reserve. Critical decisions are made during hour(s)-ahead and real-time power system operation regarding the commitment and dispatch of generators to ensure power delivery is both reliable and economic. These decisions are typically made by a security constrained optimal flow, which determines future generator commitments, dispatches, and ensures adequate reserves are available in the event of a contingency (unexpected outage) or if future system conditions deviate from forecasts. However, security has been always based on a pre-specified subset of contingency constraints whose enforcement does not guarantee security under all possible future possibilities while also giving little or no weight to the likelihood of each contingent event or the severity of its consequences. Existing tools, which are based exclusively on deterministic optimization models, do not yield optimal operational decisions to address these new challenges, in terms of both reliability and cost-effectiveness. This project has focused on developing a stochastic optimal power flow (SOPF) framework, which integrates renewable resource uncertainty, load uncertainty, distributed storage (DS), demand response (DR) products, in a holistic manner to address the uncertainty associated with ever-increasing renewable resources, along with the inclusion of distributed demand response products in future power systems. A proof-of-concept problem was created using the Pennsylvania-Jersey-Maryland (PJM) power system network. Synthetic wind generation was added to the system to simulate 50% wind penetration. A 1-hour test of SOPF operation indicated more than 6% operational cost savings. The project continued by adding the Midwestern Independent System Operator (MISO) as a partner, with focus shifting from SOPF to Stochastic Look-Ahead Unit Commitment (SLAC). Unlike PJM, MISO is faced with significant renewable energy resources within its footprint and is challenged with substantial uncertainty in its operations. The SLAC distinguishes itself from existing tools that operators use. At best, today’s tools solve two to three cases independently, where one or two system parameters, such as forecasted load level (e.g., a low, base, and high forecast), are varied and the resulting scenarios are analyzed independently. The stochastic-based optimization of SLAC leverages statistical information from an ensemble of potential operational scenarios and their respective likelihood. The SLAC output can be translated into valuable information to the operator such as suggested commitments, optimal scheduling and dispatch of resources, reserve requirements at both locational and zonal resolutions, ramping availability and requirements, availability of demand response including operational guidance concerning the near-term and real-time coordination between distributed energy resources, and utilization of distributed storage resources. The developed SOPF/SLAC tool, a stand-alone tool compatible with existing EMSs, will provide system operators with unprecedented visibility, flexibility and predictability to these resources and operational guidance concerning the real-time coordination between DERs and DR/DS products. The game changing and practical impact of this disruptive technology will be dramatic and will usher in a new era in the electric power industry, wherein green energy concepts are fully embraced, and electric power costs are lowered throughout the nation.

42 ENGINEERING↗

Gamma-Ray Transient Network Science Analysis Group Report

The Interplanetary Network (IPN) is a detection, localization and alert system that utilizes the arrival time of transient signals in gamma-ray detectors on spacecraft separated by planetary baselines to geometrically locate the origin of these transients. Due to the changing astrophysical landscape and the new emphasis on time domain and multi messenger astrophysics (TDAMM) from the Pathways to Discovery in Astronomy and Astrophysics for the 2020s , this Gamma-ray Transient Network Science Analysis Group was tasked to understand the role of the IPN and high-energy monitors in this new era. The charge includes describing the science made possible with these facilities, tracing the corresponding requirements and capabilities, and highlighting where improved operations of existing instruments and the IPN would enhance TDAMM science. While this study considers the full multiwavelength and multimessenger context, the findings are specific to space-based high-energy monitors. These facilities are important both for full characterization of these transients as well as facilitating follow-up observations through discovery and localization. The full document reports the history of this field in Section 1, followed by our detailed analyses and findings in some 68 pages, providing a holistic overview of the role of the IPN and high-energy monitors in the coming decades.

79 ASTRONOMY AND ASTROPHYSICS↗