Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Environmental Protection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

2012 Groundwater Monitoring Report Project Shoal Area Subsurface Corrective Action Unit 447

The Project Shoal Area (PSA) in Nevada was the site of a 12-kiloton underground nuclear test in 1963. Although the surface of the site has been remediated, investigation of groundwater contamination resulting from the test is still in the corrective action process. Annual sampling and hydraulic head monitoring are conducted at the site as part of the subsurface corrective action strategy. Analytical results from the 2012 monitoring are consistent with those of the previous years, with tritium detected only in well HC-4. The tritium concentration in groundwater from well HC-4 remains far below the U.S. Environmental Protection Agency-established maximum contaminant level of 20,000 picocuries per liter. Concentrations of total uranium and gross alpha were also detected during this monitoring period, with uranium accounting for nearly all the gross alpha activity. The total uranium concentrations obtained from this monitoring period were consistent with previous results and reflect a slightly elevated natural uranium concentration, consistent with the mineralized geologic terrain. Isotopic ratios of uranium also indicate a natural source of uranium in groundwater, as opposed to a nuclear-test-related source. Water level trends obtained from the 2012 water level data were consistent with those of previous years. The corrective action strategy for the PSA is currently focused on revising the site conceptual model (SCM) and evaluating the adequacy of the current monitoring well network. Some aspects of the SCM are known; however, two major concerns are the uncertainty in the groundwater flow direction and the cause of rising water levels in site wells west of the shear zone. Water levels have been rising in the site wells west of the shear zone since the first hydrologic characterization wells were installed in 1996. While water levels in wells west of the shear zone continue to rise, the rate of increase is less than in previous years. The SCM will be revised, and an evaluation of the groundwater monitoring network will be conducted when water levels at the site have stabilized.

54 ENVIRONMENTAL SCIENCES↗

Report on Lessons Learned from the NP 2010 Early Site Permit Program FINAL REPORT

This report provides a summary of lessons learned from the demonstration of the licensing process for three Early Site Permit (ESP) applications supported as part of the Department of Energy’s (DOE) Nuclear Power 2010 (NP 2010) program. The ESP process was established by the Nuclear Regulatory Commission (NRC) to enable completion of the site evaluation component of nuclear power plant licensing under 10 CFR Part 52 before a utility makes a decision to build a plant. Early Site Permits are valid for 10 to 20 years and can be renewed for an additional 10 to 20 years. NRC review of an ESP application addresses site safety issues, environmental protection issues, and plans for coping with emergencies. Successful completion of the ESP process will establish that a site is suitable for possible future construction and operation of a nuclear power plant. Most importantly, an ESP resolves significant site-related safety and environmental issues early in the decision process and helps achieve acceptance by the public. DOE competitively selected Dominion Nuclear Energy North Anna, LLC (Dominion); System Energy Resources, Inc. (an Entergy subsidiary); and Exelon Generation Company, LLC (Exelon) in 2002 to demonstrate the ESP process and provided cost-shared support through the NP 2010 program. Dominion pursued an ESP for the North Anna site in Virginia; System Energy Resources, Inc. pursued an ESP for the Grand Gulf site in Mississippi; and Exelon pursued an ESP for the Clinton site in Illinois. After successfully demonstrating the process, the NRC issued an ESP for Clinton on March 17, 2007; Grand Gulf on April 5, 2007; and North Anna on November 27, 2007. As with all successful projects, there are lessons to be learned from the NP 2010 early site permitting demonstration that can help improve future implementation guidance documents and regulatory review standards. In general, these lessons pertain to the effectiveness of the regulatory process, experience related to guidance for developing and reviewing ESP applications, issues involving ESP plant parameters, and suggestions for future ESP applicants. The development, submittal, and issuance of these first ESPs under DOE’s NP 2010 program started the momentum to exercise NRC’s new 10 CFR Part 52 licensing process. Several key questions that define critical issues regarding the effectiveness of regulations pertaining to ESPs have been identified and summarized in this report. However, the final resolution of whether the ESP component of the Part 52 process significantly contributes to the predictability in nuclear power plant licensing requires more experience and time, such as the completion of the ongoing combined Construction and Operating License (COL) process for the North Anna and Grand Gulf sites. The three ESP project participants prepared and submitted to DOE lessons learned reports from their experience in developing, submitting, and receiving an ESP. This document summarizes these reports, which are appended hereto. The Nuclear Energy Institute (http://www.nei.org/) and NRC (http://www.nrc.gov/) have also prepared reports regarding their perspectives on lessons learned during the ESP process. Their documents can be accessed on their respective web sites. Following is a summary of the lessons learned from the NP 2010 ESP projects. Effectiveness of the ESP Process: In general, the ESP process is expected (subject to demonstration of the ESP finality provisions in the North Anna and Grand Gulf ESPs) to provide high value for applicants as a site banking and risk mitigation strategy. However, several aspects of the initial process, such as NRC hearings and determining an acceptable approach to the NRC’s Emergency Planning requirements, proved challenging for the applicants. Project Execution: Initial regulatory and industry guidance for planning and executing an ESP application program proved to be insufficient to address NRC’s document review expectations. However, continuous communication between NRC and the applicants helped establish an acceptable framework for the applications and resulted in the successful issuance of three ESPs. Still, formal guidance from both NRC and industry is needed for issues involving merchant plants; data collection issues; and interactions between NRC, the public, and the applicants. Specific Plant Parameter Issues: The use of the Plant Parameter Envelope (PPE) approach, when the applicant has not yet chosen a reactor technology, proved to be a major source of confusion between applicants and NRC. This issue had also been a topic of discussion during the NRC ESP hearings. Based upon North Anna and Grand Gulf COLA experiences, the need should be evaluated for future NRC guidance pertaining to the PPE approach to clarify these issues. In addition, NRC, applicants, and industry spent considerable time and resources deciding how to employ new seismic analysis approaches. Future guidance in this area would also be very useful. Best Project Practices: A variety of good practices were identified, such as using specific project tracking and milestone items, handling very large documents electronically, employing a formal and rigorous document review process, and sharing large files across organizational sites. This report also includes a set of general recommendations to assist future ESP applicants. Several recommendations highlight the need for NRC and industry to continue to work together to improve the ESP process.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

2020 NEPA Polychlorinated Biphenyl (PCB) Risk Assessment

The Waste Isolation Pilot Plant (WIPP) facility is a U.S. Department of Energy (DOE) operating repository 654 m below the surface in a thick salt formation in southeastern New Mexico. The DOE disposes transuranic (TRU) waste produced from atomic energy defense activities at the WIPP facility. A portion of the waste shipped to the WIPP facility contains TRU radionuclides co-mingled with polychlorinated biphenyls (PCBs), which fall under U.S. Environmental Protection Agency (EPA) regulations implementing the Toxic Substances Control Act (TSCA). This report documents the risks of PCBs co-mingled with TRU waste (hereafter designated as PCB/TRU waste) designated for disposal at the WIPP facility. This analysis is input to the National Environmental Policy Act (NEPA) assessment by the DOE Carlsbad Field Office (CBFO) for the proposed increase of the WIPP facility disposal area to include additional waste panels (but not to increase the legislated WIPP volume). This analysis is not a compliance calculation to support a certification renewal nor does it support a planned change request (PCR) or planned change notice (PCN) to be submitted to the EPA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FINAL REPORT ON THE AQUATIC MERCURY ASSESSMENT STUDY

In February 2000, the United States Environmental Protection Agency (EPA) Region 4 issued a proposed Total Maximum Daily Load (TMDL) for total mercury in the middle and lower Savannah River. The initial TMDL, which would have imposed a 1 ng/l mercury limit for discharges to the middle/lower Savannah River, was revised to 2.8 ng/l in the final TMDL released in February 2001. The TMDL was intended to protect people from the consumption of contaminated fish, which is the major route of mercury exposure to humans. The most bioaccumulative form of mercury is methylmercury, which is produced in aquatic environments by the action of microorganisms on inorganic mercury. Because of the environmental and economic significance of the mercury discharge limits that would have been imposed by the TMDL, the Savannah River Site (SRS) initiated several studies concerning: (1) mercury in SRS discharges, SRS streams and the Savannah River, (2) mercury bioaccumulation factors for Savannah River fish, (3) the use of clams to monitor the influence of mercury from tributary streams on biota in the Savannah River, and (4) mercury in rainwater falling on the SRS. The results of these studies are presented in detail in this report. The first study documented the occurrence, distribution and variation of total and methylmercury at SRS industrial outfalls, principal SRS streams and the Savannah River where it forms the border with the SRS. All of the analyses were performed using the EPA Method 1630/31 ultra low-level and contaminant-free techniques for measuring total and methylmercury. Total mercury at National Pollutant Discharge Elimination System (NPDES) outfalls ranged from 0.31-604 ng/l with a mean of 8.71 ng/l. Mercury-contaminated groundwater was the source for outfalls with significantly elevated mercury concentrations. Total mercury in SRS streams ranged from 0.95-15.7 ng/l. Mean total mercury levels in the streams varied from 2.39 ng/l in Pen Branch to 5.26 ng/l in Tims Branch. Methylmercury ranged from 0.002 ng/l in Upper Three Runs to 2.60 ng/l in Tims Branch. Total mercury in the Savannah River ranged from 0.62 ng/l to 43.9 ng/l, and methylmercury ranged from 0.036 ng/l to 7.54 ng/l. Both total and methylmercury concentrations were consistently high in the river near the mouth of Steel Creek. Total mercury was positively correlated with methylmercury (r = 0.88). Total mercury bound to particulates ranged from 41% to 57% in the river and from 28% to 90% in the streams. Particulate methylmercury varied from 9% to 37% in the river and from 6% to 79% in the streams. Small temporary pools in the Savannah River swamp area near and around Fourmile Branch had the highest concentrations observed in the Savannah River watershed, reaching 1,890 ng/l for total mercury and 34.0 ng/l for methylmercury. The second study developed a mercury bioaccumulation factor (BAF) for the Savannah River near SRS. A BAF is the ratio of the concentration of mercury in fish flesh to the concentration of mercury in the water. BAFs are important in the TMDL process because target concentrations for mercury in water are computed from BAFs. Mercury BAFs are known to differ substantially among fish species, water bodies, and possibly seasons. Knowledge of such variation is needed to determine a BAF that accurately represents average and extreme conditions in the water body under study. Analysis of fish tissue and aqueous methylmercury samples collected at a number of locations and over several seasons in a 110 km (68 mile) reach of the Savannah River demonstrated that BAFs for each species under study varied by factors of three to eight. Influences on BAF variability were location, habitat and season-related differences in fish mercury levels and seasonal differences in methylmercury levels in the water. Overall (all locations, habitats, and seasons) average BAFs were 3.7 x 10{sup 6} for largemouth bass, 1.4 x 10{sup 6} for sunfishes, and 2.5 x 10{sup 6} for white catfish. This study showed that determination of representative BAFs for large rivers requires the collection of large numbers of fish and aqueous methylmercury samples over at least one complete seasonal cycle from the entire area and all habitats to be represented by the TMDL. The third study concerned the use of clams as an indicator of the influence of SRS discharges on mercury levels in Savannah River biota. Mercury levels were compared in Asiatic clams (Corbicula fluminea) collected from the discharge plumes and just upstream of the mouths of SRS creeks and two creeks located downstream from the SRS. Asiatic clams were selected for study because their relatively sedentary behavior made them a better indicator of local mercury exposure than mobile organisms.

36 MATERIALS SCIENCE↗

Electronic Waste (E-Waste) Recycling: Barriers and Opportunities for State, Local, and Tribal Governments

Electronic waste, or e-waste, encompasses end-of-life electrical and electronic equipment, including computers, monitors, televisions, printers, cell phones, household appliances with electronic components, and small consumer devices containing batteries or circuitry. E-waste is one of the fastest-growing components of the U.S. waste stream, with nearly 8 million tons generated in 2022. E-waste presents two related public-interest considerations. First, e-waste contains economically and strategically important materials: base metals (copper, aluminum, iron, steel), precious metals (gold, silver, platinum group metals), and critical materials such as rare earth elements, gallium, and indium that appear on the U.S. Geological Survey's (USGS) 2025 List of Critical Minerals. Second, many electronic devices contain hazardous constituents - including lead, mercury, cadmium, and brominated flame retardants - as well as rechargeable batteries that can pose fire risks during handling. Effective management of these constituents helps protect workers, communities, and the environment. In the United States, it is estimated that less than 20% of e-waste is formally collected and recycled, leaving over 6 million tons landfilled or otherwise unrecovered. This fact sheet provides state and local decision-makers an overview of (1) e-waste composition and recoverable materials, (2) technology pathways used to recover those materials, and (3) examples of operational and partnership structures used to provide e-waste recycling capacity in the United States. It is intended to complement existing collection-program guidance available through U.S. Environmental Protection Agency (EPA) and other sources.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Antarctica Radiological Source Removals (Final Report)

On 18 May 2015, the research vessel Akademik Fedorov of the Russian Antarctic Expedition (RAE) delivered four radioisotope thermoelectric generators (RTGs) from Antarctica to the port of St. Petersburg, Russia. The RTGs had been previously used in the work program of the former Soviet Antarctic Expedition (SAE). From the mid-1970s, RTGs have been used to provide autonomous power at geophysical and meteorological stations located in remote regions of Antarctica. The research was completed in the early 1990s, but not all the generators had been removed when the stations were decommissioned. The remaining four unsecured RTGs, with their strontium-90 ( 90 Sr) radiological material and a combined total activity of 80,000 curies (Ci), still posed a potential risk as they could be used for nefarious purposes. Therefore, a plan of action for the removal of the RTGs from Antarctica was developed. This was done within the framework of the international program for the disposal of Russian RTGs. Financial support and technical oversight was provided by the U.S. Department of Energy (DOE), while logistical support was provided by the Russian Antarctic Expedition (RAE) of the Arctic and Antarctic Research Institute (AARI) and by subsidiaries of the Russian Federation’s Rosatom State Corporation. Recovering and repatriating the RTGs from the continent of Antarctica to the Russian Federation proved to be a very difficult task, including satisfying all the legal aspects within a very tight timeframe. This involved indemnification issues, adhering to new laws enacted after the Soviet Union era, and obtaining all the necessary permits and certifications for transport of the RTGs by air, sea, and land. It was an international, collaborative effort involving the cooperation of multiple organizations to complete the legal work and preparation of necessary documents. In addition, AARI needed to create a separate structure within its organization to manage the process, including the provision of special medical screenings, training, and certifications of its institute personnel. This was done so AARI could fulfill its obligation for the safe handling of radioactive materials while in the field. Recovery of the RTGs required overcoming several logistical hurdles. The Akademik Fedorov, which transported the RTGs back to the Russian Federation, required retrofits to accommodate the RTGs for safe and secure transport of radioactive material. The United States Project Team (USPT) inspected the vessel while it was in dry dock in Turku, Finland, being retrofitted with their design. Special sleds had to be designed to transport RTGs, as well as equipment for identifying crevasses in the glaciers, over the Antarctic packed snow and ice. Provision of adequate fuel supplies for the long trek to the interior of Antarctica to recover one of the RTGs also had to be addressed. With the successful recovery, repatriation, and disassembly of the RTGs, the Radioactive Heat Sources (RHSs) were extracted and dispositioned, thus eliminating any risk of these radioactive sources being used for terrorist purposes. Successful completion of the project also fulfilled the requirements of the Protocol on Environmental Protection to the Antarctic Treaty concerning the need to remove unused radioactive materials.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot-Scale Modular Research Facility for Acidic Water Pollution Cleanup and Domestic Production of Critical Minerals for National Security

A recent study by Penn State researchers revealed that Pennsylvania AMD streams originate from abandoned mines, with coal refuse piles of the lower Kittanning coal seam containing the most valuable heavy rare earth elements. Penn State has developed a three-stage process to recover these critical minerals, tested it for proof of concept, and secured a patent. Funded by the US DOE, a modular pilot-scale research and development unit has been designed and built to process 1,000 gallons per day of AMD from a site managed by the Pennsylvania Department of Environmental Protection (PA DEP). The system will selectively recover iron, aluminum, rare earth elements, and cobalt-nickel-manganese concentrates from AMD, followed by a proprietary downstream purification process. These operations aim to produce concentrates of critical minerals while treating acid mine drainage to meet environmental standards and evaluate different feedstocks. This presentation will describe the design, operation, and innovations of the proposed process and pilot facility, emphasizing its role in promoting sustainable recovery of critical minerals from legacy waste streams.

Pisupati, Sarma V [Center for Critical Minerals, T↗

Review on Preprocessing Strategies, Deactivation, Thermal Safety, and Future Perspectives in Lithium-Ion Battery Recycling

The rapid growth in the use of lithium-ion batteries (LIBs) in electric vehicles, consumer electronics, and renewable energy storage has made effective end-of-life management essential. Recycling LIBs is critical not only for resource recovery and environmental protection but also for ensuring safety and economic viability. This review focuses on the preprocessing technologies that precede typical recovery processes, including disassembly, sorting, discharging, electrolyte removal, dismantling, thermal treatment, separation, and flotation. These steps play a foundational role in determining the efficiency, safety, and environmental impact of LIB recycling. LIBs pose substantial fire and explosion risks due to residual charge, flammable electrolytes, and reactive materials. The conditions and successive progression of the exothermic reactions which lead to thermal runaway has been discussed. It also explores secure deactivation techniques such as external circuit discharge, saline immersion, and thermomechanical methods, alongside fire prevention strategies including the use of flame retardants, elimination of oxidants, and reduction of heat generation and accumulation. Challenges and future directions are outlined, highlighting the need for standardized designs, automation, and safer, more sustainable recycling infrastructure. Furthermore, this review is distinguished by its focused analysis of preprocessing and deactivation steps, with particular attention to the thermal safety engineering aspects of LIB recycling.

Battery deactivation↗

Corrective Action Decision Document/ Closure Report for Corrective Action Unit 556: Dry Wells and Surface Release Points, Nevada Test Site, Nevada with Errata Sheet and ROTC 1

This Corrective Action Decision Document (CADD)/Closure Report (CR) has been prepared for Corrective Action Unit 556, Dry Wells and Surface Release Points, located at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996; as amended February 2008). Corrective Action Unit (CAU) 556 is comprised of four corrective action sites (CASs): • 06-20-04, National Cementers Dry Well • 06-99-09, Birdwell Test Hole • 25-60-03, E-MAD Stormwater Discharge and Piping • 25-64-01, Vehicle Washdown and Drainage Pit The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure of CAU 556 with no further corrective action. To achieve this, corrective action investigation (CAI) activities began on February 7 and were completed on June 19, 2008, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 556: Dry Wells and Surface Release Points, Nevada Test Site, Nevada (NNSA/NSO, 2007). The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent. • Provide sufficient information and data to complete appropriate corrective actions. The CAU 556 data were evaluated based on the data quality assessment process, which demonstrated the quality and acceptability of the data for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the COCs for each CAS. The results of the CAI identified COCs at one of the four CASs in CAU 556 that required the completion of a corrective action. Assessment of the data generated from investigation activities conducted at CAU 556 revealed the following: • Corrective Action Sites 06-20-04, 06-99-09, and 25-64-01 do not contain contamination at concentrations exceeding the FALs. • Polychlorinated biphenyl (PCB) contamination above the FAL was identified in the surface and/or shallow subsurface soils at the outfall and around Catch Basin 2, and in soils contained within the catch basins and the manhole at CAS 25-60-03. A corrective action of close in place with a soil removal action and use restriction (UR) was completed at CAS 25-60-03. The PCB-contaminated soils were removed from the outfall area and around Catch Basin 2, and disposed of at a Nevada Test Site landfill as part of a removal action. The catch basins and the manhole were sealed shut by filling them with grout. The end of the outfall pipe was plugged using grout, covered with soil, and the area was regraded. A UR was applied to the entire stormwater system at CAS 25-60-03, which includes the three catch basins, manhole, and associated piping. No further action is the corrective action for CASs 06-20-04, 06-99-09, and 25-64-01. The liquids in the test holes at CAS 06-99-09 were removed for disposal and the features were filled with grout as a best management practice. The drainage pipe between the vehicle washdown pad and the drainage pit at CAS 25-64-01 was sealed at each end as a best management practice. The corrective actions were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. They were judged to meet all requirements for the technical components evaluated. The corrective actions meet all applicable federal and state regulations for closure of the site and will reduce potential exposure pathways to the contaminated media to an acceptable level at CAU 556. Therefore, the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • Maintain a UR for the entire stormwater drainage system (i.e., three catch basins, one manhole, and associated piping) at CAS 25-60-03. • No further corrective action for CAU 556. • A Notice of Completion to the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office is requested from the Nevada Division of Environmental Protection for closure of CAU 556. • Corrective Action Unit 556 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.

54 ENVIRONMENTAL SCIENCES↗

A Multivariate Dynamic Spatial Factor Model for Speciated Pollutants and Adverse Birth Outcomes

Evidence suggests that exposure to elevated concentrations of air pollution during pregnancy is associated with increased risks of birth defects and other adverse birth outcomes. While current regulations put limits on total PM2.5 concentrations, there are many speciated pollutants within this size class that likely have distinct effects on perinatal health. However, due to correlations between these speciated pollutants, it can be difficult to decipher their effects in a model for birth outcomes. To combat this difficulty, we develop a multivariate spatio-temporal Bayesian model for speciated particulate matter using dynamic spatial factors. These spatial factors can then be interpolated to the pregnant women’s homes to be used to model birth defects. The birth defect model allows the impact of pollutants to vary across different weeks of the pregnancy in order to identify susceptible periods. Here, the proposed methodology is illustrated using pollutant monitoring data from the Environmental Protection Agency and birth records from the National Birth Defect Prevention Study.

54 ENVIRONMENTAL SCIENCES↗

Comparison of Vehicle Efficiency Technology Attributes and Synergy Estimates

Analyzing the future fuel economy of light-duty vehicles (LDVs) requires detailed knowledge of the vehicle technologies available to improve LDV fuel economy. The National Highway Transportation Safety Administration (NHTSA) has been relying on technology data from a 2001 National Academy of Sciences (NAS) study (NAS 2001) on corporate average fuel economy (CAFE) standards, but the technologyparameters were updated in the new proposed rulemaking (EPA and NHTSA 2009) to set CAFE and greenhouse gas standards for the 2011 to 2016 period. The update is based largely on an Environmental Protection Agency (EPA) analysis of technology attributes augmented by NHTSA data and contractor staff assessments. These technology cost and performance data were documented in the Draft Joint TechnicalSupport Document (TSD) issued by EPA and NHTSA in September 2009 (EPA/NHTSA 2009). For these tasks, the Energy and Environmental Analysis (EEA) division of ICF International (ICF) examined each technology and technology package in the Draft TSD and assessed their costs and performance potential based on U.S. Department of Energy (DOE) program assessments. ICF also assessed the technologies?other relevant attributes based on data from actual production vehicles and from recently published technical articles in engineering journals. ICF examined technology synergy issues through an ICF in-house model that uses a discrete parameter approach.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

FEASIBILITY STUDY REPORT FOR THE 200-ZP-1 GROUNDWATER OPERABLE UNIT

The Hanford Site, managed by the U.S. Department of Energy (DOE), encompasses approximately 1,517 km{sup 2} (586 mi{sup 2}) in the Columbia Basin of south-central Washington State. In 1989, the U.S. Environmental Protection Agency (EPA) placed the 100, 200, 300, and 1100 Areas of the Hanford Site on the 40 Code of Federal Regulations (CFR) 300, 'National Oil and Hazardous Substances Pollution Contingency Plan' National Contingency Plan [NCPD], Appendix B, 'National Priorities List' (NPL), pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The 200 Areas NPL sites consist of the 200 West and 200 East Areas (Figure 1-1). The 200 Areas contain waste management facilities, inactive irradiated fuel reprocessing facilities, and the 200 North Area (formerly used for interim storage and staging of irradiated fuel). Several waste sites in the 600 Area, located near the 200 Areas, also are included in the 200 Areas NPL site. The 200 Areas NPL site is in a region referred to as the 'Central Plateau' and consists of approximately 700 waste sites, excluding sites assigned to the tank farm waste management areas (WMAs). The 200-ZP-1 Groundwater Operable Unit (OU) consists of the groundwater located under the northern portion of the 200 West Area. Waste sources that contributed to the 200-ZP-1 OU included cribs and trenches that received liquid and/or solid waste in the past from the Z Plant and T Plant aggregate areas, WMA-T, WMA-TX/TY, and the State-Approved Land Disposal Site (SALDS). This feasibility study (FS) for the 200-ZP-1 Groundwater OU was prepared in accordance with the requirements of CERCLA decision documents. These decision documents are part of the Administrative Record for the selection of remedial actions for each waste site and present the selected remedial actions that are chosen in accordance with CERCLA, as amended by the Superfund Amendments and Reauthorization Act of 1986, and to the extent practicable, the NCP. This FS conforms to the conditions set forth in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 2003) and amendments, signed by the Washington State Department of Ecology (Ecology), EPA, and DOE Richland Operations Office (RL). This also includes Tri-Party Agreement Milestone M-015-00C for completing all 200 Area non-tank farm OU pre-Record of Decision (ROD) documents on or before December 31, 2011. This FS supports the final remedy selection for the 200-ZP-1 OU, as described in the Remedial Investigation/Feasibility Study Work Plan for the 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI/FS work plan) (DOE/RL-2003-55), as agreed upon by RL and EPA. Tri-Party Agreement Milestone M-015-48B required Draft A of the 200-ZP-1 OU FS and proposed plan to be transmitted to EPA by September 30, 2007. As agreed to with EPA in the 200 Area Unit Managers Meeting Groundwater Operable Unit Status (FH-0503130), the baseline risk assessment (BRA) was delayed from inclusion in the remedial investigation (RI) report and is completed and documented in this FS. The Remedial Investigation Report for 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI report) (DOE/RL-2006-24) included an evaluation of human health and ecological risks and hazards. The RI report identified the radiological and chemical contaminants of potential concern (COPCs) that represent the primary risks to human health and the environment. The complete risk assessment in this FS incorporates additional analytical data from the unconfined aquifer that were obtained during or after preparation of the RI report, particularly for carbon tetrachloride and technetium-99. This FS also includes the initial results from an ongoing study of technetium-99 contamination near WMA-T, the sampling of new wells near the 216-W-LC laundry waste crib and T Plant, updated Hanford vadose zone fate and transport modeling, and groundwater particle-tracking analysis. The purpose of this FS is to develop and evaluate alternatives for remediation of the groundwater in the 200-ZP-1 OU. The alternatives considered provide a range of potential response actions (i.e., no action; institutional controls and monitored natural attenuation [MNA]; and pump-and-treat with MNA, flow-path control, and institutional controls) that are appropriate to address site-specific conditions. The alternatives are evaluated against seven of the nine CERCLA evaluation criteria defined in Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA (EPA/540/G-891004). The remaining two CERCLA criteria will be formally assessed during the public comment period. The FS evaluation serves as the basis for identifying a remedy to mitigate potential risks to human health and the environment. A preferred alternative (or alternatives) will be presented to the public for review and comment in the proposed plan.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

OPERA models for predicting physicochemical properties and environmental fate endpoints

The collection of chemical structure information and associated experimental data for quantitative structure–activity/ property relationship (QSAR/QSPR) modeling is facilitated by an increasing number of public databases containing large amounts of useful data. However, the performance of QSAR models highly depends on the quality of the data and modeling methodology used. This study aims to develop robust QSAR/QSPR models for chemical properties of environmental interest that can be used for regulatory purposes. This study primarily uses data from the publicly available PHYSPROP database consisting of a set of 13 common physicochemical and environmental fate properties. These datasets have undergone extensive curation using an automated workflow to select only high-quality data, and the chemical structures were standardized prior to calculation of the molecular descriptors. The modeling procedure was developed based on the five Organization for Economic Cooperation and Development (OECD) principles for QSAR models. A weighted k-nearest neighbor approach was adopted using a minimum number of required descriptors calculated using PaDEL, an open-source software. The genetic algorithms selected only the most pertinent and mechanistically interpretable descriptors (2–15, with an average of 11 descriptors). The sizes of the modeled datasets varied from 150 chemicals for biodegradability half-life to 14,050 chemicals for logP, with an average of 3222 chemicals across all endpoints. The optimal models were built on randomly selected training sets (75%) and validated using fivefold cross-validation (CV) and test sets (25%). The CV Q2 of the models varied from 0.72 to 0.95, with an average of 0.86 and an R2 test value from 0.71 to 0.96, with an average of 0.82. Modeling and performance details are described in QSAR model reporting format and were validated by the European Commission’s Joint Research Center to be OECD compliant. All models are freely available as an open-source, command-line application called OPEn structure–activity/property Relationship App (OPERA). OPERA models were applied to more than 750,000 chemicals to produce freely available predicted data on the U.S. Environmental Protection Agency’s CompTox Chemistry Dashboard.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Compliance Sampling Applications in MEC Clean-Up at Military Training Sites

Millions of acres of Department of Defense (DoD) closed, transferred and transferring ranges may contain munitions and explosives of concern (MEC) (General Accounting Office, 2001). It is usually necessary to conduct geophysical surveys to search for MEC at these ranges before they can be released from DoD control for other uses. The process of searching for and removing MEC should be carefully planned to follow a quality control process to achieve cleanup goals. After detected MEC have been removed, a confirmation survey of the cleaned areas may be conducted to increase confidence in the cleanup process. These confirmation surveys are the focus of this paper. One possible statistically-based approach for conducting a confirmation survey is to use “accept-on-zero” attribute compliance sampling (AOZ ACS) (Schilling 1978, 1982; Squeglia, 1994). This approach involves conducting an inspection or sampling of a random selection of n “units” from among the total number of units (N) for a site. For example, the site may be divided into N non-overlapping 200ft x 200ft land areas (grids), n of which are randomly selected and inspected for MEC (n < N). The number n is statistically determined by specifying N and the confidence required that no more than Y% of the 200ft x 200ft units contain MEC. An example is provided by Williams (2003) for a site near Denver, Colorado. He describes the use of process quality control and AOZ ACS as it is laid out in Military-Standard-1916 (DoD 1996, 1999). The purpose of this paper is to (i) provide the mathematical foundation of AOZ ACS and an equation that can be used to compute n, (ii) discuss the pros and cons of AOZ ACS when units are defined to be either individual transects or anomalies, and (iii) present the results of simulation studies conducted to investigate the performance of AOZ ACS when individual transects are not randomly selected and there is a non-random spatial pattern of MEC. Goals (ii) and (iii) are of particular interest to the DoD and Environmental Protection Agency (EPA) as they grapple with the design of confirmation surveys.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Y-12 National Security Complex Biological Monitoring and Abatement Program Plan

This document provides the Biological Monitoring and Abatement Program (BMAP) Plan for East Fork Poplar Creek (EFPC), as required by the Y-12 National Security Complex (Y-12 Complex) National Pollutant Discharge Elimination System (NPDES) permit which became effective December 1, 2011. The BMAP was first developed in 1985 by staff in the Environmental Science Division at the Oak Ridge National Laboratory at the request of the Y-12 Complex. The multidisciplinary and quantitative biological monitoring approaches used for the BMAP were developed, from the beginning, in close consultation with Y-12 Complex Environmental Compliance staff, as well as the State of Tennessee and the Environmental Protection Agency. A draft BMAP Plan was submitted to the Tennessee Department of Environment and Conservation (TDEC) in May 2012 and was approved by TDEC with revision in December 2012. The TDEC’s Plan changes are incorporated in this final BMAP Plan issued in January 2013. The general approach to the 2013 BMAP Plan follows previous precedent, and addresses all BMAP-related NPDES permit requirements. The focus of the monitoring effort is on EFPC and comparable reference streams, including Brushy Fork and Hinds Creek. Two other stream systems near the Y-12 Complex, Bear Creek and McCoy Branch, are similarly monitored using BMAP and TDEC protocols as required in the permit; however, these streams are monitored by Comprehensive Environmental Response, Compensation, and Liability Act -funded programs and are only briefly summarized in this Plan. Three major tasks comprise the current program: fish bioaccumulation, benthic macroinvertebrate community, and fish community. A concomitant task, toxicity testing of storm drains, is also implemented at the Y-12 Complex and briefly described in the Plan. Each BMAP task differs slightly in the number of sites and frequency of sampling, depending on need as determined by previous monitoring. Sampling rationale and specific methods for each task are provided herein. A summary of program integration components, including data management, quality assurance, and reporting aspects, are also provided. The BMAP is an internationally recognized biological monitoring program that is a valuable case study for the U.S. Department of Energy (DOE) and the nation. First and foremost, the program evaluates Tennessee Water Quality Criteria (as required in the NPDES permit) by conducting studies to annually evaluate bioaccumulation of contaminants of concern, and the receiving streams’ biological integrity. The program has been successful in evaluating ecological effects and their causes, and has provided actionable information in the design and application of pollution abatement actions. Most importantly, the program design focuses on assessing spatial and temporal change, and has documented substantial ecological recovery in response to various facility actions. The program results have therefore become a key measure of how well the DOE facilities are doing relative to protecting the environment, and provide assurance to regulators and the public that stream conditions are improving. The DOE’s mission and environmental management in Oak Ridge will continue to evolve as the facilities modernize and various decontamination and decommissioning activities and pollution abatement actions are implemented. Many changes are expected at the Y-12 Complex in the next few years that have the potential to positively affect, or on a short-term basis negatively affect, the stream environment. The BMAP approach described here will continue to provide an important integrated measure of receiving stream conditions and ecological response to future facility actions.

Peterson, Mark J.↗

Antibody-Based Diagnostics and Production for High Consequence Animal Pathogens

New Horizons Diagnostic Corporation (NHD) develops and manufactures testing products for the detection of bacteria and toxins in human, environmental, surface, food, and water samples for government, municipal and corporate customers. It offers diverse medical products, such as products for testing cholera, gonorrhea, syphilis, and drug abuse screening products. The major product line for NHD is the development, marketing and sale of rapid antibody based diagnostic kits. World Health Organization (WHO) studies have shown that since 1996, infectious and parasitic diseases accounted for 43% of the 40 million deaths in developing countries. In the US alone, the death rate due to infectious diseases rose 58% from 1980 to 1992. The incidence of food-borne illness continues to rise. Emerging infectious diseases in animals with the potential to afflict human populations, such as BSE and avian influenza, continue to increase in number as well. As many as 81 million illnesses and 9,000 deaths occur each year in the US from food-borne microorganisms. In addition, pesticides in food give rise to an estimated 6,000 cancer cases annually in the US. The Environmental Protection Agency (EPA) estimated, in the early 1990s, that approximately 43% of the water systems serving 120 million people had EPA violations, and nearly one million people became ill due to contaminated water. The company also provides bio threat detection products, including diagnostic kits, collection kits, and environmental kits. The collaborative effort, if successful, will permit the identification and development of new and improved diagnostic kits for the targeted diseases. New Horizon Diagnostics matched DOE’s dollars through a Cooperative Research and Development Agreement (CRADA). That CRADA is the subject of this report. The proposal was ultimately funded and the CRADA between NHD and PNNL was established. PNNL managed the activities at the Russian State Diagnostic and Prevention Center for Human and Animal Diseases (DPC) and its collaborators (Ivanovsky Virology Institute, the All-Russian Institute for Animal Health (ARRIAH), and Gamaleya Institute) to support the efforts between NHD and DPC and it collaborators in developing commercially viable diagnostics and therapeutics.

59 BASIC BIOLOGICAL SCIENCES↗

Comparison of Vehicle Efficiency Technology Attributes and Synergy Estimates

Analyzing the future fuel economy of light-duty vehicles (LDVs) requires detailed knowledge of the vehicle technologies available to improve LDV fuel economy. The National Highway Transportation Safety Administration (NHTSA) has been relying on technology data from a 2001 National Academy of Sciences (NAS) study (NAS 2001) on corporate average fuel economy (CAFE) standards, but the technology parameters were updated in the new proposed rulemaking (EPA and NHTSA 2009) to set CAFE and greenhouse gas standards for the 2011 to 2016 period. The update is based largely on an Environmental Protection Agency (EPA) analysis of technology attributes augmented by NHTSA data and contractor staff assessments. These technology cost and performance data were documented in the Draft Joint Technical Support Document (TSD) issued by EPA and NHTSA in September 2009 (EPA/NHTSA 2009). For these tasks, the Energy and Environmental Analysis (EEA) division of ICF International (ICF) examined each technology and technology package in the Draft TSD and assessed their costs and performance potential based on U.S. Department of Energy (DOE) program assessments. ICF also assessed the technologies, other relevant attributes based on data from actual production vehicles, and recently published technical articles in engineering journals. ICF examined technology synergy issues through an ICF in-house model that uses a discrete parameter approach.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Marine Mammal Behavioral Response to Tidal Turbine Sound

The sound emitted by tidal turbines overlaps with the generalized hearing ranges for marine mammals and may, consequently, affect marine mammal behavior. Because of the strong environmental protections for marine mammals, these effects are of interest to resource agencies and project developers. The primary goal of this project is to improve the understanding of how sound emitted by tidal turbines may affect marine mammal behavior, with the intent that such understanding may allow this environmental risk to be “retired” for initial demonstrations and arrays. A secondary project goal is to evaluate the efficacy of marine mammal observations from a shore-based vantage point as a method to detect change as a consequence of marine energy stressors. Three, two-week trials were conducted across spring, summer and autumn of 2017 during which vantage-point observations of marine mammals were made from land. We refer to these two-week periods as ‘trials’ as they represent different periods of field data collection. These observations consisted of scan samples every 10 minutes with a set of binoculars and a DSLR camera. When pinnipeds were sighted, still images were taken. When harbor porpoise were sighted, focal follows using video were initiated. These data were later analyzed to estimate the location of animals sighted using photogrammetric techniques. For approximately half of each trial period, a boat was moored in the study area from which an underwater projector was used to play back tidal turbine sounds at a broadband source level of 158 dB re µPa @ 1 m. The other half of each trial period had no playbacks and was used as a control period. During the control and playback periods, ancillary data were collected in the study area near the sea floor (ambient noise, tidal velocity, and porpoise clicks) while weather and vessel tracks were recorded near the vantage-point station. Harbor seals did not show a significant response to the simulated turbine noise, nor did harbor porpoise change their closest point of approach or change the direction/deviation of the paths during periods when the playback was occurring. While porpoise sightings and porpoise acoustic detections were significantly reduced during playback periods in the first two trials, the number of detections during the playback periods increased during the third trial. Similarly, the calculated distance from porpoises to the playback location suggests that harbor porpoises avoided an area around the playback location of approximately 300 m during Trial 1, which decreased to approximately 100 m in Trial 2, and disappeared in Trial 3. This could be an indication of habituation or increased tolerance, either to the playback sound or the vessel presence. Our finding of no significant effect of turbine noise on harbor seals contrast with the findings in a previous study by Hastie et al. (2017) conducted in United Kingdom waters. However, due to substantive differences in source levels and propagation loss, seals in our study would need to have been within 10 m of the playback location to experience similar received levels to those in the Hastie et al. study. Consequently, the two studies may actually be in agreement. Our findings of significant effect of turbine noise on harbor porpoise are in line with previous studies suggesting the harbor porpoise are sensitive to noise. However, we note that, due to cost and logistical constraints, the playback vessel was only mooring during the playback periods. Consequently, we cannot definitively ascribe the changes in porpoise behavior to the simulated turbine noise, playback vessel presence, or a combination of both factors. This methodological limitation and other lessons learned are discussed to benefit future studies that explore the effects of acoustic stressors on marine mammals.

16 TIDAL AND WAVE POWER↗