Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

Control and Non-Payload Communications Generation 1 Prototype Radio Flight Test Report

Unmanned aircraft (UA) represent a new capability that will provide a variety of services in the Government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized because of the lack of a common understanding of what is required to safely operate Unmanned Aircraft Systems in the National Airspace System (UAS in the NAS). The desire and ability to fly UA is of increasing urgency. The application of UA to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UA to the NAS. Existing Federal Aviation Regulations, procedures, and technologies do not allow routine UA access to the NAS. Access to the NAS is hampered by challenges such as the lack of an onboard pilot to see and avoid other aircraft; the ability of a single pilot or operator to control multiple UA; the reliance on command and control (C2) links; the altitudes, speeds, and duration at which the aircraft fly; and the wide variation in UA size and performance. NASA is working with other Government agencies to provide solutions that reduce technical barriers and make access to the NAS routine. This goal will be accomplished through system-level integration of key concepts, technologies, or procedures and through demonstrations of these integrated capabilities in an operationally relevant environment. This project provides an opportunity to transition the acquired empirical data and knowledge to the Federal Aviation Administration and other stakeholders to help them define the requirements for routine UA access to the NAS.Radio communications channels for UA are currently managed through exceptions and use either Department of Defense frequencies for line-of-sight (LOS) and satellite-based communications links, low-power LOS links in amateur bands, or unlicensed Industrial/Scientific/Medical (ISM) frequencies. None of these frequency bands are designated for safety and regularity of flight. Only recently has radiofrequency (RF) spectrum been allocated by the International Telecommunications Union specifically for commercial UA C2, LOS communication (L-Band: 960 to 1164 MHz, and C-Band: 5030 to 5091 MHz). The safe and efficient integration of UA into the NAS requires the use of protected RF spectrum allocations and a new data communications system that is both secure and scalable to accommodate the potential growth of these new aircraft. Data communications for UA-referred to as control and non-payload communications (CNPC)-will be used to exchange information between a UA and a ground station (GS) to ensure safe, reliable, and effective UA flight operation. The focus of this effort is on validating and allocating new RF spectrum and data link communications to enable civil UA integration into the NAS. Through a cost-sharing cooperative agreement with Rockwell Collins, Inc., the NASA Glenn Research Center is exploring and performing the necessary development steps to realize a prototype UA CNPC system. These activities include investigating signal waveforms and access techniques, developing representative CNPC radio hardware, and executing relevant testing and validation activities. There is no intent to manufacture the CNPC end product, rather the goals are to study, demonstrate, and validate a typical CNPC system that will allow safe and efficient communications within the L-Band and C-Band spectrum allocations. The system is addressing initial "seed" requirements from RTCA, Inc., Special Committee 203 (SC-203) and is on a path to Federal Aviation Administration certification. This report provides results from the flight testing campaign of the Rockwell Collins Generation 1 prototype radio, referred hereafter as the "radio." The radio sets operate within the 960- to 977-MHz frequency band with both air and ground radios using identical hardware. Flight tests involved one aircraft and one GS. Results include discussion of aircraft flight paths and associated radio performance.

Shalkhauser, Kurt A.↗

Dividing the Concentrator Target From the Genesis Mission

The Genesis spacecraft, launched in 2001, traveled to a Lagrangian point between the Earth and Sun to collect particles from the solar wind and return them to Earth. However, during the return of the spacecraft in 2004, the parachute failed to open during descent, and the Genesis spacecraft crashed into the Utah desert. Many of the solar wind collectors were broken into smaller pieces, and the field team rapidly collected the capsule and collector pieces for later assessment. On each of the next few days, the team discovered that various collectors had survived intact, including three of four concentrator targets. Within a month, the team had imaged more than 10,000 fragments and packed them for transport to the Astromaterials Acquisition and Curation Office within the ARES Directorate at JSC. Currently, the Genesis samples are curated along with the other extraterrestrial sample collections within ARES. Although they were broken and dirty, the Genesis solar wind collectors still offered the science community the opportunity to better understand our Sun and the solar system as a whole. One of the more highly prized concentrator collectors survived the crash almost completely intact. The Genesis Concentrator was designed to concentrate the solar wind by a factor of at least 20 so that solar oxygen and nitrogen isotopes could be measured. One of these materials was the Diamond-on-Silicon (DoS) concentrator target. Unfortunately, the DoS concentrator broke on impact. Nevertheless, the scientific value of the DoS concentrator target was high. The Genesis Allocation Committee received a request for approximately 1 cm(sup 2) of the DoS specimen taken near the focal point of the concentrator for the analysis of solar wind nitrogen isotopes. The largest fragment, Genesis sample 60000, was designated for this allocation and needed to be precisely cut. The requirement was to subdivide the designated sample in a manner that prevented contamination of the sample and minimized the risk of losing or breaking the precious requested sample fragment. The Genesis curator determined that the use of laser scribing techniques to "cut" a precise line and subsequently cleave the sample (in a controlled break of the sample along that line) was the best method for accomplishing the sample subdivision. However, there were risks, including excess heating of the sample, that could cause some of the implanted solar wind to be lost via thermal diffusion. Accidentally breaking the sample during the handling and cleaving process was an additional risk. Early in fiscal year 2013, to address this delicate, complicated task, the ARES Directorate assembled its top scientists to develop a cutting plan that would ensure success when applied to the actual concentrator target wafer; i.e., to produce an approximately 1 cm(sup 2) piece from the requested area of the wafer. The team, subsequently referred to as the JSC Genesis Tiger Team, spent months researching and testing parameters and techniques related to scribing, cleaving, transporting, handling, and holding (i.e., mounting) the specimen. The investigation required considerable "thinking outside the box," and many, many trials using nonflight wafer analogs. After all preliminary testing, the following method was adopted as the final cutting plan. It was used in two final end-to-end practice runs before being used on the actual flight target wafer. The wafer was oriented on the laser cutting stage with the 100 and 010 directions of the wafer parallel to the corresponding X and Y directions of the cutting stage. The laser was programed to scribe 31 lines of the appropriate length along the Y stage direction. The programed scribe lines were separated by 5 micron in the X direction. The laser parameters were set as follows: (1) The laser power was 0.5 watts; (2) each line consisted of 50 passes, with the Z position being advanced 5 micron per pass; and (3) 30 s would elapse before the next line was scribed to allow for wafer cool down from any possible heating via the laser. The ablated material that "stuck" in the "scribe-cut" was removed from the "cut" using an ultrasonic micro-tool. After all the ablated silicon was removed from the wafer, the wafer was repositioned in exactly the same orientation on the laser stage. The laser was focused using the bottom of the wafer channel, and the 31-line scribing pattern described above was reprogrammed using the Z position of the groove bottom as the starting Z value instead of the top wafer surface, which was used previously. Upon completion of the second set of scribes, the ultrasonic micro-tool was again used to clean out the cut. The wafer was remounted on the stage in exactly the same orientation as before. The laser was again focused on the bottom of the groove. This time, however, the laser was.programed to scribe only one line down the exact center of the channel. The final scribe line consisted of 100 passes with a Z advance of 5 micron per pass and with the laser power set at 0.5 watts. As mentioned above, the final cutting plan was practiced in two end-to-end trials using non-flight, triangular-shaped silicon wafers similar in size and orientation to the actual DOS 60000 target sample. The actual scribing of the triangular-shaped wafers required scribing two lines and cleaving (i.e. scribe-cleave, then scribe-cleave) to obtain the piece requested for allocation. Early in December 2012, after many months of experiments and practicing and perfecting the techniques and procedures, the team successfully subdivided the Genesis DoS 60000 target sample, one of the most scientifically important samples from the Genesis mission (figure 2). On December 17, 2012, the allocated piece of concentrator target sample was delivered to the requesting principal investigator.The cutting plan developed for the subdivision of this sample will be used as the model for subdividing future requested Genesis flight wafers (appropriately modified for different wafer types).

Lauer, H. V., Jr.↗

Management by Trajectory Trade Study of Roles and Responsibilities Between Participants and Automation Report

This report describes a trade study of roles and responsibilities associated with the Management by Trajectory (MBT) concept. The MBT concept describes roles, responsibilities, and information and automation requirements for providing air traffic controllers and managers the ability to quickly generate, evaluate and implement changes to an aircraft's trajectory. In addition, the MBT concept describes mechanisms for imposing constraints on flight operator preferred trajectories only to the extent necessary to maintain safe and efficient traffic flows, and the concept provides a method for the exchange of trajectory information between ground automation systems and the aircraft that allows for trajectory synchronization and trajectory negotiation. The participant roles considered in this trade study include: airline dispatcher, flight crew, radar controller, traffic manager, and Air Traffic Control System Command Center (ATCSCC) traffic management specialists. The proposed allocation of roles and responsibilities was based on analysis of several use cases that were developed for this purpose as well as for walking through concept elements. The resulting allocation of roles and responsibilities reflects both increased automation capability to support many aviation functions, as well as increased flexibility to assign responsibilities to different participants - in many cases afforded by the increased automation capabilities. Note that the selection of participants to consider for allocation of each function is necessarily rooted in the current environment, in that MBT is envisioned as an evolution of the National Airspace System (NAS), and not a revolution. A key feature of the MBT allocations is a vision for the traffic management specialist to take on a greater role. This is facilitated by the vision that separation management functions, in addition to traffic management functions, will be carried out as trajectory management functions. This creates an opportunity for flexibility, allowing the traffic management specialist to carry out tasks that today can only be carried out by the controller currently in contact with the aircraft. This additional tasking for the traffic management specialist comes with requirements for workload management. An increased role for the Data-side (D-side) controller relative to the Radar-side (R-side) controller is a potential approach to mitigating workload for the traffic management specialist, as the D-side controller would have similar ability to perform separation management functions in what today might be considered the "trajectory management" timeframe. This analysis did not distinguish between the D-side and R-side controllers since in many cases the R-side controller works unassisted.

Fernandes, Alicia D.↗

NASA's Space Launch System: Deep-Space Delivery for Smallsats

Designed for human exploration missions into deep space, NASA's Space Launch System (SLS) represents a new spaceflight infrastructure asset, enabling a wide variety of unique utilization opportunities. While primarily focused on launching the large systems needed for crewed spaceflight beyond Earth orbit, SLS also offers a game-changing capability for the deployment of small satellites to deep-space destinations, beginning with its first flight. Currently, SLS is making rapid progress toward readiness for its first launch in two years, using the initial configuration of the vehicle, which is capable of delivering 70 metric tons (t) to Low Earth Orbit (LEO). On its first flight test of the Orion spacecraft around the moon, accompanying Orion on SLS will be small-satellite secondary payloads, which will deploy in cislunar space. The deployment berths are sized for "6U" CubeSats, and on EM-1 the spacecraft will be deployed into cislunar space following Orion separate from the SLS Interim Cryogenic Propulsion Stage. Payloads in 6U class will be limited to 14 kg maximum mass. Secondary payloads on EM-1 will be launched in the Orion Stage Adapter (OSA). Payload dispensers will be mounted on specially designed brackets, each attached to the interior wall of the OSA. For the EM-1 mission, a total of fourteen brackets will be installed, allowing for thirteen payload locations. The final location will be used for mounting an avionics unit, which will include a battery and sequencer for executing the mission deployment sequence. Following the launch of EM-1, deployments of the secondary payloads will commence after sufficient separation of the Orion spacecraft to the upper stage vehicle to minimize any possible contact of the deployed CubeSats to Orion. Currently this is estimated to require approximately 4 hours. The allowed deployment window for the CubeSats will be from the time the upper stage disposal maneuvers are complete to up to 10 days after launch. The upper stage will fly past the moon at a perigee of approximately 100km, and this closest approach will occur about 5 days after launch. The limiting factor for the latest deployment time is the available power in the sequencer system. Several NASA Mission Directorates were involved in the development of programs for the competition, selection, and development of EM-1 payloads that support directorate priorities. CubeSat payloads on EM-1 will include both NASA research experiments and spacecraft developed by industry, international and potentially academia partners. The Human Exploration and Operations Mission Directorate (HEOMD) Advanced Exploration Systems (AES) Division was allocated five payload opportunities on the EM-1 mission. Near Earth Asteroid (NEA) Scout is designed to rendezvous with and characterize a candidate NEA. A solar sail, an innovation the spacecraft will demonstrated for the CubeSat class, will provide propulsion. Lunar Flashlight will use a green propellant system and will search for potential ice deposits in the moon's permanently shadowed craters. BioSentinel is a yeast radiation biosensor, planned to measure the effects of space radiation on deoxyribonucleic acid (DNA). Lunar Icecube, a collaboration with Morehead State University, will prospect for water in ice, liquid, and vapor forms as well as other lunar volatiles from a low-perigee, highly inclined lunar orbit using a compact Infrared spectrometer. Skyfire, a partnership with Lockheed Martin, is a technology demonstration mission that will perform a lunar flyby, collecting spectroscopy, and thermography data to address questions related to surface characterization, remote sensing, and site selection. NASA's Space Technology Mission Directorate (STMD) was allocated three payload opportunities on the EM-1 mission. These slots will be filled via the Centennial Challenges Program, NASA's flagship program for technology prize competitions, which directly engages the public, academia, and industry in open prize competitions to stimulate innovation. The NASA Science Mission Directorate (SMD) was allocated two payload opportunities on the EM-1 mission. The CubeSat Mission to Study Solar Particles (CuSP) payload will study the sources and acceleration mechanisms of solar and interplanetary particles in near-Earth orbit, support space weather research by determining proton radiation levels during Solar Energetic Particle (SEP) events and identifying suprathermal properties that could help predict geomagnetic storms. The LunaH-Map payload will help scientists understand the quantity of H-bearing materials in lunar cold traps (~10 km), determine the concentration of H-bearing materials with 1m depth, and constrain the vertical distribution of H-bearing materials. The final three payload opportunities for the EM-1 mission were allocated for NASA's international space agency counterparts. The flight opportunities are intended to benefit the international space agency and NASA as well as further the collective space exploration goals. ArgoMoon is sponsored by ESA/ASI and will fly along with the ICPS on its disposal trajectory to perform proximity operations with the ICPS post-disposal, take external imagery of engineering and historical significance, and perform an optical communications demonstration. EQUULEUS, sponsored by JAXA, will fly to a libration orbit around the Earth-Moon L2 point and demonstrate trajectory control techniques within the Sun-Earth- Moon region for the first time by a nano spacecraft. The mission will also contribute to the future human exploration scenario by understanding the radiation environment in geospace and deep space, characterizing the flux of impacting meteors on the far side of the moon, and demonstrating the future deep space exploration scenario using the "deep space port" at Lagrange points. OMOTENASHI, also sponsored by JAXA, will land the smallest lunar lander to date on the lunar surface to demonstrate the feasibility of the hardware for distributed cooperative exploration system. Small landers will enable multi-point exploration, which is complimentary with large-scale human exploration. Once on the lunar surface, the OMOTENASHI spacecraft will observe the radiation and soil environments of the lunar surface by active radiation measurements and soil shear measurements. Following EM-1, Space Launch System will evolve to the more-powerful Block 1B configuration, which uses a new Exploration Upper Stage to increase the vehicle's LEO payload capability from 70 t to 105 t. With that transition, the Orion Stage Adapter, which will carry the secondary payloads on EM-1, will be phased out, and a new Universal Stage Adapter will be introduced, creating opportunities for flying larger secondary payloads. This paper will provide a brief status of SLS progress toward first launch; an overview of smallsat accommodations, integration, and operations on EM-1; information about the specific payloads flying on that launch; and a discussion of future accommodations and opportunities for secondary payloads on SLS for Exploration Mission-2 and beyond.

Robinson, Kimberly F.↗

NASA's Space Launch System: Deep-Space Opportunities for SmallSats

Designed for human exploration missions into deep space, NASA's Space Launch System (SLS) represents a new spaceflight infrastructure asset, enabling a wide variety of unique utilization opportunities. While primarily focused on launching the large systems needed for crewed spaceflight beyond Earth orbit, SLS also offers a game-changing capability for the deployment of small satellites to deep-space destinations, beginning with its first flight. Currently, SLS is making rapid progress toward readiness for its first launch in two years, using the initial configuration of the vehicle, which is capable of delivering 70 metric tons (t) to Low Earth Orbit (LEO). On its first flight test of the Orion spacecraft around the moon, accompanying Orion on SLS will be small-satellite secondary payloads, which will deploy in cislunar space. The deployment berths are sized for "6U" CubeSats, and on EM-1 the spacecraft will be deployed into cislunar space following Orion separate from the SLS Interim Cryogenic Propulsion Stage. Payloads in 6U class will be limited to 14 kg maximum mass. Secondary payloads on EM-1 will be launched in the Orion Stage Adapter (OSA). Payload dispensers will be mounted on specially designed brackets, each attached to the interior wall of the OSA. For the EM-1 mission, a total of fourteen brackets will be installed, allowing for thirteen payload locations. The final location will be used for mounting an avionics unit, which will include a battery and sequencer for executing the mission deployment sequence. Following the launch of EM-1, deployments of the secondary payloads will commence after sufficient separation of the Orion spacecraft to the upper stage vehicle to minimize any possible contact of the deployed cubesats to Orion. Currently this is estimated to require approximately 4 hours. The allowed deployment window for the cubesats will be from the time the upper stage disposal maneuvers are complete to up to 10 days after launch. The upper stage will fly past the moon at a perigee of approximately 100km, and this closest approach will occur about 5 days after launch. The limiting factor for the latest deployment time is the available power in the sequencer system. Several NASA Mission Directorates were involved in the development of programs for the competition, selection, and development of EM-1 payloads that support directorate priorities. CubeSat payloads on EM-1 will include both NASA research experiments and spacecraft developed by industry, international and potentially academia partners. The Human Exploration and Operations Mission Directorate (HEOMD) Advanced Exploration Systems (AES) Division was allocated five payload opportunities on the EM-1 mission. Near Earth Asteroid (NEA) Scout is designed to rendezvous with and characterize a candidate NEA. A solar sail, an innovation the spacecraft will demonstrated for the CubeSat class, will provide propulsion. Lunar Flashlight will use a green propellant system and will search for potential ice deposits in the moon's permanently shadowed craters. BioSentinel is a yeast radiation biosensor, planned to measure the effects of space radiation on deoxyribonucleic acid (DNA). Lunar Icecube, a collaboration with Morehead State University, will prospect for water in ice, liquid, and vapor forms as well as other lunar volatiles from a low-perigee, highly inclined lunar orbit using a compact Infrared spectrometer. Skyfire, a partnership with Lockheed Martin, is a technology demonstration mission that will perform a lunar flyby, collecting spectroscopy, and thermography data to address questions related to surface characterization, remote sensing, and site selection. NASA's Space Technology Mission Directorate (STMD) was allocated three payload opportunities on the EM-1 mission. These slots will be filled via the 2 Centennial Challenges Program, NASA's flagship program for technology prize competitions, which directly engages the public, academia, and industry in open prize competitions to stimulate innovation. The NASA Science Mission Directorate (SMD) was allocated two payload opportunities on the EM-1 mission. The CubeSat Mission to Study Solar Particles (CuSP) payload will study the sources and acceleration mechanisms of solar and interplanetary particles in near-Earth orbit, support space weather research by determining proton radiation levels during Solar Energetic Particle (SEP) events and identifying suprathermal properties that could help predict geomagnetic storms. The LunaH-Map payload will help scientists understand the quantity of H-bearing materials in lunar cold traps (~10 km), determine the concentration of H-bearing materials with 1m depth, and constrain the vertical distribution of H-bearing materials. The final three payload opportunities for the EM-1 mission were allocated for NASA's international space agency counterparts. The flight opportunities are intended to benefit the international space agency and NASA as well as further the collective space exploration goals. ArgoMoon is sponsored by ESA/ASI and will fly along with the ICPS on its disposal trajectory to perform proximity operations with the ICPS post-disposal, take external imagery of engineering and historical significance, and perform an optical communications demonstration. EQUULEUS, sponsored by JAXA, will fly to a libration orbit around the Earth-Moon L2 point and demonstrate trajectory control techniques within the Sun-Earth-Moon region for the first time by a nano spacecraft. The mission will also contribute to the future human exploration scenario by understanding the radiation environment in geospace and deep space, characterizing the flux of impacting meteors on the far side of the moon, and demonstrating the future deep space exploration scenario using the "deep space port" at Lagrange points. OMOTENASHI, also sponsored by JAXA, will land the smallest lunar lander to date on the lunar surface to demonstrate the feasibility of the hardware for distributed cooperative exploration system. Small landers will enable multi-point exploration, which is complimentary with large-scale human exploration. Once on the lunar surface, the OMOTENASHI spacecraft will observe the radiation and soil environments of the lunar surface by active radiation measurements and soil shear measurements. Following EM-1, Space Launch System will evolve to the more-powerful Block 1B configuration, which uses a new Exploration Upper Stage to increase the vehicle's LEO payload capability from 70 t to 105 t. With that transition, the Orion Stage Adapter, which will carry the secondary payloads on EM-1, will be phased out, and a new Universal Stage Adapter will be introduced, creating opportunities for flying larger secondary payloads. This paper will provide a brief status of SLS progress toward first launch; an overview of smallsat accommodations, integration, and operations on EM-1; information about the specific payloads flying on that launch; and a discussion of future accommodations and opportunities for secondary payloads on SLS for Exploration Mission-2 and beyond.

Robinson, Kimberly F.↗

From Apollo to the Future, the NASA Curation Model for Engaging the Sample Science Community Maximizes Science on Extraterrestrial Samples

The Astromaterials Acquisition and Curation Office at Johnson Space Center (JSC) has enjoyed a long-term partnership (50 years!) with a broad community of planetary sample scientists. This partnership has enabled the curators of planetary samples to plan for and enact evolving requirements for preservation of sample scientific integrity and for handling and long-term storage. The basis for this relationship is a standing peer review advisory committee composed of leading scientists who are recognized for achievements in sample analysis. The committee and its descendants have brought familiarity with the most relevant scientific investigations and the associated analytical and contamination challenges. Beginning with Apollo, the review committee was charged with oversight of curatorial operations and with ensuring fair access to samples. As additional samples from other planetary bodies were acquired, the committee evolved, taking on new responsibilities, reflected in committee name changes. However, oversight of curatorial operations and fair allocation of samples remain basic responsibilities. Committee recommendations are sent to the NASA Headquarters Discipline Scientist for approval. To minimize conflict of interest and maximize fair access, the rules governing the make-up of the committee is structured. Systematic rotation of leadership and staggered terms of membership allow the committee to retain expertise while bringing in fresh ideas. The first peer review committee was called the Lunar Sample Analysis and Planning Team (LSAPT) and was formalized in early 1968 with about 15 members. Their function was to review a) the equipment and procedures used in the new Lunar Receiving Laboratory (LRL); b) the proficiency and capability of the LRL staff; c) the sequence of sample analysis and allocation after quarantine release; and d) the findings of the Preliminary Examination Team (PET). According to LSAPT member Gerald Wasserburg, one of the first issues they faced was deciding whether to have most of the sample analyses performed in house at the LRL or to distribute samples to members of the scientific community. LSAPT concluded that the major scientific investigations should be carried out externally to the LRL by scientists chosen for their expertise in specific disciplines. Further they recommended that the PET's basic characterization of samples be circulated to the broad scientific community. LSAPT set its own agenda, paid attention to facility details, closely monitored the move of samples from the LRL to the interim curatorial facility in 1973, and was active in inspecting curation facilities. Between 1975 and 1979, a Facility Subcommittee of LSAPT oversaw the design and construction of a permanent facility for preservation of lunar samples. The result was an outstanding facility still in use today. In 1977, a separate peer review committee, the Meteorite Working Group (MWG), was formed to evaluate requests for new meteorites then being collected in Antarctica under what would in 1980 become a 3-agency agreement (National Science Foundation, NASA, Smithsonian Institution). By 1979, after lunar samples were moved into the new permanent facility, the vacated gloveboxes and laboratory were prepared for meteorite curation. Recognizing that LSAPT had been helpful in setting up the JSC curatorial facility for Antarctic meteorites, JSC recommended the review committee be given expanded duties, including advice on curation and analysis of materials from other planetary bodies and the name be changed to Lunar and Planetary Sample Team (LAPST). In 1993, LAPST was renamed the Curation and Analysis Planning Team for Extraterrestrial Materials (CAPTEM) to reflect additional functions. CAPTEM is chartered to be (1) a community-based, interdisciplinary forum for discussion and analysis of matters concerning the collection and curation of extraterrestrial samples, including planning future sample return missions and (2) a standing review panel, charged with evaluating proposals requesting allocation of all extraterrestrial samples contained in NASA collections. Efficiency and flexibility are gained through use of subcommittees, both ad hoc and standing. Transition of the MWG to a subcommittee of CAPTEM was completed in 2017. Today subcommittees review allocation requests for lunar samples, Antarctic meteorites, cosmic dust, Stardust cometary samples, Genesis solar wind samples, and samples returned from asteroids. Other subcommittees address facilities, informatics, and micro-cratered substrates. Planetary samples have been sent to research teams in over 30 countries world-wide. The expertise in the care and fair distribution of astromaterials by NASA using this model spans generations of planetary sample scientists and is a valuable resource to be tapped for future sample returns - OSIRIS-REx, Hayabusa 2, and Mars 2020.

Allton, Judith↗

Assessing Relay Communications for Mars Sample Return Surface Mission Concepts

The Mars Sample Return (MSR) Campaign would be a 3-mission campaign concept supported by NASA and ESA to return samples from the Mars surface. MSR would, for the first time ever, present a need to communicate with multiple surface assets that are co-located on Mars in a coordinated effort to accomplish the unified objective of fetching, transporting, and returning samples from Mars. Currently, Mars surface assets relay data to and from Earth using a number of orbiters in what’s known as the Mars Relay Network (MRN). This network is characterized by a small number of surface assets distributed across the Martian globe and a larger number of orbiters to provide relay services. As of June 2020, there are two surface assets for which five orbiters are providing relay. During the MSR Campaign, there would be two rovers and a lander that all would require relay communication from a small number of Mars orbiters to meet the aggressive MSR timeline. The inversion of the current MRN paradigm, a system of many surface assets requiring relay and few orbiters to provide relay, necessitates the unique challenge of optimally allocating relay passes to maximize the operational capability of all assets. The allocation must consider a large number of trade variables including Mars asset operational requirements and Earth ground system constraints, including staffing schedules, operations planning across time zones, and more. To address these telecommunication challenges, the Mars Asset Relay Mission Link Allocation Design Environment (MARMLADE) tool was developed. It is a MATLAB-based tool to assign orbiter passes or Direct-From-Earth (DFE) links to each of the three surface assets and quantify the operational efficiency of each surface asset.MARMLADE uses a data set of simulated Mars relay orbiter geometry and telecommunication capabilities provided by JPL’s Telecom Orbit Analysis and Simulation Tool (TOAST) software to compute which asset should get each pass based on a series of heuristics and predictions of all assets’ states. Within MARMLADE, the user can provide inputs including the option for time-based pass splitting, fixed FWD data rate capabilities, DFE communication capabilities, and link parameters allowing for the assessment of complex operations and hardware trades using surface mission operational efficiency as a primary figure of merit. As the MSR mission concepts continue to mature, MARMLADE is being used to assess ability of all MSR elements to meet the surface mission timeline requirements and to provide relay link allocations to each of the MSR surface assets.This paper will describe the motivation and design of the MARMLADE tool and how it is being used to perform campaign and mission level trades, generate requirements, and support development of the MSR surface mission scenarios.

Lee, Charles↗

A Framework for Evaluating Distributed Electric Propulsion on the SUSAN Electrofan Aircraft

This work presents a framework for evaluating models and algorithms for Distributed Electric Propulsion (DEP) on the SUSAN Electrofan Aircraft. Throughout the development of the SUSAN aircraft, the performance of various configurations of the aircraft will need to be analyzed. However, the static behavior alone is not sufficient to describe the performance of these configurations. Therefore, simulation with fully integrated subsystem models is required. The proposed framework considers the vehicle aerodynamic, propulsion, and control subsystems. The presented framework automatically generates control laws for any vehicle configuration in response to changes in these subsystems. To compare these different vehicle configurations, various time and frequency domain performance metrics are compared. Three different system modifications are used as cases to evaluate this framework. The first modification integrates the propulsion control system with the flight controller to enable differential thrust without stalling the main engine. This evaluation case is used to validate the framework for aircraft configurations with coupled subsystems. The second modification compares the effect of the vertical tail size on open and closed loop performance. This evaluation case is used to validate the framework for controlling different configurations and tuning towards comparable closed loop performance despite changes to the aircraft's aerodynamic model. The third modification implements two different control allocation schemes. This evaluation case demonstrates the framework's ability to evaluate allocation modifications needed to take advantage of DEP. The first evaluation case is used to show that controller integration enables differential thrust, improving realized wingfan bandwidth by up to 40\% in simulation. The second evaluation case demonstrates that the framework can stabilize the reduced tail size aircraft with closed loop control. The third evaluation case demonstrates that a pseudoinverse control allocation scheme improves lateral velocity settling time by approximately 17~seconds over a symmetric-thrust allocation. These cases show that the framework is useful for evaluating the performance of integrated system designs, enabling analyses of new models and algorithms for the SUSAN distributed electric propulsion vehicle.

Nicholas C Ogden↗

Persistent heap Management library

PERM is a C library for persistent heap management and is intended for use with a dynamic-memory allocator (e.g. malloc, free). The PERM memory allocator replaces the standard C dynamic memory allocation functions with compatible versions that provide persistent memory to application programs. Memory allocated with the PERM allocatory will persist between program invocations after a call to a checkpoint function. This function essentially saves the state of the heap and registered global variables to a file which may reside in flash memory or other node local storage. A few other functions are also provided by the library to manage checkpoint files. Global variables in an application can be marked persistent and be included in a checkpoint by using a compiler attribute defined as PERM. The PERM checkpoint methof is not dependent on the programming model ans works with distributed memory or shared memory programs.

Source record↗

Funding Mechanisms for Federal Geothermal Permitting

The Department of Energy's (DOE) Geothermal Technologies Office (GTO) initiated a Geothermal Regulatory Roadmap (GRR) in March 2012 to facilitate the development of utility-scale geothermal power. The GRR team conducted a series of workshops during the summer of 2012, which included key representatives from federal and state agencies, as well as industry and other stakeholders involved in the permitting and development of utility-scale geothermal projects. In many of the GRR meetings held with agencies, industry, and other stakeholders, a recurring issue was competing priorities for agency staff's time, which result in permit processing delays. Some agency personnel explained how only a percentage of their weekly or monthly time is allocated to geothermal due to geothermal budget allocations. Others described how their time allocation was determined by agency priorities, and not by specific geothermal budget allocations. In these cases, geothermal may not be a priority at all. One suggestion that was to increase geothermal permit fees or to develop some other mechanisms of cost recovery to fund additional geothermal positions or contractors to process permits more quickly. Because much of the geothermal resource available in the western U.S. is on federal lands, analysis of cost recovery programs could identify opportunities for additional funding mechanisms to support federal agency personnel and processing permits for geothermal projects. This paper discusses: federal agency revenues received for geothermal projects, including: (1) lease revenues, (2) fixed fees, and (3) cost recovery fees; and potential federal agency budget sources for processing geothermal applications, including: (1) cost-recovery fees for services rendered, (2) set-aside funds (such as those employed by EPAct2005), and (3) the appropriations process. This paper then analyzes the three budget sources as mechanisms for increasing funds available to federal agencies for processing geothermal permits and approvals. This paper concludes that both set-asides and cost-recovery fees for services rendered were effective ways of ensuring sufficient funding for processing geothermal authorizations on federally-managed public lands in a timely manner.

15 GEOTHERMAL ENERGY↗

Virtual FPGA management and optimization system

A macro scheduler includes a resource tracking module configured to update a database enumerating a plurality of macro components of a set of field programmable gate array (FPGA) devices, a communication interface configured to receive from a first client device a first design definition indicating one or more specified macro components for a design, resource allocation logic configured to allocate a first set of macro components for the design by allocating one of the plurality of macro components for each of the one or more specified macro components indicated in the first design definition, and configuration logic configured to implement the design in the set of FPGA devices by configuring the first set of allocated macro components according to the first design definition.

97 MATHEMATICS AND COMPUTING↗

Value of Information in Fuel Cycle Decision-making

Transitions between nuclear fuel cycles with uncertain key parameters (e.g., SNF and HLW disposal costs, fast reactor capital costs) have been examined using a decision-making under uncertainty methodology. The methodology explicitly incorporates uncertainties in key parameters into the decision-making process by constructing a stochastic model and embedding uncertainties as bifurcations in the decision-tree. The framework of this methodology allows for interpretation using a real options valuation or game theoretic approach, reviewed in. The work presented here extends the decision-making under uncertainty framework to calculate the value of information, which may be used to inform a game against nature. These games against nature have been applied to resource allocation problems, where scarce resources are allocated to maximize expected payoffs. More broadly, the value of developing alternative technologies may be considered under the same framework, where an investment portfolio for technology deployment may be developed. Here, the value of information is taken as the value of reducing uncertainty in key parameters, and these values may be substituted for the traditional payoff matrix when considering allocating scarce resources. Games against nature may provide a unique perspective on R and D funding decisions when considering transitions between nuclear fuel cycles. By determining the value of reducing uncertainties (of gaining information on probability distributions) scarce resources may be allocated in such a way to maximize their utility. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Market mechanism to enable grid-aware dispatch of Aggregators in radial distribution networks

This paper presents a market-based optimization framework wherein Aggregators can compete for nodal capacity across a distribution feeder and guarantee that allocated flexible capacity cannot cause overloads or congestion. This mechanism, thus, allows Aggregators with allocated capacity to pursue a number of services at the whole-sale market level to maximize revenue of flexible resources. Based on Aggregator bids of capacity (MW) and network access price ($/MW), the distribution system operator (DSO) formulates an optimization problem that prioritizes capacity to the different Aggregators across the network while implicitly considering AC network constraints. This grid-aware allocation is obtained by incorporating a convex inner approximation into the optimization framework that prioritizes hosting capacity to different Aggregators. We adapt concepts from transmission-level capacity market clearing, utility demand charges, and Internet-like bandwidth allocation rules to distribution system operations by incorporating nodal voltage and transformer constraints into the optimization framework. Simulation based results on IEEE distribution networks showcase the effectiveness of the approach.

Nazir, Mohammad Nawaf↗

A Method for the Selection of Exploration Areas for Unconformity Uranium Deposits

The method we propose employs two analyses: (1) exploration simulation and risk valuation and (2) portfolio optimization. The first analysis, implemented by the investment worth system (IWS), uses Monte Carlo simulation to integrate a wide spectrum of uncertain and varied components to a relative frequency histogram for net present value of the exploration investment, which is converted to a risk-adjusted value (RAV). Iterative rerunning of the IWS enables the mapping of the relationship of RAV to magnitude of exploration expenditure, X. The second major analysis uses RAV vs. X maps to identify that subset (portfolio) of areas that maximizes the RAV of the firm's multiyear exploration budget. The IWS, which is demonstrated numerically, consists of six components based on the geologic description of a hypothetical basin and project area (PA) and a mix of hypothetical and actual conditions of an unidentified area. The geology is quantified and processed by Bayesian belief networks to produce the geology-based inputs required by the IWS. An exploration investment of $60 M produced a highly skewed distribution of net present value (NPV), having mean and median values of $4,160 M and $139 M, respectively. For hypothetical mining firm Minex, the RAV of the exploration investment of $60 M is only $110.7 M. An RAV that is less than 3% of mean NPV reflects the aversion by Minex to risk as well as the magnitude of risk implicit to the highly skewed NPV distribution and the probability of 0.45 for capital loss. Potential benefits of initiating exploration of a portfolio of areas, as contrasted with one area, include increased marginal productivity of exploration as well as reduced probability for nondiscovery. For an exogenously determined multiyear exploration budget, a conceptual framework for portfolio optimization is developed based on marginal RAV exploration products for candidate PAs. PORTFOLIO, a software developed to implement optimization, allocates exploration to PAs so that the RAV of the exploration budget is maximized. Moreover, PORTFOLIO provides a means to examine the impact of magnitude of budget on the composition of the exploration portfolio and the optimum allocation of exploration to PAs that comprise the portfolio. Using fictitious data for five PAs, a numerical demonstration is provided of the use of PORTFOLIO to identify those PAs that comprise the optimum exploration portfolio and to optimally allocate the multiyear budget across portfolio PAs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Life cycle greenhouse gas emissions of hydrogen fuel production from chlor-alkali processes in the United States

By-product hydrogen from chlor-alkali processes can help meet the increasing demand for hydrogen fuel in early fuel cell electric vehicle markets (e.g., California) in the U.S. Hydrogen produced from chlor-alkali plants is typically combusted for process heat on site, vented to the atmosphere (i.e., wasted), or sold to the external merchant hydrogen market. Whether it is combusted, vented, or sold as a commodity, relevant information is lacking as to the life-cycle environmental benefits or trade-offs of using by-product hydrogen from chlor-alkali plants. A life-cycle analysis framework was employed to evaluate well-to-gate greenhouse gas (GHG) emissions associated with by-product hydrogen from chlor-alkali processes in comparison with hydrogen from the conventional centralized natural gas steam methane reforming (central SMR) pathway. U.S.-specific, plant-by-plant, and up-to-date chlor-alkali production characteristics were incorporated into the analysis. In addition to the venting and combustion scenarios, to deal with the multi-functionality of the chlor-alkali processes that simultaneously produce chlorine, sodium hydroxide, and hydrogen, two different co-product allocation strategies were adopted mass allocation and market value allocation. It was estimated that by-product hydrogen production from chlor-alkali processes creates 1.3-9.8 kg CO 2 e/kg H 2 of life-cycle GHG emissions on average, which is 20-90% less than the conventional central SMR pathway. The results vary with co-product treatment scenarios, regional electric grid characteristics, on-site power generation, product prices, and hydrogen yield. Despite the variations in the results, it was concluded that the life-cycle GHG emission reduction benefits of using by-product hydrogen from chlor-alkali processes are robust. In conclusion, with a diverse set of scenario analyses, the study developed a comprehensive and detailed life-cycle GHG emissions inventory of the chlor-alkali by-product hydrogen pathway and quantified sensitivity indices in the context of different assumptions and input parameter values.

08 HYDROGEN↗

Hyperbaric Oxygen Treatment of Chronic Refractory Radiation Proctitis: A Randomized and Controlled Double-Blind Crossover Trial With Long-Term Follow-Up

Purpose: Cancer patients who undergo radiotherapy remain at life-long risk of radiation-induced injury to normal tissues. We conducted a randomized, controlled, double-blind crossover trial with long-term follow-up to evaluate the effectiveness of hyperbaric oxygen for refractory radiation proctitis. Methods and Materials: Patients with refractory radiation proctitis were randomized to hyperbaric oxygen at 2.0 atmospheres absolute (Group 1) or air at 1.1 atmospheres absolute (Group 2). The sham patients were subsequently crossed to Group 1. All patients were re-evaluated by an investigator who was unaware of the treatment allocation at 3 and 6 months and Years 1-5. The primary outcome measures were the late effects normal tissue-subjective, objective, management, analytic (SOMA-LENT) score and standardized clinical assessment. The secondary outcome was the change in quality of life. Results: Of 226 patients assessed, 150 were entered in the study and 120 were evaluable. After the initial allocation, the mean SOMA-LENT score improved in both groups. For Group 1, the mean was lower (p 0.0150) and the amount of improvement nearly twice as great (5.00 vs. 2.61, p = 0.0019). Similarly, Group 1 had a greater portion of responders per clinical assessment than did Group 2 (88.9% vs. 62.5%, respectively; p 0.0009). Significance improved when the data were analyzed from an intention to treat perspective (p = 0.0006). Group 1 had a better result in the quality of life bowel bother subscale. These differences were abolished after the crossover. Conclusion: Hyperbaric oxygen therapy significantly improved the healing responses in patients with refractory radiation proctitis, generating an absolute risk reduction of 32% (number needed to treat of 3) between the groups after the initial allocation. Other medical management requirements were discontinued, and advanced interventions were largely avoided. Enhanced bowel-specific quality of life resulted.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

The bill alignment test: Identifying trade-offs with residential rate design options

The proliferation of smart meter data allows the application of new analytic methods to inform regulatory deliberations. The bill alignment test (BAT) method, which compares the costs allocated to each residential customer with their electric bill, is introduced to help regulators consider how a proposed rate design balances various regulatory criteria. The BAT requires an explicit statement of preferences by policymakers or stakeholders and choices about allocating residual costs unassociated with customer-level causality. The BAT is applied to more than 35,000 smart-meter customer load profiles to assess the trade-offs associated with proposed rate designs. Here this example demonstrates the impact of residual cost allocation preferences and tariff design choices on proposed tariff evaluation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A modest proposal: a market-based approach to generation interconnection process reform

Rather than allocating queue positions and priority processing rights using a ''first-come, first-served'' or some other administratively determined allocation scheme, a more robust and defensible proposal would allocate queue positions and processing priority to developers who value them the most because they have the highest marginal costs of delay or waiting. Such an approach could be structured as a price-based auction. (author)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗