A measured energy use, solar production, and building air leakage dataset for a zero energy commercial building

This paper provides an open dataset of measured energy use, solar energy production, and building air leakage data from a 328 m 2 (3,531 ft 2 ) all-electric, zero energy commercial building in Virginia, USA. Over two years of energy use data were collected at 1-hour intervals using circuit-level energy monitors. Over six years of solar energy production data were measured at 1-hour resolution by 56 microinverters (presented as daily and monthly data in this dataset). The building air leakage data was measured post-construction per ASTM-E779 Standard Test Method for Determining Air Leakage Rate by Fan Pressurization and the United States Army Corps (USACE) Building Enclosure Testing procedure; both pressurization and depressurization results are provided. The architectural and engineering (AE) documents are provided to aid researchers and practitioners in reliable modeling of building performance. The paper describes the data collection methods, cleaning, and convergence with weather data. This dataset can be employed to predict, benchmark, and calibrate operational outcomes in zero energy commercial buildings.

14 SOLAR ENERGY↗

DARHT Axis 1 Performance Results with and without a Blumlein Charge Unit

The Dual-Axis Radiographic Hydrodynamic Test (DARHT) facility provides flash radiography capabilities using two electron Linear Induction Accelerators (LIA’s). Axis 1 of DARHT produces a 20- MeV, 2-kA, 80-ns-FWHM electron beam. As DARHT Axis 1 enters its twentieth year of operation, the probability of Blumlein Charge Unit (BCU) failure has increased and the risk of a failure on the day of an explosive experiment has become more likely. Replacement time for a BCU is four to six hours. This report examines the radiographic and beam transport effect of operating the accelerator with a missing or reduced charge voltage BCU. The results are compared with normal, full machine operation. A prescription for alternate operation with missing or reduced charge voltage on BCU22 is given.

47 OTHER INSTRUMENTATION↗

Micro-Environmental Control System (Final Report)

This project developed an innovative micro-environmental control system (µX) that enables office buildings to reduce energy used for heating and cooling by 15% or more. The µX is a compact, quiet, and ergonomic device that is designed to be installed under an office workstation; it is designed to maintain occupant comfort when room thermostat setpoints are incremented by 4°F or more (warmer in the summer and cooler in the winter) to save energy. When ambient room temperatures are outside of the usual comfort range, the µX maintains occupant comfort by delivering personalized cooling or heating locally to each office worker. The µX provides personalized cooling using a micro vapor compression system that includes a new high-performance micro-scroll compressor and a novel thermal storage unit. The vapor compression system operates at night to freeze a phase-change material (PCM). During the workday, the cooling stored in the PCM is released as a cool breeze of air to make occupants more comfortable. The micro-scroll compressor was developed specifically for this application; it is smaller than any of its type, minimizing the amount of power needed. In heating mode, the µX maintains occupant comfort using a foot heating mat with an infrared reflective box. The µX R&D project was conducted by Syracuse University in collaboration with United Technologies Research Center, Air Innovations, Bush Technical, and Cornell University. Over the course of the initial three-year project, the team developed and evaluated four versions of the unit, advancing the concept to Technology Readiness Level 6. The capabilities of individual proof-of-concept prototypes were verified in tests that were conducted with: 1) units in psychrometric chambers, 2) an instrumented manikin in a laboratory, and 3) human subjects in laboratories that simulate office environments. The tests verified that the µX prototypes met or exceeded all performance targets required to enable office buildings to reduce energy used for heating and cooling by 15% or more by maintaining occupant comfort when thermostat setpoints are incremented by 4°F or more.

25 ENERGY STORAGE↗

New Los Alamos space instrument goes for a spin

Scientists and engineers at Los Alamos National Laboratory are using a unique centrifuge facility to evaluate a flight-ready telemetry system for evaluating a nuclear weapons test missile launch. "The telemetry unit was designed and manufactured by Los Alamos' Intelligence and Space Research Division," said Telemetry Program Manager Myles Fitzgerald. "Telemetry is a data stream of information on temperature, acceleration, vibration, strain, all the conditions a system encounters during a test flight." Because a test missile flight ultimately ends with the test system completely destroyed, telemetry data from the flight must be collected by receiving stations along the flight path. "The purpose of the centrifuge test is to subject the electronics to a high gravitational load (G-load) that's representative of what the system will experience when re-entering the Earth's atmosphere," said weapons test engineer Alex Cusick.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

New Los Alamos space instrument goes for a spin

Scientists and engineers at Los Alamos National Laboratory are using a unique centrifuge facility to evaluate a flight-ready telemetry system for evaluating a nuclear weapons test missile launch. "The telemetry unit was designed and manufactured by Los Alamos' Intelligence and Space Research Division," said Telemetry Program Manager Myles Fitzgerald. "Telemetry is a data stream of information on temperature, acceleration, vibration, strain, all the conditions a system encounters during a test flight." Because a test missile flight ultimately ends with the test system completely destroyed, telemetry data from the flight must be collected by receiving stations along the flight path. "The purpose of the centrifuge test is to subject the electronics to a high gravitational load (G-load) that's representative of what the system will experience when re-entering the Earth's atmosphere," said weapons test engineer Alex Cusick.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Hardtack I

After thirty-four tests, Hardtack I came to an end on August 18, 1958, with the thirty-fifth and final test, Fig. Four days later, President Dwight Eisenhower told Norris Bradbury, “I am today announcing that the United States will suspend nuclear weapons tests for a period of twelve months and, under certain conditions of progress toward real disarmament, continue that suspension on a year-to-year basis.”1 Although not intended, Eisenhower’s announcement made Fig the last nuclear test conducted in the Marshall Islands.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

The Nuclear Non-Proliferation Treaty and the Comprehensive Nuclear-Test-Ban Treaty, the relationship

The Nuclear Non-Proliferation Treaty (NPT) is the most important international security arrangement that we have that is protecting the world community and this has been true for many years. But it did not happen by accident, it is a strategic bargain in which 184 states gave up the right forever to acquire the most powerful weapon ever created in exchange for a commitment from the five states allowed to keep nuclear weapons under the NPT (U.S., U.K., Russia, France and China), to share peaceful nuclear technology and to engage in disarmament negotiations aimed at the ultimate elimination of their nuclear stockpiles. The most important part of this is the comprehensive nuclear test ban (CTBT); the thinking by the 184 NPT non-nuclear weapon states was and is that they understand that the elimination of nuclear weapon stockpiles is a long way off, but at least the NPT nuclear weapon states could stop testing the weapons. The CTBT has been ratified by 161 states but by its terms it can only come into force if 44 nuclear potential states ratify; 36 have of the 44 have ratified it, the remaining eight include the United States and seven others, most of whom are in effect waiting for the United States. No state has tested a nuclear weapon-except for complete outlier North Korea-in 15 years. There appears to be no chance that the U.S. Senate will approve the CTBT for ratification in the foreseeable future, but the NPT may not survive without it. Perhaps it is time to consider an interim measure, for the UN Security Council to declare that any future nuclear weapon test any time, anywhere is a 'threat to peace and security', in effect a violation of international law, which in today's world it clearly would be.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Assessment of the Technical Maturity of Generation IV Concepts for Test or Demonstration Reactor Applications, Revision 2

The United States Department of Energy (DOE) commissioned a study the suitability of different advanced reactor concepts to support materials irradiations (i.e. a test reactor) or to demonstrate an advanced power plant/fuel cycle concept (demonstration reactor). As part of the study, an assessment of the technical maturity of the individual concepts was undertaken to see which, if any, can support near-term deployment. A Working Group composed of the authors of this document performed the maturity assessment using the Technical Readiness Levels as defined in DOE’s Technology Readiness Guide . One representative design was selected for assessment from of each of the six Generation-IV reactor types: gas-cooled fast reactor (GFR), lead-cooled fast reactor (LFR), molten salt reactor (MSR), supercritical water-cooled reactor (SCWR), sodium-cooled fast reactor (SFR), and very high temperature reactor (VHTR). Background information was obtained from previous detailed evaluations such as the Generation-IV Roadmap but other technical references were also used including consultations with concept proponents and subject matter experts. Outside of Generation IV activity in which the US is a party, non-U.S. experience or data sources were generally not factored into the evaluations as one cannot assume that this data is easily available or of sufficient quality to be used for licensing a US facility. The Working Group established the scope of the assessment (which systems and subsystems needed to be considered), adapted a specific technology readiness scale, and scored each system through discussions designed to achieve internal consistency across concepts. In general, the Working Group sought to determine which of the reactor options have sufficient maturity to serve either the test or demonstration reactor missions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2010

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2010 and includes inspection and repair activities completed at the following seven CAUs: · CAU 400: Bomblet Pit and Five Points Landfill (TTR) · CAU 407: Roller Coaster RadSafe Area (TTR) · CAU 424: Area 3 Landfill Complexes (TTR) · CAU 426: Cactus Spring Waste Trenches (TTR) · CAU 453: Area 9 UXO Landfill (TTR) · CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR) · CAU 487: Thunderwell Site (TTR)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2013

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2013 and includes inspection and repair activities completed at the following CAUs: • CAU 400: Bomblet Pit and Five Points Landfill (TTR) • CAU 407: Roller Coaster RadSafe Area (TTR) • CAU 424: Area 3 Landfill Complexes (TTR) • CAU 453: Area 9 UXO Landfill (TTR) • CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. Photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted on May 14, 2013. Maintenance was performed at CAU 400, CAU 424, and CAU 453. At CAU 400, animal burrows were backfilled. At CAU 424, erosion repairs were completed at Landfill Cell A3-3, subsidence was repaired at Landfill Cell A3-4, and additional lava rock was placed in high-traffic areas to mark the locations of the surface grade monuments at Landfill Cell A3-3 and Landfill Cell A3-8. At CAU 453, two areas of subsidence were repaired and animal burrows were backfilled. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2013. The vegetation monitoring report is included in Appendix F.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2014

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2014 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Photographs taken during inspections are included in Appendix D. The annual post-closure inspections were conducted on May 28, 2014. Maintenance was required at CAU 407. Animal burrows were backfilled and erosion repairs were performed. Vegetation monitoring was performed at CAU 407 in June 2014. The vegetation monitoring report is included in Appendix E.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing an Instrumentation Package for in-Water Testing of Marine Hydrokinetic Energy Devices: Preprint

The ocean-energy industry is still in its infancy and device developers have provided their own equipment and procedures for testing. Currently, no testing standards exist for ocean energy devices in the United States. Furthermore, as prototype devices move from the test tank to in-water testing, the logistical challenges and costs grow exponentially. Development of a common instrumentationpackage that can be moved from device to device is one means of reducing testing costs and providing normalized data to the industry as a whole. As a first step, the U.S. National Renewable Energy Laboratory (NREL) has initiated an effort to develop an instrumentation package to provide a tool to allow common measurements across various ocean energy devices. The effort is summarized in thispaper. First, we present the current status of ocean energy devices. We then review the experiences of the wind industry in its development of the instrumentation package and discuss how they can be applied in the ocean environment. Next, the challenges that will be addressed in the development of the ocean instrumentation package are discussed. For example, the instrument package must be highlyadaptable to fit a large array of devices but still conduct common measurements. Finally, some possible system configurations are outlined followed by input from the industry regarding its measurement needs, lessons learned from prior testing, and other ideas.

13 HYDRO ENERGY↗

Field Evaluation of the Performance of the RTU Challenge Unit: Daikin Rebel

Packaged rooftop air-conditioning units (RTUs) are used in 44% (2.5 million) of all commercial buildings, serving over 57% (46 billion square feet) of the commercial building floor space in the United States (EIA 2012). The primary energy consumption associated with RTUs is over 2.2 quads annually. Therefore, even a small improvement in efficiency or part-load operation of these units can lead to significant reductions in energy use and carbon emissions. Starting in 2011, the U.S. Department of Energy’s (DOE’s) Building Technologies Office funded a series of projects related to RTUs. Some projects were intended to improve the operating efficiency of the existing RTUs, while others were focused on improving the operating efficiency of new units. This report documents the field-testing and comparison of the seasonal efficiency of a state-of-art RTU Challenge unit and a standard unit. Section II provides the background for the work. Section III describes the measurement and verification plan for the field tests. Section IV describes the measurement and verification evaluation plan. The results are described in Section V. The lessons learned and recommendations for future work are presented in Section VI. A list of references is provided in Section VII.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

High Reliability R-10 Windows Using Vacuum Insulating Glass Units

The objective of this effort was for EverSealed Windows (“EverSealed” or “ESW”) to design, assemble, thermally and environmentally test and demonstrate a Vacuum Insulating Glass Unit (“VIGU” or “VIG”) that would enable a whole window to meet or exceed the an R-10 insulating value (U-factor ≤ 0.1). To produce a VIGU that could withstand any North American environment, ESW believed it needed to design, produce and use a flexible edge seal system. This is because a rigid edge seal, used by all other know VIG producers and developers, limits the size and/or thermal environment of the VIG to where the unit is not practical for typical IG sizes and cannot withstand severe outdoor environments. The rigid-sealed VIG’s use would be limited to mild climates where it would not have a reasonable economic payback when compared to traditional double-pane or triple-pane IGs. ESW’s goals, in addition to achieving a sufficiently high R-value to enable a whole window to achieve R-10, included creating a VIG design that could be produced for a cost equal to or lower than a traditional triple-pane IG (low-e, argon filled). ESW achieved these goals. EverSealed produced, tested and demonstrated a flexible edge-seal VIG that had an R-13 insulating value and the edge-seal system durability to operate reliably for at least 40 years in the harshest climates of North America.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada. For Calendar Year 2015, Revision 0

This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2015 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved closure reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. The annual post-closure inspections were conducted on May 12, 2015. Maintenance was required at CAU 453. Cracking along the north trench was repaired. One monument is missing at CAU 424; it will be replaced in 2016. Postings at CAUs 407, 424, 453, and 487 contain contact information for TTR Security. It was noted that protocols may not be in place to ensure that the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) is notified if access is needed at these sites. NNSA/NFO is working with the U.S. Air Force and Sandia to determine whether more appropriate contact information or new protocols are warranted for each CAU. Based on these inspections, there has not been a significant change in vegetation, and vegetation monitoring was not recommended at CAU 400 or CAU 407 in 2015.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada: For Calendar Year 2017, Revision 0

This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR) and the Nevada Test and Training Range (NTTR). This report covers calendar year 2017 and includes visual inspection and repair activities completed at the following CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR) CAU 407: Roller Coaster RadSafe Area (TTR) CAU 424: Area 3 Landfill Complexes (TTR) CAU 453: Area 9 UXO Landfill (TTR) CAU 487: Thunderwell Site (TTR) Visual inspections were conducted according to the post-closure plans in the approved closure reports and subsequent correspondence with the Nevada Division of Environmental Protection. The annual post-closure inspections were conducted on May 23, 2017. No maintenance or repair issues were noted at CAU 400 and CAU 487. Maintenance items and subsequent repairs include the following: CAU 407: A large animal burrow was observed in the southeast corner of the cover during the inspection. Two additional animal burrows were discovered during repair actions. All cover defects were repaired on January 9, 2018. CAU 424: CAS 03-08-002-A304 (Landfill Cell A3-4): A new monument was installed and the subsidence area was repaired on January 9, 2018. CAU 424: CAS 03-08-002-A308 (Landfill Cell A3-8): Lava rock, used to mark the two eastern monument locations, was noted as missing during the inspection. The lava rock was replaced on January 9, 2018. CAU 453: Five large animal burrows, located near the east–central portion of cover, was noted during the inspection. Eight additional animal burrows were discovered during repair actions. All cover defects were repaired on January 9, 2018.

54 ENVIRONMENTAL SCIENCES↗