Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technical issues”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Society of abdominal radiology gastrointestinal bleeding disease-focused panel consensus recommendations for CTA technical parameters in the evaluation of acute overt gastrointestinal bleeding

Purpose: To formulate consensus recommendations for CT angiography technical parameters used to evaluate overt gastrointestinal (GI) bleeding. Methods: An electronic questionnaire consisting of 17 questions was sent to a panel of 16 radiologists with expertise on the imaging of GI bleeding from the Society of Abdominal Radiology GI Bleeding disease-focused panel to obtain consensus agreement on issues related to CTA technical parameters for imaging overt GI bleeding. A multi-round Delphi method of voting was performed to obtain consensus which was defined as ≥ 80% agreement. Results: Consensus agreement was reached in 15/17 (89%) of the questions including the technique for the administration of IV contrast, the number of phases, scan timing, and image reconstruction. Conclusions: A panel of experts on the imaging of GI bleeding from the Society of Abdominal Radiology was able to reach consensus on the majority of technical parameters used for CTA of overt GI bleeding. These recommendations should improve the quality of patient care by adopting these minimal technical requirements for optimal exam performance and lead to less variation in the performance of these exams which will facilitate collecting and comparing published data from different centers. These recommendations will need revisions as additional scientific data become available.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Digital Prototyping Methods to Enable Product Development Analysis Cycle Compression in Aerospace Systems

Historically, the product development life cycle (spanning from origination of a systems concept to initial delivery or fielding) for large-scale aerospace systems is 10-25 years. Examples of recent programs exhibiting this timeline are the Space Shuttle (13 years), , International Space Station (18 years), NASA Hubble telescope (16 years), USAF F-35 Strike Fighter (22 years), Missile Defense Agency THAAD (21 years), USAF V-22 Osprey (26 years), USAF B-2 Spirt (19 years), US Army RAH-66 Comanche (22 years, cancelled prior to fielding), James Webb Space Telescope (25 years), Space Launch System (10 years). This list illustrates the challenges of developing and fielding a modern integrated multi-disciplinary aerospace system. These development timelines are often preceded by significant research and development programs and followed by multiple increments, blocks, or spirals to reach planned operational capability. In the modern era of aerospace system acquisition, there is significant pressure to reduce system development timelines to meet system objectives and enable competitiveness in the current industry and landscape. Across the aerospace industry, a range of rapid acquisition and prototyping programs are seeking to achieve system development within timelines considerably less than 10 years. Notably, in September of 2019, NASA issued a solicitation for the development and demonstration of a Human Landing System (HLS) to deliver humans to the lunar surface by 2024 (5 years) and for the development and demonstration of a more sustainable HLS by 2026 (7 years). Lengthy product development cycle timelines are a product of multiple factors ranging from programmatic, sociological, technical, and systems engineering issues. New approaches in systems engineering provide new ways to enable these compressed development timelines. These approaches employ expanded application of advanced systems engineering methods and cross-cutting digital tools to accelerate system development, utilizing digital prototyping to connect maturing sub-system or component technologies into system or system-of-systems hardware prototypes. Approaches such as the use of system integrating physics relationships to reduce the number of design analysis cycle iterations and state analysis modeling to reduce necessary software testing (and improving coverage of system execution scenarios) represent steps forward in reducing the engineering time needed to field new systems. In addition to cost, schedule and performance benefits, expanded digital exploration and demonstration reduce risk in live system test and demonstration. This incremental demonstration approach, where digital prototyping and demonstration leads and informs full system test and demonstration, could be more important for space applications because of the increased difficulty of test and demonstration of space systems and architectures. The Advanced Concepts Office (ACO) at Marshall Space Flight Center merges traditional multi-disciplinary concept definition methods with modern, cross-cutting systems engineering concepts to enable iterative design and analysis of space architectures and systems through coordinated, strategic management of human capital, technical processes, and technology. This paper provides an overview of that approach, including recent examples and a strategic path forward to enabling continued reduction of aerospace system product development life cycles.

Michael D Watson↗

The Geo Quick Ride (GQR) Program: Providing Inexpensive and Frequent Access to Space

This paper examines piggybacking NASA, university, and industry payloads on commercial geosynchronous satellites. NASA's RSDO Office awarded Geo Quick Ride (GQR) study contracts in 1998 to spacecraft manufactures to examine the issues with flying secondary payloads. The study results were very promising. Commercial communication satellites have frequent flights and significant unused resources that could be used to fly secondary payloads. However, manifesting secondary payloads on a commercial revenue-generating satellite is a complex problem to solve. The solution requires multiple simultaneous approaches in order to be successful. There are business, economic, technical, schedule, and organizational issues to be resolved. This paper examines the Geo Quick Ride (GQR) concept, discusses the development issues, and describes how this concept solves many of these issues.

Caffrey, Robert↗

Verification and Validation of Flight-Critical Systems

For the first time in many years, the NASA budget presented to congress calls for a focused effort on the verification and validation (V&V) of complex systems. This is mostly motivated by the results of the VVFCS (V&V of Flight-Critical Systems) study, which should materialize as a a concrete effort under the Aviation Safety program. This talk will present the results of the study, from requirements coming out of discussions with the FAA and the Joint Planning and Development Office (JPDO) to technical plan addressing the issue, and its proposed current and future V&V research agenda, which will be addressed by NASA Ames, Langley, and Dryden as well as external partners through NASA Research Announcements (NRA) calls. This agenda calls for pushing V&V earlier in the life cycle and take advantage of formal methods to increase safety and reduce cost of V&V. I will present the on-going research work (especially the four main technical areas: Safety Assurance, Distributed Systems, Authority and Autonomy, and Software-Intensive Systems), possible extensions, and how VVFCS plans on grounding the research in realistic examples, including an intended V&V test-bench based on an Integrated Modular Avionics (IMA) architecture and hosted by Dryden.

Brat, Guillaume↗

Bibliography of Lewis Research Center technical contributions announced in 1976

Abstracts of Lewis authored publications and publications resulting from Lewis managed contracts which were announced in the 1976 issues of STAR (Scientific and Technical Aerospace Reports) and IAA (International Aerospace Abstracts) are presented. Research reports, journal articles, conference presentations, patents and patent applications, and these are included. The arrangement is by NASA subject category. Citations indicate report literature (identified by their N-numbers) and the journal and conference presentations (identified by their A-numbers). A grouping of indexes helps locate specific publications by author (including contractor authors), contractor organization, contract number, and report number.

Source record↗

Metallurgical Analysis of the High Flux Isotope Reactor (HFIR) Carrier Lifting Bails (Rev.1)

The dissolution rates of the aluminum alloys in the High Flux Isotope Reactor (HFIR) element carriers and the Material Test Reactor (MTR) L-bundles in the H-Canyon facility have been identified as the possible cause of extended dissolutions that result in significant time and financial expenditures. A study, carried out by Savannah River National Laboratory (SRNL) to determine relationships between the dissolution rates and the metallurgical properties of the aluminum alloy materials of construction of the HFIR carriers and the L-bundles, considered the dissolution rates of aluminum alloy (AA) series 1100, 6061, and 6063. The study determined that the aluminum alloy compositions played a principal role in the dissolution rate of the carrier/bundle components. Higher dissolution rates were correlated with lower concentrations of the minor element additions in the alloys and with specific element concentrations. Aluminum alloys 1100 and 6063 were found to have similar dissolution rates that were approximately two orders of magnitude (100X) greater than those of AA6061. Based on the results of the dissolution behavior study, a Technical Assistance Request (TAR) was first issued to determine if the replacement of AA6061-T6 with AA6063-T6 is feasible for the HFIR carrier lifting bails. A Technical Task Request was then issued to consider AA6063-T5 as well as other alloys to improve possible supply chain issues. The metallurgical properties of the L-bundle (specifically the end caps) were not evaluated in this report because L-Bundle drawings already allow for the use of AA6063-T6 in all structural components. The HFIR carriers are composed of thin-walled components with significant surface areas that allow for relatively quick overall dissolution times. Conversely, the carrier lifting bails and the supporting constituents are composed of solid bars and thick plate regions with relatively small surface areas that experience longer overall dissolution times. While the MTR L-bundle design includes allowances for the materials of construction to be either AA6061-T6 or AA6063-T6, the HFIR carriers are specified to be constructed fully with AA6061-T6 alloy. This report analyzes the recommendations of the dissolution behavior study to replace the materials of construction of the HFIR carrier lifting bails. The analysis considers the operational requirements of the lifting bail and its supporting structures. To decrease dissolution times, the analysis considers direct replacement of the material as well as reductions in the thicknesses of the components to decrease the mass of the elements. Material reductions are considered on options for using either AA6061 and/or AA6063. The calculations are based on specifications from the American Society of Mechanical Engineer (ASME) and The Aluminum Association, Inc. design codes. The analysis finds that direct replacement of the lifting bail material of construction with AA6063-T6, and AA6063-T5 as well as reductions in the dimensions of the lifting bail components are acceptable. Note that this study considers the structural suitability of the alloys. It does not consider their dissolution rates in the dissolvers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Atmospheric Cold Plasma Jet Coating and Surface Treatment for Improved Adhesive Bonding Performance of Dissimilar Material Joints Subject to Harsh Environmental Exposure

The program goal was the development and demonstration of a novel material coating system using an innovative atmospheric cold microwave plasma jet to enable surface functionalization for corrosion protection, wear resistance and improved bonding strength. The technical approach was directed towards proof-of-concept demonstration of advanced point-of-manufacturing material bonding to improve adhesive joint performance subject to harsh environmental exposure. The assembled team, consisting of the researchers at the University of Illinois, end-users at General Motors and small business manufacturer Starfire Industries, successfully demonstrated a single, cost-effective, high-volume production process that meets the requirements of multi-material combinations relevant to the energy-intensive transportation industry (e.g. Al-steel, Mg-steel, Al-Mg and Al-CFRP joints for body-in-white structures) while eliminating offline pretreatment for Al and Mg alloy substrates that are energy intensive, have chemical waste disposal issues, and add cost. Technical demonstration of dissimilar material joining while maintaining bonding strength and cohesion after long-duration environmental exposure was accomplished for all materials of interest. This novel approach has broad applicability for manufacturing in automotive, aerospace, marine, railcar, and specialty consumer goods, etc.

36 MATERIALS SCIENCE↗

ISO New England Dual Fuel Capabilities to Limit Natural Gas and Electricity Interdependencies

Since 2000, natural gas has seen tremendous growth as a fuel source for electricity generation in the United States (U.S.) with annual installations exceeding 20 GW in all but four years. It also accounts for an increasingly significant share of the nation’s electricity generation, growing from around 15 percent in the early part of the 2000s to between 26 and 29 percent in the last three years. (1) Increasing reliance on natural gas has led to concerns that an extreme weather event – which may cause curtailments in gas delivery – or a natural gas infrastructure failure could lead to local or regional electric reliability issues. (2) These concerns stem from differences in delivery methods of natural gas to electric generating units (EGUs) contrasted with the fuel delivery and storage methods for traditional baseload power systems (i.e. coal and nuclear units).1 (3) Although it seems that there is an abundance of natural gas in a post-shale gas world, infrastructure limitations and differences in electric and natural gas markets persist that differentiate natural gas-fired generators from traditional baseload power generators. Such concerns can be partially mitigated by modifying natural gas EGUs for operation on secondary fuels and installing on-site fuel storage for the secondary fuel, thus ensuring continuity of operation in the case of a gas delivery problem.2 This report examines technical, regulatory, and market issues associated with operating power plants primarily fueled with natural gas, on a secondary fuel, such as fuel oil or liquefied natural gas (LNG). In addition, a regional case study was completed to identify the current and near-term potential for dual fuel operation in New England, along with a market impact analysis of potential cost savings during an extreme weather event. The New England Independent System Operator (ISO-NE) was selected as the study area based on a preponderance of natural gas-fired generators contributing to the regional generating capacity mix (nearly 50 percent natural gas), limited natural gas supply infrastructure, and the potential for natural gas delivery disruptions due to cold weather events, exacerbated by the lack of bulk natural gas storage in the region.

03 NATURAL GAS↗

The Future of Low-Carbon Electricity

We review future global demand for electricity and major technologies positioned to supply it with minimal greenhouse gas (GHG) emissions: renewables (wind, solar, water, geothermal, and biomass), nuclear fission, and fossil power with CO2 capture and sequestration. We discuss two breakthrough technologies (space solar power and nuclear fusion) as exciting but uncertain additional options for low-net GHG emissions (i.e., low-carbon) electricity generation. In addition, we discuss grid integration technologies (monitoring and forecasting of transmission and distribution systems, demand-side load management, energy storage, and load balancing with low-carbon fuel substitutes). For each topic, recent historical trends and future prospects are reviewed, along with technical challenges, costs, and other issues as appropriate. Although no technology represents an ideal solution, their strengths can be enhanced by deployment in combination, along with grid integration that forms a critical set of enabling technologies to assure a reliable and robust future low-carbon electricity system.

09 BIOMASS FUELS↗

Final Assessment of Manual Ultrasonic Examinations Applied to Detect Flaws in Primary System Dissimilar Metal Welds at North Anna Power Station

PNNL conducted a technical assessment of the NDE issues and protocols that led to missed detections of several axially oriented flaws in a steam generator primary inlet dissimilar metal weld at North Anna Power Station, Unit 1 (NAPS-1). This particular component design exhibits a significant outside-diameter (OD) taper that is not included as a blind performance demonstration mock-up within the industry’s Performance Demonstration Initiative, administered by EPRI. For this reason, the licensee engaged EPRI to assist in the development of a technical justification to support the basis for a site-specific qualification. The service-induced flaws at NAPS-1 were eventually detected as a result of OD surface machining in preparation for a full structural weld overlay. The machining operation uncovered the existence of two through-wall flaws, based on the observance of primary water leaking from the dissimilar metal weld. A total of five axially oriented flaws were detected in varied locations around the weld circumference. The field volumetric examination that was conducted at NAPS-1 was a non-encoded, real-time manual ultrasonic examination. PNNL conducted both an initial assessment, and subsequently, a more rigorous technical evaluation (reported here), which has identified an array of NDE issues that may have led to the subject missed detections. These evaluations were performed through technical reviews and discussions with NRC staff, EPRI NDE Center personnel, industry and ISI vendor personnel, and ultrasonic transducer manufacturers, and laboratory tests, to better understand the underlying issues at North Anna.

cracks↗

Issues in Formation of Cryogenic Pellets for Fusion Applications

Cryogenic pellets are used for injection into fusion plasmas to add fuel to build up density and replace the ions lost from fusion reactions and imperfect confinement in the plasma. These pellets are formed at cryogenic temperatures with pure hydrogenic isotopes or mixtures of the isotopes. Technology to make these pellets and inject them into plasmas has been under development for many years, and various methods using freezing or desublimation have been shown to produce high-quality solid pellets suitable for injection. The throughput needed and possible impurity content from the necessary recirculation of fusion exhaust gases are two of the key issues to overcome for fusion pellet fueling systems in long-pulse burning plasmas. Here, we describe the technical challenges associated with these issues and the capability of pellet formation extruders to overcome them.Cryogenic pellets of deuterium, neon, and argon are also used in fusion tokamak devices for disruption mitigation in the form of large pellets that can be injected on demand to quickly dissipate the plasma thermal energy through radiation and add significant density in order to prevent runaway electron formation. Here, the issue is not throughput as with the fueling pellets but rather is the time it takes to form pellets of the size needed and the ability to dislodge them immediately on demand when needed to mitigate a disruption. The method used to make these pellets by desublimation is described, and examples related to how pellet size and input gas parameters affect the formation time are provided.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utah FORGE: Optimization of a Plug-and-Perf Stimulation (Fervo Energy)

Information around the plug-and-perf treatment design at Utah FORGE by Fervo Energy. Objective and Purpose: - Develop a multistage hydraulic stimulation approach designed specifically to target the top three factors that control the technical and commercial viability of an EGS system: i) Achieving sufficient injectivity to support high cross-well flow rates ii) Distributing flow evenly across the wellbore and reservoir to maximize heat mining efficiency, ensure sustained heat transfer, and mitigate thermal breakthrough iii) Overcoming the effects of stress heterogeneity, stress shadowing, and variations in natural fracture properties during the stimulation treatment, leading to a more predictable stimulated reservoir volume and offset well placement - The following activities will be performed: i) Design, plan, and execute a multistage plug-and-perf stimulation treatment at a Fervo site with data acquisition and well testing activities aimed at addressing key technical aspects of the issues above ii) Perform data processing and interpretation of field results to translate the results form the Fervo site to a site-specific design at the Utah FORGE site iii) Design, plan, and execute a multistage plug-and-perf stimulation treatment design at the Utah FORGE site Methods and Approach: - Design a detailed data acquisition plan to maximize learning around: i) DFIT testing ii) Petrophysical logging, image logging iii) Permanent DAS/DTS fiber optic monitoring iv) Deep borehole microseismic monitoring v) Shallow borehole induced seismicity monitoring vi) Injection/production testing (RTA analysis, tracer testing) vii) Integrated numerical modeling and production forecasting

15 GEOTHERMAL ENERGY↗

Solar Energy Research Institute for India and the United States (SERIIUS): Lessons and Results from a Binational Consortium

This book describes the development, functioning, and results of a successful binational program to promote significant scientific advances in Earth-abundant photovoltaics (PV) and concentrated solar power (CSP), advanced process/manufacturing technologies, multiscale modeling and reliability testing, and analysis of integrated solar energy systems. SERIIUS is a consortium between India and the United States dedicated to developing new solar technologies and assessing their potential impact in the two countries. The consortium consists of nearly 50 institutions including academia, national laboratories, and industry, with the goal of developing significant new technologies in all areas of solar deployment. In addition, the program focused on workforce development through graduate students, post-doctoral students, and an international exchange program. Particular emphasis was placed on the following efforts: creating disruptive technologies in PV and CSP through high-impact fundamental and applied research and development (R&D); identifying and quantifying the critical technical, economic, and policy issues for solar energy development and deployment in India; overcoming barriers to technology transfer by teaming research institutions and industry in an effective project structure; building a new platform for binational collaboration using a formalized R&D project structure, along with effective management, coordination, and decision processes; creating a sustainable network and workforce development program from which to build large collaborations and fostering a collaborative culture and outreach programs. This includes using existing and new methodologies for collaboration based on advanced electronic and web-based communication to facilitate functional international teams. The book summarizes the general lessons learned from these experiences.

14 SOLAR ENERGY↗

The scientific case for a JET D-T experiment

After the first high power D-T experiment in JET in 1997 (DTE1), when JET was equipped with Carbon PFC's, a proposed second high power (up to ∼40MW) D-T campaign (DTE2) in the current Be/W vessel will address essential operational, technical, diagnostics and scientific issues in support of ITER. These experiments are proposed to minimize the risks to ITER by testing strategies for the management of the in-vessel tritium content, by providing the basis for transferring operational scenarios from non-active operation to D-T mixtures and by addressing the issue of the neutron measurement accuracy. Dedicated campaigns with operation in Deuterium, Hydrogen and Tritium before the D-T campaign proper will allow the investigation of isotope scaling of the H-mode transition, pedestal physics, heat, particle, momentum and impurity transport in much greater detail than was possible in DTE1. The D-T campaign proper will include validations of the baseline ELMy H-Mode scenario, of the hybrid H-mode and advanced tokamak scenarios, as well as the investigation of alpha particle physics and the qualification of ICRH scenarios suitable for D-T operation. This paper reviews the scientific goals of DTE2 together with a summary of the results of DTE1.

07 ISOTOPE AND RADIATION SOURCES↗

A Project Lifetime Approach to the Management of Induced Seismicity Risk at Geologic Carbon Storage Sites

The geologic storage of carbon dioxide (CO 2 ) is one method that can help reduce atmospheric CO 2 by sequestering it into the subsurface. Large-scale deployment of geologic carbon storage, however, may be accompanied by induced seismicity. We present a project lifetime approach to address the induced seismicity risk at these geologic storage sites. This approach encompasses both technical and nontechnical stakeholder issues related to induced seismicity and spans the time period from the initial consideration phase to postclosure. These recommendations are envisioned to serve as general guidelines, setting expectations for operators, regulators, and the public. They contain a set of seven actionable focus areas, the purpose of which are to deal proactively with induced seismicity issues. Although each geologic carbon storage site will be unique and will require a custom approach, these general best practice recommendations can be used as a starting point to any site-specific plan for how to systematically evaluate, communicate about, and mitigate induced seismicity at a particular reservoir.

58 GEOSCIENCES↗

IFT&E Industry Report: Wind Turbine-Radar Interference Test Summary

Wind turbines have grown in size and capacity with today's average turbine having a power capacity of around 1.9 MW, reaching to heights of over 495 feet from ground to blade tip, and operating with speeds at the tip of the blade up to 200 knots. When these machines are installed within the line-of-sight of a radar system, they can cause significant clutter and interference, detrimentally impacting the primary surveillance radar (PSR) performance. The Massachusetts Institute of Technology's Lincoln Laboratory (MIT LL) and Sandia National Laboratories (SNL) were co-funded to conduct field tests and evaluations over two years in order to: I. Characterize the impact of wind turbines on existing Program-of-Record (POR) air surveillance radars; II. Assess near-term technologies proposed by industry that have the potential to mitigate the interference from wind turbines on radar systems; and III. Collect data and increase technical understanding of interference issues to advance development of long-term mitigation strategies. MIT LL and SNL managed the tests and evaluated resulting data from three flight campaigns to test eight mitigation technologies on terminal (short) and long-range (60 nmi and 250 nmi) radar systems. Combined across the three flight campaigns, more than 460 of hours of flight time were logged. This paper summarizes the Interagency Field Test & Evaluation (IFT&E) program and publicly- available results from the tests. It will also discuss the current wind turbine-radar interference evaluation process within the government and a proposed process to deploy mitigation technologies.

Karlson, Benjamin↗