Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “programming systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

NASA university program management information system, FY 1986

The University Program Report provides current information and related statistics for approximately 4300 grants/contracts/cooperative agreements active during the report period. NASA Field centers and certain Headquarters Program Offices provide funds for those R&D activities in universities which contribute to the mission needs of that particular NASA element. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program.

Source record↗

NASA university program management information system, FY 1985

The University Program Report provides current information and related statistics for approximately 4200 grants/contracts/cooperative agreements active during the reporting period. NASA Field Centers and certain Headquarters Program Offices provide funds for those research and development activities in universities which contribute to the mission needs of that particular NASA element. This annual report is one means of documenting the NASA-University relationship, frequently denoted, collectively, as NASA's University Program.

Source record↗

NASA University program management information system, FY 1993

The University Program Report, Fiscal Year 1993, provides current information and related statistics for 7682 grants/contracts/cooperative agreements active during the report period. NASA field centers and certain Headquarters program offices provide funds for those R&D activities in universities which contribute to the mission needs of that particular NASA element. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program.

Source record↗

NASA university program management information system, FY 1994

The University Program report, Fiscal Year 1994, provides current information and related statistics for 7841 grants/contracts/cooperative agreements active during the reporting period. NASA field centers and certain Headquarters program offices provide funds for those activities in universities which contribute to the mission needs of that particular NASA element. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program.

Source record↗

NASA University Program Management Information System: FY 1995

The University Program Report, Fiscal Year 1995, provides current information and related statistics for grants/contracts/cooperative agreements active during the report period. NASA field centers and certain Headquarters program offices provide funds for those R&D activities in universities which contribute to the mission needs of that particular NASA element. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program.

Source record↗

Programming your way out of the past: ISIS and the META Project

The ISIS distributed programming system and the META Project are described. The ISIS programming toolkit is an aid to low-level programming that makes it easy to build fault-tolerant distributed applications that exploit replication and concurrent execution. The META Project is reexamining high-level mechanisms such as the filesystem, shell language, and administration tools in distributed systems.

Birman, Kenneth P.↗

Extreme Heterogeneity 2018 - Productive Computational Science in the Era of Extreme Heterogeneity: Report for DOE ASCR Workshop on Extreme Heterogeneity

The 2018 Basic Research Needs Workshop on Extreme Heterogeneity identified five Priority Research Directions for realizing the capabilities needed to address the challenges posed in this era of rapid technological change. This report captures the outcomes of that workshop. In the context of extreme heterogeneity, it defines basic research needs and opportunities in computer science research to develop smart and trainable operating and runtime systems, programming environments, and predictive tools that will make future systems easier to adapt to scientists’ computing needs and easier for facilities to deploy securely.

97 MATHEMATICS AND COMPUTING↗

An implementation of the distributed programming structural synthesis system (PROSSS)

A method is described for implementing a flexible software system that combines large, complex programs with small, user-supplied, problem-dependent programs and that distributes their execution between a mainframe and a minicomputer. The Programming Structural Synthesis System (PROSSS) was the specific software system considered. The results of such distributed implementation are flexibility of the optimization procedure organization and versatility of the formulation of constraints and design variables.

Rogers, J. L., Jr.↗

Applying the Transactive Systems Business Value Model to IRP

As part of the Transactive Systems Program at Pacific Northwest National Laboratory, a value modeling system was developed to support the evaluation of transactive systems. The technique is general enough to be applied outside transactive systems and to demonstrate this capability, a project was undertaken to use this value modeling technique as a means for modeling the valuation process undertaken by vertically integrated utilities when undergoing integrated resource planning (IRP). IRP is the process by which vertically integrated utilities (those that both serve customers directly as well as manage and run generation assets to do so) regularly go through to demonstrate to their regulators that they have a plan to meet the expected future load of their customers in a least cost and compliant manner. Traditionally this has been primarily an issue of how many and of which types of power plants to build but increasingly has included alternative measures such as demand response programs. Increasingly, environmental regulations play a significant role in both determine what types of power plants can be built under current regulations as well as what retrofits or upgrades need to be made to existing plants to allow them to continue to operate. Two use-case diagrams were constructed, one showing the showing the process by which IRP is carried out and another showing how a vertically integrated utility procures the resources it requires to meet load now and in the future. These diagrams help clarify the difference and provide a high-level outline of the two processes. A class diagram was constructed to clearly define the types of actors that would be considered in this model and the relationships between them. This diagram tacitly indicates which types of actors are and are not included in the model which provides significant guidance in defining the scope of the model. The relationship between the classes/actors provides further indication of what areas of the model have higher levels of detail and by implication bear more significance in modeling the system. Using the classes/actors defined in the class diagram, a business value diagram was constructed that defines the key value streams exchanged between the actors. This diagram provides a clear expression of the business case of the vertically integrated utility and who its counterparties are during the process of meeting load. These value streams have not only to do with meeting the load but doing so in a manner that meets environmental regulations. Increasingly, IRPs have three key metrics to evaluate a given plant to meet load: net present value of revenue required, emissions, and renewable energy credits. From this business value diagram, more detailed activity diagrams were formed that focus on a few of the key value stream exchanges, showing the process by which each party accrues value. These diagrams provide insight into the timing and sequence of the interactions in a way that the business value diagrams did not. The transactive value model was found to be highly compatible with IRP and provided a clear, simple model of the analysis done during IRP and key metrics driving IRP decisions. In particular it highlighted a few key items that may or may not have been as clear prior to the development of the model. Specifically, the role of the environmental regulations has become increasingly important and two of the three key metrics by which IRPs are typically evaluated are environmentally focused. Additionally, though generally not acknowledged, the role of the investor was included in this model as they are an essential source of capital in building new power plants and cannot be ignored when defining the business case of the vertically integrated utility.

24 POWER TRANSMISSION AND DISTRIBUTION↗

PLSS 2.5 Fan Design and Development

NASA is building a high fidelity prototype of an advanced portable life support system (PLSS) as part of the Advanced Exploration Systems Program. This new PLSS, designated as PLSS 2.5, will advance component technologies and systems knowledge in order to inform a future flight program. The oxygen ventilation loop of its predecessor, PLSS 2.0, is driven by a centrifugal fan developed using specifications from over five years ago. PLSS technology and system parameters have matured to the point where the existing fan will not perform adequately for the new prototype. In addition, areas of potential improvement have been identified with the existing fan that could be addressed in a new design. As a result, a new fan was designed and tested for the PLSS 2.5. The PLSS 2.5 fan is a derivative of the one used in PLSS 2.0. It uses the same basic non-metallic can around the motor, but with a larger volute and impeller to meet the higher pressure drop requirements of the PLSS 2.5 loop. This allows it to operate at rotational speeds that are matched to rolling element bearings, and which create reasonably low impeller tip speeds. Development of the fan also considered a shrouded impeller design that allows larger clearances for greater oxygen safety and better performance.

Converse, David↗

Consolidation and Centralization of Waste Operations Business Systems - 12319

This abstract provides a comprehensive plan supporting the continued development and integration of all waste operations and waste management business systems. These include existing systems such as ATMS (Automated Transportation Management System), RadCalc, RFITS (Radio Frequency Identification Transportation System) Programs as well as incorporating key components of existing government developed waste management systems and COTS (Computer Off The Shelf) applications in order to deliver a truly integrated waste tracking and management business system. Some of these existing systems to be integrated include IWTS at Idaho National Lab, WIMS at Sandia National Lab and others. The aggregation of data and consolidation into a single comprehensive business system delivers best practices in lifecycle waste management processes to be delivered across the Department of Energy facilities. This concept exists to reduce operational costs to the federal government by combining key business systems into a centralized enterprise application following the methodology that as contractors change, the tools they use to manage DOE's assets do not. IWITS is one efficient representation of a sound architecture currently supporting multiple DOE sites from a waste management solution. The integration of ATMS, RadCalc and RFITS and the concept like IWITS into a single solution for DOE contractors will result in significant savings and increased efficiencies for DOE. Building continuity and solving collective problems can only be achieved through mass collaboration, resulting in an online community that DOE contractors and subcontractors access common applications, allowing for the collection of business intelligence at an unprecedented level. This is a fundamental shift from a solely 'for profit' business model to a 'for purpose' business model. To the conventional-minded, putting values before profit is an unfamiliar and unnatural way for a contractor to operate - unless however; your objective is to build a strong, strategic alliance across the enterprise in order to execute an unprecedented change in waste management, transportation and logistical operations. The success of such an initiative can be achieved by creating a responsible framework by enabling key individuals to 'own' the sustainability of the program. This includes the strategic collaboration of responsible revolutionaries covering application developers, information owners and federal stakeholders to ensure compliance, security and risk management are 'baked' into the process and sustainability is fostered through continued innovation by both technology and application functionality. This ensures that working software can adapt to changing circumstances and is the principle measure of the success of the program. The consolidation of waste management business systems must be achieved in order to realize efficiencies in information technology portfolio management, data integrity, business intelligence and the lifecycle management of hazardous materials within the DOE enterprise architecture. By identifying best practices across the enterprise and aggregating computational and application development resources, you can provide a unified, holistic solution serviceable from a single location while being accessed from anywhere. The business impact of integrating and delivering a unified solution would reduce costs to the Department of Energy within the first year of deployment with increased savings annually. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Management Information System Model for Program Management

The development of a model to simulate the information system of a program management type of organization is reported. The model statistically determines the following parameters: type of messages, destinations, delivery durations, type processing, processing durations, communication channels, outgoing messages, and priorites. The total management information system of the program management organization is considered, including formal and informal information flows and both facilities and equipment. The model is written in General Purpose System Simulation 2 computer programming language for use on the Univac 1108, Executive 8 computer. The model is simulated on a daily basis and collects queue and resource utilization statistics for each decision point. The statistics are then used by management to evaluate proposed resource allocations, to evaluate proposed changes to the system, and to identify potential problem areas. The model employs both empirical and theoretical distributions which are adjusted to simulate the information flow being studied.

Shipman, D. L.↗

Design and development of a passive propellant management system

This paper describes the passive propellant management system program being conducted for the NASA-Marshall Space Flight Center. The objectives of this program are to design and develop a hydrazine propellant acquisition system which will acquire propellant in low- or zero-g environments and also retain this propellant under high axially directed accelerations that may be experienced during launch and orbit-to-orbit transfer. The system design requirements were established to satisfy requirements for a large number of potential NASA and military applications, such as orbit-to-orbit shuttles and satellite vehicles. The resulting concept is a multicompartmented tank with independent surface-tension acquisition channels in each compartment. The tank is designed to provide greater than 98% expulsion efficiency when subjected to the simultaneous requirements of acceleration, vibration, and outflow usage. The system design has the unique capability to demonstrate low-g performance in a one-g test environment, and the test program has been structured around this capability.

Regnier, W. W.↗

Systems analysis - Key to NASA's data system planning

Critical steps in the systems analysis process for NASA's data system planning are: (1) compilation of future user/mission requirements, (2) development of alternative overall data system concepts which satisfy requirements, (3) assessment of future development and availability of data system technology, and (4) cost/performance tradeoff studies of the alternative concepts for systems optimization. Tasks within the NEEDS (NASA End-to-End Data System) Program, which correspond to the critical steps in this systems analysis process are examined.

Nelson, R. W.↗

A xenon ion propulsion module for enhanced spacecraft capability

Design, development and preliminary testing of a two-engine xenon ion propulsion module for early flight evaluation is described. Extensive use is made of flight spare propellant system components and also engineering model 30-cm ion engines and assemblies originally developed for the Solar Electric Propulsion System program. Significant design features include a redundant propellant feed system that incorporates a novel gas pulse assembly for rapid and completely reliable engine startup, a central neutralizer subsystem with dual neutralizers for redundancy, and major ion engine performance improvements resulting in a nearly doubling of the 30-cm engine thrust in addition to operating on xenon rather than mercury propellant. At a module input power of 10.0 kw, maximum thrust and specific impulse are projected to be 0.4 N and 3,500 sec. respectively, for a total module efficiency of 67 percent. Total mass of the xenon ion module, including the propellant tank, is only 70.2 kg. The technical approaches taken towards developing and integrating the subsystems comprising this ion propulsion module are presented and discussed in detail.

Aston, G.↗

Acquisition-Management Program

NASA Acquisition Management Subsystem (AMS) program integrated NASA-wide standard automated-procurement-system program developed in 1985. Designed to provide each NASA installation with procurement data-base concept with on-line terminals for managing, tracking, reporting, and controlling contractual actions and associated procurement data. Subsystem provides control, status, and reporting for various procurement areas. Purpose of standardization is to decrease costs of procurement and operation of automatic data processing; increases procurement productivity; furnishes accurate, on-line management information and improves customer support. Written in the ADABAS NATURAL.

Avery, Don E.↗

NASA/FAA North Texas Research Station Overview

NTX Research Staion: NASA research assets embedded in an interesting operational air transport environment. Seven personnel (2 civil servants, 5 contractors). ARTCC, TRACON, Towers, 3 air carrier AOCs(American, Eagle and Southwest), and 2 major airports all within 12 miles. Supports NASA Airspace Systems Program with research products at all levels (fundamental to system level). NTX Laboratory: 5000 sq ft purpose-built, dedicated, air traffic management research facility. Established data links to ARTCC, TRACON, Towers, air carriers, airport and NASA facilities. Re-configurable computer labs, dedicated radio tower, state-of-the-art equipment.

Borchers, Paul F.↗

Core Modeling & Decision Support Capabilities: FASTSim, RouteE, T3CO & OpenPATH

These are the slides on NREL's Core Modeling and Decision Support Capabilities project for presentation at the 2023 Annual Merit Review for the U.S. Department of Energy, Vehicle Technologies Office. The project is funded by the Energy-Efficient Mobility Systems program to support four core tools: the Future Automotive Systems Technology Simulator (FASTSim), the Route Energy Prediction Model (RouteE), the Transportation Technology Total Cost of Ownership (T3CO) tool, and the Open Platform for Agile Trip Heuristics (OpenPATH).

ADVANCED PROPULSION SYSTEMS↗