Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “particle design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Implications of the GSFC Q3 model for trapped particle motion

The Uranus magnetic field model of Connerney et al. (1987), designated GSFC Q3, is used to compute field geometric invariant parameters that determine the adiabatic motion of energetic charged particles trapped in the Uranian magnetosphere, performing computations only for points located along the Voyager 2 flyby trajectory. The L-shell values computed along the Voyager-2 trajectory were compared with L shell values corresponding to the orbital positions for the Uranian satellites Ariel, Umbriel, Miranda, and Titania for a time period centered on the time of the Voyager 2 closest approach to the planet. Bimodal distributions of L minima asociated with the orbital motion of the moons are obtained, thus complicating the model predictions and correlations with charged particle data. The location of charged particle absorption signatures associated with the sweeping effects of the Uranian satellites is reasonably predicted, but significant discrepancies remain which cannot be explained by Q3 model uncertainties.

Acuna, M. H.↗

Proof of principal for staircase auger chip removal theory

A proof of principal design of the staircase auger theory is provided for lunar drilling. The drill is designed to drill holes 30 meters deep and 0.1 meters in diameter. The action of the auger is 0.01 meter strokes at a varying number of strokes per second. A detailed analysis of the interaction of the auger and particle was done to optimize the parameters of the auger. This optimum design will allow for proper heat removal and reasonable drilling time. The drill bit is designed to scoop the particles into the auger while efficiently cutting through the moon's surface.

Barron, Jeffrey B.↗

Auroral X-ray detection from rocket overflights

Remote sensing of auroral X-rays from the topside can provide both local and global information concerning X-ray and energetic particle deposition within the middle atmosphere. Usually, contamination of X-ray detectors by corpuscular radiation can severely affect the scope and accuracy of the measurement. Preliminary results obtained with a rocket-borne instrument designed to operate cleanly in a precipitating particle environment are reported. Two dimensional images of the atmospheric bremsstrahlung X-ray sources were also constructed from the detector scan produced by payload translation and coning.

Goldberg, A.↗

Design of biomass management systems and components for closed loop life support systems

The design of a biomass management system (BMS) for use in a closed loop support system is presented by University of Florida students as the culmination of two design courses. The report is divided into two appendixes, each presenting the results of one of the design courses. The first appendix discusses the preliminary design of the biomass management system and is subdivided into five subsystems: (1) planting and harvesting, (2) food management, (3) resource recovery, (4) refurbishing, and (5) transport. Each subsystem is investigated for possible solutions to problems, and recommendations and conclusions for an integrated BMS are discussed. The second appendix discusses the specific design of components for the BMS and is divided into three sections: (1) a sectored plant growth unit with support systems, (2) a container and receiving mechanism, and (3) an air curtain system for fugitive particle control. In this section components are designed, fabricated, and tested.

Nevill, Gale E., Jr.↗

Plume Particle Collection and Sizing from Static Firing of Solid Rocket Motors

Thermal radiation from the plume of any solid rocket motor, containing aluminum as one of the propellant ingredients, is mainly from the microscopic, hot aluminum oxide particles in the plume. The plume radiation to the base components of the flight vehicle is primarily determined by the plume flowfield properties, the size distribution of the plume particles, and their optical properties. The optimum design of a vehicle base thermal protection system is dependent on the ability to accurately predict this intense thermal radiation using validated theoretical models. This article describes a successful effort to collect reasonably clean plume particle samples from the static firing of the flight simulation motor (FSM-4) on March 10, 1994 at the T-24 test bed at the Thiokol space operations facility as well as three 18.3% scaled MNASA motors tested at NASA/MSFC. Prior attempts to collect plume particles from the full-scale motor firings have been unsuccessful due to the extremely hostile thermal and acoustic environment in the vicinity of the motor nozzle.

Sambamurthi, Jay K.↗

Griffin: A MOOSE-based reactor physics application for multiphysics simulation of advanced nuclear reactors

Griffin is a Multiphysics Object-Oriented Simulation Environment (MOOSE) based reactor physics application for multiphysics simulations of advanced reactor designs jointly developed by Idaho National Laboratory and Argonne National Laboratory. This paper summarizes the motivation, significance, architecture, design, and features of Griffin. Griffin offers flexible and extensible features to address the challenges associated with advanced reactor designs. These features range from fundamental particle transport to specific reactor physics tasks. The features cover a wide range including on-the-fly and traditional two-step cross-section generation methods, steady-state and transient transport solvers suitable for both heterogeneous and homogeneous models, high-fidelity depletion where thousands of isotopes can be tracked and low-fidelity depletion characterized by burnup, etc. The most fundamental aspect that sets Griffin apart from other reactor analysis codes is that it is developed based on the MOOSE framework. A modular development approach is strongly enforced, with multiphysics being an essential element considered since the beginning of Griffin’s development. Griffin links various MOOSE physics modules and couples to other MOOSE-based applications and non-MOOSE-based applications for multiphyiscs simulations. Griffin includes three modules: ISOXML for preparing and managing multigroup cross sections, radiation transport for solving the neutron transport equation, and reactor analysis for user-oriented reactor physics analysis functionalities. Griffin uses various finite element methods for spatial discretization, multigroup approximation for energy discretization and discrete ordinates method, spherical harmonics expansion method, and diffusion approximation for streaming direction discretization to solve the neutron transport equation. Griffin’s flexibility is evidenced through Griffin’s various applications to fast reactor, high-temperature reactor, pebble bed reactor, molten salt reactor, and microreactor designs. Griffin development follows the software quality assurance procedure for MOOSE-based applications and with software requirements consistent with the ASME NQA-1 standard. Griffin has been adopted into the reactor analysis system for the U.S. NRC and is in use at U.S. companies, universities and national laboratories.

97 MATHEMATICS AND COMPUTING↗

Charge per Micro-Pulse Calculation for Ideal Lujan and WNR beams

A complete redesign of the LANSCE front-end is currently under development for the Los Alamos Modernization Project (LAMP). This includes the replacement of the traditional Cockroft-Walton injection system to the newer radiofrequency quadrupole (RFQ) standard. LANSCE accelerates both H- and H+ beams and therefore requires an unconventional application for RFQ systems. A new facility could consider using an independent RFQ for each beam species. However, with the tight space of the LANSCE injector facility, it would prove difficult to instrument. Our initial studies have shown that a single RFQ could be used. The negatively- and positively-charged direct current (DC) beams are shaped, bunched, and accelerated out of phase to each other, with very little interaction. This would work for all possible H+ beam gates and most H- Beam gates. However, a challenge arises with the Weapons Neutron Research (WNR) beam structure that requires the acceleration of bunched beams at higher charge density per pulse. The Long Bunch Enable Gate (LBEG) used for the Lujan center is the best example of a standard injector beam gate. The beam gate, or Macro-Pulse (MP), is 625-us long, separated by at least 8.3 ms. A chopper is used to dice the MP into 1750 mini-Pulses (mP), which are 290-ns wide. After chopping, the MP contains 100,000 micro-Pulses (uP), which are generated by the linac acceleration structure modulated at 201.25 MHz; that is, the micro-Pulses are separated 5 ns apart from each other. The H+ beam structure will be very similar once a chopper is added to its transport. However, the Multi-Pulse Enable Gate (MPEG) used for WNR is significantly different in structure. In this case, the mP is chopped to be only 35-ns wide. This width is then rotated into a single 201.25 MHz RF bucket using the Low Frequency Buncher (LFB). This is proving difficult for the RFQ design in the LAMP upgrade. We began investigating the amount of current sent to WNR for two reasons. Firstly, we wanted to find a solution to avoid using the Low Frequency Buncher to simplify the LAMP RFQ design. It is simple to inject and accelerate a 35 mA DC beam in the LAMP RFQ (this is done in numerous accelerator facilities). However, injecting a short bunch with a larger current (once compressed to 5 ns to meet the RFQ frequency) may be difficult. Second, we have a technique called PSR2WNR in which we do not employ the Low Frequency Buncher, but rather accumulate 5 LBEG uP (5 ns) in the PSR and deliver the accumulated beam to WNR every 1.8 us. As a result, we could provide to WNR with five accumulated LBEG uPs every shot. The goal here is to create a rapid kicker with a frequency response of 555 kHz. DARHT-II and other accelerator facilities have constructed kickers of this type for other uses, and our engineers consider this technology as feasible.

43 PARTICLE ACCELERATORS↗

LEBT Buncher / Feed Forward / Frequency Generation: System Design Document (SDD)

The LAMP Low Energy Beam Transport (LEBT) transfers a continuous beam at 100 keV from the ion source to RFQ in LEBT. A LEBT buncher imposes an energy tilt to initiate velocy bunching in the chopped beam pulse about 25 ns long to form a short MPEG bunch. One possible option for the LEBT buncher based on a two-gap LC-circuit driven structure was considered, which is similar to the existing LANSCE low-frequncy buncher (LFB). Another possible option is a non-resonant element driven by a pulse-forming-network that provides a single pulse at the repetition frequency of MPEG beam, with a period of 1.8 µs. The LEBT operation is synchronized with the accelerator timing system.

43 PARTICLE ACCELERATORS↗

LAMP Technical Readiness Evaluation Report (Rev. 1)

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed. Corresponding Technical Readiness Levels (TRLs) were also determined for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Only two subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

Two-Piece Screens for Decontaminating Granular Material

Two-piece screens have been designed specifically for use in filtering a granular material to remove contaminant particles that are significantly wider or longer than are the desired granules. In the original application for which the twopiece screens were conceived, the granular material is ammonium perchlorate and the contaminant particles tend to be wires and other relatively long, rigid strands. The basic design of the twopiece screens can be adapted to other granular materials and contaminants by modifying critical dimensions to accommodate different grain and contaminant- particle sizes. A two-piece screen of this type consists mainly of (1) a top flat plate perforated with circular holes arranged in a hexagonal pattern and (2) a bottom plate that is also perforated with circular holes (but not in a pure hexagonal pattern) and is folded into an accordion structure. Fabrication of the bottom plate begins with drilling circular holes into a flat plate in a hexagonal pattern that is interrupted, at regular intervals, by parallel gaps. The plate is then folded into the accordion structure along the gaps. Because the folds are along the gaps, there are no holes at the peaks and valleys of the accordion screen. The top flat plate and the bottom accordion plate are secured within a metal frame. The resulting two-piece screen is placed at the bottom opening of a feed hopper containing the granular material to be filtered. Tests have shown that such long, rigid contaminant strands as wires readily can pass through a filter consisting of the flat screen alone and that the addition of the accordion screen below the flat screen greatly increases the effectiveness of removal of wires and other contaminant strands. Part of the reason for increased effectiveness is in the presentation of the contaminant to the filter surface. Testing has shown that wire type contamination will readily align itself parallel to the material direction flow. Since this direction of flow is nearly always perpendicular to the filter surface holes, the contamination is automatically aligned to pass through. The two-filter configuration reduces the likelihood that a given contaminant strand will be aligned with the flow of material by eliminating the perpendicular presentation angle. Thus, for wires of a certain diameter, a two-piece screen is 20 percent more effective than is the corresponding flat perforated plate alone, even if the holes in the flat plate are narrower. An accordion screen alone is similarly effective in catching contaminants, but lumps of agglomerated granules of the desired material often collect in the valleys and clog the screen. The addition of a flat screen above the accordion screen prevents clogging of the accordion screen. Flat wire screens have often been used to remove contaminants from granular materials, and are about as effective as are the corresponding perforated flat plates used alone.

Backes, Douglas↗

MEBT Chopper System: System Design Document (SDD)

The Medium Energy Beam Transport (MEBT) chopper removes unwanted beam bunches by deflecting them to a target from a bunched beam transported through the MEBT from RFQ to the Drift-Tube Linac (DTL) entrance. The unchopped bunches propagate through the MEBT to DTL, while the deflected bunches are deposited on a target downstream of chopper. The chopper system consists of a deflecting structure, where the beam-deflecting fields are created, and a pulse generator (pulser) that feeds this structure with voltage pulses having the required time pattern. Ideally, the system should turn deflection on and off in the time interval between the bunches to prevent partially chopped / deflected bunches. This usually requires traveling slow-wave chopper structures where the field propagates with the same velocity as the beam, as illustrated in Fig. 1.

43 PARTICLE ACCELERATORS↗

LAMP Technical Readiness Evaluation Report

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risk to the project. These recent design modifications include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (ie choppers, kickers, and bunchers). • An additional H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional RFQ design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project KPPs. • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Three subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

LEBT Chopper System: System Design Document (SDD)

The Low Energy Beam Transport (LEBT) chopper creates a required beam time structure by chopping out (removing by deflecting from the beam path) unwanted parts of a continuous beam transported from the ion source to RFQ in LEBT. The unchopped parts of the beam propagate through the LEBT, while the deflected parts are deposited on an absorbing target. The chopper system in general consists of a deflecting structure, where the beam-deflecting fields are created, and a pulse generator that feeds this structure with voltage pulses having the required time pattern. The system should turn deflection on and off within a short time interval, because the beam parts within the pulse front and end will be only partially deflected and will form unwanted tails of the beam pulse downstream. This can be achieved with traveling slow-wave chopper structures where the field propagates with the same velocity as the beam, as illustrated in Fig. 1.

43 PARTICLE ACCELERATORS↗

LAMP DTL Scoping Studies (Technical Report)

The present studies are based on the preliminary design efforts, and on the Scoping Studies of the “Strawman” design of LAMP front-end upgrade, referred in the text below to as “Feb.2024 Iteration”, presented in. The main accomplishment of present studies was substantial increase of the fidelity of the beam dynamics simulations in the proposed drift tube linac (DTL). The main accent was on development of the methodology for calculation of the longitudinal (synchrotron) and transverse (betatron) oscillations frequencies (phase advance per focusing period) values and providing the accelerating structure focusing lattice that has safe parameters of such oscillations to avoid unwanted emittance growth and possible beam halo formation. The resulting values of the oscillations phase advances are presented in Table 1, and in Figure 5 in the main body of the report. Special efforts were made to achieve the RF power consumption within limits of the existing RF power system and make sure that DTL fits in the existing tunnel. The LAMP scope does not suggest any additional building and/or tunnel construction. Table 1 summarizes some of these results, as well as Table 3 in the main body of the report.

43 PARTICLE ACCELERATORS↗

Thermal Analysis of a Solid Particle Light-Trapping Planar Cavity Receiver Using Computational Fluid Dynamics

Concentrated solar power (CSP) is one of the most effective ways of harnessing solar power to create efficient, durable, and resilient energy systems. This study entails thermal modeling and analysis of a novel central tower receiver configuration. This receiver uses solid particles as the heat transfer fluid (HTF), a promising option for third-generation CSP systems. The configuration considered here is the light-trapping planar cavity receiver (LTPCR) introduced by the National Renewable Energy Laboratory. While heat transfer studies of various LTPCR subsystems have been done, system-level thermal analysis of the LTPCR receiver has not been attempted. This study also presents important sensitivity analyses of the operating parameters of the CSP system, which can help guide the design of future central tower receivers. This study employs Ansys Fluent as a computational fluid dynamics (CFD) tool to model fluid dynamics and heat transfer in the receiver, intending to quantify its thermal performance. The model seamlessly integrates Monte Carlo ray tracing data, which generates absorbed solar flux profiles from the heliostat field design, with the heat transfer characteristics of the fluidized particle bed. This unified model is designed to accurately predict the thermal behavior of the LTPCR. Analysis of preliminary results reveals that the primary loss mechanisms are radiative and natural convective losses, in that order. Based on observations from a baseline case, several strategies are suggested and numerically tested. These solutions include selective cooling of high-temperature regions and manipulation of particle bed parameters. Selective cooling of high-temperature regions reduced the peak temperature by 151 degrees C and decreased thermal losses by 0.9%. Improving the particle-wall heat transfer coefficient (P-W HTC) of the particle bed decreased the thermal losses by 1.7% and decreased the peak temperatures by 57 degrees C. Decreasing the particle inlet temperature (PIT) also reduced thermal losses by 3.5% and decreased peak temperatures by 29 degrees C. Compounding these strategies improved the thermal losses of the receiver from 13.5% in the baseline case to 7.5%. Additionally, the study explores the variation in thermal performance across different locations of the receiver, where a variation of thermal losses from 12.9% to 17.3% is found. This allows a comprehensive evaluation of potential improvements in efficiency and temperature management.

computational fluid dynamics↗

Microgravity Particle Dynamics

This research seeks to identify the experiment design parameters for future flight experiments to better resolve the effects of thermal and velocity gradients on gas-solid flows. By exploiting the reduced body forces and minimized thermal convection current of reduced gravity experiments, features of gas-solid flow normally masked by gravitationally induced effects can be studied using flow regimes unattainable under unigravity. This paper assesses the physical scales of velocity, length, time, thermal gradient magnitude, and velocity gradient magnitude likely to be involved in laminar gas-solid multiphase flight experiments for 1-100 micro-m particles.

Clark, Ivan O.↗

ORBUMP Pulsed Dipole Magnet Design for Fermilab Booster

Fermilab initiated the accelerator magnet system upgrade project PIP-II for future neutrino experiments. Old ORBUMP pulsed dipoles should be replaced with new stronger magnets occupying the same space as old ones. Four of these magnets connected in series form dogleg type of proton beam orbit. The magnet field and 19 kA current pulse length are close to 1 ms. Old magnet cores were based on a ferrite material. For new magnets, a magnet gap field is above 0.4 T, which completely saturates ferrite material. So, for the magnet core, 0.127 mm thick laminations of low carbon steel with inorganic coating, as the magnet were placed in a vacuum box. There were investigated transient magnet parameters including skin effect in the iron core and in the single-turn copper coil. The integrated field homogeneity was improved by the copper coil shimming. Simulated by OPERA3D power losses were used for the thermal analysis by ANSYS code. The magnet performance is strongly coupled with the power source. The dynamic magnet inductance and resistance were included in the pulsed power source design. Finally, the paper presented the ORBUMP magnet system design.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Design, construction and commissioning of a technological prototype of a highly granular SiPM-on-tile scintillator-steel hadronic calorimeter

The CALICE collaboration is developing highly granular electromagnetic and hadronic calorimeters for detectors at future energy frontier electron-positron colliders. After successful tests of a physics prototype, a technological prototype of the Analog Hadron Calorimeter has been built, based on a design and construction techniques scalable to a collider detector. The prototype consists of a steel absorber structure and active layers of small scintillator tiles that are individually read out by directly coupled SiPMs. Each layer has an active area of 72 × 72 cm^2 and a tile size of 3 × 3 cm^2. With 38 active layers, the prototype has nearly 22,000 readout channels, and its total thickness amounts to 4.4 nuclear interaction lengths. The dedicated readout electronics provide time stamping of each hit with an expected resolution of about 1 ns. The prototype was constructed in 2017 and commissioned in beam tests at DESY. It recorded muons, hadron showers and electron showers at different energies in test beams at CERN in 2018. In this paper, the design of the prototype, its construction and commissioning are described. The methods used to calibrate the detector are detailed, and the performance achieved in terms of uniformity and stability is presented.

47 OTHER INSTRUMENTATION↗