Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operational”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Groundwater remediation at the Fernald preserve, Cincinnati, Ohio modeling and resulting 2014 well field operational changes - 15324

The Fernald Preserve became a US DOE Office of Legacy Management site in November 2006, for long-term surveillance and maintenance following completion (with the exception of completing groundwater cleanup) of the Comprehensive Environmental Response, Compensation, and Liability Act; environmental remediation; and site restoration. When the site was turned over to the Office of Legacy Management, approximately 76 hectares (189 acres) of the Great Miami Aquifer (GMA) remained contaminated with uranium above the final remediation level of 30 micrograms per liter. Uranium contamination is being removed from groundwater in the GMA through a pump-and-treat operation that is predicted by groundwater modeling to continue until 2033. Certifying that cleanup objectives have been met and removing the remediation infrastructure after pump-and-treat (P and T) operations are complete will require a minimum of 3 additional years. The current P and T remedy has operated well. From August 1993 through December 2013 the remedy has been used to remove 5,345 kg (11,784 lb) of uranium from the GMA. A variety of metrics are used to track how the P and T operation is progressing and are reported each year in the Site Environmental Report for the Fernald site. The metrics show that the effectiveness of uranium removal is slowly decreasing (a common observation for P and T remedies) and that operational changes needed to be considered. Several different operational changes were modeled to determine if model-predicted cleanup dates could be shortened and if the effectiveness of the groundwater remediation could be improved. With the concurrence and support of US EPA, Ohio EPA, and site stakeholders, operational changes were agreed upon and implemented in 2014 that are predicted to increase the effectiveness of the ongoing operation and shorten cleanup times for a portion of the aquifer. Although the overall predicted length of the remediation was not shortened, modeling predicts that key areas of the uranium plume will be re-mediated sooner. This paper provides a status of the groundwater remediation under way at the Fernald Preserve near Cincinnati, presents the operational changes that were implemented in 2014, and summarizes the groundwater modeling that supported the changes. This paper also illustrates the potential benefits that can be gained by pro-actively managing a pump-and-treat operation and looking for innovative ways to adjust the operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analytical solutions for quantum walks on 1D chain with different shift operators

In this paper, we study the discrete-time quantum walks on 1D Chain with the moving and swapping shift operators. We derive analytical solutions for the eigenvalues and eigenstates of the evolution operator U{sup -hat} using the Chebyshev polynomial technique, and calculate the long-time averaged probabilities for the two different shift operators respectively. It is found that the probability distributions for the moving and swapping shift operators display completely different characteristics. For the moving shift operator, the probability distribution exhibits high symmetry where the probabilities at mirror positions are equal. The probabilities are inversely proportional to the system size N and approach to zero as N→∞. On the contrary, for the swapping shift operator, the probability distribution is not symmetric, the probability distribution approaches to a power-law stationary distribution as N→∞ under certain coin parameter condition. We show that such power-law stationary distribution is determined by the eigenstates of the eigenvalues ±1 and calculate the intrinsic probability for different starting positions. Our findings suggest that the eigenstates corresponding to eigenvalues ±1 play an important role for the swapping shift operator. - Highlights: • QWs on 1D chain with the moving and swapping operators are studied for the first time. • We derive analytical results for the probability distribution for the two operators. •We compare the dynamics of QWs with two different shift operators. • We find the particular eigenvalues ±1 play an important role for the dynamics. • We use the Chebyshev technique to treat the problem.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Economic optimization of operations for hybrid energy systems under variable markets

We prosed a hybrid energy systems (HES) which is an important element to enable increasing penetration of clean energy. Our paper investigates the operations flexibility of HES, and develops a methodology for operations optimization for maximizing economic value based on predicted renewable generation and market information. A multi-environment computational platform for performing such operations optimization is also developed. In order to compensate for prediction error, a control strategy is accordingly designed to operate a standby energy storage element (ESE) to avoid energy imbalance within HES. The proposed operations optimizer allows systematic control of energy conversion for maximal economic value. Simulation results of two specific HES configurations are included to illustrate the proposed methodology and computational capability. These results demonstrate the economic viability of HES under proposed operations optimizer, suggesting the diversion of energy for alternative energy output while participating in the ancillary service market. Economic advantages of such operations optimizer and associated flexible operations are illustrated by comparing the economic performance of flexible operations against that of constant operations. Sensitivity analysis with respect to market variability and prediction error, are also performed.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Residual-based error correction for neural operator accelerated infinite-dimensional Bayesian inverse problems

We explore using neural operators, or neural network representations of nonlinear maps between function spaces, to accelerate infinite-dimensional Bayesian inverse problems (BIPs) with models governed by nonlinear parametric partial differential equations (PDEs). Neural operators have gained significant attention in recent years for their ability to approximate the parameter-to-solution maps defined by PDEs using as training data solutions of PDEs at a limited number of parameter samples. The computational cost of BIPs can be drastically reduced if the large number of PDE solves required for posterior characterization are replaced with evaluations of trained neural operators. However, reducing error in the resulting BIP solutions via reducing the approximation error of the neural operators in training can be challenging and unreliable. We provide an a priori error bound result that implies certain BIPs can be ill-conditioned to the approximation error of neural operators, thus leading to inaccessible accuracy requirements in training. To reliably deploy neural operators in BIPs, we consider a strategy for enhancing the performance of neural operators: correcting the prediction of a trained neural operator by solving a linear variational problem based on the PDE residual. We show that a trained neural operator with error correction can achieve a quadratic reduction of its approximation error, all while retaining substantial computational speedups of posterior sampling when models are governed by highly nonlinear PDEs. The strategy is applied to two numerical examples of BIPs based on a nonlinear reaction–diffusion problem and deformation of hyperelastic materials. We demonstrate that posterior representations of the two BIPs produced using trained neural operators are greatly and consistently enhanced by error correction.

97 MATHEMATICS AND COMPUTING↗

The Effects of Degraded Digital Instrumentation and Control Systems on Human-system Interfaces and Operator Performance: HFE Review Guidance and Technical Basis

New and advanced reactors will use integrated digital instrumentation and control (I&C) systems to support operators in their monitoring and control functions. Even though digital systems are typically highly reliable, their potential for degradation or failure could significantly affect operator performance and, consequently, impact plant safety. The U.S. Nuclear Regulatory Commission (NRC) supported this research project to investigate the effects of degraded I&C systems on human performance and plant operations. The objective was to develop human factors engineering (HFE) review guidance addressing the detection and management of degraded digital I&C conditions by plant operators. We reviewed pertinent standards and guidelines, empirical studies, and plant operating experience. In addition, we conducted an evaluation of the potential effects of selected failure modes of the digital feedwater system on human-system interfaces (HSIs) and operator performance. The results indicated that I&C degradations are prevalent in plants employing digital systems and the overall effects on plant behavior can be significant, such as causing a reactor trip or causing equipment to operate unexpectedly. I&C degradations can impact the HSIs used by operators to monitor and control the plant. For example, sensor degradations can make displays difficult to interpret and can sometimes mislead operators by making it appear that a process disturbance has occurred. We used the information obtained as the technical basis upon which to develop HFE review guidance. The guidance addresses the treatment of degraded I&C conditions as part of the design process and the HSI features and functions that support operators to monitor I&C performance and manage I&C degradations when they occur. In addition, we identified topics for future research.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Operational Probabilistic Tools for Solar Uncertainty (OPTSUN) (Final Project Report for DOE Solar Forecasting II Project)

Increasing levels of solar PV can challenge system operations and may require novel methods to operate the power system reliably and efficiently. Power system operating plans generally use deterministic forecasts, in which the variable energy resources are represented by the expected value for each interval of the decision horizon. Probabilistic forecasts are relatively new but have the potential to address the shortfalls of deterministic forecasts. However, understanding how best to use such forecasts is still a key gap in industry and was the focus of this project. The project had three workstreams. In a forecasting workstream, improvements were made to baseline probabilistic forecasts using a number of new approaches such as machine learning methods and improved input data. In a design workstream, advanced simulation tools used these forecasts to investigate newly proposed reserve determination methods. Lastly, in a demonstration workstream a scheduling management platform (SMP) was developed to leverage probabilistic forecasts in a modular and customizable manner. In order to study the benefits that could be accrued, the project team collaborated with three utility partners (Duke Energy, Southern Company and Hawaiian Electric) to deliver improved probabilistic forecasts for each region and to model each region in case studies using advanced production cost modeling tools. Different methods to determine operating reserve requirements from probabilistic forecasts were developed, simulated, and tested across each region. The benefits of using these newly proposed methods varied by utility, but, in general, using probabilistic forecasts as well as historical data to set the reserve requirements seems to improve reliability related results, with less risk of reserve or supply shortfalls. The cost implications were not always straightforward; in some cases the new methods could show a reduction in expected operating costs, but often the increase in reserves associated with better risk mitigation using probabilistic forecasts could result in an increase in operating costs in the simulations. The SMP tool was developed to process probabilistic forecasts from their initial receipt through to scheduling decisions. This open-source tool consists of several modules for scenario development, reserve requirements calculation, and visualization. The SMP tool was demonstrated to a wide range of operators and stakeholders at all three utilities and further improved based on their feedback. The tool will be available on www.epri.com/optsun. The proposed probabilistic information-based reserve determination approaches have the potential to be implemented by different regions to ensure an economic and reliable power system operation on power systems integrating increasing levels of variable renewable resources. The innovative yet practical methods developed in this project demonstrated tangible benefits from using probabilistic forecasts beyond just study-based assessments to include three unique balancing areas. The demonstrated benefits across the multiple utility environments, are expected to provide system operators in all regions the confidence required and a platform to adopt the new forecasting and operating methods.

14 SOLAR ENERGY↗

Exploring Multidimensional Spatial-Temporal Hydropower Operational Flexibilities by Modeling and Optimizing Water-Constrained Cascading Hydroelectric Systems

Because of unique characteristics such as clean and cost-competitive electricity as well as fast-ramping and storage abilities, the power industry continues to evolve its operation strategies for cascading hydroelectric (CHE) systems for providing enhanced values to the grid, especially under the deeper renewable resource integration. However, existing operation practices of CHEs predate the integration of renewables, which could prohibit the effective utilization of their inherent flexibilities in delivering maximum financial benefits and providing valuable grid services to the power system and electricity market operations. Indeed, modeling and optimizing these resource-limited while flexible CHE assets with uncertainties and imperfect information across multiple spatial-temporal dimensions present significant challenges. To facilitate CHE facility operators in effectively coordinating water usage and hydropower plant operations across multiple timescales, this project aims to fill the existing gaps by developing a suite of accurate water inflow (WI) forecast models as well as enhanced CHE modeling and optimization approaches with proper consideration of their unique characteristics, which would help explore their multidimensional spatial-temporal operational flexibility potentials. The developed approaches could better align reservoir operation strategies with variability and uncertainty of future water availability. They can also promote more effective utilization of multidimensional spatial-temporal hydropower operational flexibility potentials by designing long-term evacuation plans of reservoirs and short-term operation of CHEs, along with their coordination with other types of renewables. The project leverages various resources to facilitate the research and development activities, including actual characteristics data of CHE systems and a library of current and future cases of Portland General Electric (PGE). These realistic data enable the project team to study how to maximize the value of CHEs under current and future portfolios and evaluate opportunities to improve operation practices.

13 HYDRO ENERGY↗

Human Supervision of Autonomous Vehicle Fleet Operations and Associated Passenger Communications: Preprint

Advances in automated vehicle (AV) technology and expanded operations are rapidly emerging with Automated Mobility District (AMD) deployments in global cities. NLR's AMD research addresses critical elements of human supervision of AV fleet operations and associated passenger communications for vehicles in which no driver or safety attendant is present. Although sufficiently advanced AVs no longer have direct oversight by a driver, fleet management remains staffed with operations personnel at the operations command and control (OCC) facility. This paper examines the functionality of the OCC, drawing comparisons of how automated train control and automated people mover OCCs operate. Within an AMD, the OCC manages various vehicle types, sizes, and operational modes, including on-demand and fixed route service, to facilitate a 'network of networks' for transport within a metropolitan area. The OCC serves as oversight for multiple AV fleets assisting AVs via remote operation of vehicles, communication, and dispatching personnel to resolve problems. The OCC also coordinates system operation, geographically staging vehicles, and managing weather, police, and emergency events. Informed by traffic management center (TMC) strategies using highly integrated software and communications, OCCs facilitate seamless information flows. OCC personnel remotely assist passengers and oversee multi-party operation to ensure safety and security. Although social norms mitigate large-capacity unattended vehicle operations, social interaction in multi-party automated small vehicles has little precedent. This poses a new frontier for society and requires research to effectively understand and manage. Future research will monitor OCC implementations, passenger interfaces, and deployment scaling of initial AMD systems.

33 ADVANCED PROPULSION SYSTEMS↗

Low-Latency Teleoperations: Operational Implications for Human Space Exploration

Low-latency teleoperations (LLT) is envisioned to be an element of human exploration missions in a number of different applications. LLT can be broadly considered to encompass any remote operation of an asset with a communication delay that is less than the human response time to allow for what is effectively "real-time" or "near real-time" operations. This paper will explore motivations and operational implications for why and how LLT might be used for human exploration space missions. LLT analyses have been performed under the auspices of the NASA Human Spaceflight Architecture Team (HAT) and Evolvable Mars Campaign (EMC). The EMC created a flexible, evolvable, capability-driven architectural strategy to enable a sustainable long-term human presence at Mars. LLT is envisioned to be part of that strategy for both in-space and on-surface applications, and this paper will expand on operational considerations within that broader strategic context, as well additional contexts. Some operational implications explored in this paper, derived largely from previous work, are: (1) crew mission support, for which we will address roles for Mission Control on earth, balanced with the capability for crew and robotic assets to operate independently, (2) science operations, with a focus on "backroom" support, highly dynamic science, and enhanced science return and efficiency, and (3) operational efficiency at a deep-space destination such as Mars, including implications for communications infrastructures and how to leverage and balance system autonomy with crew operations, both of which can inform the overall operational "choreography" between crew members, multiple shifts, and exploration assets.

human spaceflight↗

Management of Operations under Visual Flight Rules in UTM for Disaster Response Missions

The disaster response domain has experienced an increased focus in recent years due to the rise in number and scale of events, lessons learned from past experience, and emerging technologies that make possible a more coordinated and effective response. As part of this focus, JAXA and NASA have been collaborating on the integration of manned and unmanned aircraft in support of disaster response operations through integrated testing of their respective mission planning and optimization system (Disaster Relief Aircraft Information Sharing Network, or D-NET) and an automated UAS traffic management system (e.g., UTM). In 2018, JAXA and NASA jointly participated in a large-scale disaster drill in Japan where the integration of systems was successfully demonstrated through real-time data exchanges, visualization, and decision making as part of the coordinated airspace management of a manned helicopter in VFR conditions and unmanned small UAS operating in common areas. This work details a flight test consisting of two flights that were conducted December 2019 near the Chofu Aerodrome in Tokyo, which focused on the evaluation of pilots operating under Visual Flight Rules (VFR) communicating through D-NET and sharing intent and position information within UTM. This work contributes to defining the necessary requirements for digital coordination between manned and unmanned operations. UTM requires the use of operation volumes, which are spatial and temporal volumes that encompass UAS flight trajectories and account for technical performance errors and deviations due to disturbances (e.g., wind). A series of flights, representing different missions, used landmark-based operation volumes and conformance of the aircraft to those operation volumes were tracked within UTM. Experienced disaster response helicopter pilots provided insight on the development of the operation plans and their usability during disaster response operations. Results from the flight test supported the suggested benefits of using landmarks for planning and positional awareness and highlighted the need for future research in advanced visualization capabilities to support operations that consider both system constraints and flight deck/airspace management interaction.

disaster response↗

Formalized Reasoning of Operational Volumes for Wildland Fire Fighting

This work is focused on the formalized reasoning of operational volumes as it relates to the current and future technologies developed by NASA to aid in wildfire fighting operations. One such technology is the unmanned aircraft system pilot kit (UASP-kit) developed by the Scalable Traffic Management for Emergency Response Operations (STEReO) project at NASA, which is used to increase situation awareness for a ground operator in the field. The UASP-kit utilizes operational volumes which represent mission areas and alerting volumes, to alert when another aircraft is within one of these volumes from received ADS-B data. This work is focused on developing a rigorous foundation for the concept of operational volumes for modeling and prototyping operations in such a tool as the UASP-kit. This includes establishing a class of algorithms to detect when an object is in an operational volume, and when an operational volume is intersecting or contained within another. Additionally, this work is focused on providing rigorous proof in an interactive theorem prover that the algorithms work as intended. Scenarios are presented that model current UASP-kit operations and extend past the current capabilities of the technology to modeling more complex scenarios such as mission planning.

Operational Volumes↗

Effects of Communication Modality on Pilot-Controller Coordination during a Simulated m:N Operation

The last decade or so has seen growing interest in new control paradigms and concepts of operation for uncrewed aircraft systems (UAS) in which multiple aircraft are piloted remotely by a single or relatively small number of people. Referred to as “one-to-many” and “many-to- many” (alternatively, “multi-operator, multi-vehicle”)—and frequently expressed as the corresponding ratios, 1:N and m:N—such novel configurations of aircraft and the people who manage them are seen as critical to the path to future operations involving UAS. Examples of industry domains interested in these control paradigms are small package delivery services utilizing small UAS and passenger-carrying, short-range “Urban Air Mobility” (UAM) operations. Stakeholders in such operations have identified communication and coordination of flight activity with air traffic controllers (ATC) as a barrier to operations. In contrast to present-day flight operations, in which a pilot communicates with one ATC on one radio frequency for one aircraft, multi-vehicle operations potentially entail a significant increase in pilot task load for management of comms. New concepts, such as UAS Service Suppliers (USSs) and Providers of Services to UAM (PSUs), have been proposed to address the known bottleneck for Air Traffic Management (ATM) presented by multi-vehicle operations. While progress has been steadily made over years developing USSs and PSUs, it is generally expected that initial UAM operations will rely on traditional voice-over-radio communication with ATC for purposes of ATM. The current study was a human-in-the-loop simulation that had participants, each possessing a Private Pilot License, act as the ground-based pilot-in- command for multiple vehicles in a hypothetical UAM service in the San Francisco Bay Area. The experiment utilized a 2-by-3, within-subjects design in which the pilot’s Vehicle Load (4 vs. 12) and Comm System (Voice, Datalink, and a Hybrid) were manipulated. The task given to pilots was to use the Comm System to coordinate flight activity for all aircraft with appropriate controllers, having to obtain departure and arrival clearances at “vertiport” facilities and transition clearances for any intermediate airspaces along the route. Pilots were additionally responsible for compliance with vectoring instructions issued by ATC. Subjective workload questionnaires (NASA-TLX) were administered following each experimental trial. Screen recordings of the pilot’s Ground Control Station (GCS) and audio recordings of trials were subsequently coded to obtain performance metrics: response times and error rates. Presented in this paper are results related to pilot responses to vectoring instructions issued by ATC. Workload was found to be significantly higher in the 12-Vehicle condition compared to the 4-Vehicle condition, nearly maxing out the NASA-TLX overall workload scale. There was no significant difference made by the Comm System on workload ratings. Pilots’ response times to communications were fastest in the Voice condition, although overall “service time” for compliance was shorter in Datalink and Hybrid conditions in most cases. Errors by pilots were frequent in both Vehicle Load conditions, most perniciously when using the Voice system. The results of this study suggest tradeoffs in advantages and disadvantages of the three comm systems. Recommendations for communication system design are provided taking the tradeoffs into account.

urban air mobility↗

Ch. 12. A Theoretical Approach to Management of Limited Attentional Resources to Support the m:N Operation in Advanced Air Mobility Ecosystem

Advanced air mobility (AAM) technologies incorporate increasingly autonomous systems that allow fully remote, independent, and intelligent operation of air vehicles to support the transportation of goods and passengers within and across urban and rural areas. With a myriad of automated technologies enabling the AAM ecosystem, the human operator’s role will likely be a passive supervisory monitor of the air vehicles, involving increasingly fewer humans (m) that manage many more autonomous systems (N), or m:N operations. Unfortunately, the human performance literature suggests that human operators will exhibit poor supervision of numerous autonomous agents due to the limits of attentional resources in the operators. In the general human information-processing model, a human operator exercises a limited pool of attentional resources to engage various information-processing stages including detecting, perceiving, comprehending, and predicting objects around them. Yamani and Horrey (2018) expanded the human information-processing model to characterize a tradeoff between information-processing demand and resource relief that automation brings in the context of automated driving. In their model, a driver interacting with an automated driving system is assumed to reallocate resources “freed” by automation to support other information-processing stages required for successful task performance. A future AAM ecosystem enabled by an orchestration of advanced automated systems, however, requires a single operator to interact with more than one air vehicle with varying levels and degrees of automated systems, making the traditional framework of human-automation interaction insufficient. To address this gap, we provide a review of the literature on situation assessment and trust, two constructs identified as critical for a fuller understanding of intimate and intricate interactions between a human operator and multiple air vehicles equipped with increasingly autonomous systems. Then, we propose an expansion of Yamani and Horrey’s (2018) model to motivate systematic research on the human operator’s role, identify factors that influence resource allocation and guide human-centered design of an interface supporting the m:N operation in the AAM environment.

Advanced Air Mobility↗

The Effect of Degraded Digital Instrumentation and Control systems on Human-system Interfaces and Operator Performance

Integrated digital instrumentation and control (I&C) systems in new and advanced nuclear power plants (NPPs) will support operators in monitoring and controlling the plants. Even though digital systems typically are expected to be reliable, their potential for degradation or failure significantly could affect the operators performance and, consequently, jeopardize plant safety. This U.S. Nuclear Regulatory Commission (NRC) research investigated the effects of degraded I&C systems on human performance and on plant operations. The objective was to develop technical basis and guidance for human factors engineering (HFE) reviews addressing the operator's ability to detect and manage degraded digital I&C conditions. We reviewed pertinent standards and guidelines, empirical studies, and plant operating experience. In addition, we evaluated the potential effects of selected failure modes of the digital feedwater control system of a currently operating pressurized water reactor (PWR) on human-system interfaces (HSIs) and the operators performance. Our findings indicated that I&C degradations are prevalent in plants employing digital systems, and the overall effects on the plant's behavior can be significant, such as causing a reactor trip or equipment to operate unexpectedly. I&C degradations may affect the HSIs used by operators to monitor and control the plant. For example, deterioration of the sensors can complicate the operators interpretation of displays, and sometimes may mislead them by making it appear that a process disturbance has occurred. We used the findings as the technical basis upon which to develop HFE review guidance.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Science-based HRA: experimental comparison of operator performance to IDAC (Information-Decision-Action Crew) simulations

Information-Decision-Action Crew (IDAC) operator model simulations of a Steam Generator Tube Rupture are compared to student operator performance in studies conducted in the Ohio State University’s Nuclear Power Plant Simulator Facility. This study is presented as a prototype for conducting simulator studies to validate key aspects of Human Reliability Analysis (HRA) methods. Seven student operator crews are compared to simulation results for crews designed to demonstrate three different decision-making strategies. The IDAC model used in the simulations is modified slightly to capture novice behavior rather that expert operators. Operator actions and scenario pacing are compared. A preliminary review of available performance shaping factors (PSFs) is presented. After the scenario in the NPP Simulator Facility, student operators review a video of the scenario and evaluate six PSFs at pre-determined points in the scenario. This provides a dynamic record of the PSFs experienced by the OSU student operators. In this preliminary analysis, Time Constraint Load (TCL) calculated in the IDAC simulations is compared to TCL reported by student operators. We identify potential modifications to the IDAC model to develop an “IDAC Student Operator Model.” This analysis provides insights into how similar experiments could be conducted using expert operators to improve the fidelity of IDAC simulations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Vertex algebra of extended operators in 4d N=2 superconformal field theories. Part I

Abstract We construct a class of extended operators in the cohomology of a pair of twisted Schur supercharges of 4d$$ \mathcal{N} $$ N =2 SCFTs. The extended operators are constructed from the local operators in this cohomology — the Schur operators — by a version of topological descent. They are line, surface, and domain wall world volume integrals of certain super descendants of Schur operators. Their world volumes extend in directions transverse to a spatial plane in Minkowski space-time. As operators in the cohomology of these twisted Schur supercharges, their correlators are (locally) meromorphic functions only of the positions where they intersect this plane. This implies the extended operators enlarge the vertex operator algebra of the Schur operators. We illustrate this enlarged vertex algebra by computing some extended-operator product expansions within a subalgebra of it for the free hypermultiplet SCFT.

Physics↗

Frequency analysis and resonant operation for efficient capacitive deionization

Capacitive deionization (CDI) performance metrics can vary widely with operating methods. Conventional CDI operating methods such as constant current and constant voltage show advantages in either energy or salt removal performance, but not both. We here develop a theory around and experimentally demonstrate a new operation for CDI that uses sinusoidal forcing voltage (or sinusoidal current). We use a dynamic system modeling approach, and quantify the frequency response (amplitude and phase) of CDI effluent concentration. Using a wide range of operating conditions, we demonstrate that CDI can be modeled as a linear time invariant system. We validate this model with experiments, and show that a sinusoid voltage operation can simultaneously achieve high salt removal and strong energy performance, thus very likely making it superior to other conventional operating methods. Based on the underlying coupled phenomena of electrical charge (and ionic) transfer with bulk advection in CDI, we derive and validate experimentally the concept of using sinusoidal voltage forcing functions to achieve resonance-type operation for CDI. Despite the complexities of the system, we find a simple relation for the resonant time scale: the resonant time period (frequency) is proportional (inversely proportional) to the geometric mean of the flow residence time and the electrical (RC) charging time. Operation at resonance implies the optimal balance between absolute amount of salt removed (in moles) and dilution (depending on the feed volume processed), thus resulting in the maximum average concentration reduction for the desalinated water. We further develop our model to generalize the resonant time-scale operation, and provide responses for square and triangular voltage waveforms as two examples. To this end, we develop a general tool that uses Fourier analysis to construct CDI effluent dynamics for arbitrary input waveforms. Using this tool, we show that most of the salt removal (~95%) for square and triangular voltage forcing waveforms is achieved by the fundamental Fourier (sinusoidal) mode. The frequency of higher Fourier modes precludes high flow efficiency for these modes, so these modes consume additional energy for minimal additional salt removed. This deficiency of higher frequency modes further highlights the advantage of DC-offset sinusoidal forcing for CDI operation.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

An Ensemble Optimization Framework for Coupled Design of Hydropower Contracts and Real-Time Reservoir Operating Rules

Often, revenues from hydropower generation depend on the operator's ability to provide firm power in the presence of uncertain inflows. The primary options available for optimizing revenue are negotiation of a firm power contract before operations begin and adjustment of the reservoir release during operations. Contract and release strategy optimization are closely coupled and most appropriately analyzed with stochastic real-time control methods. Here we use an ensemble-based approach to stochastic optimization that provides a convenient way to construct nonparametric revenue probability distributions to explore the implications of uncertainty. The firm power contract is a simplified bilateral fixed price agreement that partially insulates operator and buyer from price fluctuations. The release control laws and firm energy target are jointly optimized to maximize the operator's expected revenue. Revenue probability distributions and related spill performance statistics indicate that predictive operating strategies such as stochastic dynamic programming and model predictive control can give significantly better performance than standard deterministic operating rules. The performance obtained from batch optimization with perfect inflow information establishes a convenient upper bound on potential revenue and provides a baseline for assessing the significance of differences between real-time operating strategies. Sensitivity analysis indicates that the benefits of predictive operational strategies are greatest for reservoirs with medium nondimensional residence times and less important for reservoirs with large residence times. Overall, probabilistic analysis of the coupled hydropower contract-operations problem provides a realistic way to assess revenue and risk for reservoirs that must provide firm power when inflows are uncertain.

13 HYDRO ENERGY↗