Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “crew scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Mitigating fatigue on the flight deck: how is controlled rest used in practice?

Controlled Rest (CR) refers to a short, voluntary nap opportunity taken by pilots on the flight deck as a countermeasure to unanticipated sleepiness in flight. This study explores the profile of CR use in a long-haul commercial airline. Forty-four pilots wore actiwatches and filled in an application-based sleep/work diary for approximately 2 weeks resulting in complete records from 239 flights. Timing of sleep periods and flight schedules were analyzed relative to home-base time. Pearson correlations were used to assess the influence of pilot demographics on CR use. A mixed-effects logistic regression was used to analyze the impact of schedule factors on CR. CR was taken on 46% (n=110) of flights, with 80% (n=106/133) of all CR attempts estimated by actigraphy to have successfully achieved sleep. Average sleep duration during successful rest periods was estimated as 31.7 ± 12.2 minutes. CR was more frequent on return (60%, n=71) vs. outbound flights (33%, n=39); 2-pilot (69%, n=83) vs. >2-pilot flights (23%, n=27); <10h (63%, n=80) vs. >10h duration flights (27%, n=30); and night (55%, n=76) vs. day flights (34%, n=34) (all p≤0.001). There was no significant difference for direction of travel (eastbound: 51%, n= 57; westbound: 40%, n= 44; p=0.059). Of note, 22% (n=26) of augmented flights contained both CR and bunk rest. Data from this airline show that CR is most commonly used as a countermeasure to sleepiness on flights <10h duration (2-pilot crews) and home-base nighttime flights. Future studies are required to determine the generalizability of these results to other airlines.

sleepiness↗

Ares I First Stage: Powering Exploration

he mission of the National Aeronautics and Space Administration (NASA) is not simply to maintain its current position with the International Space Station and other space exploration endeavors, but to build a permanent outpost on the Moon and then travel on to explore ever more distant terrains. The Constellation Program will oversee the development of the crew capsule, launch vehicles, and other systems needed to achieve this mission. From this initiative will come two new launch vehicles: the Ares I and Ares V. The Ares I will be a human-rated vehicle, which will be used for crew transport; the Ares V, a cargo transport vehicle, will be the largest launch vehicle ever built. The Ares Projects team at Marshall Space Flight Center (MSFC) in Huntsville, Alabama is assigned with developing these two new vehicles. The Ares I vehicle will have an in-line, two-stage rocket configuration. The first stage will provide the thrust or propulsion component for the Ares rocket systems through the first two minutes of the mission. The First Stage Team is tasked with developing the propulsion system necessary to liftoff from the Earth and loft the entire Ares vehicle stack toward low-Earth orbit. Building on the legacy of the Space Shuttle and other NASA space exploration initiatives, the propulsion for the Ares I First Stage will be a Shuttle-derived reusable solid rocket motor. Progress to date by the First Stage Team has been robust and on schedule. This presentation provides an overview and update on the design and development of the Ares I First Stage Propulsion system.

Tiller, Bruce K.↗

Progress on Ares First Stage Propulsion

The mission of the National Aeronautics and Space Administration (NASA) is not simply to maintain its current position with the International Space Station and other space exploration endeavors, but to build a permanent outpost on the Moon and then travel on to explore ever more distant terrains. The Constellation Program will oversee the development of the crew capsule, launch vehicles, and other systems needed to achieve this mission. From this initiative will come two new launch vehicles: the Ares I and Ares V. The Ares I will be a human-rated vehicle, which will be used for crew transport; the Ares V, a cargo transport vehicle, will be the largest launch vehicle ever built. The Ares Projects team at Marshall Space Flight Center (MSFC) in Huntsville, Alabama is assigned with developing these two new vehicles. The Ares I vehicle will have an in-line, two-stage rocket configuration. The first stage will provide the thrust or propulsion component for the Ares rocket systems through the first two minutes of the mission. The First Stage Team is tasked with developing the propulsion system necessary to liftoff from the Earth and loft the entire Ares vehicle stack toward low-Earth orbit. Building on the legacy of the Space Shuttle and other NASA space exploration initiatives, the propulsion for the Ares I First Stage will be a Shuttle-derived reusable solid rocket motor. Progress to date by the First Stage Team has been robust and on schedule. This paper provides an update on the design and development of the Ares First Stage Propulsion system.

Priskos, Alex S.↗

Coolant Leak from ISS External Active Thermal Control System (EATCS) – An Examination of Most Probable

The Port (P1) and Starboard (S1) External Active Thermal Control Systems (EATCS) are single phase, mechanically pumped ammonia loops that operate independently to cool the majority of the hardware and payloads onboard the International Space Station (ISS). A slow ammonia leak was detected using pressure and quantity telemetry five years after the P1 EATCS was activated. The leak gradually accelerated to a rate that locating and isolating the leak became imperative to maintain cooling capability. Partial pressure measurements from the Robotic External Leak Locator (RELL) scan surveys narrowed the search to the supply and return jumpers connecting one of three radiators to the system. Subsequently, the ISS crew performed high definition video surveys during an Extravehicular Activity (EVA), or spacewalk, and ammonia flakes were observed projecting from the jumpers. Thus, the ground teams were confident that the culprit for the ammonia leak was the jumpers. The ammonia leak stopped after ground teams remotely isolated and vented those jumpers and associated radiator. Both jumpers were removed and returned to the ground, and a root cause investigation was conducted. A calibrated leak test determined the bulk of the ammonia leaked through a pair of seals in a Quick Disconnect (QD), or connector, on one end of the return jumper. The return jumper QD was dissected, visually inspected, chemically tested and evaluated. The results indicated the most probable cause of the accelerating ammonia leak was due to defective seals, plating delamination underneath the seals, and on-orbit thermal cycles exacerbating the delamination. Both jumpers were refurbished, relaunched to the ISS, and scheduled to be reinstalled during an EVA in 2022. It appeared the issue was unique, but recently the S1 EATCS is showing signs of an accelerating ammonia leak, and RELL scans narrowed the source to a similar pair of radiator jumpers.

Thermal Control↗

Coolant Leak from ISS External Active Thermal Control System (EATCS) – An Examination of Most Probable

The Port (P1) and Starboard (S1) External Active Thermal Control Systems (EATCS) are single phase, mechanically pumped ammonia loops that operate independently to cool majority of the hardware and payloads onboard the International Space Station (ISS). A slow ammonia leak was detected using pressure and quantity telemetry five years after the P1 EATCS was activated. The leak gradually accelerated to a rate that locating and isolating the leak became imperative to maintain cooling capability. Partial pressure measurements from the Robotic External Leak Locator (RELL) scan surveys narrowed the search to the supply and return jumpers connecting one of three radiators to the system. Subsequently, the ISS crew performed high definition video surveys during an Extravehicular Activity (EVA), or spacewalk, and ammonia flakes were observed projecting from the jumpers. Thus, the ground teams were confident that the culprit of the ammonia leak were the jumpers. The ammonia leak stopped after ground teams remotely isolated and vented those jumpers and associated radiator. Both jumpers were removed and returned to the ground, and a root cause investigation was conducted. A calibrated leak test determined the bulk of the ammonia leaked through a pair of seals in a Quick Disconnect (QD), or connector, on one end of the return jumper. The return jumper QD was dissected, visually inspected, chemically tested and evaluated. The results indicated the most probable cause of the accelerating ammonia leak was due to defective seals, plating delamination underneath the seals, and on-orbit thermal cycles exacerbating the delamination. Both jumpers were refurbished, relaunched to the ISS, and scheduled to be reinstalled during an EVA in 2022. It appeared the issue was unique, but recently the S1 EATCS is showing signs of an accelerating ammonia leak, and RELL scans narrowed the source to a similar pair of radiator jumpers.

Thermal Control↗

Development of the J-2X Engine for the Ares I Crew Launch Vehicle and the Ares V Cargo Launch Vehicle: Building on the Apollo Program for Lunar Return Missions

The United States (U.S.) Vision for Space Exploration directs NASA to develop two new launch vehicles for sending humans to the Moon, Mars, and beyond. In January 2006, NASA streamlined its hardware development approach for replacing the Space Shuttle after it is retired in 2010. Benefits of this approach include reduced programmatic and technical risks and the potential to return to the Moon by 2020, by developing the Ares I Crew Launch Vehicle (CLV) propulsion elements now, with full extensibility to future Ares V Cargo Launch Vehicle (CaLV) lunar systems. This decision was reached after the Exploration Launch Projects Office performed a variety of risk analyses, commonality assessments, and trade studies. The Constellation Program selected the Pratt & Whitney Rocketdyne J-2X engine to power the Ares I Upper Stage Element and the Ares V Earth Departure Stage. This paper narrates the evolution of that decision; describes the performance capabilities expected of the J-2X design, including potential commonality challenges and opportunities between the Ares I and Ares V launch vehicles; and provides a current status of J-2X design, development, and hardware testing activities. This paper also explains how the J-2X engine effort mitigates risk by building on the Apollo Program and other lessons lived to deliver a human-rated engine that is on an aggressive development schedule, with its first demonstration flight in 2012.

Snoddy, Jim↗

Coolant Leak from ISS External Active Thermal Control System (EATCS) – An Examination of Most Probable

The Port (P1) and Starboard (S1) External Active Thermal Control Systems (EATCS) are single phase, mechanically pumped ammonia loops that operate independently to cool majority of the hardware and payloads onboard the International Space Station (ISS). A slow ammonia leak was detected using pressure and quantity telemetry five years after the P1 EATCS was activated. The leak gradually accelerated to a rate that locating and isolating the leak became imperative to maintain cooling capability. Partial pressure measurements from the Robotic External Leak Locator (RELL) scan surveys narrowed the search to the supply and return jumpers connecting one of three radiators to the system. Subsequently, the ISS crew performed high-definition video surveys during an Extravehicular Activity (EVA), or spacewalk, and ammonia flakes were observed projecting from the jumpers. Thus, the ground teams were confident that the culprit of the ammonia leak were the jumpers. The ammonia leak stopped after ground teams remotely isolated and vented those jumpers and associated radiator. Both jumpers were removed and returned to the ground, and a root cause investigation was conducted. A calibrated leak test determined the bulk of the ammonia leaked through a pair of seals in a Quick Disconnect (QD), or connector, on one end of the return jumper. The return jumper QD was dissected, visually inspected, chemically tested and evaluated. The results indicated the most probable cause of the accelerating ammonia leak was due to defective seals, plating delamination underneath the seals, and on-orbit thermal cycles exacerbating the delamination. Both jumpers were refurbished, relaunched to the ISS, and scheduled to be reinstalled during an EVA in 2022. It appeared the issue was unique, but recently the S1 EATCS is showing signs of an accelerating ammonia leak, and RELL scans narrowed the source to a similar pair of radiator jumpers.

Darnell Cowan↗

NASA Additive Manufacturing Initiatives for Deep Space Human Exploration

Additive Manufacturing (AM) is being infused into aerospace industries at an accelerated pace. Reasons for this rapid adoption include: (1) Innovation Capability e.g. design features such as topology optimization, integrated fluid passages, and mesh structures; (2) Rapid Development and Optimization - ability to quickly iterate the design, development, and test cycle; (3) Affordability - reductions in part counts, cost, and schedule. NASA's Marshall Space Flight Center (MSFC) has taken a leadership role in application of AM technologies for deep space human exploration, leading the Agency's In Space Manufacturing (ISM) initiative and the application of AM for a broad variety of space propulsion systems. MSFC has championed the development of ISM capabilities since our first reduced-gravity aircraft experiment flew in 1999. Partnering with Made In Space, MSFC placed the first 3D Printer on ISS in 2014 and the second generation printer, the Additive Manufacturing Facility, in 2016. The next ISS technology demonstration will be the Refabricator, a recycler/basic printer scheduled to launch in late Fall 2018. Ground-based development is progressing in common use materials, metals 3D printing, printed electronics, and the new cornerstone of ISM, the FabLab. The latest developments in each area will be described. An overview of NASA's In Space Robotic Manufacturing and Assembly (IRMA) ground-based risk reduction projects will also be presented. MSFC has aggressively incorporated AM capabilities for design and development of space propulsion components. The capabilities have been rapidly matured and extensively exercised to produce and hot-fire test the Additive Manufacturing Demonstrator Engine, an in-space class prototype engine. This experience base has been extended to support Aerojet Rocketdyne in the application of AM to the RS-25, the Space Launch System Core Stage engine, and to small propulsion systems and thrusters for small satellites and cubesats. The latest developments will be described. In responding to a request from NASA's Commercial Crew Program for a consistent methodology for evaluation of AM processes and parts, MSFC began development of a draft standard for AM space flight hardware in late 2014. The draft was broadly disseminated for comments in mid-2015, and subsequently revised into two documents, a standard and a specification for AM space flight hardware, which were formally released by MSFC in October 2017. An overview of the key elements of these documents will be presented.

Clinton, Raymond↗

Demolition of the K-27 Building at the East Tennessee Technology Park (ETTP) - 17423

On February 8, 2016, URS - CH2M Oak Ridge LLC (UCOR) initiated the demolition of the East Tennessee Technology Park's (ETTP's) final gaseous diffusion building in DOE's Oak Ridge Environmental Management program. Building K-27 was a 35,582 m{sup 2} (383,000 ft{sup 2}) gaseous diffusion building that contained approximately 92,903 m{sup 2} (1 million ft{sup 2}) of floor space. It was one of five gaseous diffusion buildings at the site, formerly known as the Oak Ridge Gaseous Diffusion Plant. The actual demolition of this facility took approximately seven months to complete; however, planning and preparation took more than three years. The deactivation process was a critical element in preparing the building for demolition. UCOR's K-27 deactivation activities began in April 2012 with the installation of safe walking paths and fall protection systems to allow safe work access. Next, all mechanical and electrical systems associated with the facility were shut down and isolated, a process known as 'cold and dark.' More than 19.3 km (12 mi) of process piping and components were marked and measured. Additionally, workers performed nondestructive assay (NDA) and vent-purge-and-drain activities and applied foam to piping and components as needed [1]. Based on characterization results, approximately 4.8 km (3 mi) of process piping, and 372 converters and compressors were removed and shipped offsite prior to demolition. Lower-hazard materials and equipment were demolished with the building structure and transported to onsite disposal facilities. Upfront waste characterization and ongoing monitoring were key to the successful disposal of demolition debris at onsite facilities. Due to process improvements in waste loading recommended by work crews, the project achieved a 50 percent improvement in the daily hauling rate during the 9,000-truckload shipping campaign. Crews worked in high-risk, high-hazard conditions and were exposed to radiological and chemical contaminants, extreme temperatures, and deteriorating infrastructure. However, the hazard controls that were put in place, based on the Integrated Safety Management System (ISMS) walk-downs and hazard determination, made the effort manageable. The overall safety performance during demolition of the facility was excellent, with no significant injuries, and exceeded industry standards and DOE target levels. Outstanding safety performance was a testament to the dedication of the workforce, given the significant hazards presented by the demolition of the Hazard Category 2 nuclear facility. Another key element to the success of the K-27 demolition was the support and approval of all stakeholders involved in this effort, including DOE, the surrounding communities, the State of Tennessee, the UCOR management team, and, most importantly, the workforce that performed this highly hazardous work. This $52 million demolition project was completed ahead of schedule with no significant injuries and in compliance with all DOE orders, site procedures, and environmental controls. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Propelling Exploration to the Moon and Beyond

As the Constellation Program enters its fourth year, the Ares Projects have made substantial progress toward sending human explorers beyond Earth orbit. The Ares I crew launch vehicle, which will take six astronauts or cargo to the International Space Station or four astronauts to rendezvous with Ares V for missions to the Moon, is the first human-rated vehicle NASA has developed in over 30 years. Since the Exploration Systems Architecture Study in 2005, the Ares Projects have completed a successful system requirements review, system definition review, and preliminary design review for the Ares I crew launch vehicle. The Ares I elements are well into development, beginning with the Shuttle-derived, five-segment solid rocket motor that will provide first-stage propulsion. The first stage team has poured its first production simulation article motor and will be pouring and firing the first five-segment development motor in 2009. Large-scale tooling has been installed and tested to produce propellant tanks for the liquid-fuel upper stage at Marshall Space Flight Center (MSFC) in Alabama. The initial upper stage units and main propulsion test article will be manufactured and tested at MSFC before transferring to Michoud Assembly Facility in Louisiana. The upper stage engine team has completed powerpack testing using Apollo J-2 heritage hardware and begun construction of a new altitude test stand at Stennis Space Center in Mississippi. The flight and integrated testing group has designed and built hardware for the Ares I-X test flight scheduled for 2009, as well as begun refurbishing existing infrastructure to support ground testing. Additionally, a base configuration has been selected for the Ares V cargo launch vehicle, which will send the Altair lunar lander and Orion to the Moon. Today, the Ares Projects are well on the way to building America s next generation of exploration-capable launch vehicles.

Cook, Stephen A.↗

Space Station Biological Research Project

NASA Ames Research Center is responsible for the development of the Space Station Biological Research Project (SSBRP) which will support non-human life sciences research on the International Space Station Alpha (ISSA). The SSBRP is designed to support both basic research to understand the effect of altered gravity fields on biological systems and applied research to investigate the effects of space flight on biological systems. The SSBRP will provide the necessary habitats to support avian and reptile eggs, cells and tissues, plants and rodents. In addition a habitat to support aquatic specimens will be provided by our international partners. Habitats will be mounted in ISSA compatible racks at u-g and will also be mounted on a 2.5 m diameter centrifuge except for the egg incubator which has an internal centrifuge. The 2.5 m centrifuge will provide artificial gravity levels over the range of 0.01 G to 2 G. The current schedule is to launch the first rack in 1999, the Life Sciences glovebox and a second rack early in 2001, a 4 habitat 2.5 in centrifuge later the same year in its own module, and to upgrade the centrifuge to 8 habitats in 2004. The rodent habitats will be derived from the Advanced Animal Habitat currently under development for the Shuttle program and will be capable of housing either rats or mice individually or in groups (6 rats/group and at least 12 mice/group). The egg incubator will be an upgraded Avian Development Facility also developed for the Shuttle program through a Small Business and Innovative Research grant. The Space Tissue Loss cell culture apparatus, developed by Walter Reed Army Institute of Research, is being considered for the cell and tissue culture habitat. The Life Sciences Glovebox is crucial to all life sciences experiments for specimen manipulation and performance of science procedures. It will provide two levels of containment between the work volume and the crew through the use of seals and negative pressure. The glovebox will accommodate use by two crew persons simultaneously and the capability for real time video down-link and data acquisition. In house testbeds and Phase B studies of the centrifuge validated the concepts of vibration isolation and autobalancing systems to meet the ISSA microgravity requirements. The vibration isolation system is effective above the centrifuge rotation frequency while the autobalancing system on the rotor removes vibration at and below the rotation rate. Torque of the Station, induced by spin-up/spindown of the centrifuge, can be minimized by controlling spin-up/spin-down rates. The SSBRP and ISSA will provide the opportunity to perform long-term, repeatable and high quality science. The long duration increments available on the Station will permit multigeneration studies of both plants and animals which have not previously been possible. The u-g habitat racks and the eight habitat centrifuge will accommodate sufficient number of specimens to permit statistically significant sampling of specimens to investigate the time course of adaptation to altered gravity environments. The centrifuge will, for the first time, permit investigators to use gravity itself as a tool to investigate fundamental processes, to investigate the intensity and duration of gravity to maintain normal structure and function, to separate the effects of u-g from other environmental factors and to examine artificial gravity as a potential countermeasure for the physical deconditioning observed during space flight.

Johnson, Catherine C.↗

Integrated Surface Power Strategy for Mars

A National Aeronautics and Space Administration (NASA) study team evaluated surface power needs for a conceptual crewed 500-day Mars mission. This study had four goals: 1. Determine estimated surface power needed to support the reference mission; 2. Explore alternatives to minimize landed power system mass; 3. Explore alternatives to minimize Mars Lander power self-sufficiency burden; and 4. Explore alternatives to minimize power system handling and surface transportation mass. The study team concluded that Mars Ascent Vehicle (MAV) oxygen propellant production drives the overall surface power needed for the reference mission. Switching to multiple, small Kilopower fission systems can potentially save four to eight metric tons of landed mass, as compared to a single, large Fission Surface Power (FSP) concept. Breaking the power system up into modular packages creates new operational opportunities, with benefits ranging from reduced lander self-sufficiency for power, to extending the exploration distance from a single landing site. Although a large FSP trades well for operational complexity, a modular approach potentially allows Program Managers more flexibility to absorb late mission changes with less schedule or mass risk, better supports small precursor missions, and allows a program to slowly build up mission capability over time. A number of Kilopower disadvantages-and mitigation strategies-were also explored.

Rucker, Michelle↗

Human Factors in the Design of the Crew Exploration Vehicle (CEV)

NASA s Space Exploration vision for humans to venture to the moon and beyond provides interesting human factors opportunities and challenges. The Human Engineering group at NASA has been involved in the initial phases of development of the Crew Exploration Vehicle (CEV), Orion. Getting involved at the ground level, Human Factors engineers are beginning to influence design; this involvement is expected to continue throughout the development lifecycle. The information presented here describes what has been done to date, what is currently going on, and what is expected in the future. During Phase 1, prior to the contract award to Lockheed Martin, the Human Engineering group was involved in generating requirements, conducting preliminary task analyses based on interviews with subject matter experts in all vehicle systems areas, and developing preliminary concepts of operations based on the task analysis results. In addition, some early evaluations to look at CEV net habitable volume were also conducted. The program is currently in Phase 2, which is broken down into design cycles, including System Readiness Review, Preliminary Design Review, and Critical Design Review. Currently, there are ongoing Human Engineering Technical Interchange Meetings being held with both NASA and Lockheed Martin in order to establish processes, desired products, and schedules. Multiple design trades and quick-look evaluations (e.g. display device layout and external window size) are also in progress. Future Human Engineering activities include requirement verification assessments and crew/stakeholder evaluations of increasing fidelity. During actual flights of the CEV, the Human Engineering group is expected to be involved in in-situ testing and lessons learned reporting, in order to benefit human space flight beyond the initial CEV program.

Whitmore, Mihriban↗

Compressed CO2 Hard Rock Drill for Mars

We have developed a down-the-hole (DTH) rotary-percussive drill prototype that could operate on compressed Mars atmospheric CO2 gas with a wireline drilling approach. This technology addresses a need for more aggressive sampling and drilling techniques, for both scientific purposes and to obtain In-Situ Resource Utilization (ISRU) resources for future NASA missions and human crew support. Using a spool of lightweight, high-pressure capillary, a DTH drill assembly would be moved in and out of the hole that could be a kilometer or more in depth. The CO2 drill is designed so that Mars atmospheric CO2 could be collected, compressed, and supplied down the hole and routed through microducts, valves, and reservoirs for the purpose of controlling miniature mechanical actuation in the assembly. By using compressed CO2, the drill system avoids the need for heavy electrical cabling and actuator systems or a liquid media for carrying away particulates as is typically used in terrestrial drilling systems. Instead, the liquid CO2 that powers the drill expands to a gas and could be channeled around the drill housing to carry cuttings to be collected in a bailing bucket. Where terrestrial systems often use drill depth vs time as a metric, a Mars drilling system would need to be extremely low mass, but would have no need to perform under tight schedules. In this paper, we will document our trade studies, progression for the design of microduct logic verified through multiple generations of prototypes, and provide predictive performance data on energy consumption, hole depth, and drill time.

Wilcox, Brian↗

Compressed CO2 Hard Rock Drill for Mars

We have developed a down-the-hole (DTH) rotary-percussive drill prototype that could operate on compressed Mars atmospheric CO2 gas with a wireline drilling approach. This technology addresses a need for more aggressive sampling and drilling techniques, for both scientific purposes and to obtain In-Situ Resource Utilization (ISRU) resources for future NASA missions and human crew support. Using a spool of lightweight, high-pressure capillary, a DTH drill assembly would be moved in and out of the hole that could be a kilometer or more in depth. The CO2 drill is designed so that Mars atmospheric CO2 could be collected, compressed, and supplied down the hole and routed through microducts, valves, and reservoirs for the purpose of controlling miniature mechanical actuation in the assembly. By using compressed CO2, the drill system avoids the need for heavy electrical cabling and actuator systems or a liquid media for carrying away particulates as is typically used in terrestrial drilling systems. Instead, the liquid CO2 that powers the drill expands to a gas and could be channeled around the drill housing to carry cuttings to be collected in a bailing bucket. Where terrestrial systems often use drill depth vs time as a metric, a Mars drilling system would need to be extremely low mass, but would have no need to perform under tight schedules. In this paper, we will document our trade studies, progression for the design of microduct logic verified through multiple generations of prototypes, and provide predictive performance data on energy consumption, hole depth, and drill time.

Wilcox, Brian↗

Hubble Space Telescope Servicing Mission 3A Rendezvous Operations

The Hubble Space Telescope (HST) hardware complement includes six gas bearing, pulse rebalanced rate integrating gyros, any three of which are sufficient to conduct the science mission. After the loss of three gyros between April 1997 and April 1999 due to a known corrosion mechanism, NASA decided to split the third HST servicing mission into SM3A, accelerated to October 1999, and SM3B, scheduled for November 2001. SM3A was developed as a quick turnaround 'Launch on Need' mission to replace all six gyros. Loss of a fourth gyro in November 1999 caused HST to enter Zero Gyro Sunpoint (ZGSP) safemode, which uses sun sensors and magnetometers for attitude determination and momentum bias to maintain attitude stability during orbit night. Several instances of large attitude excursions during orbit night were observed, but ZGSP performance was adequate to provide power-positive sun pointing and to support low gain antenna communications. Body rates in ZGSP were estimated to exceed the nominal 0.1 deg/sec rendezvous limit, so rendezvous operations were restructured to utilize coarse, limited life, Retrieval Mode Gyros (RMGs) under Hardware Sunpoint (HWSP) safemode. Contingency procedures were developed to conduct the rendezvous in ZGSP in the event of RMGA or HWSP computer failure. Space Shuttle Mission STS-103 launched on December 19, 1999 after a series of weather and Shuttle-related delays. After successful rendezvous and grapple under HWSP/RMGA, the crew changed out all six gyros. Following deploy and systems checkout, HST returned to full science operations.

Lee, S.↗

System Architecture Modeling for Technology Portfolio Management using ATLAS

Strategic planners and technology portfolio managers have traditionally relied on consensus-based tools, such as Analytical Hierarchy Process (AHP) and Quality Function Deployment (QFD) in planning the funding of technology development. While useful to a certain extent, these tools are limited in the ability to fully quantify the impact of a technology choice on system mass, system reliability, project schedule, and lifecycle cost. The Advanced Technology Lifecycle Analysis System (ATLAS) aims to provide strategic planners a decision support tool for analyzing technology selections within a Space Exploration Architecture (SEA). Using ATLAS, strategic planners can select physics-based system models from a library, configure the systems with technologies and performance parameters, and plan the deployment of a SEA. Key parameters for current and future technologies have been collected from subject-matter experts and other documented sources in the Technology Tool Box (TTB). ATLAS can be used to compare the technical feasibility and economic viability of a set of technology choices for one SEA, and compare it against another set of technology choices or another SEA. System architecture modeling in ATLAS is a multi-step process. First, the modeler defines the system level requirements. Second, the modeler identifies technologies of interest whose impact on an SEA. Third, the system modeling team creates models of architecture elements (e.g. launch vehicles, in-space transfer vehicles, crew vehicles) if they are not already in the model library. Finally, the architecture modeler develops a script for the ATLAS tool to run, and the results for comparison are generated.

Thompson, Robert W.↗

Integrated Vehicle Ground Vibration Testing of Manned Spacecraft: Historical Precedent

For the first time in nearly 30 years, NASA is developing a new manned space flight launch system. The Ares I will carry crew and cargo to not only the International Space Station, but onward for the future exploration of the Moon and Mars. The Ares I control system and structural designs use complex computer models for their development. An Integrated Vehicle Ground Vibration Test (IVGVT) will validate the efficacy of these computer models. The IVGVT will reduce the technical risk of unexpected conditions that could place the vehicle or crew in jeopardy. The Ares Project Office's Flight and Integrated Test Office commissioned a study to determine how historical programs, such as Saturn and Space Shuttle, validated the structural dynamics of an integrated flight vehicle. The study methodology was to examine the historical record and seek out members of the engineering community who recall the development of historic manned launch vehicles. These records and interviews provided insight into the best practices and lessons learned from these historic development programs. The information that was gathered allowed the creation of timelines of the historic development programs. The timelines trace the programs from the development of test articles through test preparation, test operations, and test data reduction efforts. These timelines also demonstrate how the historical tests fit within their overall vehicle development programs. Finally, the study was able to quantify approximate staffing levels during historic development programs. Using this study, the Flight and Integrated Test Office was able to evaluate the Ares I Integrated Vehicle Ground Vibration Test schedule and workforce budgets in light of the historical precedents to determine if the test had schedule or cost risks associated with it.

Lemke, Paul R.↗