Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “construction technology”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Digital Engineering Sensor Architectures for Future Microreactor Builds

The development of new nuclear reactors continues to be high risk during the construction phase, with many programs exceeding their budget by 2–3×. This work entails an investigation of sensors that can be utilized during the construction of microreactors and their incorporation into a digital twin supporting the construction process. These sensors can be used to monitor construction progress, inform of variances from the expected design, and verify that the reactor is being built to the planned building information management model. This will ensure reactor equipment and components accurately interact through welding or additive manufacturing technologies. This study illustrates the importance of the digital engineering architecture for microreactor deployment.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Prototyping the Light Detection of the DUNE Near Detector

The Deep Underground Neutrino Experiment (DUNE) is a long-baseline neutrino oscillation experiment with a 70kt liquid argon time projection chamber (LAr TPC) at the Far Detector complex at the Sanford Underground Research Facility (SURF) and a Near Detector (ND) complex planned for the Fermi National Accelerator Laboratory. The ND complex plans for three detector subsystems, including a modular LAr TPC comprised of 35 optically segregated modules. The modular detector design required the development a novel dielectric light readout, the ArCLight technology, which can be operated in a high voltage environment and has a large active surface. A demonstrator of four modular detectors, DUNE ND-LAr 2x2, will operate in 2023 in Fermilab's NuMI beam. After the construction of the modules was completed, they were successfully operated and commissioned in liquid argon using cosmic-ray muons at the University of Bern. This talk will discuss the designs of the light readout systems used in these modules with focus on the construction and commissioning of the ArCLights as well as the performance of the LRS during the tests at Bern.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Distribution Grid Impact Study in Highland Park, Michigan: Understanding Rooftop Solar, Behind-the-Meter Energy Storage, Electric Vehicle Charging, and Building Electrification [Slides]

Through the Communities LEAP (Local Energy Action Program) Pilot, the National Renewable Energy Laboratory (NREL) engaged the Highland Park Stakeholder Coalition to scope four technical assistance work areas to address their energy needs and goals. This slide deck addresses the highlighted tasks under work area "B" related to policy analysis, due diligence, and case studies for removing barriers and providing best practices for local clean energy development. Highland Park community members face frequent, long-duration power interruptions due largely to the aging distribution system serving the area and the legacy design standards used in its construction. While degrading physical infrastructure such as poles, crossarms, and transformers can result in this substandard reliability, another notable characteristic of this legacy system is the lower, 4.8 kV, voltage class. This is a legacy construction standard which many utilities, DTE included, are phasing out in favor of higher, 15 or 25 kV, voltage classes instead. The existing 4.8 kV distribution system serving Highland Park may limit significant adoptions of clean-energy technologies like high percentages of building electrification or electric vehicle adoption. The following analysis seeks to quantify these limitations under a variety of clean-energy technology adoption scenarios. It compares the overall system risks of the present system to those of a hypothetical, upgraded 13.2 kV system, using NREL-developed risk metrics and offers upgrade cost considerations. The legacy 4.8 kV voltage class serving Highland park is not, as we have modeled it, a major limitation to the widespread adoption of cost-optimal rooftop solar and/or behind-the-meter energy storage. Within our modeling framework, these technologies namely impact secondary, low-voltage assets, which may be remedied without the need for a system-wide upgrade to a 13.2 kV voltage class. Our model of the current 4.8kV system indicates it is not capable of supporting community-wide electrification efforts. Widespread building electrification, and the resulting large increase in wintertime load, dramatically increases the prevalence of voltage violations and thermal overloading on the current 4.8 kV distribution system. These impacts illustrate the need for system-wide upgrades to a 13.2 kV voltage class to accommodate these technologies. Low to Moderate DER adoption does not adversely impact the grid but does improve undervoltage and asset overloading issues. However, these benefits are insufficient to defer grid upgrades. Higher DER penetration is shown to increase overvoltage and asset overloading in future electrification scenarios.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Active Reservoir Management Engineering and Evaluation Summary – Brine Extraction and Storage Test Phase II Final Report – Volumes 1-3

The Energy & Environmental Research Center (EERC) conducted a multiyear program over two phases to perform a field study of the potential efficacy of formation water extraction during carbon dioxide (CO 2 ) injection for CO 2 storage as a means of improving efficiency and/or effectiveness. Phase I was a 2-year study on potential methodologies for a field study of pressure management, culminating in site selection and experimental and site design. Phase II was a 7-year effort that involved constructing site facilities, conducting experiments, and evaluating collected field data. The experimental portion was split into two collaborative components, one for the active reservoir management (ARM) experiment and a second component to host and demonstrate potential water treatment technologies appropriate for high-saline brine at the project site. The results of the overall project are expected to benefit future saline storage projects through validation of techniques that may reduce stress on sealing formations, increase storage capacity, and reduce area of review. The following report focuses on the Phase II ARM experimental implementation and results. A second companion report summarizes the results of the high-saline brine demonstrations.

54 ENVIRONMENTAL SCIENCES↗

Building on success in systems design of high yielding low‐input energycanes for marginal lands

Energycane and Miscanthus are highly sustainable and productive perennial grasses that produce a large annual crop of shoot biomass. Theoretical analysis of metabolism has suggested that these crops could be engineered to accumulate 20% of their harvestable biomass as oil. Given their much higher biomass yields than soybean and canola, this would yield several times more oil per acre. This could be converted to biodiesel or sustainable aviation fuel (SAF) by well‐established technologies. Energycane is well suited to the southeast quarter of the contiguous 48 states and Miscanthus to the northeast quarter. The objective of this award was to provide the foundation for converting these crops to oilcanes from DNA constructs and transformation to field trials and pilot plant development of oil extraction. Genetic engineering focused on development and implementation of improved constructs to increase oil levels, and increased photosynthesis to support the additional energy needed for oil production. The specific progress in each of our subtasks follows together with the products arising.

09 BIOMASS FUELS↗

Evaluating Acoustic vs. AI-Based Satellite Leak Detection in Aging US Water Infrastructure: A Cost and Energy Savings Analysis

The aging water distribution system in the United States, constructed mainly during the 1970s with some pipes dating back 125 years, is experiencing significant deterioration leading to substantial water losses. Along with the potential for water loss savings, improvements in the distribution system by using leak detection technologies can create net energy and cost savings. In this work, a new framework has been presented to calculate the economic level of leakage within water supply and distribution systems for two primary leak detection technologies (acoustic vs. satellite). In this work, a new framework is presented to calculate the economic level of leakage (ELL) within water supply and distribution systems to support smart infrastructure in smart cities. A case study focused using water audit data from Atlanta, Georgia, compared the costs of two leak mitigation technologies: conventional acoustic leak detection and artificial intelligence–assisted satellite leak detection technology, which employs machine learning algorithms to identify potential leak signatures from satellite imagery. The ELL results revealed that conducting one survey would be optimum for an acoustic survey, whereas the method suggested that it would be expensive to utilize satellite-based leak detection technology. However, results for cumulative financial analysis over a 3-year period for both technologies revealed both to be economically favorable with conventional acoustic leak detection technology generating higher net economic benefits of USD 2.4 million, surpassing satellite detection by 50%. A broader national analysis was conducted to explore the potential benefits of US water infrastructure mirroring the exemplary conditions of Germany and The Netherlands. Achieving similar infrastructure leakage index (ILI) values could result in annual cost savings of $\$4$–$\$4.8$ billion and primary energy savings of 1.6–1.9 TWh. These results demonstrate the value of combining economic modeling with advanced leak detection technologies to support sustainable, cost-efficient water infrastructure strategies in urban environments, contributing to more sustainable smart living outcomes.

acoustic leak detection↗

Determining Design Criteria for Feeding Biomass into a Fluidized Bed Using a Feed Screw

Many pathways have been discovered for the thermochemical conversion of biomass to products. These pathways often show very promising results on the benchtop scale and could be economical with the appropriate scale up. However, many of the fundamental challenges of scaling up thermochemical reactions are not well understood. One primary problem area that rarely receives much upfront attention is feeding large quantities of biomass into thermochemical reactors. As biomass transitions from ambient to reactor conditions, it undergoes chemical and physical changes that affect its flowability. Often these changes lead to agglomeration of feed particles within the transfer screw, leading to large clumps of feed entering and disrupting the fluidized bed, or more critically leading to a plug in the feed screw causing costly downtime and maintenance to remove. This transitional phase must be better understood for scale up of conversion technologies to be successful. The Feedstock-Conversion Interface Consortium (FCIC) is a collaboration of eight National Laboratories. FCIC is currently conducting research on screw feeding of biomass into thermochemical fluidized bed reactors. Heat transfer models have been constructed for the screw/reactor interface. Mechanical forces on biomass within screw feeder are being determined, as well as how those forces change by varying feed screw design. Feedstock physical and chemical properties are then being measured along these temperature and mechanical force gradients. This work will better inform feed screw design for scale up, increasing the success rate of future biorefineries. Discussion will include research approach, testing, and preliminary results.

09 BIOMASS FUELS↗

PERLE: A novel facility for ERL development and applications in multi-turn configuration and high-power regime

The development of ERLs has been recognized as one of the five main pillars of accelerators R&D in support of the European Strategy for Particle Physics (ESPP). The international panel in charge of the ERL Roadmap definition recognized PERLE project as “a central part of the roadmap for the development of energy-recovery linacs”, with milestones to be achieved by the next ESPP in 2026. PERLE project is aiming at the construction of a novel ERL facility for the development and application of the energy recovery technique in multi-turn configuration, high current and large energy regime. It will operate in a 3-turns mode, first at 250 MeV, then upgraded to 500 MeV with 20mA beam current. Such challenging parameters make PERLE a unique multi-turn ERL facility operating at an unexplored operational power regime (10MW), studying and validating a broad range of accelerator phenomena, paving the way for the future larger scale ERLs. PERLE will be the necessary demonstrator for the future HEP machine (LHeC / FCC-eh), with which it shares the same technological choices and beam parameters. Furthermore, PERLE opens a new frontier for the physics of “the electromagnetic probe”. It will be the first ERL dedicated to Nuclear Physics for studying the eN interaction with radioactive nuclei. Here we will report on the project status, introduce the main ongoing achievements and describe the staged strategy we will adopt toward the construction of PERLE machine at its nominal performances.

Kaabi, Walid↗

Status and future plans for C 3 R&D

C 3 is an opportunity to realize an e + e - collider for the study of the Higgs boson at √s = 250 GeV, with a well defined upgrade path to 550 GeV while staying on the same short facility footprint. C 3 is based on a fundamentally new approach to normal conducting linear accelerators that achieves both high gradient and high efficiency at relatively low cost. Given the advanced state of linear collider designs, the key system that requires technical maturation for C 3 is the main linac. This paper presents the staged approach towards a facility to demonstrate C 3 technology with both Direct (source and main linac) and Parallel (beam delivery, damping ring, ancillary component) R&D. The primary goal of the C 3 Demonstration R&D Plan is to reduce technical and cost risk by building and operating the key components of C 3 at an adequate scale. This R&D plan starts with the engineering design, and demonstration of one cryomodule and will culminate in the construction of a 3 cryomodule linac with pre-production prototypes. This R&D program would also demonstrate the linac rf fundamentals including achievable gradient and gradient stability over a full electron bunch train and breakdown rates. It will also investigate beam dynamics including energy spread, wakefields, and emittance growth. This work will be critical to confirm the suitability of the C 3 beam parameters for the physics reach and detector performance in preparation for a Conceptual Design Report (CDR), as well as for follow-on technology development and industrialization. The C 3 Demonstration R&D Plan will open up significant new scientific and technical opportunities based on development of high-gradient and high-efficiency accelerator technology. It will push this technology to operate both at the GeV scale and mature the technology to be reliable and provide high-brightness electron beams. The timeline for progressing with C 3 technology development will be governed by practical limitations on both the technical progress and resource availability. It consists of four stages: Stage 0) Ongoing fundamental R&D on structure prototypes, damping and vibrations. Stage 1) Advancing the engineering maturity of the design and developing start-to-end simulations including space-charge and wakefield effects. This stage will include testing of strucutres operating at cryogenic temperatures. Beam tests would be performed with high beam current to test full beam loading. Stage 2) Production and testing of the first cryomodule at cryogenic temperatures. This would provide sufficient experimental data to compile a CDR and it is anticipated for Stage 2 to last 3 years and to culminate with the transport of photo-electrons through the first cryomodule. Stage 3) Updates to the engineering design of the cryomodules, production of the second and third cryomodule and their installation. Lower charge and lower emittance beams will be used to investigate emittance growth. The successful full demonstration of the 3 cryomodules to deliver up to a 3 GeV beam and achieve the C 3 five gradient will allow a comprehensive and robust evaluation of the technical design of C 3 as well as mitigate technical, schedule, and cost risks required to proceed with a Technical Design Report (TDR).

radiation hardened magnets↗

Development of X-ray Wavefront Sensing Techniques for Adaptive Optics Control at the Advanced Photon Source

The planning and construction of new and upgraded high-brightness X-ray synchrotron and free electron laser sources, such as the Advanced Photon Source upgrade project (APS-U), are driving numerous opportunities to advance X-ray science and technologies. At the same time, an increasing number of highly diverse beamline experiments demand wavefront-preserving adaptive X-ray optics with both high precision and flexibility. At the APS, significant effort has been devoted to developing next-generation adaptive and corrective optics combined with state-of-the-art at-wavelength wavefront sensing techniques and an intelligent feedback control system for the automation and self-alignment of beamline optical systems. This article reviews recent achievements in these areas at the APS. Further, these include the development of in-situ wavefront sensing, the application in active feedback control of ultra-precision deformable mirrors, and the exploration of non-invasive wavefront sensing techniques for adaptive optics and beamline diagnostics.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Unconventional quantum oscillations and evidence of nonparabolic electronic states in quasi-two-dimensional electron system at complex oxide interfaces

The simultaneous occurrence of electric-field controlled superconductivity and spin-orbit interaction makes two-dimensional electron systems (2DES) constructed from perovskite transition metal oxides promising candidates for the next generation of spintronics and quantum computing. It is, however, essential to understand the electronic bands thoroughly and verify the predicted electronic states experimentally in these 2DES to advance technological applications. Here, we present insights into the electronic states of the 2DES at oxide interfaces through comprehensive investigations of Shubnikov–de Haas oscillations in three different systems: EuO/KTaO 3 , LaAlO 3 /SrTiO 3 , and amorphous-LaAlO 3 /KTaO 3 . To accurately resolve these oscillations, we conducted transport measurements in high magnetic fields up to 60 T and low temperatures down to 100 mK. For 2D confined electrons at these interfaces, we observed a progressive increase of oscillations frequency and cyclotron mass with the magnetic field. We interpret these universal and intriguing findings by considering the existence of nontrivial electronic bands, for which the 𝐸−𝑘 dispersion incorporates both linear and parabolic relations. In addition to providing experimental evidence for nonparabolic electronic states in KTaO 3 and SrTiO 3 2DES, the unconventional oscillations presented in this study establish a paradigm for quantum oscillations in 2DES based on perovskite transition metal oxides, where the oscillation frequencies in 1/𝐵 exhibit quadratic dependence on the magnetic field.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

High-temperature quantum valley Hall effect with quantized resistance and a topological switch

Edge states of a topological insulator can be used to explore fundamental science emerging at the interface of low dimensionality and topology. Achieving a robust conductance quantization, however, has proven challenging for helical edge states. In this work, we show wide resistance plateaus in kink states—a manifestation of the quantum valley Hall effect in Bernal bilayer graphene—quantized to the predicted value at zero magnetic field. The plateau resistance has a very weak temperature dependence up to 50 kelvin and is flat within a dc bias window of tens of millivolts. We demonstrate the electrical operation of a topology-controlled switch with an on/off ratio of 200. These results demonstrate the robustness and tunability of the kink states and its promise in constructing electron quantum optics devices.

Science & Technology - Other Topics↗

Reversed Field Pinch Research in MST (Final Technical Report)

This is the Final Technical Report for the cooperative agreement DE-FC02-05ER54814 titled “Reversed Field Pinch Research in MST” spanning the funding period 4/1/2005 to 12/14/2019. It summarizes key results from MST research, major publications and presentations, and the mentoring of graduate students and postdocs. The Madison Symmetric Torus (MST) is unique within the U.S. and world fusion plasma program. As one of just five operating reversed field pinch (RFP) experiments, and the only one in the U.S., MST has had an important role in advancing the fundamental understanding of the RFP plasma configuration. The MST research program targets topics that intersect with all three goals. While MST provides a unique opportunity to advance the science and fusion potential of the RFP, as a cousin to the tokamak and stellarator plasma configurations the RFP is a valuable partner in establishing validated predictive capability for fusion science more generally. Specific combinations of the major variables in toroidal confinement, like magnetic field strength, plasma current, and shaping, define the different configurations. By exploring adjacent regions in this major variable parameter space, the RFP exposes dependencies not otherwise accessible in the tokamak and stellarator. This diversity enlarges the arena for scientific discovery, both for fusion and plasma physics. The basic science emphasis for MST research has been the self-organizing behavior of RFP plasmas. This inspired MST’s participation in the NSF Physics Frontier Center for Magnetic Self-Organization in Laboratory and Astrophysical Plasmas (CMSO), which ran from 2004-2016 and motivated a substantial fraction of MST’s research goals and capabilities. By all measures the MST Program has been remarkably successful in publications, community engagement, and mentoring of young scientists. While the DOE-FES’s proof-of-principle program for the RFP now languishes through the cessation of this cooperative agreement, operation of MST continues as one of two devices included in the new Wisconsin Plasma Physics Laboratory (WiPPL) basic science user facility. The scope of present research for MST in WiPPL is narrowed to the basic science associated with the RFP magnetic configuration and the advancement of specific fusion topics, which now includes studies of disruptions in tokamak plasmas. The world’s effort in RFP fusion research continues, despite a lack of U.S. federal support to investigate the RFP configuration for fusion application, most notably through a major upgrade to the RFX-mod2 facility in Italy [1] and the recent construction of the KTX facility at USTC in China. First plasmas for RFX-mod2 are anticipated in 2021.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Technology Development and Field Monitoring in nZEB - US Country report IEA HPT Annex 49 Task 3

The International Energy Agency (IEA) Heat Pumping Technologies (HPT) Annex 49, “Design and Integration of Heat Pumps for Nearly Zero Energy Buildings,” deals with the application of heat pumps (HPs) as a core component of the HVAC system for nearly or net-zero energy buildings. This report covers the Task 3 activities of the US team. Three institutions are involved on the US team and have worked on the following projects. 1) Oak Ridge National Laboratory (ORNL) summarized development activities since the conclusion of IEA HPT Annex 40 for several integrated HP (IHP) systems - electric ground-source IHP and air-source IHP versions and engine-driven AS-IHP version. 2) The University of Maryland partnered with ORNL and Blue Bear Management to develop a personal cooling device called RoCo that can provide personalized conditioned air to occupants in inadequately or unconditioned environments. With RoCo, building facility management can elevate the HVAC thermostat settings without compromising occupants’ thermal comfort. Researchers have found that a 4°F increase in thermostat settings can save 12–30% energy savings. Therefore, RoCo is a promising technology that can help reduce building energy consumption and facilitate achievement of net-zero energy building performance. 3) The National Institute of Standards and Technology (NIST) is working on a field study effort on the NIST Net-Zero Energy Residential Test Facility. Two air-source split-system HPs were installed in a residential, net-zero energy home that was constructed as a laboratory on the NIST campus in Gaithersburg, Maryland. The first HP was a two-stage, 7 kW (2 ton), 15.8 seasonal energy efficiency ratio (SEER), 9.05 heating seasonal performance factor (HSPF) conventionally ducted system; the second HP was a variable-speed, 10.6 kW (3 ton), 14 SEER, 8.35 HSPF, high-velocity ducted system. These two systems operated side by side, using separate supply ducts and a common return duct, on a weekly alternating schedule to condition the home that was operated with very consistent simulated thermal loads. The team wanted to determine whether the high-velocity system could provide comparable energy-use efficiency to the conventional system. The results of this study showed that it did meet the required loads and had slightly greater efficiency; the average cooling coefficient of performance (COP) was (0.40 ± 0.11) higher, and the average heating COP was statistically equal. A new firmware was provided at the end of the heating season that greatly improved the performance of the high-velocity system; its average heating COP went from (1.8 ± 0.9) to (2.5 ± 1.1) at a 95% confidence level. The new firmware heating COP averaged (1.05 ± 0.23) higher than the old firmware over the same outdoor temperatures. The defrost performance is very different for these two systems, yet they consumed equivalent energy per HDD. The conventional system uses a timed-initiate, temperature-terminate algorithm with auxiliary electric resistive heating, whereas the high-velocity system uses calculated evaporator parameters with a hot-gas bypass before a full reverse-cycle defrost with no supplementary resistive heat.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Pulsed High Temperature Superconducting Central Solenoid for Revolutionizing Tokamaks

Commonwealth Fusion Systems (CFS) has developed the technical foundation for a fast-ramping High Temperature Superconducting (HTS) Central Solenoid Model Coil (CSMC), addressing key challenges in fusion energy advancement. This breakthrough enables the design of all-HTS pulsed tokamak power plants that promise to reduce projected electricity costs by 50% and overnight construction costs by 25% compared to steady-state tokamaks, while eliminating the need for complex external current drives.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Elucidating the corrosion mechanism of Ni-based superalloys in the presence of uranium-containing chloride molten salt

The United States Department of Energy (DOE) is committed to the advancement of nuclear reactor technology through initiatives such as the Advanced Reactor Development Program (ARDP), in an effort to diversify the United States energy portfolio towards more sustainable energy options. The ARDP includes demonstration by industry partners of molten chloride fast reactors (MCFRs). Construction of MCFRs requires qualified nuclear structural materials. Unfortunately, there are no current materials that are fully qualified by the Nuclear Regulatory Commission for the construction of molten salt reactors, including MCFRs. Adapting current structural material qualifications requires expansion of our current knowledgebase on the property-performance relationships regarding corrosion performance. In this investigation, we assess microstructural changes in a Ni-based superalloy after exposure to a UCl3¬-containing chloride salt eutectic mixture through a correlated multi-modal approach combining several advanced characterization techniques, including scanning electron microscopy/focused ion beam (SEM/FIB) and transmission electron microscopy (TEM). SEM/FIB analysis will illustrate changes in elemental composition, microstructure, and isotopic information acquired from energy x-ray dispersive spectroscopy (EDS), electron backscatter diffraction (EBSD), and secondary ion mass spectroscopy (SIMS), respectively. This information will then aid in identifying localized regions to elucidate the corrosion mechanism with TEM through a combination of electron diffraction, electron energy loss spectroscopy (EELS), and additional EDS. The findings from this investigation will further expand our assessment of the corrosion performance of structural materials in molten salt chloride systems, aiding to developing fully qualified materials for construction of MCFRs.

36 MATERIALS SCIENCE↗

High Yield, Economical and Environmentally Benign Production of Rare Earth Elements from Coal Ash (Phase II Final Summary Report)

Fly ash stored in landfills and ponds across the United States is an attractive, abundant domestic resource for the cost-effective recovery of rare earth elements (REE) and other critical minerals (CM). Physical Sciences Inc. (PSI) and its team members, Winner Water Services (WWS) and University of Kentucky/Center for Applied Energy Research (UK/CAER) successfully executed a multiphase program that developed technologies and their implementation in a pilot plant. We demonstrated plant operations for cost-effective and environmentally-friendly production of rare earth element oxide (REO) concentrates, and the critical minerals scandium and aluminum (in the forms of salts or oxide products), from coal ash. We also constructed and demonstrated a research-scale (0.5 kg/day) micropilot facility to validate the key physical and chemical processing operations, predict yields, and troubleshoot process bottlenecks. The project team then designed, constructed and operated two decoupled pilot plants: (1) an operational pilot plant for physical separation processes with capacity of 0.4 metric tons per day (tpd), where we optimized processes to produce selected ash fractions as the feedstock for chemical processing and as valuable byproducts such as cenospheres, magnetic ash, and secondary fuel carbon, and (2) an operational pilot plant for chemical ash processing with a capacity of 0.5 tpd that developed optimized processes for the production of: (a) REO concentrates, (b) critical minerals (Sc, Al), and (c) beneficiated ash as a valuable byproduct suitable for cement applications. In Phase I, the project team (with Equinox Chemicals in place of WWS) developed and demonstrated the feasibility of the physical and chemical separation processes, developed the design of a pilot plant, and began the development of a preliminary techno-economic model. In the baseline (initial) Phase II program, the project team developed and demonstrated the above pilot scale plant, producing salable REE concentrates, including Y and Sc (REYSc), plus commercially viable byproducts, using environmentally safe and high-yield physical and chemical enrichment processes. The team successfully demonstrated chemical pilot design, construction, shakedown, and operations of the plant. We produced the Phase II deliverable REYSc concentrate ((50 g of >60 wt.% purity REYSc salts on elemental basis), generated the feed for the Phase II follow-on program, identified processing challenges for future optimizations, and refined the techno-economic model. In the Phase II follow-on program, the project team: (1) developed and demonstrated processes to increase the REE amount by 3X (content basis) and convert the Phase II REE salt mixture to an oxide mixture, (2) produced/delivered >38 g of REO mixture with >85 wt.% purity (elemental basis); (3) developed processes to recover critical minerals scandium and aluminum from intermediate streams; (4) produced/delivered > 1 g of scandium salt mixture with >85 wt. % purity (elemental basis); (5) produced/delivered > 100 g of aluminum oxide type material with >70% wt. purity (elemental basis); and (6) updated the techno-economic model from the baseline Phase II program to assess CAPEX and OPEX of a commercial operation. This program has developed extensive databases on process chemistry, unit operations, plant engineering, and techno-economics that will enable further scale-up toward commercial plant design. Specific future developments will be focused on achieving dramatic savings in energy, reagent usage, and operating costs. The combined results will contribute significantly for maturing the technologies of REE recovery from coal byproducts and promote the establishment of domestic REE and CM supply chains.

01 COAL, LIGNITE, AND PEAT↗