Design change management in regulation of nuclear fleets: World nuclear association's working groups on Cooperation in Reactor Design Evaluation and Licensing (CORDEL)

The 60 year life of a reactor means that a plant will undergo change during its life. To ensure continuing safety, changes must be made with a full understanding of the design intent. With this aim, regulators require that each operating organisation should have a formally designated entity responsible for complete design knowledge in regard to plant safety. INSAG-19 calls such an entity 'Design Authority'. This requirement is difficult to achieve, especially as the number of countries and utilities operating plants increases. Some of these operating organisations will be new, and some will be small. For Gen III plants sold on a turnkey basis, it is even more challenging for the operating company to develop and retain the full knowledge needed for this role. CORDEL's Task Force entitled 'Design Change Management' is investigating options for effective design change management with the aim to support design standardization throughout a fleet's lifetime by means of enhanced international cooperation within industry and regulators. This paper starts with considering the causes of design change and identifies reasons for the increased beneficial involvement of the plant's original vendor in the design change process. A key central theme running through the paper is the definition of responsibilities for design change. Various existing mechanisms of vendor-operator interfaces over design change and how they are managed in different organisational and regulatory environments around the world are considered, with the functionality of Owners Groups and Design Authority being central. The roles played in the design change process by vendors, utilities, regulators, owners' groups and other organisations such as WANO are considered The aerospace industry approach to Design Authority has been assessed to consider what lessons might be learned. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The Time Needed to Implement the Blue Ribbon Commission Recommendation on Interim Storage - 13124

The report of the Blue Ribbon Commission on America's Nuclear Future [1] makes a number of important recommendations to be considered if Congress elects to redirect U.S. high-level radioactive waste disposal policy. Setting aside for the purposes of this discussion any issues related to political forces leading to stopping progress on the Yucca Mountain project and driving the creation of the Commission, an important recommendation of the Commission was to institute prompt efforts to develop one or more consolidated storage facilities. The Blue Ribbon Commission noted that this recommended strategy for future storage and disposal facilities and operations should be implemented regardless of what happens with Yucca Mountain. It is too easy, however, to focus on interim storage as an alternative to geologic disposal. The Blue Ribbon Commission report does not go far enough in addressing the magnitude of the contentious problems associated with reopening the issues of relative authorities of the states and federal government with which Congress wrestled in crafting the Nuclear Waste Policy Act [2]. The Blue Ribbon Commission recommendation for prompt adoption of an interim storage program does not appear to be fully informed about the actions that must be taken, the relative cost of the effort, or the realistic time line that would be involved. In essence, the recommendation leaves to others the details of the systems engineering analyses needed to understand the nature and details of all the operations required to reach an operational interim storage facility without derailing forever the true end goal of geologic disposal. The material presented identifies a number of impediments that must be overcome before the country could develop a centralized federal interim storage facility. In summary, and in the order presented, they are: 1. Change the law, HJR 87, PL 107-200, designating Yucca Mountain for the development of a repository. 2. Bring new nuclear waste legislation to the floor of the Senate, overcoming existing House support for Yucca Mountain; 3. Change the longstanding focus of Congress from disposal to storage; 4. Change the funding concepts embodied in the Nuclear Waste Policy Act to allow the Nuclear Waste fund to be used to pay for interim storage; 5. Reverse the Congressional policy not to give states or tribes veto or consent authority, and to reserve to Congress the authority to override a state or tribal disapproval; 6. Promulgate interim storage facility siting regulations to reflect the new policies after such changes to policy and law; 7. Complete already underway changes to storage and transportation regulations, possibly incorporating changes to reflect changes to waste disposal law; 8. Promulgate new repository siting regulations if the interim storage facility is to support repository development; 9. Identify volunteer sites, negotiate agreements, and get Congressional approval for negotiated benefits packages; 10. Design, License and develop the interim storage facility. The time required to accomplish these ten items depends on many factors. The estimate developed assumes that certain of the items must be completed before other items are started; given past criticisms of the current program, such an assumption appears appropriate. Estimated times for completion of individual items are based on historical precedent. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Siting and Transportation for Consolidated Used Nuclear Fuel Management Facilities: A Proposed Approach for a Regional Initiative to Begin the Dialogue - 13562

The Blue Ribbon Commission on America's Nuclear Future (BRC) was formed in January 2010 to conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle, and to develop a new national strategy. Over two years, the BRC held dozens of meetings and heard from hundreds of Federal, State, Tribal, and local officials, as well as representatives of trade and labor organizations, technical groups, non-governmental organizations, and other stakeholders. The Commission's final report (issued January 26, 2012) offers a strategy to resolve longstanding challenges to responsible management of the United States' nuclear waste legacy. The Commission recommended Congressional action to rewrite parts of the Nuclear Waste Policy Act (NWPA); however, a comprehensive legislative overhaul will likely take years to fully implement. The nature and characteristics of nuclear waste, the activities that generated it, and the past history of federal efforts to manage the waste make it virtually certain that finding workable solutions will be controversial and difficult. As the BRC report suggests, this difficulty can be made insurmountable if top-down, federally-mandated efforts are forced upon unwilling States, Tribes, and local communities. Decades of effort and billions of ratepayer and taxpayer dollars have been spent attempting to site and operate spent fuel storage and disposal facilities in this manner. The experience thus far indicates that voluntary consent and active partnership of States, Tribes, and local governments in siting, designing, and operating such facilities are critical. Some States, Tribes, and local communities have indicated that, given adequate scientific and technical information, along with appropriate incentives, assurances, and authority, they might be willing to consider hosting facilities for consolidated storage and disposal of spent nuclear fuel. The authors propose a new regional approach to identifying and resolving issues related to the selection of a consolidated storage site. The approach would be characterized by informed discussion and deliberation, bringing together stakeholders from government, the non-governmental (NGO) community, industry, and other sectors. Because site selection would result in regional transportation impacts, the development of the transportation system (e.g., route identification, infrastructure improvements) would be integrated into the issue-resolution process. In addition to laying out the necessary steps and associated timeline, the authors address the challenges of building public trust and confidence in the new waste management program, as well as the difficulty of reaching and sustaining broad-based consensus on a decision to host a consolidated storage facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

La Hague Legacy Waste Recovery Program: Scope, Progress and Issues -12080

A significant inventory of process waste of varying natures and quantities has been generated during the thirty years of operation of UP2 400 facility on the site of La Hague, France. The retrieval, packaging and final storage of such an inventory has never been achieved before in France and thus requires the design and qualification of new processes, equipment, and waste packages. Following AREVA strategic decisions and French safety authority requirements, the legacy waste program has begun around the year 2000 and is scheduled to be completed around the year 2025. It is under the responsibility of AREVA Site Value Development Project teams. For each category of waste to be recovered, AREVA teams conducted detailed investigations, defined recovery modes, treatment processes, as well as final waste package forms, which they subsequently submitted to French safety and waste management authorities. A Task force initiative was subsequently launched to optimize the program cost and scenario, and lead to an optimization of about 15% of the entire program. The qualification of processes and waste packages required a significant amount of research and development which is now well under way for processes, and scheduled to be completed in 2015. Preparation work has begun on several installations to clear space for the construction of future retrieval facilities, scheduled to begin in the coming three years. La Hague Legacy waste retrieval program represents a significant challenge in the sense that it covers a significant variety and quantity of waste needing recovery and reconditioning, with tight financial objectives and a binding recovery schedule. During the past five years, AREVA SVD successfully conducted design, research, development, and qualification activities which lead to the definition of qualified processes and waste packages for each retrieval program. Preparation work and supplier consultations are now on-going, in order to meet our objectives of beginning retrieval operations in compliance with our commitments to the safety authorities, in 2015 and 2016. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of regulatory support program based on the 10 years joint cooperation between Norway and Russian Federation - 15635

The Norwegian Radiation Protection Authority (NRPA) has been implementing a regulatory support program in the Russian Federation for over 10 years, as part of the Norwegian government's Plan of Action for enhancing nuclear and radiation safety with special focus on nuclear legacy problems in Northwest Russia. During this time there has been cooperation in more than 24 different projects. Significant component of the Plan of Action is to provide support its sister authorities in the Russian Federation, over the years a considerable degree of confidence and mutual trust has been built up among all the relevant organizations, allowing for real progress to be made in meeting protection objectives. The main goal of the regulatory projects is to develop regulatory requirements to ensure protection of personnel, population and environment, during remediation uranium and nuclear legacy sites. Many of the legacy issues originated from the military program. It is therefore vital that the military authority has agreed to be a part of the cooperation program, i.e. Directorate of State Supervision over Nuclear and Radiation Safety of the Ministry of Defense of the Russian Federation. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Progress on Resuming Full Construction on the Waste Treatment and Immobilization Plant's High-Level Waste Facility - 16283

The U.S. Department of Energy (DOE) restricted certain engineering, procurement and construction work on the Waste Treatment and Immobilization Plant's (WTP) High-Level Waste (HLW) Facility in 2012 and early 2013 because of unresolved technical issues, and a need to align the nuclear safety basis with the design as the HLW Facility technical issues were resolved. The DOE Office of River Protection (ORP) needed a way to minimize the government's risk exposure, while continuing limited critical path construction work and resolving the technical and safety basis issues. ORP issued the Plan for Evaluation and Decision to Proceed for the High-Level Waste Facility in October 2013 to establish the process to evaluate the WTP contractor's progress on resolving the issues and to identify actions and deliverables needed to facilitate an ORP decision to resume production activities. This process provided for a phased resumption of HLW engineering, procurement and construction activities, with two decision points: Decision 1: Authorization to resume design/production engineering along with limited procurements and construction ramp-up. Decision 2: Full authorization to resume engineering, procurement and construction. In August 2014, ORP provided authorization for the WTP contractor to resume all engineering work necessary to finalize the design of the HLW Facility. The decision to proceed with production engineering in the HLW Facility was based on significant progress in resolving technical issues and improving work processes to align the HLW design and safety basis. ORP is working closely with the WTP contractor to facilitate decisions for resuming procurement of HLW Facility equipment with safety functions, and resuming full construction in the most complex process cells in the Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Major Achievements of the Springfields Decommissioning Program - 16512

Since the 1940's, Springfields has manufactured fuel products for the UK's nuclear power stations and for international customers. The early operations were in support of the atomic weapons program, closely followed by fuel manufacture for electricity generation via the Magnox power stations commencing in the late 1950's. In 2005, responsibility for the assets and liabilities of Springfields was transferred to the Nuclear Decommissioning Authority (NDA). A new company, Springfields Fuels Limited, was created to run the site, which was managed and operated by Westinghouse Electric UK Ltd on the NDA's behalf. On April 1, 2010, Westinghouse entered into an agreement with the NDA for a long-term lease of the Springfields site, which transferred responsibility for the commercial fuel manufacturing business and Springfields Fuels Limited to Westinghouse. Today, the main Springfields activities include: - Oxide fuels for Advanced Gas-cooled and Light Water Reactors, as well as intermediate fuel products, such as powders, granules and pellets, - Manufacture of Uranium Hexafluoride (now in Care and Maintenance), - Processing and recovery of Uranium residues, - Decommissioning and demolition of redundant plants and buildings. Some 120 plant buildings and support facilities have been successfully decommissioned and demolished in the period 1996 to date. These range from 1940's buildings, subsequently converted for nuclear fuel manufacture, together with some of the formerly sealed chemical agent manufacture and storage facilities. Decommissioning of the now redundant Magnox manufacturing facilities is ongoing at Springfields without compromising the other site operations. Westinghouse is managing all activities related to the whole lifecycle, planning, design, safety case, radiation protection, Post Operational Clean Out (POCO), service diversions, characterization, decommissioning all phases through to ground remediation, waste disposal and agreed end states. Decommissioning of process plants starts with the removal of the majority of radiological activity or hazard contained within the plant. This is known as Post Operational Clean Out. Once this is complete, the plant may be dismantled. Work is scoped and defined within packages (at plant or cell level) to aid control and commercial monitoring as the decommissioning is progressed. This package approach also enables clean or lightly contaminated items to be removed separately to aid potential re-cycling and minimize decontamination and waste disposal costs. Westinghouse is further optimising work package delivery by planning parallel POCO and Decommissioning work phases within plant at a cell level to systematically remove redundant plant and reduce hazard earlier, whilst optimising use of both internal and external resources to reduce total project cost. Waste and Residues from all phases are disposed of via authorized disposal routes and in accordance with our environmental authorizations. On completion of decommissioning and removal of plant and equipment the building is re-assessed radiologically, categorized and appropriate remediation work progressed to render it safe for conventional demolition. The major elements of the success achieved to date can be attributed to the following elements: - Overall programme management with extensive experience of planning, cost, and risk management. Integration of the programme within a major commercial site without compromising safety or operations. - Complete site EHS management working within a complex regulatory framework including the Nuclear Site Licenses, Environmental Authorisations and Security requirements. - Avoiding safety complacency by use of rigorous and systematic process to emphasise safety over competing goals. Including structured use of Human Performance and Corrective Action and Learning processes. - Unique safety experiences attained through complex hazard reduction across a broad range of uranium manufacturing and chemical hazard/agent facilities. - Project leadership and excellence utilizing a core site team to deploy repeatable processes and safe practices to deliver complex scope within budget and schedule. - Optimised use of internal and external resources, with extensive use of Operating Experience to drive continuous improvement and problem resolution. - Management of Contractors from initial selection, pre-qualification, tender assessment and Performance using varied contract forms across delivery phases. - Use of Westinghouse expertise for safety case, waste management, uranium recovery, health physics and design. - Implementation of a work package to ensure gated discreet manageable packages. Underpinned by package specific method statements, with appropriate hold points to maintain management and control of the works. - Continuous local safety focus via safety planning, induction, plant specific training, proactive risk assessment, and a defined approach to decoupling operating plant safety cases enabling focussed and usable documentation. This paper will provide an overview of the latest decommissioning activities achieved on the Springfields site and will focus on best practices that allowed Westinghouse to maintain the program on time and on budget. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transfer and Transition: Interagency Coordination for Managing Public Lands at UMTRCA Title II Sites in Wyoming - 16614

By the end of fiscal year 2025, the U.S. Department of Energy (DOE) Office of Legacy Management (LM) is anticipating adding 17 sites remediated under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) to the current inventory of 90 sites that it manages. Among the new sites are ones where federal public lands occur within the proposed long-term care boundary, the boundary determined by the Nuclear Regulatory Commission and LM as necessary to maintain site protectiveness for the entombed uranium mill tailings and residual groundwater contamination. For these sites, public land withdrawals for land and minerals will need to be established. LM's primary mission at UMTRCA sites is to protect the public and the environment from exposure to contamination at the sites. For the sites with public lands or federally controlled minerals that will be transferring to LM, the Office will apply to the Department of the Interior (DOI) Bureau of Land Management (BLM) for new, public land and mineral withdrawals. At most current LM UMTRCA sites that involved public lands and minerals, DOI granted DOE 'full administrative jurisdiction' and permanent withdrawals. Hence, these withdrawals are, permanently, no longer subject to public land, mining, and mineral-leasing laws and regulations. LM is coordinating with DOI/BLM in Wyoming to permanently withdraw full and partial jurisdiction at future UMTRCA Title II sites in that state. This approach would allow LM to fully administer surface lands and minerals, where necessary, and DOI and LM to administer surface lands and leasable minerals where it would not jeopardize sites' radiological safety and long-term public and environmental protection. This 'shared-jurisdiction approach' will meet LM's strategic goal of protecting human health and the environment but also allow BLM to fulfill their mission to 'manage and conserve the lands under the mandate of multiple-use and sustained yield'. In addition, LM could also fulfill the fourth goal of its Strategic Plan, to optimize land use and assets. The portions of the sites where LM will ask for full jurisdiction are those that contain the disposal cell and any adjacent lands and minerals required to maintain and protect it. It is anticipated that the shared jurisdiction portion of the withdrawal would largely coincide with land where known or projected contaminated groundwater from the past ore processing exists or will migrate over time. Examples of BLM-authorized activities on the shared jurisdiction portions of the withdrawals may include livestock grazing, wildlife habitat improvement projects, recreation, and rights of ways for roads, pipelines, utilities, and communication sites. In addition, BLM could authorize subsurface uses such as oil and gas, coal, or geothermal development or groundwater pumping from deeper aquifers if the proposal would not disturb groundwater contamination. For areas of the withdrawal where the agencies will share jurisdictional authority, DOE LM and BLM will develop an interagency agreement (IA) to define acceptable uses and associated roles and responsibilities. To ensure maximum protection of human health and the environment, each site's IA will include a provision allowing DOE LM the right of first refusal against any action it believes might affect radiological safety at the site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning of a Historic Waste Storage Facility in Austria - 19059

Nuclear Engineering Seibersdorf Ltd. (NES) performed decommissioning of an old waste storage facility, the so called 'bunker', which was commissioned in 1968 and used until 1978 for the storage of radioactive waste from medical, industrial and research activities, as well as from the operation of the Austrian research reactor ASTRA. Due to the layout of the bunker the initial decommissioning plan was to decontaminate the inner walls of the caverns and afterwards perform clearance measurements on the standing structure. However, throughout the first phase of decommissioning it turned out, that contaminations penetrated deeper into the concrete structure as initially anticipated, which made an adoption of the decommissioning strategy necessary. By changing the workflow and to remove non-contaminated parts of the structure first, also the strategy for the clearance measurements had to be adapted. The selective decommissioning strategy and the demand that measurements shall be performed by an accredited body, required to set up an adequate communication structure to keep the workflow going. Moreover, a fast communication between NES, the competent authority and the authority's (external) experts was necessary to receive clearance licenses on time, and to prevent backlog of dismantled material. The paper reports on the initial and the adapted decommissioning strategy and the challenges within the changed approach. Applied decontamination and decommissioning methods and the implemented radiation protection measures will be discussed. Furthermore, information on the methodologies for clearance measurements, the collaboration of the accredited body with the decommissioning team, as well as on the communication between NES and the competent authority will be given. Finally, a balance of radioactive waste vs. conventionally disposed waste will be shown. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design, Construction, and Commissioning of the RH LLW Disposal Facility at INL - 19445

The newly-commissioned Remote-Handled Low-Level Waste (RH LLW) Disposal Facility at Idaho National Laboratory (INL) provides permanent disposal capability critical for continuing INL nuclear research and Naval Reactors missions at the Idaho site. The facility mission need [critical decision (CD)- 0] was approved in 2009. Alternative selection (CD-1) was finalized in 2011. The project performance baseline (CD-2/3) was approved and design was initiated in 2014 and construction began in 2015. Construction was completed and transitioned to Materials and Fuels Complex (MFC) Operations in 2017. The facility successfully achieved readiness with authorization to begin operations (CD-4) in 2018. The $77 M line-item capital-acquisition project was completed six months ahead of the congressional commitment date and significantly under budget. This paper presents highlights of the RH LLW Disposal Facility project delivery and a summary of facility features and critical characteristics. Highlights include: - As a hazard category II nuclear facility, the project complied with United States Department of Energy (DOE) requirements for incorporation of nuclear safety into facility design and construction as identified in DOE-STD-1189 as well as 10 CFR 835 Subpart K requirements for incorporation of ALARA principles in facility design. - From an environmental compliance perspective, the facility was subject to National Environmental Policy Act requirements resulting in a Finding of No Significant Impact as determined by an Environmental Assessment. An operating disposal authorization statement from the Low-Level Waste Disposal Facility Federal Review Group (LFRG) authorizing waste disposal operations in accordance with DOE Order 435.1 was obtained. - The project was delivered using a design-build delivery method with a firm-fixed price with incentive fee contracting mechanism. The project was executed as a line-item capital-acquisition project, in full compliance with DOE Order 413.3B under INL's certified Earned Value Management System (EVMS) program. - The facility supports twenty years of waste disposal operations with five disposal vault configurations in four vault arrays supporting six different cask/canister system configurations. Three of the six cask/canister systems currently exist and three will be developed to support future operations. There are a total of 446 waste disposal vaults that will accommodate disposal of a total of 939 stainless steel radioactive waste canisters. The facility is designed to accommodate canisters with contact radiation dose rates as high as 600 Sievert/hour (60,000 Rem/hour). - The facility underwent a rigorous readiness review process in accordance with DOE Order 425.1D. Readiness activities included rigorous facility testing and shakedown activities, a management-self assessment, a contractor operational readiness review, and a DOE operational readiness review. Readiness was demonstrated for an existing cask/canister system (the MFC HFEF-5 cask). Separate readiness activities will be conducted for each cask/canister system as they are brought online for facility operations. INL's successful delivery of the project has provided waste disposal capability to ensure long-term viability of planned and current facilities and missions associated with both INL and the Naval Reactors Facility. Successful execution of the project has proven to be strategically important to future capital investments in capabilities necessary to advance INL's mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developments in the Regulatory Framework of Nuclear Waste Management in Germany - Licensing Procedures for storage of SNF and Public Involvement - 19612

According to article 6 of the German Atomic Energy Act (AtG), storage of Spent Nuclear Fuel requires a license. The competent licensing authority in this field is the Federal Office for Safety of Nuclear Waste Management (BfE). According to the Act for selecting a repository site for heat-generating radioactive waste (HAW) (Site Selection Act - StandAG) dating from 2017, BfE has been assigned the task of developing, conducting, and evaluating public participation procedures in the process of site search and selection for a deep geological repository for radioactive waste and SNF. Article 6 AtG applies to interim storage of SNF. If the legally defined licensing conditions by article 6 (2) AtG are met, the storage license applied for has to be granted. For on-site facilities, interim storage has been limited to 40 years. The licensing procedures for interim storage of SNF are carried out in accordance with the general administrative procedural rules. In certain cases due to the Environmental Impact Assessment Act (EIA Act), an EIA has to be carried out. In these cases, a formalized licensing procedure including an involvement of the public is conducted. The Nuclear Licensing Procedure Ordinance (AtVfV) originating from 1977 and reformulated in 1995 defines formalized rules for the public participation procedure which have to be followed strictly. These include a public hearing. The risen objections are evaluated by the licensing authority and taken account of in the licensing decision. The process of repository site selection defined by the StandAG exceeds these formalized procedures significantly: The objective of this process is to achieve a broad social consensus about the site selection procedure and about a repository site that will offer the best possible safety for one million years. Therefore, the process has to be particularly transparent, and involvement of the public - including newly developed forms of public involvement - is an essential part of it. BfE as competent authority in both the fields of repository site search and selection and licensing of interim storage of SNF has recently developed new strategies of involving the public concerning interim storage of SNF. Supplementing the standard licensing procedures, BfE presently informs and involves the public about topical issues regarding the present state and recent developments in the field of interim storage of SNF. Current central topics are for example the return of HAW and MAW from reprocessing of SNF in France and UK as well as perspective longer interim storage periods on the interface with final disposal. Regarding longer interim storage, host communities of interim storage facilities are concerned that interim storage might be extended indefinitely. Additionally, there is a strong fear of transports of radioactive waste and SNF from one place to another. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiological Performance Modeling: Platform Comparison

Zapadnoe Uranium Mill Tailings Site, Pridneprovsky Chemical Plant Ukraine: Two exposure scenarios were utilized to develop performance assessment models in GoldSim and NORMALYSA. The first scenario is an onsite worker exposed to radioactivity through external ground irradiation as well as radon and radioactive dust inhalation. The second being an offsite Resident 300 years after institutional control exposed through the ingestion of garden vegetables irrigated by contaminated ground water, ingestion of fish from Konoplyanka River, and agricultural activities in contaminated garden. NORMALYSA utilizes a modular interface to connect extensive pre-created modules to develop contaminant transport and risk assessment models for safety assessments and performance assessments at NORM and legacy sites. Developed by Facilia AB, the program was tested with the creation of the Zapadnoe model under the International Atomic Energy Agency MODARIA Il Working Group 1 (WG1). Default values are provided for input parameters where site specific data and distributions lack. Probabilistic simulations and inputs are limited to parameters with assigned Gaussian probability functions. Similar results for transient worker inhalation dose were found in comparison with the Zapadnoe GoldSim model. However, the NORMALYSA model has results larger by an order of magnitude for external radiation in the transient worker and for aquatic food ingestion, inhalation, and garden food ingestion to the resident. Performance Assessment Modeling: Radiological performance models promote good management and support in remediation and environmental decision making by optimizing radioactive waste disposal site performance. a performance assessment model of the Zapadnoe uranium mill tailings site and a model for calculating authorized limits at Los Alamos National Laboratory are created to demonstrate and highlight the respective capabilities of three modeling platforms: GoldSim, NORMALYSA, and RESRAD-Onsite. GoldSim is a general-purpose modeling platform with the ability to simulate site-specific FT radionuclide transport and risk assessment using a graphical interface to create and link elements that act as indivisible building blocks of the model. The Zapadnoe performance assessment model created in GoldSim is composed of input parameters collected from site specific parameters from WG1 as well as standard assumptions seen in the Generic PA Model from Neptune and Company. The multivariate Zapadnoe simulation contains both deterministic and probabilistic simulation capabilities with the ability to quantitatively represent the uncertainty and associated risks of the site via the Monte Carlo simulation method. Model parameters, documentation, and assumptions are built directly into the model creating a transparent, reproducible, and more purposeful site specific model. To demonstrate this, an ingestion of water pathway was included in addition to the exposure pathways included in the NORMALYSA model. GoldSim offers a wide variety of probability distributions to choose from as well as many tools to visualize the uncertainty of the models and explore which pathways and radionuclides dominate dose. In contrast to the NORMALYSA model, the GoldSim model uses dynamic simulation to calculate tritium concentrations. Authorized limits support the evaluation of radiological health effects from radionuclides present in bulk contaminated soil in order to assist in the process of clearing land for release under different uses. Calculations of authorized limits in RESRAD-Onsite and GoldSim models support the evaluation for 15 radionuclides using a residential exposure scenario, indoor and outdoor inhalation of dust and vapor phase radionuclides (tritium), incidental soil ingestion, and ingestion grown fruits and Vegetables. RESRAD-Onsite, developed by Argonne National Laboratory is a dedicated computer code for calculating radiation doses and cancer risks to an individual located on top of radioactively contaminated soils. It can also be used to provide guidelines for deriving radionuclide soil levels corresponding to a specific dose criterion. The menu driven user interface facilitates selection of radionuclides and soil concentrations, as well as defines parameter values related to materials, environmental factors, and exposure pathways. The program contains radionuclide-specific data such as dose conversion factors and risk coefficients, as well as soil-water partition coefficients and transfer factors for biotic media. The GoldSim model successfully emulates the RESRAD-Onsite code using identical radiological decay and ingrowth factors, radiation dose conversion factors, and other input parameters. DE EEDE ETS Each model supports dynamic modeling of radionuclide ingrowth and decay over time, and integrate this capability with the transport of radionuclides in the environment via processes such as advection and/or diffusion in fluids, or within porous solid media, The applicability of each program is heavily dependent on project context. In the context of developing Authorized Limits, RESRAD-Onsite may be a more desirable option as it was developed for this particular application. For simple disposal or legacy sites or sites that do not need site-specific model structure, NORMALYSA may be a desirable modeling platform, GoldSim can be used to model any problem for which RESRAD or NORMALYSA is applicable, but its strength lies in its flexibility, analytical, and probabilistic capabilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

System Health and Status Reporting is Used to Improve Infrastructure Systems at the Hanford Site - 20449

Reliable physical infrastructure systems are vital to completing the clean-up mission and the start-up and commissioning of new nuclear waste processing facilities at the Hanford Site. Key infrastructure systems at Hanford include water, sewer, and electrical utilities, roads, telecommunications/network systems, and fire systems. All of the infrastructure systems are non-nuclear, General Service systems that are being maintained under formal engineering configuration control and none are specifically credited in any documented safety analysis (DSA). Starting in calendar year 2017, the Hanford Site's infrastructure and services contractor started producing system health and status reports for a total of 15 critical infrastructure systems as means to get a better understanding of each system's health and how it could be improved to ensure better and more reliable service delivery. As the reporting, tracking, and use of the metrics has matured, the number of systems for which reports are being developed has been expanded to a total of 23. Each of the critical infrastructure systems are assigned primary and alternate design authorities that complete qualifications on each assigned system. The design authorities actively manage and maintain configuration control on each of their systems and track metrics associated with availability, maintenance (corrective and preventive), and configuration of the technical baseline. The metrics are based on the principles established in Chapter V of DOE O 420.1C, Facility Safety, [1] and have been tailored as appropriate to each of the key infrastructure systems. An overall assessment of system health is performed and documented on a routine basis (e.g., quarterly). Included in this documentation is a quantitative score for each of the metrics (i.e., availability, maintenance, configuration management) along with results of system walk-downs, description of any permanent design modifications, identification of new or emerging issues and vulnerabilities affecting the system, and an assessment by the design authority of actions necessary to improve the system health score. The overall status scores are calculated using a formula and based on a pre-determined grading scale, a color is assigned for simple presentation. The information gained from developing the reports is being used to (1) assist with making timely and better informed decisions through the use of solid technical bases that are increasing the overall reliability and capabilities of the Site's infrastructure systems as new expense and capital projects in the Reliability Projects Investment Portfolio (RPIP) are prioritized and executed; (2) feed the risk management program, and (3) integrate the technical content of Master Plans that describe the Site's needs for the system and the system's capabilities to meet those future needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Novel Instrumentation for Advanced Quantum Chromodynamics Studies with Flavor Sensitivity

The true nature of ordinary matter has always fascinated humankind, whose imagination has been pointed to the right direction since the 5th century BC with the first known atomic theory by Leucippus and Democritus. They described the matter as formed by small, invisible, indivisible, and eternal particles: the atoms. A long investigation followed them, including contributions from several of history?s greatest philosophers and scientists. The progress led to the understanding that atoms have an internal structure consisting of a central nucleus composed of protons and neutrons, surrounded by a cloud of electrons. About 50 years ago, scientists discovered that nucleons also have an internal structure. Through the Deep Inelastic Scattering (DIS) experiments, on which a lepton is scattered off a nucleon, it was possible to access the distribution of partons inside the nucleon along the longitudinal direction defined by the hard-scale probe. It was a crucial step in developing Quantum Chromodynamics (QCD), currently the best theory describing the subatomic matter. Ultimately, DIS was recognized as a limited tool to investigate the nucleon structure because it is mainly sensitive to observables at the probe?s energy scale. In recent decades, theoretical developments have allowed defining soft-scale observables by measuring more complex processes. Reactions such as Semi-Inclusive Deep Inelastic Scattering (SIDIS) with single or di-hadron production, can provide information about the momentum of parton inside the nucleon. In particular, polarized SIDIS allows access to the Transverse-Momentum-Dependent (TMD) parton distributions describing the correlations of the quark and gluon degrees of freedom in transverse momentum and spin. This study can provide three-dimensional imaging of nucleon structure and inner dynamics, as long as the hadronic component in the final state can be measured. Identifying the species of the produced particles provides information on the quark flavor and assumes a crucial role in this context. The thesis describes the work carried out by the author in preparing novel instrumentation for particle identification in the final state of DIS experiments, to support modern analysis of the parton dynamics within the basic confined object (nucleon) with flavor sensitivity. The work has been focused on the CLAS12 spectrometer in operation at Jefferson Laboratory (JLab), Newport News, VA, USA, and the ePIC experiment in preparation for the future Electron-Ion Collider (EIC) at Brookhaven National Laboratory (BNL), Long Island, NY, USA. CLAS12 is a fixed-target experiment using a 12 GeV beam of polarized electrons scattering off polarized nuclear targets. In 2018 and 2022, two Ring Imaging Cherenkov (RICH) detector modules were installed to improve the ?±/K± separation in the high-momentum region (3÷8 GeV/c) of the experiment. The author contributed to the assembly, installation, and com- missioning of the second RICH module, to the efficiency studies of the first module, and to the first SIDIS analysis with high-momentum kaons identified by the RICH. These studies led to the observation of the first spin asymmetry with high-momentum kaons from the CLAS12 experiment, and an initial assessment of the systematic error associated with the hadron identification. ePIC will be the first experiment at the future EIC, the new collider designed to expand the frontiers of QCD. The author was involved in the development of the dual-radiator Ring Imaging Cherenkov (dRICH). This detector will interpolate the measurements of the Cherenkov angles of photons produced by relativistic particles crossing two different radiators to identify charged hadrons. The author contributed to the studies conducted with the dRICH prototype, developing the reconstruction and analysis software and simulations, characterizing the aerogel radiator samples, and being responsible for the tracking system used during the beam tests. The performance obtained by the prototype has been progressively improved and the results are now comparable with the expectation derived from the simulation and satisfy the requirements of the experiment. In Chapter 1, the SIDIS theory is briefly introduced, outlying the connection with the experimental measurement. Chapter 2 includes the description of the CLAS12 RICH, its assembly and installation, and the efficiency study. In Chapter 3, the analysis of the Beam-Spin Asymmetry associated with SIDIS kaons is described. Chapter 4 describes the contribution to the dRICH for EIC, starting from a description of the ePIC experiment and focusing on the studies performed for the dRICH prototype. The conclusions of this work are summarized at the end.

Vallarino, Simone↗

CMS Token Transition

Within the LHC community, a momentous transition has been occurring in authorization. For nearly 20 years, services within the Worldwide LHC Computing Grid (WLCG) have authorized based on mapping an identity, derived from an X.509 credential, or a group/role, derived from a VOMS extension issued by the experiment. A fundamental shift is occurring to capabilities: the credential, a bearer token, asserts the authorizations of the bearer, not the identity. By the HL-LHC era, the CMS experiment plans for the transition to tokens, based on the WLCG Common JSON Web Token profile, to be complete. Services in the technology architecture include the INDIGO Identity and Access Management server to issue tokens; a HashiCorp Vault server to store and refresh access tokens for users and jobs; a managed token bastion server to push credentials to the HTCondor CredMon service; and HTCondor to maintain valid tokens in long-running batch jobs. We will describe the transition plans of the experiment, current status, configuration of the central authorization server, lessons learned in commissioning token-based access with sites, and operational experience using tokens for both job submissions and file transfers.

43 PARTICLE ACCELERATORS↗

DEVELOPMENT OF A ROTARY MICROFILTER FOR RADIOACTIVE WASTE APPLICATIONS

The processing rate of Savannah River Site (SRS) high-level waste decontamination processes are limited by the flow rate of the solid-liquid separation. The baseline process, using a 0.1 micron cross-flow filter, produces {approx}0.02 gpm/sq. ft. of filtrate under expected operating conditions. Savannah River National Laboratory (SRNL) demonstrated significantly higher filter flux for actual waste samples using a small-scale rotary filter. With funding from the U. S. Department of Energy Office of Cleanup Technology, SRNL personnel are evaluating and developing the rotary microfilter for radioactive service at SRS. The authors improved the design for the disks and filter unit to make them suitable for high-level radioactive service. They procured two units using the new design, tested them with simulated SRS wastes, and evaluated the operation of the units. Work to date provides the following conclusions and program status: (1) The authors modified the design of the filter disks to remove epoxy and Ryton{reg_sign}. The new design includes welding both stainless steel and ceramic coated stainless steel filter media to a stainless steel support plate. The welded disks were tested in the full-scale unit. They showed good reliability and met filtrate quality requirements. (2) The authors modified the design of the unit, making installation and removal easier. The new design uses a modular, one-piece filter stack that is removed simply by disassembly of a flange on the upper (inlet) side of the filter housing. All seals and rotary unions are contained within the removable stack. (3) While it is extremely difficult to predict the life of the seal, the vendor representative indicates a minimum of one year in present service conditions is reasonable. Changing the seal face material from silicon-carbide to a graphite-impregnated silicon-carbide is expected to double the life of the seal. Replacement of the current seal with an air seal could increase the lifetime to 5 years and is undergoing testing in the current work. (4) The bottom bushing showed wear due to a misalignment during the manufacture of the filter tank. Replacing the graphite bushing with a more wear resistant material such as a carbide material will increase the lifetime of the bushing. This replacement requires a more wear resistant part or coating to prevent excessive wear of the shaft. The authors are currently conducting testing with the more wear resistant bushing. (5) The project team plans to use the rotary microfilter as a filter in advance of an ion exchange process under development for potential deployment in SRS waste tank risers.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multilinear algebra for analyzing data with multiple linkages.

Link analysis typically focuses on a single type of connection, e.g., two journal papers are linked because they are written by the same author. However, often we want to analyze data that has multiple linkages between objects, e.g., two papers may have the same keywords and one may cite the other. The goal of this paper is to show that multilinear algebra provides a tool for multilink analysis. We analyze five years of publication data from journals published by the Society for Industrial and Applied Mathematics. We explore how papers can be grouped in the context of multiple link types using a tensor to represent all the links between them. A PARAFAC decomposition on the resulting tensor yields information similar to the SVD decomposition of a standard adjacency matrix. We show how the PARAFAC decomposition can be used to understand the structure of the document space and define paper-paper similarities based on multiple linkages. Examples are presented where the decomposed tensor data is used to find papers similar to a body of work (e.g., related by topic or similar to a particular author's papers), find related authors using linkages other than explicit co-authorship or citations, distinguish between papers written by different authors with the same name, and predict the journal in which a paper was published.

97 MATHEMATICS AND COMPUTING↗

Analysis of Unit-Level Changes in Operations with Increased SPP Wind from EPRI/LCG Balancing Study

Wind power development in the United States is outpacing previous estimates for many regions, particularly those with good wind resources. The pace of wind power deployment may soon outstrip regional capabilities to provide transmission and integration services to achieve the most economic power system operation. Conversely, regions such as the Southeastern United States do not have good wind resources and will have difficulty meeting proposed federal Renewable Portfolio Standards with local supply. There is a growing need to explore innovative solutions for collaborating between regions to achieve the least cost solution for meeting such a renewable energy mandate. The Department of Energy funded the project 'Integrating Midwest Wind Energy into Southeast Electricity Markets' to be led by EPRI in coordination with the main authorities for the regions: SPP, Entergy, TVA, Southern Company and OPC. EPRI utilized several subcontractors for the project including LCG, the developers of the model UPLAN. The study aims to evaluate the operating cost benefits of coordination of scheduling and balancing for Southwest Power Pool (SPP) wind transfers to Southeastern Electric Reliability Council (SERC) Balancing Authorities (BAs). The primary objective of this project is to analyze the benefits of regional cooperation for integrating mid-western wind energy into southeast electricity markets. Scenarios were defined, modeled and investigated to address production variability and uncertainty and the associated balancing of large quantities of wind power in SPP and delivery to energy markets in the southern regions of the SERC. DOE funded Oak Ridge National Laboratory to provide additional support to the project, including a review of results and any side analysis that may provide additional insight. This report is a unit-by-unit analysis of changes in operations due to the different scenarios used in the overall study. It focuses on the change in capacity factors and the number of start-ups required for each unit since those criteria summarize key aspects of plant operations, how often are they called upon and how much do they operate. The primary analysis of the overall project is based on security-constrained unit commitment (SCUC) and economic dispatch (SCED) simulations of the SPP-SERC regions as modeled for the year 2022. The SCUC/SCED models utilized for the project were developed through extensive consultation with the project utility partners, to ensure the various regions and operational practices are represented as best as possible in the model. SPP, Entergy, Oglethorpe Power Company (OPC), Southern Company, and the Tennessee Valley Authority (TVA) actively participated in the project providing input data for the models and review of simulation results and conclusions. While other SERC utility systems are modeled, the listed SERC utilities were explicitly included as active participants in the project due to the size of their load and relative proximity to SPP for importing wind energy.

17 WIND ENERGY↗