Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “accelerator physics”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

SBND Analysis using ML Reconstruction Chain

As part of the Short Baseline Neutrino (SBN) Program at Fermilab, the Short Baseline Near Detector (SBND) is positioned in the Booster Neutrino Beam (BNB) and explores neutrino-argon interactions with unprecedented statistics. SBND is a Liquid Argon Time Projection Chamber (LArTPC). Electrons produced through ionization drift toward three wire planes, providing signals that form 2D images of particle trajectories. I introduce the Scalable Particle Imaging using Neural Embeddings (SPINE) framework, which employs a Machine Learning (ML)-based 3D reconstruction using a series of neural networks. Here, we present SPINE’s reconstruction chain, analysis approaches, and results from our latest simulation samples.

43 PARTICLE ACCELERATORS↗

Towards Field Emission Free Cavity Processing and String Assembly at Fermilab

Cavities and cryomodules assembled at Fermilab have demonstrated unprecedented field emission (FE) free gradients. However, consistent FE-free performance is not guaranteed. Many lessons were learned, and continued vigilance is a must. In addition, several improvements have been identified to further push the state-of-the-art low particulate cavity processing and assembly at Fermilab. Those included the optimization of nitrogen flow, robotic-assisted assembly, and low-particulate fasteners. We share our latest results and vision for the future clean assemblies of cavities and cryomodule strings.

43 PARTICLE ACCELERATORS↗

Rapid-cycling HTS magnet for muon acceleration

A very wide range of operational temperatures of the HTS (YBCO) superconductor makes it suitable for the construction of rapid-cycling magnets required for the muon acceleration. The measured [3] very low power loss of the 0.4 T magnet operating at 300 T/s suggested a realistic possibility of the HTS-based accelerator magnet with much higher magnetic field and ramp rate. The magnet core and the HTS cable designs for the 2 T field in the 30 mm beam gap are presented. The simulation of the HTS cable hysteresis power loss for the 1000 T/s ramp rate is discussed in terms of the operational temperatures and required cryogenic power.

43 PARTICLE ACCELERATORS↗

Fermilab Neutrino Program – Accelerators & Experiments

We provide an overview of the Fermilab neutrino program, including details for both the accelerator and experiment aspect of the program. On the accelerator side, the current operation of the proton complex is presented, alongside the status of the upcoming PIP-II upgrade and the newly proposed ACE-MIRT upgrade. On the detector side, the SBN and NOVA programs are presented, as well as the status of the upcoming DUNE/LBNF upgrade. The Fermilab neutrino program planning is contextualized in terms of the recent P5 report, as well as ongoing discussions on future flavor and collider programs.

43 PARTICLE ACCELERATORS↗

On the Life Expectancy Ot High-power CW Magnetrons for Superconducting Accelrators

Modern CW or pulse Superconducting RF (SRF) accelerators require efficient RF sources controllable in phase and power with a reduced cost. Therefore, utilization of the high-power CW magnetrons as RF sources in SRF accelerator projects was proposed in a number of works, e.g., [1, 2]. But typically, the CW magnetrons are designed as RF sources for industrial heating, and the lifetime of the tubes is not the first priority as it is required for high-energy accelerators. The high-power industrial CW magnetrons use the cathodes made of pure tungsten. The emission properties of the tungsten cathodes are not deteriorated much by electron and ion bombardments, but the latter causes sputtering of the cathode in the magnetron crossed fields. The sputtered cathode material covers the magnetron interior. This leads to sparks and discharges that limit the life of the magnetrons. We considered an analysis of magnetron failure modes vs. output power [3]. We developed a model of ionization of the residual gas in the magnetrons interaction space and simulated the spattering of the cathode in 100 kW CW magnetrons to estimate the life expectancy. Basing on results we proposed ways to increase the CW magnetrons longevity for SRF accelerators.

43 PARTICLE ACCELERATORS↗

Emittance Measurements with Wire Scanners in the Fermilab Side-Coupled Linac

The Fermilab Side-Coupled Linac accelerates H- beam from 116 MeV to 400 MeV through seven 805 MHz modules. Twelve wire scanners are present in the Side Coupled Linac and four are present in the transfer line between the Linac and the Booster synchrotron ring. These wire scanners act as important diagnostic instru-ments to directly collect information on the beam s transverse distribution. The manipulation of the condi-tions of wire scanner data collection enables further characterization of the beamline, such as calculating emittance and the Twiss parameters of the beam at select regions. Here we present the results of these studies and characterization of the non-Gaussian transverse beam distribution observed.

43 PARTICLE ACCELERATORS↗

NIOLD Run 4 Report

In this report we discuss the motivation, methods, and analysis of the IOTA Run 4 studies of the Nonlinear Integrable Optics, Landau Damping (NIOLD) experiment. We introduce Landau Damping, an effect that damps collective instabilities in particle accelerators. We also introduce and discuss a new method to measure stability diagrams which quantify the strength of Landau Damping, that employs an antidamper. We also present the data collection process, the data analysis procedure, and the preliminary results. The first results qualitatively agree with the analytical predictions and the simulations. Next steps for the current data and goals for future data are also discussed.

43 PARTICLE ACCELERATORS↗

Exploring the Great Pyramid: Detector Technical Design Report with Stand-Alone Monte Carlo Simulations

Cosmic-ray muon imaging has been used to non-destructively examine the Pyramids of Khufu and Khafre on the Giza Plateau; the EGP project will continue this line of research by undertaking a full tomographic scan of the former and by doing so will increase the sensitivity of the technique by upwards of two orders of magnitude. For this purpose, a muon telescope using triangular (vernier) detector cells far outperforms one with rectangular cells, providing an angular and positional RMS improvement by a factor of 4 for the same cost per unit area. A refinement algorithm was developed to handle tracks that produce secondaries. The triangular detector yields a positional resolution for a back-projection to the center of the pyramid of less than 20 cm, ensuring that a feature large enough to be of significance will still be seen by the telescope. This method is shown to be able to accurately and precisely reconstruct tracks of muons that pass through the King s Chamber, Queen s Chamber, and Grand Gallery.

43 PARTICLE ACCELERATORS↗

Horn Location Sensors (HLS) for LBNF

The Long-Baseline Neutrino Facility (LBNF) will deliver the world's most powerful muon neutrino beam to the Deep Underground Neutrino Experiment (DUNE), initially operating at 1.2 MW and upgradeable to 2.4 MW. Ensuring the accurate direction of this beam is critical for DUNE's precision goals. This talk introduces the Horn Location Sensors (HLS) system, designed to provide precise, relative measurements of the focusing horns, targets, and beam position monitors in the neutrino beamline. The HLS system employs high-precision FSI-based hydrostatic leveling sensors to track vertical motion and tilt, achieving precision on the order of 0.1 mm. Built for minimal maintenance in radioactive environments, the HLS system ensures precise alignment of beamline components during high-power operations. This system is essential for maintaining beam accuracy and enhancing DUNE's scientific performance.

43 PARTICLE ACCELERATORS↗

LBNF Target Complex Remote Handling

The Long Baseline Neutrino Facility (LBNF) near site at the Fermilab campus in Illinois, USA includes a target complex which houses a 1.5 – 1.8m long graphite neutrino production target, a pre-target baffle, three neutrino focusing horns (A,B,C), and a decay pipe 200m in length leading to an energy absorber / beam dump housed in an adjacent absorber building. The prompt dose rates are such that the Target Hall must be unoccupied while beam is on target. During maintenance periods, the Target Hall can be occupied by trained personnel. However, residual dose rates of activated components necessitate certain operations, such as the annual replacement of the target, be executed remotely by personnel located in a shielded room within the Target Hall. This presentation covers details designed into the infrastructure, equipment, and procedures to allow for successful execution of remote handling operations.

43 PARTICLE ACCELERATORS↗

New Muon Campus Simulations for the Muon $g\textrm{-}2$ Experiment at Fermilab

The Muon $g\textrm{-}2$ Experiment (E989) at Fermilab conducted high-precision measurements of the muon anomalous magnetic moment $a_{\mu}$ using a storage ring from 2018 to 2023, achieving a remarkable precision of $200\:\mathrm{ppb}$ over Runs 1-3, with analyses for Runs 4-6 ongoing. A comprehensive understanding of the storage ring's beam dynamics and its accurate simulations are crucial for achieving the experiment's ambitious goals. One of the requirements for this effort is a very detailed knowledge of the phase space distribution of the beam. To address this requirement, we performed high-statistics simulations of the Muon $g\textrm{-}2$ Target Station (AP0) and the Muon Campus beamlines: M2 and M3, followed by the Delivery Ring, and then M4 and M5. The resulting muon distribution at the end of the M5 beamline from our previous $3\times10^{12}$ protons-on-target (PoT) simulation serves as an essential input for the storage ring simulations. In 2024, to facilitate the analyses of Runs 4-6, we have updated our Muon Campus models and re-optimised certain parameters to reflect the operational currents and wire chamber measurements of the beam. For these optimisations, we employed the heterogeneous island method, implemented in our evolutionary optimisation tool, glyfada. This key update addresses the need to use the best possible beam for the storage ring simulations and thus supports the experiment's overall precision. The Muon $g\textrm{-}2$ Experiment at Fermilab has successfully achieved its $70\:\mathrm{ppb}$ systematic uncertainty goal and collected 21 times more data than its predecessor at BNL. The updated and improved Muon Campus models and simulations not only facilitate the experiment's efforts to potentially resolve the current tension between experimental measurements and theoretical predictions of $a_{\mu}$, but also provide a basis for future simulations for the Mu2e Experiment (E-973), which utilises shared Muon Campus beamlines.

43 PARTICLE ACCELERATORS↗

Progress in developing a superconducting accelerator for efficient eBeam and X-ray production

The PIP-II Accelerator is an 800 MeV superconducting Linac in the injection chain of the Fermilab accelerator complex. The LLRF systems for the 125 cavities which include a few normal conducting cavities in the warm front-end section, use a variety of LLRF hardware components and sub-systems that are part of the timing and synchronization system. This includes a master oscillator and phase averaging reference line, a beam pattern generator to enable beam transfer between non-harmonic RF systems and beam loading compensation systems synchronized to a start of beam trigger. The timing signals are based on a 650 MHz clock with manchester encoded event information and data provided over optical fiber. The timing and synchronization systems and their performance parameters will be described here.

43 PARTICLE ACCELERATORS↗

Proton Improvement Plan II (PIP-II) Clock and Timing

The PIP-II timing system is planned to be a two-part system consisting of a global timing system (referred to as ACLK) that provides high level, event-based timing for the whole Fermilab accelerator complex while the second part is a RF synchronized clock system unique to the PIP-II Linac itself (referred to as LCLK). The ACLK System will make use of an external 10 MHz GPS based signal source as a reference for its 650 MHz phase lock as it is the reference frequency for the TCLK output of the system (needed to support legacy hardware around complex). The LCLK System will use a PIP-II Linac RF reference (162.5 MHz) from the Linac LLRF system to allow beam synchronized event placement. Both the ACLK and LCLK systems will have a clock output with a data frame of 16 event bits + 32 data bits with frames broadcast at 650 MHz, phase locked to the 10MHz reference in the case of ACLK and the PIP-II LLRF sourced 162.5 MHz reference in the case of LCLK.

43 PARTICLE ACCELERATORS↗