Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Transportation System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

The Space Transportation System summer environment on launch pad

This paper describes a 2D flow and thermalanalysis to determine the solar effect on the Space Shuttle launch components subsequent to the external tank (ET) loading operation in extremely hot conditions. An existing CFD code Parabolic Hyperbolic or Elliptical Numerical Integration Code Series was used in the study. The analysis was done for a 2D slice between planes perpendicular to the longitudinal axis of the STS and passing through the lower portions of the Redesigned Solid Rocket Motors (RSRMs), the ET, and the wing of the Orbiter. The results are presented as local and average values of the heat transfer coefficient, and the Nusselt number, and the surface temperature around the RSRMs and the ET. Solar heating effects increased the surface temperatures of the RSRMs by 9-11 F. Higher prelaunch surface temperatures measured on the east and west RSRMs (in the inboard region between the RSRMs and the ET) during 19 most recent launches of the STS are correlated as a function of the ambient temperature.

Ahmad, R. A.↗

An accelerated development, reduced cost approach to lunar/Mars exploration using a modular NTR-based space transportation system

Benefits and rationale for developing a common, modular lunar/Mars space transporation system (STS) based on nuclear thermal rocket (NTR) are presented. The modular NTR is based on three key components including a 50 klbf NERVA-derived engine used in clusters of 2 or 3, two standardized tank sizes developed for the First Lunar Outpost and Mars cargo vehicle applications, and a preintegrated truss/propellant feed system used for transferring LH2 from the drop tanks into the 'in-line' tank. It is concluded that, by using these components in a 'building block' fashion, a variety of single and multi-engine lunar and Mars vehicles can be configured to satisfy particular mission requirements.

Borowski, S.↗

Aerobraking technology for manned space transportation systems

The paper discusses aerobraking technology for manned missions to Mars. Special attention is given to the human and technical parameters that strongly affect the design of aerobrakes and the aerothermodynamic environment which will be encountered during atmospheric passage to Mars, and to the thermal protection technology for aerobrakes, including some recent developments in ablative thermal protection materials. Some results of tests are presented, and recommendations are made for future technology developments in aerobraking.

Arnold, J. O.↗

Space Transportation System design for operations in the 2000+ era

Highlights of design studies for the Personnel Launch System (PLS) and the Advanced Manned Launch System (AMLS) are reviewed, and the benefits achieved by the involvement of product development teams (PDTs) in the advanced design environment are considered. The definition of system concept for the PLS and the AMLS and the development philosophy of the systems are addressed, including the adoption of major features of aircraft design, development, and operation, including performance trending, the use of certified airframe and powerplant personnel, lifetime certification, and the operational environment. Design features of the systems are examined.

Ehrlich, C. F., Jr.↗

Hermes CX-7: Air transport system design simulation

The Hermes CX-7 has been designed to service the overnight parcel package delivery needs of the cities of Aeroworld as determined in the G-Dome Enterprises market survey. The design optimization centers on the prime goal of servicing the needs of these cities as efficiently and profitably as possible. The greatest factors which affect the design of an aircraft for the mission outlined in the Request for Proposal are cost, construction feasibility and effectiveness of the design. Other influencing factors are given by the constraints of the market, including a maximum takeoff and landing distance of 60 feet, storage capability in a container of size 5 ft. x 3 ft. x 2 ft., cargo packages of 2 inch and 4 inch cubes, and ability to turn with a radius no larger than 60 feet. Safety considerations such as flying at or below Mach one (30 ft/s) and controllability and maintainability of the aircraft must also be designed into the aircraft. Another influential factor is the efficiency of the aircraft which involves optimizations and tradeoffs of such factors as weight, lifting surface sizing, structural redundancy, and material costs.

Amer, Brian↗

The S.T.o.R.M. (tm): Air transport system design simulation

The members of Team Asylum have proposed a helicopter design concept, called the S.T.o.R.M., in order to meet the market demands for an aircraft to perform overnight package delivery services in Aeroworld. The helicopter concept was chosen over a fixed wing aircraft design to fulfill the mission requirements for a variety of reasons, all of which will be discussed later. However, many critical design areas needed to be investigated as part of the helicopter concept's selection. One of the most significant design factors was the weight of the aircraft. This determined the selection of the propulsion system necessary to get the S.T.o.R.M. off the ground, and maintain flight once airborne. Another significant factor that went hand in hand with the motor selection was the choice of the main rotor. Since the main rotor is the primary source of lift for the helicopter, its proper selection became increasingly important.

Source record↗

JEFF: Air transport system design simulation

Jeff is a remotely piloted vehicle designed by the Blue Team, a division of AE441, Inc., to fulfill the mission proposed by G-Dome Enterprises: to build a cost efficient aircraft to service Aeroworld with overnight cargo delivery. The design of Jeff was most significantly influenced by the need to minimize costs. This objective was pursued by building fewer large planes as opposed to many small planes. Thus, by building an aircraft with a large payload capacity, G-Dome Enterprises will be able to minimize the large costs and the large number of cycles that are associated with a large fleet. Another factor which had a significant influence on our design was the constraint that our design had to fit into a 2'x2'x5' storage container. This constraint meant that unless we wanted to build foldable wings that Jeff's span would be limited to 10 feet. Since this was not enough lifting surface to suit our needs a canard configuration was chosen to get the needed lifting surface and avoid the structural dilemma of foldable wings. The aircraft is constructed mainly of balsa, with spruce wing and canard spars and a monokote covering. It was designed to support a maximum payload weight of 35 oz. (total aircraft weight of 108 oz.) and withstand a maximum load factor of 2.5.

Source record↗

Liquid Rocket Booster (LRB) for the Space Transportation System (STS) Systems Study. Amendment 13: Orientation meeting

The topics are presented in viewgraph form and include the following: LRB study results summary -- Feb. 1989; LRB study results -- Jan. 1990; Shuttle configuration with booster options; LRB study results -- Sept. 1990; LRB statement of work tasks; ground rules and assumptions; study flow of design, manufacturing/production, and test program/certification; study products; study schedule; and candidate 1.5 stage engine arrangements.

Source record↗

Establishing the infrastructure - An integrated Space Transportation System

A discussion is presented concerning the various transfer vehicle/propulsion systems that are currently under consideration within the egis of the NASA Space Exploration Initiative for the establishment of an infrastructure for lunar base construction and Mars exploration. Cryogenically fueled and nuclear propulsion alternatives are considered, as well as such advanced concepts as that employing nuclear-electric propulsion and artificial gravity and a solar-electric propulsion zero-gravity concept. Mars lander and earth-to-LEO launcher concepts are also noted.

Huber, W. G.↗

Advanced transportation system studies technical area 3: Alternate propulsion subsystem concepts, volume 2

The Alternate Propulsion Subsystem Concepts contract had five tasks defined for the first year. The tasks were: F-1A Restart Study, J-2S Restart Study, Propulsion Database Development, Space Shuttle Main Engine (SSME) Upper Stage Use, and CER's for Liquid Propellant Rocket Engines. The detailed study results, with the data to support the conclusions from various analyses, are being reported as a series of five separate Final Task Reports. Consequently, this volume only reports the required programmatic information concerning Computer Aided Design Documentation, and New Technology Reports. A detailed Executive Summary, covering all the tasks, is also available as Volume 1.

Levak, Daniel↗

Advanced transportation system studies technical area 3: Alternate propulsion subsystem concepts, volume 3

The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F-1A Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results, and the program cost estimates are described in more detail in Volume 1 - Executive Summary and in individual Final Task Reports.

Levak, Daniel↗

Advanced transportation system studies technical area 3: Alternate propulsion system concepts. SSME upper stage use

The main objective was to determine viable methods for starting the Space Shuttle Main Engine (SSME) in an altitude environment and restarting it in an orbit environment with minimum changes in utilization of the engine system or hardware. The study concluded that the use of the SSME in an upper stage is feasible with minimal changes to the engine systems. The altitude start case requires only a change in the valve sequencing during start and reorificing of the ASI lines. Inlet pressures can be moderately low at 40 psia for the LOX and 32 psia for the H2. The orbital restart case adds the need to recirculate propellant and thermal control paint (to keep the turbomachinery inlets cold to minimize the tank pressures needed), and the need to heat two small components (to maintain acceptable mixture ratios during the early part of the start). These actions allow start anytime after approximately 120 minutes. Earlier starts (approximately one hour) are also possible but would require additional component heating for mixture ratio control during the early portion of the start sequence.

Strangeland, Eric↗

Advanced transportation system studies, technical area 3. Alternate propulsion subsystem concepts: J-2S restart study

The objectives were to assess what design changes would be required to remit late production of the J-2S engine for use as a large high energy upper stage engine. The study assessed design changes required to perform per the J-2S model specification, manufacturing changes required due to obsolescence or improvements in state-of-the-practice, availability issues for supplier provided items, and provided cost and schedule estimates for this configuration. The confidence that J-2S production could be reinitiated within reasonable costs and schedules was provided. No significant technical issues were identified in either the producibility study or in the review of previous technical data. Areas of potential cost reduction were identified which could be quantified to a greater extent with further manufacturing planning. The proposed schedule can be met with no foreseeable impacts. The results of the study provided the necessary foundation for the detailed manufacturing and test plans and non-recurring and recurring cost estimates that are needed to complete the effort to reinitiate production of the J-2S engine system.

Vilja, John↗

Microbiological analysis of debris from Space Transportation System (STS)-55 Spacelab D-2

Filter debris from the Spacelab module D-2 of STS-55 was analyzed for microbial contamination. Debris from cabin and avionics filters was collected by Kennedy Space Center personnel on May 8, 1993, 2 days postflight. Debris weights were similar to those of previous Spacelab missions. Approximately 5.1E+5 colony forming units per gram of debris were enumerated from the cabin and avionics filter debris, respectively. these numbers were similar in previous missions for which the entire contents were analyzed without sorting of the material. Bacterial diversity was small compared to previous missions, with no gram negative bacteria isolated. Only one bacterial species, Corynebacterium pseudodiphtheriticum, was not isolated previously by the laboratory from Spacelab debris. This organism is a normal inhabitant of the pharynx. A table listing all species of bacteria isolated by the laboratory from previous Spacelab air filters debris collection is provided.

Huff, T. L.↗

Nuclear electric propulsion: A better, safer, cheaper transportation system for human exploration of Mars

NASA has completed a preliminary mission and systems study of nuclear electric propulsion (NEP) systems for 'split-sprint' human exploration and related robotic cargo missions to Mars. This paper describes the study, the mission architecture selected, the NEP system and technology development needs, proposed development schedules, and estimated development costs. Since current administration policy makers have delayed funding for key technology development activities that could make Mars exploration missions a reality in the near future, NASA will have time to evaluate various alternate mission options, and it appears prudent to ensure that Mars mission plans focus on astronaut and mission safety, while reducing costs to acceptable levels. The split-sprint nuclear electric propulsion system offers trip times comparable to nuclear thermal propulsion (NTP) systems, while providing mission abort opportunities that are not possible with 'reference' mission architectures. Thus, NEP systems offer short transit times for the astronauts, reducing the exposure of the crew to intergalactic cosmic radiation. The high specific impulse of the NEP system, which leads to very low propellant requirements, results in significantly lower 'initial mass in low earth orbit' (IMLEO). Launch vehicle packaging studies show that the NEP system can be launched, assembled, and deployed, with about one less 240-metric-ton heavy lift launch vehicle (HLLV) per mission opportunity - a very Technology development cost of the nuclear reactor for an NEP system would be shared with the proposed nuclear surface power systems, since nuclear systems will be required to provide substantial electrical power on the surface of Mars. The NEP development project plan proposed includes evolutionary technology development for nuclear electric propulsion systems that expands upon SP-100 (Space Power - 100 kw(e)) technology that has been developed for lunar and Mars surface nuclear power, and small NEP systems for interplanetary probes. System upgrades are expected to evolve that will result in even shorter trip times, improved payload capabilities, and enhanced safety and reliability.

Clark, John S.↗

Potential impacts of advanced aerodynamic technology on air transportation system productivity

Summaries of a workshop held at NASA Langley Research Center in 1993 to explore the application of advanced aerodynamics to airport productivity improvement are discussed. Sessions included discussions of terminal area productivity problems and advanced aerodynamic technologies for enhanced high lift and reduced noise, emissions, and wake vortex hazard with emphasis upon advanced aircraft configurations and multidisciplinary solution options.

Bushnell, Dennis M.↗

Advanced transportation system studies technical area 2(TA-2): Heavy lift launch vehicle development: Executive summary - volume 1

The purpose of the TA-2 contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. This document is part of the final report for the TA-2 contract. The final report consists of three volumes: Volume 1 is the Executive Summary, Volume 2 is Technical Results, and Volume 3 is Program Cost Estimates. The document-at-hand, Volume 1, provides a summary description of the technical activities that were performed over the entire contract duration, covering three distinct launch vehicle definition activities: heavy-lift (300,000 pounds injected mass to low Earth orbit) launch vehicles for the First Lunar Outpost (FLO), medium-lift (50,000-80,000 pounds injected mass to low Earth orbit) launch vehicles, and single-stage-to-orbit (SSTO) launch vehicles (25,000 pounds injected mass to a Space Station orbit).

McCurry, J.↗

Advanced transportation system studies technical area 2 (TA-2): Heavy lift launch vehicle development: Program Cost estimates - volume 3

The purpose of the TA-2 contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. The basic period of performance of the TA-2 contract was from May 1992 through May 1993. No-cost extensions were exercised on the contract from June 1993 through July 1995. This document is part of the final report for the TA-2 contract. The final report consists of three volumes: Volume 1 is the Executive Summary, Volume 2 is Technical Results, and Volume 3 is Program Cost Estimates. The document-at-hand, Volume 3, provides a work breakdown structure dictionary, user's guide for the parametric life cycle cost estimation tool, and final report developed by ECON, Inc., under subcontract to Lockheed Martin on TA-2 for the analysis of heavy lift launch vehicle concepts.

McCurry, J. B.↗