Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Test Loop”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Controlled Pyroshock Test Transients Can Be Used To Better Match Operational Shock Transients and Reduce Artificial Pyroshock Test Failures [Slides]

Shock analysis is typically done via SRS (shock response spectrum). Oftentimes shock analysis is not performed because most loads specifications only supply SRS requirements with no representative shock transients that can be used for analysis. SRS analysis is too conservative. There is no structural dynamics involved as all modes are assumed to have peak responses simultaneously and in-phase with each other. It is possible that all other loads and combination of loads show the design to be good, whereas SRS analysis (1000 g’s are involved) results may require redesign. Multiple shock transients can satisfy a SRS, yet most loads documents don’t provide a representative shock transient that could be used for shock analysis. Shock testing is less common than harmonic and random vibration testing. Engineers typically go into shock tests with very little knowledge of what to expect. A pass/fail type of approach with very little engineering done to prepare for the test or to control the type of shock transient is used. Most engineers will not model the shock test fixture due to lack of knowledge about the details of the test setup. Shock analysis and testing is often an open loop type situation with no test setup modeling, no test correlation, and no control over the test shock transient. In this work, if we can create applied test force transient that comes close to matching calculated force transient then a more reasonable acceleration transient will be created at the test reference accelerometer that better matches operational shocks.

42 ENGINEERING↗

Permanent magnets for the return loop of the Cornell-Brookhaven energy recovery linac test accelerator

214 neodymium permanent magnets have been manufactured for the return loop of the CBETA multi-turn ERL at Cornell University. There are 5 types of quadrupole and combined-function gradient magnets using a variant of the circular Halbach design. These are made out of NdFeB material and glued into an aluminium housing with water channels for temperature stabilisation. The NdFeB wedges and magnet construction were done by outside companies, while the final “tuning” using inserts containing 64 iron rods per magnet was done at BNL over a period of about 6 months. Average relative field errors of 2.2×10 -4 were achieved on the beam region. The magnet strengths vary by type but are of order 10 T/m for quadrupole component and up to 0.3 T for the dipole. This paper reports on the field quality and timeline achieved in this production process

43 PARTICLE ACCELERATORS↗

MODEL DEVELOPMENT AND VERIFICATION OF A 1,350°C AIR RECEIVER TEST SYSTEM

Open-loop volumetric receivers work with air at atmospheric pressure and are suitable for single-cycle or multicycle power plants. A novel additively manufactured (AM) silicon carbide (SiC), ceramic matrix composite (CMC) volumetric receiver was developed that consisted of a lattice structure, which absorbs solar radiation and converts it into heat energy. Heat energy from the porous receiver was transferred to heated ambient air. The receiver acted as a convective heat exchanger, transferring heat to the fluid through convection. Engineering was facilitated to develop a high-temperature air receiver test bed at Sandia national Laboratories (SNL) capable of demonstrating a 50kWth open-loop volumetric SiC air receiver module developed by General Electric Aerospace Research (GE Aerospace). This paper presents the development of the high temperature AM SiC-CMC air receiver, the test bed, and the first testing operations of this device, which was experimentally demonstrated to achieve 1,350°C for over 3.5 hours of operation, based on input flux levels of 67–91 W/cm2 0.5-2.5 kg/s flow rates. From the test campaign results, based on the measured convective heat transfer to the airflow and bounded radiative-loss assumptions, the solar-thermal efficiency of HOTSSTAR test module was estimated to be approximately as high as 74% for representative test conditions.

14 SOLAR ENERGY↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Operating Wind Turbine as Synchronous Generator: Modeling and Power-Hardware-in-the-Loop Demonstration

Grid-forming (GFM) control of Type 3 and Type 4 wind turbine generators (WTGs) has attracted substantial attention in power systems research; however, the limited overcurrent capability of power electronics converters continues to deteriorate the grid strength of the evolving power systems. Synchronous wind, also referred to as a Type 5 WTG, offers a unique GFM solution to address grid integration and grid strength issues by keeping the grid largely synchronous at very high integration levels of renewable generation. A Type 5 WTG interfaces with the electric grid via a synchronous generator driven by a variable speed hydraulic torque converter; hence, the wind rotor operates in variable-speed mode for maximum power generation, and the generator shaft remains synchronous to the grid. This paper develops and tests a high-fidelity model of a Type 5 WTG in a power-hardware-in-the-loop testing environment, and it presents its operation characteristics under different grid contingencies. The power-hardware-in-the-loop demonstration shows that a Type 5 WTG inherently behaves as a GFM unit and can obtain similar performance in terms of power response, wind rotor dynamics, and stability enhancement compared to a Type 3 WTG in GFM control mode. Furthermore, the paper provides further insight into how Type 5 WTGs can support the smooth transition to power systems with high integration levels of inverter-based resources.

17 - WIND ENERGY↗

Status of Kilowatt-Class Stirling Power Conversion Using a Pumped NaK Loop for Thermal Input

Free-piston Stirling power conversion has been identified as a viable option for potential Fission Surface Power (FSP) systems on the Moon and Mars. Proposed systems consist of two or more Stirling convertors, in a dual-opposed configuration, coupled to a low-temperature uranium-dioxide-fueled, liquid-metal-cooled reactor. To reduce developmental risks associated with liquid-metal loop integration, a test rig has been built to evaluate the performance of a pair of 1-kW free-piston Stirling convertors using a pumped sodium-potassium (NaK) loop for thermal energy input. Baseline performance maps have been generated at the Glenn Research Center (GRC) for these 1-kW convertors operating with an electric heat source. Each convertor was then retrofitted with a custom-made NaK heater head and integrated into a pumped NaK system at the Marshall Space Flight Center (MSFC). This paper documents baseline testing at GRC as well as the progress made in integrating the Stirling convertors into the pumped NaK loop.

Briggs, Maxwell H.↗

Conceptual Neutronics Scoping for Ramp Testing in the Advanced Test Reactor

With the closer of the Halden Boiling Water Reactor in 2018, the global capacity for in-reactor power ramp testing has been lost. As such tests provide valuable data for understanding pellet-cladding interaction (PCI) phenomena, finding new facilities for ramp testing is of interest to the United States Accident-Tolerant Fuel (ATF) Program. Several options at Idaho National Laboratory (INL) are being evaluated for adding ramp test capabilities. In the Transient Reactor Test Facility (TREAT), one option is testing inside a Transient Water Irradiation System in TREAT (TWIST) capsule. In the Advanced Test Reactor (ATR), one option under consideration is testing in an I-Loop toward the outer edge of the core. Another is testing in Loop-2A, located in the Center Flux Trap (CFT) of the ATR. In this paper, we examine the conceptual scoping for the Loop-2A experiment known as ATF-2Ramp.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Conceptual Neutronics Scoping for Ramp Testing in the Advanced Test Reactor

With the closure of the Halden Boiling Water Reactor in 2018, the global capacity for in-reactor power ramp testing has been lost. As such tests provide valuable data for understanding pellet-cladding interaction (PCI) phenomena, finding new facilities for ramp testing is of interest to the United States Accident-Tolerant Fuel (ATF) Program. Several options at Idaho National Laboratory (INL) are being evaluated for adding ramp test capabilities. In the Transient Reactor Test Facility (TREAT), one option is testing inside a Transient Water Irradiation System in TREAT (TWIST) capsule. In the Advanced Test Reactor (ATR), one option under consideration is testing in an I-Loop toward the outer edge of the core. Another is testing in Loop-2A, located in the Center Flux Trap (CFT) of the ATR. In this paper, we examine the conceptual scoping for the Loop-2A experiment known as ATF-2Ramp.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Cybersecurity Testbed for Smart Buildings

Smart buildings are equipped with a plethora of cyber-physical systems, such as Internet of Things (IoT) devices and building automation systems. These devices, especially in commercial buildings, use legacy communications and hardware that were not designed with cybersecurity in mind. With increasing cyber threats in recent years, smart buildings have become an increasing target for attacks, but not enough published data are available from these incidents to study or replicate the scenarios to defend buildings. As part of the U.S. Department of Energy-funded project focusing on developing the Building Intelligence with Layered Defense Using Security-Constrained Optimization and Security Risk Detection (BUILD-SOS) platform, we developed a cybersecurity test bed for smart buildings. This test bed includes a building simulation tool, virtual devices, emulated operational technology networks, and remote hardware-in-the-loop. Using this test bed, we performed different cyberattacks on the smart building model and collected both physical building data, to understand the impacts on the building, and network data, to aid in separating mechanical faults from cyberattacks during the detection. This test bed is a significant tool in protecting smart buildings from cyberattacks because it can aid in both cybersecurity analysis and the evaluation of other cyberattack detection tools by testing the tools in a secure environment without impacting the building operations.

cyber-physical systems↗

A Cybersecurity Testbed for Smart Buildings

Smart buildings are equipped with a plethora of cyber-physical systems, such as Internet of Things (IoT) devices and building automation systems. These devices, especially in commercial buildings, use legacy communications and hardware that were not designed with cybersecurity in mind. With increasing cyber threats in recent years, smart buildings have become an increasing target for attacks, but not enough published data are available from these incidents to study or replicate the scenarios to defend buildings. As part of the U.S. Department of Energy-funded project focusing on developing the Building Intelligence with Layered Defense Using Security-Constrained Optimization and Security Risk Detection (BUILD-SOS) platform, we developed a cybersecurity test bed for smart buildings. This test bed includes a building simulation tool, virtual devices, emulated operational technology networks, and remote hardware-in-the-loop. Using this test bed, we performed different cyberattacks on the smart building model and collected both physical building data, to understand the impacts on the building, and network data, to aid in separating mechanical faults from cyberattacks during the detection. This test bed is a significant tool in protecting smart buildings from cyberattacks because they can aid in both cybersecurity analysis and the evaluation of cyberattack detection tools by testing the tools in a secure environment without impacting the building operations.

alfalfa↗

Introduction of the PELICAN loop, a Full-Scale Pressure Drop Test Facility

The Versatile Test Reactor (VTR) is a test reactor currently under development by the US Department of Energy. This reactor will rely on fast neutrons enabling novel and wide-ranging experiment to support the development of the various advanced reactor technologies. With the high flux achievable, accelerated testing of fluid and materials will be made possible. To support VTR design efforts [1], an experimental facility has been designed and constructed at Argonne National Laboratory to recreate the hydraulic flow conditions within the VTR’s primary heat transport system (PHTS). This facility, the Pressure drop Experimental Loop for Investigations of Core Assemblies in advanced Nuclear reactors, PELICAN, measures the pressure drop across a full-scale fuel assembly containing prototypic axial reflectors, fuel, and plena components. Here, we first describe the design considerations required to recreate aspects of the VTR. Then we discuss the design and construction of PELICAN to address these design requirements, the design and construction of the test articles placed inside PELICAN’s test section, and finally present some of the first experimental results.

Grannan, A. M.↗

Overview of the MSTI 2 processor-in-the-loop simulator

To thoroughly test the on-board software for the MSTI 2 spacecraft, it was necessary to generate an environment for the software which accurately simulated the on-orbit conditions of the spacecraft. To achieve this, the MSTI 2 Processor-In-the-Loop (PIL) high-fidelity simulator was developed. The entire development was completed in 3 months and required 4 man-months of effort. This paper describes the design and development of this simulator and the methodology employed.

Rygaard, Christopher A.↗

An experimental and theoretical investigation of the liquefaction dynamics of a phase change material in a normal gravity environment

Experimental and theoretical investigations were undertaken to determine the role of gravity-induced free convection upon the liquefaction dynamics of a cylindrical paraffin slab under normal gravity conditions. The experimental equipment consisted of a test cell, a fluid-loop heating system, and a multipoint recorder. The test chamber was annular in shape with an effective radius of 1.585 cm and a length of 5.08 cm. The heating chamber was a 1.906 cm diameter tube going through the center of the test chamber, and connected to the fluid loop heating system. All experimental runs were made with the longitudinal axis of the test cell in the vertical direction to insure that convection was not a function of the angular axis of the cell. Ten melting runs were made at various hot wall temperatures. Also, two pure conduction solidification runs were made to determine an experimental latent heat of fusion.

Bain, R. L.↗

Thermal Vacuum Testing of a Multi-Evaporator Miniature Loop Heat Pipe

Under NASA's New Millennium Program Space Technology 8 Project, four experiments are being developed for future small system applications requiring low mass, low power, and compactness. GSFC is responsible for developing the Thermal Loop experiment, which is an advanced thermal control system consisting of a miniature loop heat pipe (MLHP) with multiple evaporators and condensers. The objective is to validate the operation of an MLHP, including reliable start-ups, steady operation, heat load sharing, and tight temperature control over the range of 273K to 308K. An MLHP Breadboard has been built and tested for 1200 hours under the laboratory environment and 500 hours in a thermal vacuum chamber. Results of the TV tests are presented here.

Ku, Jentung↗

Adaptation of a modern medium helicopter (Sikorsky S-76) to higher harmonic control

Sikorsky Aircraft has performed analytical studies, design analyses, and risk reduction tests have been performed for Higher Harmonic Control (HHC) on the S-76. The S-76 is an 8 to 10,000 lb helicopter which cruises at 145 kts. Flight test hardware has been assembled, main servo frequency response tested and upgraded, aircraft control system shake tested and verified, open loop controllers designed and fabricated, closed loop controllers defined and evaluated, and rotors turning ground and flight tests planned for the near future. Open loop analysis shows that about 2 deg of higher harmonic feathering at the blade 75% radius will be required to eliminate 4P vibration in the cockpit.

Oleary, J. J.↗

2009 Continued Testing of the Orion Atmosphere Revitalization Technology

An amine-based carbon dioxide (CO2) and water vapor sorbent in pressure-swing regenerable beds has been developed by Hamilton Sundstrand and baselined for the Orion Atmosphere Revitalization System (ARS). In three previous years at this conference, reports were presented on extensive Johnson Space Center (JSC) testing of this technology in a sea-level pressure environment with simulated and real human metabolic loads in both open and closed-loop configurations. The test article design was iterated a third time before the latest series of such tests, which was performed in the first half of 2009. The new design incorporates a canister configuration modification for overall unit compactness and reduced pressure drop, as well as a new process flow control valve that incorporates both compressed gas purge and dual-end vacuum desorption capabilities. This newest test article is very similar to the flight article designs. Baseline tests of the new unit were performed to compare its performance to that of the previous test articles. Testing of compressed gas purge operations helped refine launchpad operating condition recommendations developed in earlier testing. Operating conditions used in flight program computer models were tested to validate the model projections. Specific operating conditions that were recommended by the JSC test team based on past test results were also tested for validation. The effects of vacuum regeneration line pressure on resulting cabin conditions was studied for high metabolic load periods, and a maximum pressure is recommended.

Button, Amy Lin↗

2009 Continued Testing of the Orion Atmosphere Revitalization Technology

An amine-based carbon dioxide (CO2) and water vapor sorbent in pressure-swing regenerable beds has been developed by Hamilton Sundstrand and baselined for the Orion Atmosphere Revitalization System (ARS). In three previous years at this conference, reports were presented on extensive Johnson Space Center (JSC) testing of this technology in a sea-level pressure environment, with simulated and real human metabolic loads, in both open and closed-loop configurations. The test article design was iterated a third time before the latest series of such tests, which was performed in the first half of 2009. The new design incorporates a canister configuration modification for overall unit compactness and reduced pressure drop, as well as a new process flow control valve that incorporates both compressed gas purge and dual-end vacuum desorption capabilities. This newest test article is very similar to the flight article designs. Baseline tests of the new unit were performed to compare its performance to that of the previous test articles. Testing of compressed gas purge operations helped refine launchpad operating condition recommendations developed in earlier testing. Operating conditions used in flight program computer models were tested to validate the model projections. Specific operating conditions that were recommended by the JSC test team based on past test results were also tested for validation. The effects of vacuum regeneration line pressure on resulting cabin conditions was studied for high metabolic load periods, and a maximum pressure is recommended

Button, Amy B.↗

Phase III integrated water recovery testing at MSFC - Design, plans, and protocols

A series of tests is being conducted at the NASA Marshall Space Flight Center (MSFC) to evaluate the performance of a closed-loop water recovery system. Testing will be conducted at various levels of integration and loop-closure, culminating in complete closure of the water system with man-in-the-loop. This paper summarizes the test goals and objectives as well as the system design, plans, and protocols which have been established.

Bagdigian, Robert M.↗