Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Technical Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

NASA’s Top Human System Research and Technology Needs for Mars

NASA is working with industry and international partners to return humans to the moon and eventually enable a human Mars mission. Within NASA, several organizations work together to identify, prioritize, fund, execute, and operationalize the crew health and performance (CHP) research and technology development (R&D) necessary to enable these future missions. These organizations include flight programs as well as other organizations such as the Health and Medical Technical Authority (HMTA), Human Research Program, Space Technology Mission Directorate, and System Capability Leadership Teams, each of which existed for several years prior to the creation of the Moon-to-Mars (M2M) Program Office in 2023. A variety of constructs, vocabularies, and processes exist for the management of risks and strategic planning across these organizations. For example, M2M objectives, program risks, human system risks, human research gaps, capability gaps, and envisioned futures are all constructs currently used within NASA for identifying and prioritizing R&D needs. Alignment and evolution of these strategic planning constructs is ongoing and will allow for alignment and traceability between M2M objectives and R&D investments at a detailed level. While this reorganization is ongoing, and even after it is established, there is a recognized need among stakeholder organizations to identify and communicate the highest CHP R&D priorities in a unified and digestible way that synthesizes the considerations and perspectives of the CHP community across NASA. To achieve this, the HMTA facilitated a series of group discussions with representatives of NASA’s CHP community, which culminated in a product identifying the eight highest priority mission-enabling CHP capabilities for human missions to Mars, referred to as the “Top Human System Capability Needs for Mars”. The list includes Earth-Independent Human Operations; Mars Duration Food System; Mars Duration Effects on Human Physiology; Risks Mitigations for Vehicle Atmospheres; Computational Injury & Anthropometric Models; Exploration Exercise Countermeasures; Individual Variability in Responses to Spaceflight; and Sensorimotor Countermeasures. Existing strategic planning and risk management tools and processes were considered, as well as practicalities of technical, cost, and schedule feasibility associated with potential R&D risk mitigations and technology solutions. The product is not owned by any one organization and does not replace existing strategic or program planning processes; rather it aims to complement and inform them with a unified set of community generated priorities. It is anticipated that this list will be re-evaluated periodically based on R&D progress and the evolving M2M architecture.

Life Support↗

Additive Manufacturing, Design, Testing, and Fabrication: A Full Engineering Experience at JSC

I worked on several projects this term. While most projects involved additive manufacturing, I was also involved with two design projects, two testing projects, and a fabrication project. The primary mentor for these was Richard Hagen. Secondary mentors were Hai Nguyen, Khadijah Shariff, and fabrication training from James Brown. Overall, my experience at JSC has been successful and what I have learned will continue to help me in my engineering education and profession long after I leave. My 3D printing projects ranged from less than a 1 cubic centimeter to about 1 cubic foot and involved several printers using different printing technologies. It was exciting to become familiar with printing technologies such as industrial grade FDM (Fused Deposition Modeling), the relatively new SLA (Stereolithography), and PolyJet. My primary duty with the FDM printers was to model parts that came in from various sources to print effectively and efficiently. Using methods my mentor taught me and the Stratasys Insight software, I was able to minimize imperfections, hasten build time, improve strength for specific forces (tensile, shear, etc...), and reduce likelihood of a print-failure. Also using FDM, I learned how to repair a part after it was printed. This is done by using a special kind of glue that chemically melts the two faces of plastic parts together to form a fused interface. My first goal with SLA technology was to bring the printer back to operational readiness. In becoming familiar with the Pegasus SLA printer, I researched the leveling, laser settings, and different vats to hold liquid material. With this research, I was successfully able to bring the Pegasus back online and have successfully printed multiple sample parts as well as functional parts. My experience with PolyJet technology has been focused on an understanding of the abilities/limits, costs, and the maintenance for daily use. Still upcoming will be experience with using a composite printer that uses FDM technology to print plastic while laying an internal filament of Kevlar or carbon-fiber inside the printed material. It has been incredible being exposed to this range of technologies and I feel very fortunate to be ready for virtually any kind of printing technology I come across in the future. Design work played a part in my internship this term as well. Working with Hai Nguyen, I was able to design a set of testing tips and a test frame for use with an Arcjet. The testing tips will be made of several different materials that will possibly be used in the heat shield of the Orion space craft. These designs included technical drawings that were presented to the fabrication shop. The frame design was created from 80/20 (a popular brand of frame construction equipment) and included an order form with pricing for fabrication. An independent design was also done for the virtual reality lab. This design was to create a hand-controller based on a previous design. This final design was sent directly to a 3D printer without technical drawings. Overall, my design work has given me experience with using 80/20, helped improve my CAD (Computer Aided Design) proficiency, and increased my knowledge of how to set up technical drawings for fabrication. The final role I have played in this internship has been to assist with testing of the inflatable technology materials working Khadijah Shariff. I began the internship assisting with permeability testing with the initial plan to continue the testing independently after training. Unfortunately, the testing apparatus suffered a technical failure and had funding pulled which cancelled that portion of the project. Further testing with inflatable technology continued with tensile testing of various stitching methods. This testing took place over a two-days and concluded successfully. Final testing was to be more tensile testing but of straps used to connect various inflatable sections. Unfortunately, the needed grips for the tensile tests could not be located and put the testing on hold. It is possible this round of testing will still take place by the end of the internship if the grips can be found. Overall, this portion of the internship has helped me become familiar with one kind of permeability test as well as a popular tensile/compression testing machine. Finally, I also had the chance to be trained using a metal lathe for making very small tips for a soldering iron. These tips will be used to melt threaded brass inserts into 3D printed plastic. Working with James Brown, I was able to successfully machine a brass rod down to as little as 0.064 inches plus or minus 0.001 inches. It was very rewarding to learn how to best use the machine and become familiar with a skill that will undoubtedly be used again in the future. I have been told by several professional engineers that learning to use a lathe and mill will be invaluable skills in the field. This knocks 50 percent of that goal off and I look forward to learning the mill at some point in the future. As is apparent with this list of projects, my internship was not focused on a single over-arching goal. Instead, I was able to gain experience in a myriad of very different areas. I feel like my time here was spent bouncing from one project to the next. Though sometimes difficult to switch gears, it was very rewarding to be a part of so much in so little time. My career and education will be positively impacted by what I have learned at JSC. My experience with 3D printing has improved my ability to handle many issues that may come up in the future with multiple different technologies. The design work I took part in, especially creating technical drawings, will help me better present designs to any engineer or shop I will encounter. My testing experience has helped me become familiar with a popular kind of tensile test machine that will likely be similar to the kinds I will encounter in the future. Finally, my experience with fabrication has given me a rare opportunity, as an engineer, to take part in the fabrication of a part. This experience will help me better tailor my future designs for the manufacturing process and has given me an appreciation for detailed/delicate machining work. My experience at JSC has been successful and will continue to assist me for a long time within the engineering field.

Zusack, Steven↗

The United States' (DOE) Action Plan for Power Sector Decarbonization

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at the 13th CEM (CEM13) in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. The U.S. Department of Energy (DOE) is pleased to release this Action Plan as a contribution to the second cohort of Action Plans released at CEM15 in Brazil in October 2024. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions, given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for Planning, Building and Operating, as well as Stakeholder Engagement where appropriate based on country priorities. These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change. This Action Plan, developed by DOE, is focused on federal actions for power sector decarbonization primarily led by DOE. There are many other actions being led by other U.S. government agencies, or at the state and local level, that are not featured in this Action Plan.

21st Century Power Partnership↗

Brazil's Action Plan for Rapid Decarbonization of Power Sectors

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at the CEM13 in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. The second cohort of action plans will be presented at CEM15 in Brazil. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions, given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for Planning, Building and Operating, as well as Stakeholder Engagement where appropriate based on country priorities. They complement, but are differentiated from, other international power sector initiatives such as the Breakthrough Agenda (whose broad purpose is to raise collective ambition) and the Global Power System Transformation Consortium (whose goals are to convene power system operators to accelerate research innovations and foster peer learning). These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change.

21st Century Power Partnership↗

Uruguay's Action Plan and Experience for Power Sector Decarbonization

A collaborative report from the Clean Energy Ministerial (CEM), Lessons Learned for Rapid Decarbonization of Power Sectors, was delivered to energy ministers and presented at the 13th CEM (CEM13) in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. The Uruguay Ministry of Industry, Energy and Mining is pleased to release this Action Plan as a contribution to the second cohort of Action Plans released at CEM15 in Brazil in October 2024. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for planning, building, and operating, as well as stakeholder engagement where appropriate based on country priorities. They complement, but are differentiated from, other international power sector initiatives such as the Breakthrough Agenda (whose broad purpose is to raise collective ambition) and the Global Power System Transformation Consortium (whose goals are to convene power system operators to accelerate research innovations and foster peer learning). These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change.

21st Century Power Partnership↗

Canada's Actions for Rapid Decarbonization of Power Sector

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at the 13th CEM (CEM13) in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. Canada is pleased to release this Action Plan as a contribution to the second cohort of Action Plans released at CEM15 in Brazil in October 2024. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions, given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for Planning, Building and Operating, as well as Stakeholder Engagement where appropriate based on country priorities. These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change.

21st Century Power Partnership↗

Program Management Tool

The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity issues among various NASA systems that impact schedules and planning.

Gawadiak, Yuri↗

Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Workshop on Space Quantum Communications and Networks

NASA’s Space Communications and Navigation (SCaN) program and the National Institute of Science and Technology (NIST) co-sponsored a two-day workshop in January 2020 on space quantum communications and networks. The workshop was hosted by the Space Sciences Laboratory of the University of California, Berkeley. About 70 invited technical and program leaders from academia, industry, and government agencies defined science goals and technology requirements for a future NASA “quantum mission” that is fully aligned with the National Quantum Initiative (NQI) vision for a space-ground quantum network. This NQI vision is also a strategic milestone in SCaN’s plans for NASA’s space-based quantum communications and networks. The overall technical objectives of the Workshop were to (i) critically evaluate various mission design concepts, (ii) converge on a small subset of quantum communication and networking experiments suitable for space applications, and (iii) identify key technology gaps and promote new and emerging technologies to enable NASA’s “quantum mission” within a 5-year horizon.

quantum communications↗

Chemical Process Safety at TRISO-Based, Metal-Based, and Salt-Based Fuel Fabrication Facilities: Technical Assessment and Guidance Assessment

As part of efforts to prepare for potential and ongoing safety reviews for licensing of advanced non-light-water reactor fuel cycles, the U.S. Nuclear Regulatory Commission (NRC) tasked Pacific Northwest National Laboratory to prepare an assessment on the state of knowledge of potential chemical processes at fuel cycle facilities supporting the front end of these fuel cycles, and to assess the associated regulatory guidance. This report provides a technical assessment of chemical process safety considerations to support NRC licensing reviews of fabrication processes for tri-structural isotropic (TRISO) based, metallic-based, and salt-based fuels. The assessments involved collecting publicly available information on the fuel fabrication processes to (i) identify the operational process steps, characteristics and chemicals involved, (ii) identify the physical safety considerations and health safety considerations during licensing reviews of the various process steps, and (iii) collect information to support assessments of severity of accidents and potential mitigative measures to be implemented. The assessment provides a foundational basis on chemical process safety considerations for advanced fuel fabrication activities, although it is recognized that licensing reviews may necessitate design-specific considerations. The specific conditions under which chemical hazards emerge will require process-specific considerations, highlighting the importance of process-informed interpretation. The assessment also determined that exposure guidelines and limits to assess the consequences of acute exposures are limited for some chemicals, although alternative limits and supplementary information from databases or safety data sheets provide sufficient information to evaluate consequences of acute exposures. In addition, it was identified that metallic and salt fuel fabrication processes may involve beryllium, which is an exposure hazard. The regulatory framework for the licensing of advanced fuel cycle facilities, per 10 CFR Part 70 Domestic Licensing of Special Nuclear Material, is deemed robust and flexible to address the chemical safety considerations in this report. A review was conducted on various regulatory guidance and technical basis documents. This included reviewing NUREG-1520, Revision 2, Standard Review Plan for Fuel Cycle Facilities License Applications – Final Report and the process descriptions in Appendix A of NUREG/CR-6410, Nuclear Fuel Cycle Facility Accident Analysis Handbook, to address advanced fuel types. As new fuels will involve process-specific chemical uses, process-specific considerations are provided in this report. Additionally, it is noted that the U.S. Department of Energy protective action criteria database includes Temporary Emergency Exposure Limits (TEELs) for process-specific chemicals. This report provides technical information to support chemical safety assessments of new advanced fuel cycle facilities and identifies technical and safety information to support licensing reviews. No regulatory barriers were identified for the licensing of advanced fuel cycle facilities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Key Takeaways: Second Cohort of Action Plans for Rapid Power Sector Decarbonization

A collaborative report from the Clean Energy Ministerial (CEM), Lessons Learned for Rapid Decarbonization of Power Sectors, was delivered to energy ministers and presented at the 13th CEM (CEM13) in the United States in September 2022. As a result, Action Plans for power sector decarbonization were developed by the first cohort of countries. The fist cohort included India, Australia, Chile, the European Union, and the United Kingdom. The first cohort's Action Plans were presented at CEM14 in India in July 2023. These Action Plans, supported by the 21st Century Power Partnership and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The second set of Action Plans has been developed by Brazil, Canada, the United States, and Uruguay, released at CEM15 in Brazil in October 2024.

21st Century Power Partnership↗

Preliminary Workforce Development and Environmental and Co-use Management Plans for a Floating Offshore Wind Platform - CRADA 609 (Final Report)

Pacific Northwest National Laboratory (PNNL) provided technical assistance to Glosten, Inc. and its affiliate, PelaStar, LLC to advance the development of their floating offshore wind (FOSW) platform. PNNL provided guidance and assessment in two areas that are important to address in the development of FOSW platforms: (1) workforce development and (2) environmental impacts and ocean co-use considerations. This work was funded by the U.S. Department of Energy’s (DOE) Wind Energy Technologies Office (WETO) through Phase 2 of the FLoating Offshore Wind ReadINess (FLOWIN) Prize. It should be noted that the Plans presented in this report are specific to the PelaStar tension-leg platform (TLP) and may not be applicable to all FOSW platforms. Workforce development and environmental/co-use impacts are highly dependent on the geographical region in which activities take place. At the request of PelaStar, PNNL focused on two regions where development may take place: the Gulf of Maine and Northern California. PNNL generated a preliminary Workforce Development Plan for PelaStar, which includes estimated job numbers and skillsets required to establish a workforce to manufacture, install, and operate their platform as part of FOSW projects. The Plan offers methods to increase diversity, equity, and inclusion practices when developing a new workforce and includes colleges and training centers for potential recruitment. Both positive and negative impacts to communities are evaluated, with potential mitigation strategies for reducing negative impacts. The structure of Community Benefit Agreements and Project Labor Agreements are discussed, noting the limitations of the role of a platform manufacturer versus the offshore wind developer. PNNL also drafted a preliminary Environmental and Co-Use Management Plan that serves as a guide to preparing an environmental assessment related to the installation and operation of PelaStar’s unique TLP design, including its potential ecological, socioeconomic, and emissions impacts. The Plan summarizes information on relevant regulatory requirements, potential impact producing factors, monitoring and mitigation measures, and physical and biological resources in the Gulf of Maine and Northern California. One of the primary perceived benefits of the PelaStar TLP is its reduced footprint due to its tensioned tendons versus catenary or taut moorings, but more research must be done as there are no studies on PelaStar’s TLP system to-date. The section also highlights ocean co-use considerations for PelaStar’s TLP system, specifically for fisheries, including existing perspectives, methods, examples, and limitations. The PNNL team established through this preliminary work and review of available literature and resources that there is not yet much research or planning around FOSW. With FOSW being a new industry, many of the findings and planning are adapted from fixed bottom offshore wind, which itself is only just taking off in the United States. More research is needed to establish best practices for workforce development and to assess environmental and ocean co-use impacts and mitigation approaches.

17 WIND ENERGY↗

Advanced Simulation and Computing: FY25 Implementation Plan

The DOE National Nuclear Security Administration (NNSA) Stockpile Stewardship Program (SSP) is an integrated technical program for maintaining the safety, security, and reliability of the U.S. nuclear stockpile. The SSP incorporates nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. The suite of data analyzed comes from activities including previous nuclear tests, stockpile surveillance, experimental research, and development and engineering programs. This integrated national program requires the continued use of experimental facilities and the computational capabilities to support the SSP missions. These component parts, in addition to an appropriately scaled production capability, enable NNSA to support stockpile requirements. The ultimate goal of the SSP, and thus of the Advanced Simulation and Computing (ASC) program, is to ensure that the U.S. maintains a safe, secure, and effective strategic deterrent.

97 MATHEMATICS AND COMPUTING↗

New inertial actuator provides isolation and stabilization in microgravity conditions

Experiments in materials and fluids processing have been conducted, or are planned, that take advantage of the low-g environment offered by space-based platforms. While the specific goals of the experiments vary, a common objective is to see improved results from the processes over those that would be obtained from similar ground-based experiments. While the space-based processing environment does offer a low-g environment, it is not disturbance free. Results of experiments already conducted, particularly those in manned vehicles, show that spacecraft induced disturbances still limit what can be achieved in materials processing. The duration of actual micro-g level environments is shorter than desired and periods of milli-g activity levels are not uncommon. While small scale experiments can be configured to overcome some of the vehicle disturbance sources, larger scale processing devices and commercial activities will require alternative methods to reduce the influences of spacecraft vibrations. Applied Technology Associates, Inc., (ATA), in cooperation with NASA Lewis Research Center, is developing hardware to provide a sustained micro-g experiment environment. This work is being sponsored under a Small Business Innovation Research (SBIR) program, which is currently in the Phase 2 development stage. ATA's approach is based on an inertial actuator, which when used as part of a closed-loop stabilization system, rejects unwanted disturbances to the experiment package. A prototype of the actuator has been fabricated and used in a laboratory demonstration to prove the principle of operation. ATA's presentation emphasized the development and testing of the Digital Materials Processing Experiment (DAMPER) inertial actuator. Physical and performance characteristics of the device are presented. Technical issues, including further optimization of the actuator's performance and plans for additional laboratory experiments, are also covered.

Blackburn, John↗

Technical Issues that Need to Be Addressed in Preparing a Large Program to Transport SNF and HLW - 20093

The U.S. Nuclear Waste Technical Review Board (Board) has been interested for many years in the Department of Energy (DOE) activities related to transporting spent nuclear fuel (SNF) and high-level radioactive waste (HLW). The Board has conducted several public meetings and issued associated reports on this topic. In September 2019, the Board issued a report entitled Preparing for Nuclear Waste Transportation-Technical Issues that Need to Be Addressed in Preparing for a Nationwide Effort to Transport Spent Nuclear Fuel and High-Level Radioactive Waste [1] that focuses on the issues DOE will need to address to plan and implement an integrated transportation program. In its report, the Board describes 30 broad technical issues that DOE needs to address and offers three sets of findings and recommendations to DOE. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lahaina Energy Partnership Community Workshop: Technical Assistance Task Updates and Discussion [Slides]

The Lahaina Energy Partnership (LEP) is an initiative funded by the U.S. Department of Energy (DOE) to support energy planning and rebuilding efforts in Hawaii's historic town of Lahaina on Maui as the community recovers from a devastating fire on August 8, 2023, with technical assistance provided by NLR. This presentation provides an update on NLR's technical assistance efforts for May 2026.

14 SOLAR ENERGY↗

Advanced Gas Turbine (AGT) Technology Development Project

This report is the eleventh in the series of Technical Summary reports for the Advanced Gas Turbine (AGT) Technology Development Project, authorized under NASA Contract DEN3-167, and sponsored by the Department of Energy (DOE). This report was prepared by Garrett Turbine Engine Company, A Division of the Garrett Corporation, and includes information provided by Ford Motor Company, the Standard Oil Company, and AiResearch Casting Company. This report covers plans and progress for the period July 1, 1985 through June 30, 1986. Technical progress during the reported period was highlighted by the 85-hour endurance run of an all-ceramic engine operating in the 2000 to 2250 F temperature regime. Component development continued in the areas of the combustion/fuel injection system, regenerator and seals system, and ceramic turbine rotor attachment design. Component rig testing saw further refinements. Ceramic materials showed continued improvements in required properties for gas turbine applications; however, continued development is needed before performance and reliability goals can be set.

Source record↗