Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TRACKING STATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Automatic electronic fish tracking system

A newly developed electronic fish tracking system to automatically monitor the movements and migratory habits of fish is reported. The system is aimed particularly at studies of effects on fish life of industrial facilities which use rivers or lakes to dump their effluents. Location of fish is acquired by means of acoustic links from the fish to underwater Listening Stations, and by radio links which relay tracking information to a shore-based Data Base. Fish over 4 inches long may be tracked over a 5 x 5 mile area. The electronic fish tracking system provides the marine scientist with electronics which permit studies that were not practical in the past and which are cost-effective compared to manual methods.

Osborne, P. W.↗

NASA's satellite relay tracking and data acquisition program

The Tracking and Data Acquisition System (TDAS) is currently being planned to support NASA missions and the Space Station and will serve as a replacement to the present Tracking and Data Relay Satellite System (TDRSS). Its operational date is currently projected for the late 1990s. Near term objectives involve the definition of a TDAS architecture, the development of functional and performance specifications and implementation of a TDRSS-to-TDAS transition plan. The present paper provides an overview of the baseline TDAS architecture and summarizes key ingredients of system and technology studies in progress. In particular, this paper addresses a summary of projected mission requirements for the TDAS era; a characterization of the space segment constellation; use of lasers, 60 GHz, and multibeam 30/20 GHz technologies; ground architecture and operational interfaces; a distributed hardware/software processing concept for more flexible and reliable interfaces, signal processing and operations. Also included is a status summary of the TDAS program plan for the 1984-1990 time frame. Finally, an overview is presented of NASA's current plans to augment the TDRSS to meet the Space Station IOC requirements in the time period 1993-2000.

Schwartz, J. J.↗

An analytical investigation of acquisition techniques and system integration studies for a radar aircraft guidance research facility, phase 2

A review of user requirements and updated instrumentation plans are presented for the aircraft tracking and guidance facility at NASA Wallops Station. User demand has increased as a result of new flight research programs; however, basic requirements remain the same as originally reported. Instrumentation plans remain essentially the same but with plans for up- and down-link telemetry more firm. With slippages in the laser acquisition schedule, added importance is placed on the FPS-16 radar as the primary tracking device until the laser is available. Limited simulation studies of a particular Kalman-type filter are also presented. These studies simulated the use of the filter in a helicopter guidance loop in a real-time mode. Disadvantages and limitations of this mode of operation are pointed out. Laser eyesafety calculations show that laser tracking of aircraft is readily feasible from the eyesafety viewpoint.

Thompson, W. S.↗

STS-96 Mission Highlights

In this second part of a three-part video mission-highlights set, on-orbit spacecrew activities performed on the STS-96 Space Shuttle Orbiter Discovery and the International Space Station are reviewed. The flight crew consists of Kent V. Rominger, Commander; Rick D. Husband, Pilot; and Mission Specialists Ellen Ochoa, Tamara E. Jernigan, Daniel T. Barry, Julie Payette (Canadian), and Valery Ivanovich Tokarev (Russian). The primary goals of this mission were to work on logistics and resupply the International Space Station. This second part in the mission series features video from Flight Day 4-7 (FD 4-7). FD 4 of STS-96 presents astronauts Tammy Jernigan and Dan Barry completing the second longest space walk in shuttle history. Footage includes Jernigan and Barry transferring and installing two cranes from the shuttle's payload bay to locations on the outside of the station. The astronauts enter the International Space Station delivering supplies and prepare the outpost to receive its first resident crew, scheduled to arrive in early 2000 on FD 5. The video also captures the crew involved in logistics transfer activities within the Discovery/ISS orbiting complex. FD 6 includes footage of Valery Tokarev and Canadian astronaut Julie Payette charging out the final six battery recharge controller units for two of Zarya's power-producing batteries and all crew members' involvement in logistics transfer activities from the SPACEHAB module to designated locations in the International Space Station. With the transfer work of FD 6 all but complete, the astronauts conduct some additional work, installing parts of a wireless strain gauge system that will help engineers track the effects of adding modules to the station throughout its assembly. Moving the few remaining items from Discovery to the ISS, then closing a series of hatches within the station's modules leading back to the shuttle are the primary activities contained in FD 7. Final coverage features Discovery's astronauts finishing their work inside the International Space Station, closing all of the hatches and readying the shuttle's small thrusters to be fired to raise the entire complex's orbit in preparation for the undocking and departure set for FD 8.

Source record↗

Hybrid Ground Station Technology for RF and Optical Communication Links

To support future enhancements of NASA's deep space and planetary communications and tracking services, the Jet Propulsion Laboratory is developing a hybrid ground station that will be capable of simultaneously supporting RF and optical communications. The main reason for adding optical links to the existing RF links is to significantly increase the capacity of deep space communications in support of future solar system exploration. It is envisioned that a mission employing an optical link will also use an RF link for telemetry and emergency purposes, hence the need for a hybrid ground station. A hybrid station may also reduce operations cost by requiring fewer staff than would be required to operate two stations. A number of approaches and techniques have been examined. The most promising ones have been prototyped for field examination and validation.

Radio frequency (RF) communications↗

DSN research and technology support

The activities at the Venus Station (DSS 13) and the Microwave Test Facility, both operated by the Development Support Group, during the 6-month period ending October 15, 1975, were discussed and progress noted. Successful remote operation of the Venus Station from Pasadena during a pulsar observing track was described, along with significant tracking of the planet Venus in an interferometric planetary radar mode. Completion of the first phase of the demonstration of long-distance (1.6-km) transmission of microwave power was reported, with an RF-to-dc conversion efficiency of better than 80% and 30 kW of dc recovered. Routine transmission of clock synchronization signals to the overseas complexes with 64-m antenna stations was also discussed, and extensive analysis of a reported problem with the DSS 14 HV dc power supply which resulted in excessive ripple voltage interfering with transmitter operation was described.

E. B. Jackson↗

TDRSS data handling and management system study. Ground station systems for data handling and relay satellite control

Results of a two-phase study of the (Data Handling and Management System DHMS) are presented. An original baseline DHMS is described. Its estimated costs are presented in detail. The DHMS automates the Tracking and Data Relay Satellite System (TDRSS) ground station's functions and handles both the forward and return link user and relay satellite data passing through the station. Direction of the DHMS is effected via a TDRSS Operations Control Central (OCC) that is remotely located. A composite ground station system, a modified DHMS (MDHMS), was conceptually developed. The MDHMS performs both the DHMS and OCC functions. Configurations and costs are presented for systems using minicomputers and midicomputers. It is concluded that a MDHMS should be configured with a combination of the two computer types. The midicomputers provide the system's organizational direction and computational power, and the minicomputers (or interface processors) perform repetitive data handling functions that relieve the midicomputers of these burdensome tasks.

Source record↗

Use of load and go countdowns by the DSN deep space stations

The Level-4 Prepass Readiness Test (PRT) (the load and go countdown) provides an effective and low risk method of improving network productivity. A carefully controlled trial period preceded the full-scale application of the Level-4 PRTS to Pioneer, Helios, and Viking cruise tracking operations. Use of this load and go concept to count down a station brings about a substantial increase in the proportion of total station hours devoted to spacecraft tracking.

Hatch, J. T.↗

Orbit Determination of Spacecraft in Earth-Moon L1 and L2 Libration Point Orbits

The ARTEMIS mission, part of the THEMIS extended mission, is the first to fly spacecraft in the Earth-Moon Lissajous regions. In 2009, two of the five THEMIS spacecraft were redeployed from Earth-centered orbits to arrive in Earth-Moon Lissajous orbits in late 2010. Starting in August 2010, the ARTEMIS P1 spacecraft executed numerous stationkeeping maneuvers, initially maintaining a lunar L2 Lissajous orbit before transitioning into a lunar L1 orbit. The ARTEMIS P2 spacecraft entered a L1 Lissajous orbit in October 2010. In April 2011, both ARTEMIS spacecraft will suspend Lissajous stationkeeping and will be maneuvered into lunar orbits. The success of the ARTEMIS mission has allowed the science team to gather unprecedented magnetospheric measurements in the lunar Lissajous regions. In order to effectively perform lunar Lissajous stationkeeping maneuvers, the ARTEMIS operations team has provided orbit determination solutions with typical accuracies on the order of 0.1 km in position and 0.1 cm/s in velocity. The ARTEMIS team utilizes the Goddard Trajectory Determination System (GTDS), using a batch least squares method, to process range and Doppler tracking measurements from the NASA Deep Space Network (DSN), Berkeley Ground Station (BGS), Merritt Island (MILA) station, and United Space Network (USN). The team has also investigated processing of the same tracking data measurements using the Orbit Determination Tool Kit (ODTK) software, which uses an extended Kalman filter and recursive smoother to estimate the orbit. The orbit determination results from each of these methods will be presented and we will discuss the advantages and disadvantages associated with using each method in the lunar Lissajous regions. Orbit determination accuracy is dependent on both the quality and quantity of tracking measurements, fidelity of the orbit force models, and the estimation techniques used. Prior to Lissajous operations, the team determined the appropriate quantity of tracking measurements that would be needed to meet the required orbit determination accuracies. Analysts used the Orbit Determination Error Analysis System (ODEAS) to perform covariance analyses using various tracking data schedules. From this analysis, it was determined that 3.5 hours of DSN TRK-2-34 range and Doppler tracking data every other day would suffice to meet the predictive orbit knowledge accuracies in the Lissajous region. The results of this analysis are presented. Both GTDS and ODTK have high-fidelity environmental orbit force models that allow for very accurate orbit estimation in the lunar Lissajous regime. These models include solar radiation pressure, Earth and Moon gravity models, third body gravitational effects from the Sun, and to a lesser extent third body gravitational effects from Jupiter, Venus, Saturn, and Mars. Increased position and velocity uncertainties following each maneuver, due to small execution performance errors, requires that several days of post-maneuver tracking data be processed to converge on an accurate post-maneuver orbit solution. The effects of maneuvers on orbit determination accuracy will be presented, including a comparison of the batch least squares technique to the extended Kalman filter/smoother technique. We will present the maneuver calibration results derived from processing post-maneuver tracking data. A dominant error in the orbit estimation process is the uncertainty in solar radiation pressure and the resultant force on the spacecraft. An estimation of this value can include many related factors, such as the uncertainty in spacecraft reflectivity and surface area which is a function of spacecraft orientation (spin-axis attitude), uncertainty in spacecraft wet mass, and potential seasonal variability due to the changing direction of the Sun line relative to the Earth-Moon Lissajous reference frame. In addition, each spacecraft occasionally enters into Earth or Moon penumbra or umbra and these shadow crossings reduche solar radiation force for several hours. The effects of these events on orbit determination accuracy will be presented. In order to plan for upcoming stationkeeping maneuvers, the maneuver planning team must take the current orbit estimate, propagate it forward to the planned maneuver time, and determine the optimal maneuver to maintain the Lissajous orbit for one or more revolutions. The propagation is performed using a Runge-Kutta 7/8 integrator and typically the position and velocity uncertainty increases with propagation time, increasing the overall uncertainty of the orbit state at the maneuver execution time. The effect of orbit knowledge uncertainty on stationkeeping operations will be presented.

Woodard, Mark↗

Orbit Determination for the Lunar Reconnaissance Orbiter Using an Extended Kalman Filter

Since launch, the FDF has performed daily OD for LRO using the Goddard Trajectory Determination System (GTDS). GTDS is a batch least-squares (BLS) estimator. The tracking data arc for OD is 36 hours. Current operational OD uses 200 x 200 lunar gravity, solid lunar tides, solar radiation pressure (SRP) using a spherical spacecraft area model, and point mass gravity for the Earth, Sun, and Jupiter. LRO tracking data consists of range and range-rate measurements from: Universal Space Network (USN) stations in Sweden, Germany, Australia, and Hawaii. A NASA antenna at White Sands, New Mexico (WS1S). NASA Deep Space Network (DSN) stations. DSN data was sparse and not included in this study. Tracking is predominantly (50) from WS1S. The OD accuracy requirements are: Definitive ephemeris accuracy of 500 meters total position root-mean-squared (RMS) and18 meters radial RMS. Predicted orbit accuracy less than 800 meters root sum squared (RSS) over an 84-hour prediction span.

LRO↗

Small Orbital Stereo Tracking Camera Technology Development

On-Orbit Small Debris Tracking and Characterization is a technical gap in the current National Space Situational Awareness necessary to safeguard orbital assets and crew. This poses a major risk of MOD damage to ISS and Exploration vehicles. In 2015 this technology was added to NASA's Office of Chief Technologist roadmap. For missions flying in or assembled in or staging from LEO, the physical threat to vehicle and crew is needed in order to properly design the proper level of MOD impact shielding and proper mission design restrictions. Need to verify debris flux and size population versus ground RADAR tracking. Use of ISS for In-Situ Orbital Debris Tracking development provides attitude, power, data and orbital access without a dedicated spacecraft or restricted operations on-board a host vehicle as a secondary payload. Sensor Applicable to in-situ measuring orbital debris in flux and population in other orbits or on other vehicles. Could enhance safety on and around ISS. Some technologies extensible to monitoring of extraterrestrial debris as well to help accomplish this, new technologies must be developed quickly. The Small Orbital Stereo Tracking Camera is one such up and coming technology. It consists of flying a pair of intensified megapixel telephoto cameras to evaluate Orbital Debris (OD) monitoring in proximity of International Space Station. It will demonstrate on-orbit optical tracking (in situ) of various sized objects versus ground RADAR tracking and small OD models. The cameras are based on Flight Proven Advanced Video Guidance Sensor pixel to spot algorithms (Orbital Express) and military targeting cameras. And by using twin cameras we can provide Stereo images for ranging & mission redundancy. When pointed into the orbital velocity vector (RAM), objects approaching or near the stereo camera set can be differentiated from the stars moving upward in background.

Bryan, Tom↗

Small Orbital Stereo Tracking Camera Technology Development

On-Orbit Small Debris Tracking and Characterization is a technical gap in the current National Space Situational Awareness necessary to safeguard orbital assets and crew. This poses a major risk of MOD damage to ISS and Exploration vehicles. In 2015 this technology was added to NASA's Office of Chief Technologist roadmap. For missions flying in or assembled in or staging from LEO, the physical threat to vehicle and crew is needed in order to properly design the proper level of MOD impact shielding and proper mission design restrictions. Need to verify debris flux and size population versus ground RADAR tracking. Use of ISS for In-Situ Orbital Debris Tracking development provides attitude, power, data and orbital access without a dedicated spacecraft or restricted operations on-board a host vehicle as a secondary payload. Sensor Applicable to in-situ measuring orbital debris in flux and population in other orbits or on other vehicles. Could enhance safety on and around ISS. Some technologies extensible to monitoring of extraterrestrial debris as well To help accomplish this, new technologies must be developed quickly. The Small Orbital Stereo Tracking Camera is one such up and coming technology. It consists of flying a pair of intensified megapixel telephoto cameras to evaluate Orbital Debris (OD) monitoring in proximity of International Space Station. It will demonstrate on-orbit optical tracking (in situ) of various sized objects versus ground RADAR tracking and small OD models. The cameras are based on Flight Proven Advanced Video Guidance Sensor pixel to spot algorithms (Orbital Express) and military targeting cameras. And by using twin cameras we can provide Stereo images for ranging & mission redundancy. When pointed into the orbital velocity vector (RAM), objects approaching or near the stereo camera set can be differentiated from the stars moving upward in background.

Bryan, Tom↗

Advanced spacecraft tracking techniques using the Tracking and Data Relay Satellite System /TDRSS/

The TDRSS will consist initially of two geosynchronous satellites and a common ground station at White Sands, New Mexico. According to current schedules, operations are to begin in November 1980. The overall TDRSS will provide high and low bit-rate telemetry, commands, and satellite-to-satellite tracking services. Each Tracking and Data Relay Satellite (TDRS) will have four antenna systems for NASA use. The common ground station at White Sands will have three 18-meter K-band antennas. The tracking equipment at the ground station is required to meet the following specifications: (1) 0.1-radian root-mean-square (rms) phase noise on nondestruct Doppler measurements; (2) 10-nanosecond rms range noise; (3) 50-nanosecond maximum systematic range error. Attention is given to two-way range and Doppler measurements, the bilateration tracking of TDRS, and an experiment using differenced one-way Doppler measurements.

Teles, J.↗

The Deep Space Network

This report presents DSN progress in flight project support, tracking and data acquisition (TDA) research and technology, network engineering, hardware and software implementation, and operations. Each issue presents material in some, but not all, of the following categories in the order indicated. - Description of the DSN - Mission Support Ongoing Planetary/Interplanetary Flight Projects Advanced Flight Projects - Radio Science - Special Projects - Supporting Research and Technology Tracking and Ground-Based Navigation Communications--Spacecraft/Ground Station Control and Operations Technology Network Control and Data Processing - Network and Facility Engineering and Implementation Network Network Operations Control Center Ground Communications Deep Space Stations - Operations Network Operations Network Operations Control Center Ground Communications Deep Space Stations - Program Planning TDA Planning Quality Assurance In each issue, the part entitled "Description of the DSN" describes the functions and facilities of the DSN and may report the current configuration of one of the five DSN systems (Tracking, Telemetry, Command, Monitor & Control, and Test & Training). The work described in this report series is either performed or managed by the Tracking and Data Acquisition organization of JPL for NASA.

Tracking and Data Acquisition organization↗

A Non-Linear Approach to Spacecraft Trajectory Control in the Vicinity of a Libration Point

An expanding interest in mission design strategies that exploit libration point regions demands the continued development of enhanced, efficient, control algorithms for station-keeping and formation maintenance. This paper discusses the development of a non-linear, station-keeping, control algorithm for trajectories in the vicinity of a libration point. The control law guarantees exponential convergence, based on a Lyaponov analysis. Controller performance is evaluated using FreeFlyer(R) and MATLAB(R) for a spacecraft stationed near the L2 libration point in the Earth-Moon system, tracking a pre-defined reference trajectory. Evaluation metrics are fuel usage and tracking accuracy. Simulation results are compared with a linear-based controller for a spacecraft tracking the same reference trajectory. Although the analysis is framed in the context of station-keeping, the control algorithm is equally applicable to a formation flying problem with an appropriate definition of the reference trajectory.

Luquette, Richard J.↗

Orbit Determination Error Analysis Results for the Triana Sun-Earth L2 Libration Point Mission

Using the NASA Goddard Space Flight Center's Orbit Determination Error Analysis System (ODEAS), orbit determination error analysis results are presented for all phases of the Triana Sun-Earth L1 libration point mission and for the science data collection phase of a future Sun-Earth L2 libration point mission. The Triana spacecraft was nominally to be released by the Space Shuttle in a low Earth orbit, and this analysis focuses on that scenario. From the release orbit a transfer trajectory insertion (TTI) maneuver performed using a solid stage would increase the velocity be approximately 3.1 km/sec sending Triana on a direct trajectory to its mission orbit. The Triana mission orbit is a Sun-Earth L1 Lissajous orbit with a Sun-Earth-vehicle (SEV) angle between 4.0 and 15.0 degrees, which would be achieved after a Lissajous orbit insertion (LOI) maneuver at approximately launch plus 6 months. Because Triana was to be launched by the Space Shuttle, TTI could potentially occur over a 16 orbit range from low Earth orbit. This analysis was performed assuming TTI was performed from a low Earth orbit with an inclination of 28.5 degrees and assuming support from a combination of three Deep Space Network (DSN) stations, Goldstone, Canberra, and Madrid and four commercial Universal Space Network (USN) stations, Alaska, Hawaii, Perth, and Santiago. These ground stations would provide coherent two-way range and range rate tracking data usable for orbit determination. Larger range and range rate errors were assumed for the USN stations. Nominally, DSN support would end at TTI+144 hours assuming there were no USN problems. Post-TTI coverage for a range of TTI longitudes for a given nominal trajectory case were analyzed. The orbit determination error analysis after the first correction maneuver would be generally applicable to any libration point mission utilizing a direct trajectory.

Marr, G.↗

Effects of tunnel and station size on the costs and service of subway transit systems

The feasibility of less spacious, less costly underground rail mass transit system designs is studied. The major cost saving expected from alternative tunnel designs results from using precast concrete segment liners in place of steel. The saying expected for a two-foot decrease in the diameter of twin, single track tunnels is about two million dollars per route mile from 13 million dollars for precast concrete segment liners (a saving of about 16%). The cost per route-mile of a double track tunnel appears to be 15 to 25% higher than for the twin, single track tunnels. The effective cost saving expected from stations with four-car train capability instead of the usual eight-car trains is nearly 25% or seven million dollars per route mile. The saving in station costs can be obtained while improving service to the user (lower transit time and less waiting for trains) up to a capacity of 36,000 riders per hour in each direction.

Dayman, B., Jr.↗

International Space Station Alpha (ISSA) Integrated Traffic Model

The paper discusses the development process of the International Space Station Alpha (ISSA) Integrated Traffic Model which is a subsystem analyses tool utilized in the ISSA design analysis cycles. Fast-track prototyping of the detailed relationships between daily crew and station consumables, propellant needs, maintenance requirements, and crew rotation via spread sheets provides adequate bench marks to assess cargo vehicle design and performance characteristics.

Gates, Robert E.↗