Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TOURS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Joint Radioisotope Electric Propulsion Studies - Neptune System Explorer

The Neptune System Explorer (NSE) mission concept study assessed opportunities to conduct Cassini-like science at Neptune with a radioisotope electric propulsion (REP) based spacecraft. REP is based on powering an electric propulsion (EP) engine with a radioisotope power source (RPS). The NSE study was commissioned under the Joint Radioisotope Electric Propulsion Studies (JREPS) project, which sought to determine the technical feasibility of flagship class REP applications. Within JREPS, special emphasis was given toward identifying tall technology tent poles, as well as recommending any new RPS technology developments that would be required for complicated REP missions. Based on the goals of JREPS, multiple RPS (e.g. thermoelectric and Stirling based RPS) and EP (e.g. Hall and ion engines) technology combinations were traded during the NSE study to determine the most favorable REP design architecture. Among the findings from the study was the need for >400We RPS systems, which was driven by EP operating powers and the requirement for a long-lived mission in the deep solar system. Additionally multiple development and implementation risks were identified for the NSE concept, as well as REP missions in general. Among the strengths of the NSE mission would be the benefits associated with RPS and EP use, such as long-term power (approx. 2-3kW) at Neptune and flexible trajectory options for achieving orbit or tours of the Neptune system. Although there are still multiple issues to mitigate, the NSE concept demonstrated distinct advantages associated with using REP for deep space flagship-class missions.

radioisotope power source (RPS)↗

Cassini Solstice Mission Maneuver Experience: Year Three

The Cassini spacecraft is now in its second Saturn tour extension, the Solstice Mission. By emphasizing propellant preservation over minimizing maneuver cycles, the Cassini Project is meeting the challenge of mission completion in 2017. Since June 2012, 18 of 21 maneuvers were performed to closely maintain the prescribed trajectory, saving downstream propellant. These and other maneuvers during the third year of the Solstice Mission (June 2012 to August 2013) are highlighted in this paper: 31 planned maneuvers targeted to 11 Titan flybys and the last planned Rhea encounter. An assessment of the updated maneuver execution-error models will also be presented.

Cassini↗

Guidance, Navigation, and Control Technology Assessment for Future Planetary Science Missions

Future planetary explorations envisioned by the National Research Council's (NRC's) report titled Vision and Voyages for Planetary Science in the Decade 2013-2022, developed for NASA Science Mission Directorate (SMD) Planetary Science Division (PSD), seek to reach targets of broad scientific interest across the solar system. This goal requires new capabilities such as innovative interplanetary trajectories, precision landing, operation in close proximity to targets, precision pointing, multiple collaborating spacecraft, multiple target tours, and advanced robotic surface exploration. Advancements in Guidance, Navigation, and Control (GN&C) and Mission Design in the areas of software, algorithm development and sensors will be necessary to accomplish these future missions. This paper summarizes the key GN&C and mission design capabilities and technologies needed for future missions pursuing SMD PSD's scientific goals.

position↗

Cassini Solstice Mission Maneuver Experience: Year Three

The Solstice Mission is the final extension of the Cassini spacecraft s tour of Saturn and its moons. To accommodate an end-of-mission in 2017, the maneuver decision process has been refined. For example, the Cassini Project now prioritizes saving propellant over minimizing maneuver cycles. This paper highlights 30 maneuvers planned from June 2012 through July 2013, targeted to nine Titan flybys and the final Rhea encounter in the mission. Of these maneuvers, 90% were performed to maintain the prescribed trajectory and preserve downstream delta V. Recent operational changes to maneuver executions based on execution-error modeling and analysis are also discussed.

Equinox Mission↗

Navigation Ground Data System Engineering for the Cassini/Huygens Mission

The launch of the Cassini/Huygens mission on October 15, 1997, began a seven year journey across the solar system that culminated in the entry of the spacecraft into Saturnian orbit on June 30, 2004. Cassini/Huygens Spacecraft Navigation is the result of a complex interplay between several teams within the Cassini Project, performed on the Ground Data System. The work of Spacecraft Navigation involves rigorous requirements for accuracy and completeness carried out often under uncompromising critical time pressures. To support the Navigation function, a fault-tolerant, high-reliability/high-availability computational environment was necessary to support data processing. Configuration Management (CM) was integrated with fault tolerant design and security engineering, according to the cornerstone principles of Confidentiality, Integrity, and Availability. Integrated with this approach are security benchmarks and validation to meet strict confidence levels. In addition, similar approaches to CM were applied in consideration of the staffing and training of the system administration team supporting this effort. As a result, the current configuration of this computational environment incorporates a secure, modular system, that provides for almost no downtime during tour operations.

Beswick, R. M.↗

Flying by Titan

The Cassini spacecraft encounters the massive Titan about once every month. These encounters are essential to the mission as Titan is the only satellite of Saturn that can provide enough gravity assist to shape the orbit tour and allow outstanding science for many years. From a navigation point of view, these encounters provide many challenges, in particular those that fly close enough to the surface for the atmospheric drag to perturb the orbit. This paper discusses the dynamics models developed to successfully navigate Cassini and determine its trajectory. This includes the moon's gravity pull with its second degree zonal harmonics J2, the attitude thrust control perturbations and the acceleration of drag.

Pelletier, Frederic J.↗

Integration of Spacecraft Telemetry into Navigation Operations for the Cassini-Huygens Mission

The Cassini orbiter is the largest and most complex interplanetary spacecraft ever built. Since attaining orbit around Saturn in the summer of 2004, Cassini, along with its Huygens probe, have been continually improving our understanding Saturn, its satellites, its enigmatic rings system, and of the solar system. One of the hallmarks of the Cassini- Huygens Project is the close working relationship between the many teams required to operate such a sophisticated spacecraft. Their ingenuity has enabled them to find new and different ways to improve their processes during Cassini's prime 4-year orbital tour. This paper will discuss the relationship between Cassini's Navigation and Spacecraft Teams and the work required to properly configure Cassini's telemetry system for Navigation. A detailed explanation of how the Navigation Team utilizes spacecraft telemetry and analysis demonstrating the benefits will also be provided. Finally, telemetry requirements for Navigation for future missions will be addressed.

AACS↗

Cassini Attitude Control Fault Protection Design: Launch to End of Prime Mission Performance

The Cassini Attitude and Articulation Control Subsystem (AACS) Fault Protection (FP) has been successfully supporting operations for over 10 years from launch through the end of the prime mission. Cassini's AACS FP is complex, containing hundreds of error monitors and thousands of tunable parameters. Since launch there have been environmental, hardware, personnel and mission event driven changes which have required AACS FP to adapt and be robust to a variety of scenarios. This paper will discuss the process of monitoring, maintaining and updating the AACS FP during Cassini's lengthy prime mission as well as provide some insight into lessons learned during tour operations.

Meakin, Peter C.↗

Cassini Orbit Determination Results: January 2006 - End of Prime Mission

After the forty-fifth flyby of Titan, the Cassini spacecraft has successfully completed the planned four-year prime mission tour of the Saturnian system. This paper reports on the orbit determination performance of the Cassini spacecraft over two years spanning 2006 - 2008. In this time span, Cassini's orbit progressed through the magnetotail and pi-transfer phases of the mission. Thirty-four accurate close encounters of Titan, one close flyby of Iapetus and one 50 km flyby of Enceladus were performed during this period. The Iapetus and Enceladus flybys were especially challenging and so the orbit determination supporting these encounters will be discussed in more detail. This paper will show that in most cases orbit determination has exceeded the navigation requirements for targeting flybys and predicting science instrument pointing during these encounters.

Lapetus↗

Communicating Navigation Data Inside the Cassini-Huygens Project: Visualizations and Tools

The Cassini-Huygens Saturn tour poses an interesting navigation challenge. From July 2004 through June 2008, the Cassini orbiter performed 112 of 161 planned maneuvers. This demanding schedule, where maneuvers are often separated by just a few days, motivated the development of maneuver design/analysis automation software tools. Besides generating maneuver designs and presentations, these tools are the mechanism to producing other types of navigation information; information used to facilitate operational decisions on such issues as maneuver cancellation and alternate maneuver strategies. This paper will discuss the navigation data that are communicated inside the Cassini-Huygens Project, as well as the maneuver software tools behind the processing of the data.

maneuver↗

Center Planning and Development: Multi-User Spaceport Initiatives

The Vehicle Assembly building at NASAs Kennedy Space Center has been used since 1966 to vertically assemble every launch vehicle, since the Apollo Program, launched from Launch Complex 39 (LC-39). After the cancellation of the Constellation Program in 2010 and the retirement of the Space Shuttle Program in 2011, the VAB faced an uncertain future. As the Space Launch System (SLS) gained a foothold as the future of American spaceflight to deep space, NASA was only using a portion of the VABs initial potential. With three high bays connected to the Crawler Way transportation system, the potential exists for up to three rockets to be simultaneously processed for launch. The Kennedy Space Center (KSC) Master plan, supported by the Center Planning and Development (CPD) Directorate, is guiding Kennedy toward a 21st century multi-user spaceport. This concept will maintain Kennedy as the United States premier gateway to space and provide multi-user operations through partnerships with the commercial aerospace industry. Commercial aerospace companies, now tasked with transporting cargo and, in the future, astronauts to the International Space Station (ISS) via the Commercial Resupply Service (CRS) and Commercial Crew Program (CCP), are a rapidly growing industry with increasing capabilities to make launch operations more economical for both private companies and the government. Commercial operations to Low Earth Orbit allow the government to focus on travel to farther destinations through the SLS Program. With LC-39B designated as a multi-use launch pad, companies seeking to use it will require an integration facility to assemble, integrate, and test their launch vehicle. An Announcement for Proposals (AFP) was released in June, beginning the process of finding a non-NASA user for High Bay 2 (HB2) and the Mobile Launcher Platforms (MLPs). An Industry Day, a business meeting and tour for interested companies and organizations, was also arranged to identify and answer any additional questions posed by potential proposers. After amending the AFP and posting additional material for potential users to consider, proposals are being accepted until July 31, at which point they will be evaluated to determine the proposer which best meets the objectives of the government. By identifying VAB HB2 as available and seeking proposals from the commercial sector for VAB HB2 and MLP use, Center Planning and Development is ensuring Kennedy Space Centers relevance in the evolving launch industry of the 21st century.

AFP↗

NASA Work Experience

I have had the opportunity to support the analytical laboratories in chemical analysis of unknown samples, using Optical Microscopy (OM), Polarizing Light Microscopy (PLM), Fourier-Transform Infrared Spectroscopy (FT-IR), Scanning Electron Microscopy with Energy Dispersive Spectroscopy (SEMEDS), and X-ray Powder Diffraction (XPD). I have assisted in characterizing fibers pulled from a spacecraft, a white fibrous residue discovered in a jet refueler truck, brown residue from a plant habitat slated for delivery to the ISS (International Space Station), corrosion on a pipe from a sprinkler, and air filtration material brought back from the ISS. I also conducted my own fiber study in order to practice techniques and further my understanding of background concepts. Furthermore, I had the opportunity to participate in diverse work assignments, where I was assigned to work with other branches of the engineering department for 1-2 days each. The first was in the Materials Science branch where I participated in the construction of the plant habitat intended for use in research aboard the ISS. The second was in the Testing Design branch where I assisted with tensile and hardness testing of over 40 samples. In addition, I have had the privilege to attend multiple tours of the NASA KSC campus, including to the Astronaut Crew Quarters, the VAB (the main area, the Columbia room, and the catwalk), the Visitor Center housing the shuttle Atlantis, the Saturn-V exhibit, the Prototype laboratory, SWAMP WORKS, the Shuttle Landing Facility, the Crawler, and the Booster Fabrication Facility (BFF). Lastly, much of my coursework prepared me for this experience, including numerous laboratory courses with topics diverse as chemistry, physics, and biology.

Florida Tech↗

Space Structure Development

The duration of my Summer 2015 Internship Tour at NASA's Johnson Space Center was spent working in the Structural Engineering Division's Structures Branch. One of the two main roles of the Structures Branch, ES2, is to ensure the structural integrity of spacecraft vehicles and the structural subsystems needed to support those vehicles. The other main objective of this branch is to develop the lightweight structures that are necessary to take humans beyond Low-Earth Orbit. Within ES2, my four projects involved inflatable space structure air bladder material testing; thermal and impact material testing for spacecraft windows; structural analysis on a joint used in the Boeing CST-100 airbag system; and an additive manufacturing design project.

Smith, Thomas↗

Center Planning and Development Student Engineer at KSC

This summer I was the Student Trainee (Engineering) Pathways Intern (co-op) at the Kennedy Space Center (KSC) in the Center Planning & Development (CPD) Directorate. CPD works with commercial companies who are interested in using KSC's unique capabilities for spaceflight, spacecraft processing, ground systems and Research & Development (R&D) projects that fall in line with NASA's Mission and Vision. CPD is divided into three (3) groups: (1) AD-A, which works on the Master Planning for the center, (2) AD-B (where I am), which works on project control, management and integration, and (3) AD-C, which works on partnership development. CPD's main goal is to make KSC the world's preeminent multi-user spaceport and maintain the center as a leader in space exploration. CPD is a very diverse group of employees having a wide knowledge of not only the Space Shuttle, but also Expendable Launch Vehicles (ELV). The director of CPD, Scott Colloredo, is on the advisory board for Commercial Space Operations (CSO) and has a degree from ERAU. I worked on a number of different tasks for AD-B, as well as CPD, that includes, but not limited to: reviewing and reissuing engineering documents, weekly notes for CPD and senior management, engineering familiarizations with facilities at KSC, leading a tour for the Embry-Riddle Aeronautical University Career Services office, and working on actual agreements/proposals that will be used in the partnership process with multiple partners, along with other projects. Most of the work I have done is sensitive information and cannot be disclosed.

Engineer↗

ROSE MIU Testing

Overview of work done by Rebekah Austin during Pathways Internship work tour. Describes ROSE MIU (Reconfigurable Operational Spacecraft for Science and Exploration Module Interface Unit) features and test plan.

hot-swap↗

Using Simulation to Analyze Acoustic Environments

One of the main projects that was worked on this semester was creating an acoustic model for the Advanced Space Suit in Comsol Multiphysics. The geometry tools built into the software were used to create an accurate model of the helmet and upper torso of the suit. After running the simulation, plots of the sound pressure level within the suit were produced, as seen below in Figure 1. These plots show significant nulls which should be avoided when placing microphones inside the suit. In the future, this model can be easily adapted to changes in the suit design to determine optimal microphone placements and other acoustic properties. Another major project was creating an acoustic diverter that will potentially be used to route audio into the Space Station's Node 1. The concept of the project was to create geometry to divert sound from a neighboring module, the US Lab, into Node 1. By doing this, no new audio equipment would need to be installed in Node 1. After creating an initial design for the diverter, analysis was performed in Comsol in order to determine how changes in geometry would affect acoustic performance, as shown in Figure 2. These results were used to produce a physical prototype diverter on a 3D printer. With the physical prototype, testing was conducted in an anechoic chamber to determine the true effectiveness of the design, as seen in Figure 3. The results from this testing have been compared to the Comsol simulation results to analyze how closely the Comsol results are to real-world performance. While the Comsol results do not seem to closely resemble the real world performance, this testing has provided valuable insight into how much trust can be placed in the results of Comsol simulations. A final project that was worked on during this tour was the Audio Interface Unit (AIU) design for the Orion program. The AIU is a small device that will be used for as an audio communication device both during launch and on-orbit. The unit will have functions including push-to-talk buttons and volume control. With this project, an existing design was modified based on prior feedback that had been received. With the modified design, I created a 3D printed prototype, shown in Figure 4, which was then used in suited evaluations performed by crew members. The feedback received from those evaluations will be utilized to help create the best possible Orion AIU. As a whole, a number of different interesting engineering projects were worked on over the course of this semester. For many of these projects, acoustic simulations provided valuable insight into how different environments would respond to sound. While work is still underway to verify the results of these simulations, the results are fascinating because of the interesting ways that sound waves interact with the environment. Going forward, it will be interesting to see how closely these results can be matched by real-world test data.

Wood, Eric J.↗

Trajectory Design for the Europa Clipper Mission Concept

Europa is one of the most scientifically intriguing targets in planetary science due to its potential suitability for extant life. As such, NASA has funded the California Institute of Technology Jet Propulsion Laboratory and the Johns Hopkins University Applied Physics Laboratory to jointly determine and develop the best mission concept to explore Europa in the near future. The result of nearly 4 years of work--the Europa Clipper mission concept--is a multiple Europa flyby mission that could efficiently execute a number of high caliber science investigations to meet Europa science priorities specified in the 2011 NRC Decadal Survey, and is capable of providing reconnaissance data to maximize the probability of both a safe landing and access to surface material of high scientific value for a future Europa lander. This paper will focus on the major enabling component for this mission concept--the trajectory. A representative trajectory, referred to as 13F7-A21, would obtain global-regional coverage of Europa via a complex network of 45 flybys over the course of 3.5 years while also mitigating the effects of the harsh Jovian radiation environment. In addition, 5 Ganymede and 9 Callisto flybys would be used to manipulate the trajectory relative to Europa. The tour would reach a maximum Jovicentric inclination of 20.1 deg. have a deterministic (Delta)V of 164 m/s (post periapsis raise maneuver), and a total ionizing dose of 2.8 Mrad (Si).

orbital mechanics↗

Using AUTORAD for Cassini File Uplinks: Incorporating Automated Commanding into Mission Operations

As the Cassini spacecraft embarked on the Solstice Mission in October 2010, the flight operations team faced a significant challenge in planning and executing the continuing tour of the Saturnian system. Faced with budget cuts that reduced the science and engineering staff by over a third in size, new and streamlined processes had to be developed to allow the Cassini mission to maintain a high level of science data return with a lower amount of available resources while still minimizing the risk. Automation was deemed an important key in enabling mission operations with reduced workforce and the Cassini flight team has made this goal a priority for the Solstice Mission. The operations team learned about a utility called AUTORAD which would give the flight operations team the ability to program selected command files for radiation up to seven days in advance and help minimize the need for off-shift support that could deplete available staffing during the prime shift hours. This paper will describe how AUTORAD is being utilized by the Cassini flight operations team and the processes that were developed or modified to ensure that proper oversight and verification is maintained in the generation and execution of radiated command files.

Goo, Sherwin↗