Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Stack Design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Validation test of advanced technology for IPV nickel-hydrogen flight cells: Update

Individual pressure vessel (IPV) nickel-hydrogen technology was advanced at NASA Lewis and under Lewis contracts with the intention of improving cycle life and performance. One advancement was to use 26 percent potassium hydroxide (KOH) electrolyte to improve cycle life. Another advancement was to modify the state-of-the-art cell design to eliminate identified failure modes. The modified design is referred to as the advanced design. A breakthrough in the low-earth-orbit (LEO) cycle life of IPV nickel-hydrogen cells has been previously reported. The cycle life of boiler plate cells containing 26 percent KOH electrolyte was about 40,000 LEO cycles compared to 3,500 cycles for cells containing 31 percent KOH. The boiler plate test results are in the process of being validated using flight hardware and real time LEO testing at the Naval Weapons Support Center (NWSC), Crane, Indiana under a NASA Lewis Contract. An advanced 125 Ah IPV nickel-hydrogen cell was designed. The primary function of the advanced cell is to store and deliver energy for long-term, LEO spacecraft missions. The new features of this design are: (1) use of 26 percent rather than 31 percent KOH electrolyte; (2) use of a patented catalyzed wall wick; (3) use of serrated-edge separators to facilitate gaseous oxygen and hydrogen flow within the cell, while still maintaining physical contact with the wall wick for electrolyte management; and (4) use of a floating rather than a fixed stack (state-of-the-art) to accommodate nickel electrode expansion due to charge/discharge cycling. The significant improvements resulting from these innovations are: extended cycle life; enhanced thermal, electrolyte, and oxygen management; and accommodation of nickel electrode expansion. The advanced cell design is in the process of being validated using real time LEO cycle life testing of NWSC, Crane, Indiana. An update of validation test results confirming this technology is presented.

Smithrick, John J.↗

Mars lander survey

The requirements, issues, and design options are reviewed for manned Mars landers. Issues such as high 1/d versus low 1/d shape, parking orbit, and use of a small Mars orbit transfer vehicle to move the lander from orbit to orbit are addressed. Plots of lander mass as a function of Isp, destination orbit, and cargo up and down, plots of initial stack mass in low Earth orbit as a function of lander mass and parking orbit, detailed weight statements, and delta V tables for a variety of options are included. Lander options include a range from minimum landers up to a single stage reusable design. Mission options include conjunction and Venus flyby trajectories using all-cryogenic, hybrid, NERVA, and Mars orbit aerobraking propulsion concepts.

William R Stump↗

Automation of Solid Oxyde Electrolyzer Cell (SOEC) & Stack Assembly

The work performed under this agreement before the No/Go decision amounted to the following: 1. Preliminary manufacturing requirements defined by business sensitivity, baseline processes & risk assessment; 2. Process & materials development, in-line gauge exploration, and preliminary automation work used to reduce risk & further refine equipment specifications; 3. “Request for Quote” issued to multiple suppliers for major equipment; 4. Application specific equipment, hardware, and fixturing will be more beneficial to fabricate inhouse; 5.Current proposals & estimates meet cycle time, capital spend, & direct labor; space is on target but requires awareness; 6. Team will continue to explore opportunities to reduce risk (dry time, traceability); 7. Go / No-Go, Purchase Orders, Equipment build & commissioning next All other future task were not completed because during the Go /No-Go decision it was confirmed this project was a "No-Go" and did not proceed past BP1; these included the following: 1. Preliminary manufacturing requirements defined by business sensitivity, baseline processes & risk assessment; 2. Process & materials development, in-line gauge exploration, and preliminary automation work used to reduce risk & further refine equipment specifications; 3. “Request for Quote” issued to multiple suppliers for major equipment; 4. Application specific equipment, hardware, and fixturing will be more beneficial to fabricate inhouse; 5. Current proposals & estimates meet cycle time, capital spend, & direct labor; space is on target but requires awareness; 6. Team will continue to explore opportunities to reduce risk (dry time, traceability) In final preparation of the termination of the Automation of Solid Oxyde Electrolyzer Cell (SOEC) & Stack Assembly, Cummins has purchased no equipment with government funds, and there is no government-owned property in Cummins possession related to this project. Minimal labor and travel were completed and paid. This acts as the Final technical report and concludes our business with DOE on this grant.

36 MATERIALS SCIENCE↗

High Frequency Design Considerations for the Large Detector Number and Small Form Factor Dual Electron Spectrometer of the Fast Plasma Investigation on NASA's Magnetospheric Multiscale Mission

Each half of the Dual Electron Spectrometer (DES) of the Fast Plasma Investigation (FPI) on NASA's Magnetospheric MultiScale (MMS) mission utilizes a microchannel plate Chevron stack feeding 16 separate detection channels each with a dedicated anode and amplifier/discriminator chip. The desire to detect events on a single channel with a temporal spacing of 100 ns and a fixed dead-time drove our decision to use an amplifier/discriminator with a very fast (GHz class) front end. Since the inherent frequency response of each pulse in the output of the DES microchannel plate system also has frequency components above a GHz, this produced a number of design constraints not normally expected in electronic systems operating at peak speeds of 10 MHz. Additional constraints are imposed by the geometry of the instrument requiring all 16 channels along with each anode and amplifier/discriminator to be packaged in a relatively small space. We developed an electrical model for board level interactions between the detector channels to allow us to design a board topology which gave us the best detection sensitivity and lowest channel to channel crosstalk. The amplifier/discriminator output was designed to prevent the outputs from one channel from producing triggers on the inputs of other channels. A number of Radio Frequency design techniques were then applied to prevent signals from other subsystems (e.g. the high voltage power supply, command and data handling board, and Ultraviolet stimulation for the MCP) from generating false events. These techniques enabled us to operate the board at its highest sensitivity when operated in isolation and at very high sensitivity when placed into the overall system.

Microchannel plates high frequency performance↗

Nickel-hydrogen cell low-Earth life test update

When individual pressure vessel (IPV) nickel-hydrogen (Ni/H2) cells were selected as the energy storage system for the Space Station Freedom in March of 1986, a limited database existed on life and performance characteristics of these cells in a low earth orbit (LEO) regime. Therefore, NASA LeRC initiated a Ni/H2 cell test program with the primary objectives of building a test facility, procuring cells from existing NASA contracts, and screening several cell designs by life testing in a LEO 35 percent depth of discharge (DOD) scenario. A total of 40 cells incorporating 13 designs were purchased from Yardney, Hughes, and Eagle-Picher. Thirty-two of the cells purchased were 65 A-hr nameplate capacity and eight cells were 50 A-hr. Yardney and Eagle-Picher cells were built with both the Air Force recirculating and the advanced back-to-back electrode stack configurations and incorporated 31 and 26 percent KOH. Acceptance testing of the first delivered cells began in March of 1988, with life testing following in September of that year.Performance comparisons of these cells are made here while specifically addressing life test data relative to the design differences.

Frate, David T.↗

Signature of Correlated Insulator in Electric Field Controlled Superlattice

On a two-dimensional crystal, a “superlattice” with nanometer-scale periodicity can be imposed to tune the Bloch electron spectrum, enabling novel physical properties inaccessible in the original crystal. While creating 2D superlattices by means of nanopatterned electric gates has been studied for band structure engineering in recent years, evidence of electron correlations-which drive many problems at the forefront of physics research-remains to be uncovered. Here, in this work, we demonstrate signatures of a correlated insulator phase in Bernal-stacked bilayer graphene modulated by a gate-defined superlattice potential, manifested as resistance peaks centered at integer multiples of single electron per superlattice unit cell carrier densities. The observation is consistent with the formation of a stack of flat low-energy bands due to the superlattice potential combined with inversion symmetry breaking. Our work paves the way to custom-designed superlattices for studying band structure engineering and strongly correlated electrons in 2D materials.

36 MATERIALS SCIENCE↗

Lithography-Defined Semiconductor Moirés with Anomalous In-Gap Quantum Hall States

Quantum materials and phenomena have attracted great interest for their potential applications in next-generation microelectronics and quantum-information technologies. In one especially interesting class of quantum materials, moiré superlattices (MSLs) formed by twisted bilayers of 2D materials, a wide range of novel phenomena are observed. However, there exist daunting challenges such as reproducibility and scalability of utilizing 2D MSLs for microelectronics and quantum technologies due to their exfoliate-tear-stack method. Here, we propose lithography-defined semiconductor MSLs, in which three fundamental parameters electron−electron interaction, spin−orbit coupling, and band topology are designable. We experimentally investigate quantum-transport properties in a moiré specimen made in an InAs quantum well. Strong anomalous in-gap states are observed within the same integer quantum Hall state. Our work opens up new horizons for studying 2D quantum-materials phenomena in semiconductors featuring superior industry-level quality and state-of-the-art technologies, and they may potentially enable new quantum-information and microelectronics technologies.

36 MATERIALS SCIENCE↗

SpinQuest Polarized Target System

The SpinQuest experiment at Fermilab uses a solid-state polarized ammonia target held at a magnetic field of 5 T, immersed in liquid helium-4, which is held at approximately 1K by the evaporation refrigerator. The refrigerator provides the required cooling power during the dynamic nuclear polarization (DNP) process and the high intensity interaction with the 120 GeV proton beam from the Fermilab main injector. The refrigerator was designed in compliance with the American Society of Mechanical Engineers (ASME) to operate safely at Fermilab. The high pumping capacity ($17,000 \:m^3/h$) roots stack provides the required pumping speed during DNP production data taking and a custom-made radiation hard flow control valve regulates the refrigerator temperature during the thermal equilibrium calibration measurements. The frequency of the microwave generator, an Extended Interaction Oscillator (EIO), is automated to keep the maximum polarization while the (Nuclear Magnetic Resonance) NMR system continuously measures the polarization of the target material. In this talk, an overview of the SpinQuest polarized target system will be presented as well as a brief report of recent commissioning activities and target performance during the early production runs in 2024.

Bandara, Vibodha [Colombo U.]↗

Efficient structures for geosynchronous spacecraft solar arrays

A prototype deployer for the STACBEAM (Stacking Triangular Articulated Compact Beam) is being developed. The STACBEAM is an accordian-folded solar array blanket. The prototype was constructed as a point design for support of a 23.9-kW blanket and is described.

Adams, L. R.↗

High density packaging and interconnect of massively parallel image processors

This paper presents conceptual designs for high density packaging of parallel processing systems. The systems fall into two categories: global memory systems where many processors are packaged into a stack, and distributed memory systems where a single processor and many memory chips are packaged into a stack. Thermal behavior and performance are discussed.

Carson, John C.↗

340 Ghz Multipixel Transceiver

A multi-pixel terahertz transceiver is constructed using a stack of semiconductor layers that communicate using vias defined within the semiconductor layers. By using a stack of semiconductor layers, the various electrical functions of each layer can be tested easily without having to assemble the entire transceiver. In addition, the design allows the production of a transceiver having pixels set 10 mm apart.

Chattopadhyay, Goutam↗

Characterization of Low Mass Deformable Mirrors and ASIC Driver for High-Contrast Imaging

The development of compact, high performance Deformable Mirrors (DMs) is one of the most important techno-logical challenges for high-contrast imaging on space missions. Microscale Inc. has fabricated and characterized piezoelectric stack actuator deformable mirrors (PZT-DMs) and Application-Speci c Integrated Circuit (ASIC) drivers for direct integration. The DM-ASIC system is designed to eliminate almost all cables, enabling a very compact optical system with low mass and low power consumption. We report on the optical tests used to evaluate the performance of the DM and ASIC units. We also compare the results to the requirements for space-based high-contrast imaging of exoplanets. .

Prada, Camilo Mejia↗

Nickel-hydrogen cell low-earth-orbit life test update

When individual pressure vessel (IPV) nickel-hydrogen (Ni/H2) cells were selected as the energy storage system for Space Station Freedom in March of 1986, a limited database existed on life and performance characteristics of these cells in a low earth orbit (LEO) regime. Therefore, NASA LeRC initiated a Ni/H2 cell test program with the primary objectives of building a test facility, procuring cells from existing NASA contracts, and screening several cell designs by life testing in a LEO 35 percent depth of discharge (DOD) scenario. A total of 40 cells incorporating 13 designs were purchased from Yardney, Hughes, and Eagle-Picher. Thirty-two of the cells purchased were 65 A-hr nameplate capacity and eight cells were 50 A-Hr. Yardney and Eagle-Picher cells were built with both the Air Force recirculating and the advanced back-to-back electrode stack configurations and incorporated 31 and 26 percent KOH. Acceptance testing of the first delivered cells began in March of 1988, with life testing following in September of that year. Performance comparisons of these cells are made here while specifically addressing life test data relative to the design differences.

Frate, David T.↗

Low Cost Propulsion Technology at the Marshall Space Flight Center: Fastrac Engine and the Propulsion Test Article

The need for low cost access to space has initiated the development of low cost liquid rocket engine and propulsion system hardware at the Marshall Space Flight Center (MSFC). The engine, the 60,000 lbf, RP-1 and LOX Fastrac Engine has been designed as a robust, low cost liquid rocket engine with applications for X-34 as well as future low cost booster systems. The engine is a turbopump fed, gas generator cycle, rocket motor with an ablative nozzle. The Propulsion Test Article (PTA) is a test bed for low cost propulsion system hardware including a composite RP-1 tank, flight feedlines and pressurization system, stacked in a booster configuration. A general description of the PTA and the Fastrac engine is given, with emphasis on the technical specification of the hardware including flow rates, pressures and other operating conditions. The process which has been used for the design and integration of this hardware is described.

Fisher, Mark F.↗

High‐Performance Fluorinated Fused‐Ring Electron Acceptor with 3D Stacking and Exciton/Charge Transport

Abstract A new fluorinated electron acceptor (FINIC) based on 6,6,12,12‐tetrakis(3‐fluoro‐4‐hexylphenyl)‐indacenobis(dithieno[3,2‐ b ;2 ′ ,3 ′ ‐ d ]thiophene) as the electron‐donating central core and 5,6‐difluoro‐3‐(1,1‐dicyanomethylene)‐1‐indanone as the electron‐deficient end groups is rationally designed and synthesized. FINIC shows similar absorption profile in dilute solution to the nonfluorinated analogue INIC. However, compared with INIC, FINIC film shows red‐shifted absorption, down‐shifted frontier molecular orbital energy levels, enhanced crystallinity, and more ordered molecular packing. Single‐crystal structure data show that FINIC molecules pack into closer 3D “network” motif through H‐bonding and π–π interaction, while INIC molecules pack into incompact “honeycomb” motif through only π–π stacking. Theoretical calculations reveal that FINIC has stronger electronic coupling and more molecular interactions than INIC. FINIC has higher electron mobilities in both horizontal and vertical directions than INIC. Moreover, FINIC and INIC support efficient 3D exciton transport. PBD‐SF/FINIC blend has a larger driving force for exciton splitting, more efficient charge transfer and photoinduced charge generation. Finally, the organic solar cells based on PBD‐SF/FINIC blend yield power conversion efficiency of 14.0%, far exceeding that of the PBD‐SF/INIC‐based devices (5.1%).

Dai, Shuixing↗

NASA's Space Launch System Begins Integration, Stacking in Preparation for Artemis I Launch

The Artemis era of human lunar exploration is nearing take-off as NASA’s new super heavy-lift launch vehicle, the Space Launch System (SLS), begins stack-ing and integration operations in mid-2020 at Kennedy Space Center (KSC) in Florida. With a planned upgrade path to progressively more powerful vehicles and availability in crew and cargo configurations, SLS provides a unique and flexible launch solution to send crew, large-scale infrastructure and robotic probes to deep space. The SLS Block 1 vehicle, the initial variant to fly, is optimized for lunar missions with a proven propulsion system consisting of four liquid hydrogen (LH2)/liquid oxygen (LOX)-fed RS-25 engines and twin five-segment solid rocket boosters (SRBs). The Block 1 vehicle can also be outfitted with an industry-standard 5 m-class payload fairing (the “cargo” configuration) and will launch at least 27 metric tons (t) of mass to trans-lunar injection (TLI). SLS is the backbone of NASA’s Artemis program, which will return the agency’s human spaceflight program to the Moon for the first time since 1972. For the Artemis I mission, SLS will send an uncrewed Orion spacecraft to TLI, where it will enter a distant retrograde lunar orbit and fly 38,000 nmi past the Moon – farther than any spacecraft built for humans has ever traveled. The SLS Block 1 vehicle for Artemis I completed manufacturing in 2019. Several elements, including the upper stage, have been delivered to the Exploration Ground Systems (EGS) program at KSC and are being prepped for integration and stack-ing. The five-segment solid rocket boosters – the largest and most powerful ever built for flight – are also complete. The booster motor segments for the Artemis I flight are scheduled to ship from prime contractor Northrop Grumman’s Utah facilities and begin stacking and integration at KSC in June 2020. The SLS core stage is the largest rocket stage NASA has ever built in terms of volume and height, and includes the avionics and the tanks that feed cryogenic propellant to the four RS-25s (formerly Space Shuttle Main Engines [SSMEs]). They have been modified with an updated controller and nozzle insulation to protect them from the hotter launch environment. The SLS core stage is currently being test-ed at NASA’s Stennis Space Center (SSC) in a series of “green run” tests to verify it meets design and performance requirements. Following the green run test series, which is scheduled to culminate with a full-duration hot-fire of the four RS-25 engines, the core stage will ship to KSC and be stacked between the sol-id rocket boosters in the Vehicle Assembly Building (VAB). Integration of the vehicle will continue with the upper stage, known as the Interim Cryogenic Propulsion Stage (ICPS) and the Launch Vehicle Stage Adapter (LVSA) on the core stage. Another adapter, the Orion Stage Adapter (OSA), connects SLS to Orion and provides housing for 13 6U CubeSat payloads manifested on Artemis I. The CubeSats will be released in deep space after Orion separates from the vehicle, and the flight marks the first ride share opportunity for independent small-sats to deep space. The second major SLS variant to come online, Block 1B, replaces the single-engine ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS). This more powerful upper stage, along with other vehicle up-grades, will enable the Block 1B vehicle to launch 38-42 t to TLI, depending on crew or cargo configuration. The final evolution of the vehicle, Block 2, will onramp evolved solid rocket boosters to increase mass to TLI to 43-46 t, de-pending on crew or cargo configuration. The Block 1B/Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing in 19.1 m or 27.4 m lengths, to provide unprecedented volume for payloads. With the initial Block 1 vehicle completely manufactured and the core stage in final testing before shipping to KSC, the SLS Program and its industry partners have made significant progress manufacturing subsequent vehicles. For the second Block 1 vehicle, the solid rocket motor segments are complete, as are the RS-25 engines with controllers. All five major components of the Artemis II core stage – the forward skirt, LOX and LH2 tanks, intertank and engine section – are manufactured and technicians are installing subsystems at NASA’s rocket factory, Michoud Assembly Facility. The RL-10 engine for the Artemis II ICPS is complete and panels have been machined for its LH2 tank. In addition, panels are machined for the vehicle’s two adapters, with welding scheduled to begin in summer 2020. Flight hard-ware is also in production for the third SLS vehicle, with several booster motor segments cast. The pace of development on the EUS has increased, with the goal to complete Critical Design Review (CDR) in December 2020. Several EUS test rings have been machined at Michoud. The EUS is designed to exe-cute a variety of missions – human spaceflight, deployment of deep-space infra-structure, or high-C3 missions to the outer solar system – with crew and cargo configurations available beginning in the mid-2020s. The near-term goal for the nation’s powerful new space exploration asset, however, is to launch the Arte-mis program, and send the first woman and the next man to the lunar surface. At the Astrodynamics Specialist Conference, the SLS program will update the community on the progress of the initial Block 1 vehicle in final green run test-ing, integration and stacking. In addition, this paper will provide an update to the community on the manufacturing status of subsequent Block 1 and Block 1B vehicles.

Steve Creech↗

Tensile deformation behavior of twist grain boundaries in CoCrFeMnNi high entropy alloy bicrystals

High entropy alloys (HEA) are a class of materials that consist of multiple elemental species in similar concentrations. The use of elements in far from dilute concentrations introduces a multi-dimensional composition design space by which the properties of metallic systems can be tailored. While the mechanical behavior of HEAs has been the subject of active research recently, the role of grain boundaries (GBs) in their deformation behavior remains poorly understood. Motivated by recent experiments on HEAs demonstrating that GBs act as nucleation sites for deformation twins, herein, we leverage atomistic simulations to construct a series of equiatomic CoCrFeMnNi HEA bicrystals with $\langle 110 \rangle$ and $\langle 111 \rangle$ symmetric twist GBs and examine their tensile behavior and underlying deformation mechanisms at 77 K. Simulation results reveal that plastic deformation proceeds by the nucleation of partial dislocations from GBs, which then grow with further loading by bowing into the bulk crystals leaving behind stacking faults. Variations in the nucleation stress exist as function of GB character, defined in this work by the twist angle. Our results provide future avenues to explore GBs as a microstructure design tool to develop HEAs with tailored properties.

36 MATERIALS SCIENCE↗

Design for Reliability and Safety Approach for the NASA New Launch Vehicle

The United States National Aeronautics and Space Administration (NASA) is in the midst of a space exploration program intended for sending crew and cargo to the international Space Station (ISS), to the moon, and beyond. This program is called Constellation. As part of the Constellation program, NASA is developing new launch vehicles aimed at significantly increase safety and reliability, reduce the cost of accessing space, and provide a growth path for manned space exploration. Achieving these goals requires a rigorous process that addresses reliability, safety, and cost upfront and throughout all the phases of the life cycle of the program. This paper discusses the "Design for Reliability and Safety" approach for the NASA new crew launch vehicle called ARES I. The ARES I is being developed by NASA Marshall Space Flight Center (MSFC) in support of the Constellation program. The ARES I consists of three major Elements: A solid First Stage (FS), an Upper Stage (US), and liquid Upper Stage Engine (USE). Stacked on top of the ARES I is the Crew exploration vehicle (CEV). The CEV consists of a Launch Abort System (LAS), Crew Module (CM), Service Module (SM), and a Spacecraft Adapter (SA). The CEV development is being led by NASA Johnson Space Center (JSC). Designing for high reliability and safety require a good integrated working environment and a sound technical design approach. The "Design for Reliability and Safety" approach addressed in this paper discusses both the environment and the technical process put in place to support the ARES I design. To address the integrated working environment, the ARES I project office has established a risk based design group called "Operability Design and Analysis" (OD&A) group. This group is an integrated group intended to bring together the engineering, design, and safety organizations together to optimize the system design for safety, reliability, and cost. On the technical side, the ARES I project has, through the OD&A environment, implemented a probabilistic approach to analyze and evaluate design uncertainties and understand their impact on safety, reliability, and cost. This paper focuses on the use of the various probabilistic approaches that have been pursued by the ARES I project. Specifically, the paper discusses an integrated functional probabilistic analysis approach that addresses upffont some key areas to support the ARES I Design Analysis Cycle (DAC) pre Preliminary Design (PD) Phase. This functional approach is a probabilistic physics based approach that combines failure probabilities with system dynamics and engineering failure impact models to identify key system risk drivers and potential system design requirements. The paper also discusses other probabilistic risk assessment approaches planned by the ARES I project to support the PD phase and beyond.

Safie, Fayssal, M.↗