Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Scheduling and planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Multi-modal Energy-optimal Trip Scheduling in Real-time (METS-R) for Transportation Hubs (Final Report)

This report summarizes the work performed under the award number EE0008524. The project develops the Multi-modal Energy-optimal Trip Scheduling in Real-time (METS-R) platform as the next-generation transportation solution based on autonomous electric vehicles (AEV) serving passenger trips from and to urban transportation hubs, to substantially reduce transportation energy consumption. Extensive data collection and analyses were first conducted to understand the demand patterns and energy consumption of hub-based on-road trips. Then, a data-driven framework that consists of an analytical module and a simulation module was proposed. For the analytical module, five planning + operation tools were developed to support the planning and energy-efficient operations of urban AEV services: the charging station planning that robotically allocates charging supplies based on the stationary charging demand distribution; the transit planning and demand adaptive scheduling model that efficiently generates\ candidate transit routes from hubs to other places and dynamically adjusts the transit time table to fit the current demand; the online energy-efficient routing that learns the energy-optimal paths from observations of link-level energy consumption in real-time; the hub-based ridesharing that matches trip requests together with account for the uncertainty of future trip demand and vehicle supply; and finally, the integrated demand prediction and anomaly detection pipeline that leverages the flight/train time table and support other planning/operation tools. To demonstrate the performance of these tools, a scalable high-performance agent-based simulator was built. We divided the urban space into multiple service zones where each zone was considered as an agent for passenger generation and vehicle charging. Two types of AEV agents were coded to model two types of mobility services: AEV taxi and AEV transit. For the AEV taxi, the team implemented the functions of pickup/drop-off passengers, energy-efficient routing, ridesharing, fleet rebalancing, and recharging. For the AEV bus, the team implemented the functions of demand-adaptive route scheduling, passenger boarding, and recharging. A high-performance computing framework was introduced to receive various profiling information (such as link energy updates, vehicle speed) from the simulator instances and communicate the operational commands back to the instances. The numerical experiments show that each of the proposed operational algorithms can reduce energy consumption and improve system efficiency. Furthermore, there exists the need to collectively consider multiple planning + operational strategies as multiple strategies can influence each other in terms of performance impacts. Recommendations for future work related to AEV planning and simulation are discussed.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Tools and Methods for Optimization of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plants (NPP) operating cycle. Refueling outages are extremely costly for a NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities in a duration of around 30 days on average. Outage staff begin working on the schedule more than a year ahead of the outage start and make every effort to build a robust schedule. Despite the robust and detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjusting. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. The Optimization of Outage Activities project under the Risk-Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program focuses on developing tools and methods to support nuclear power plants with optimization of outage schedules. The goal of the outage optimization is the completion of all planned and emergent outage activities as fast as possible while maintaining highest level of safety. This report describes the initial development of tools to support outage management that leverage computational and machine learning methods developed in other RISA and LWRS projects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Repository-based software engineering program: Concept document

This document provides the context for Repository-Based Software Engineering's (RBSE's) evolving functional and operational product requirements, and it is the parent document for development of detailed technical and management plans. When furnished, requirements documents will serve as the governing RBSE product specification. The RBSE Program Management Plan will define resources, schedules, and technical and organizational approaches to fulfilling the goals and objectives of this concept. The purpose of this document is to provide a concise overview of RBSE, describe the rationale for the RBSE Program, and define a clear, common vision for RBSE team members and customers. The document also provides the foundation for developing RBSE user and system requirements and a corresponding Program Management Plan. The concept is used to express the program mission to RBSE users and managers and to provide an exhibit for community review.

Source record↗

Designing Autonomy into Interfaces for Long-Duration Missions

As NASA develops technologies for long-duration crewed missions, we must understand how communication between ground control teams and astronauts differs from the current dynamic to adapt new concepts for long-duration mission operations. Today, ground control teams support astronauts with immediate availability to answer questions, resolve issues, and manage activities. In the near future, however, extended communication delays during long-duration missions will require astronauts to become more autonomous. As many of the responsibilities shift from the ground control teams to the astronauts on-board, the concept of operations must also change from how it functions today. With increased astronaut autonomy, software tools must be developed that enable efficient completion of mission tasks without increased mental workload. Designing software tools to facilitate crew autonomy requires development teams to know which data will enhance quick decision making while providing necessary context for situational awareness of systems being managed on-board. NASA's Autonomous Systems and Operations (ASO) team is presently developing a software interface tool, EXPRESS (EXpedite the PRocessing of Experiments for Space Station) 2.5 to enable a long-duration crew to schedule activities for and operate autonomous systems. This paper describes details of the integrated human factors approach that drove the design of the elements of the software tool, including self-managed scheduling, constraint-driven planning, autonomous system fault recovery, and recommended troubleshooting actions. Additionally, this paper will chronicle ASO modifications of the user interface after the team's first flight demonstration, how it was based on lessons learned during software development, as well as from crew feedback in order to develop the current version which will be demonstrated on ISS in 2021. In the upcoming ISS demonstration, the astronaut crew will be given scenarios for scheduling and operating autonomous system activities, including off-nominal scenarios and autonomous system recoveries. The demonstration of the EXPRESS 2.5 tool is a step towards improved levels of autonomy as our new journeys take us farther into space.

autonomy↗

A look at the universe in gamma rays

The scientific background and objectives, proposed instruments, spacecraft constraints, operations plans and present status and schedule of the Gamma Ray Observatory (GRO), a shuttle-launched free-flyer satellite currently planned by NASA, are reviewed. Objectives for the satellite study of the highest energy electromagnetic radiation in the cosmos discussed include the investigation of the evolution of compact objects, nucleosynthesis, gamma-ray objects whose nature is not yet known, the gamma-ray properties of the Galaxy and other galaxies, cosmological effects and intense gamma-ray bursts. The five instruments considered in the definition study which span six decades in energy are presented and proposed experiments are outlined. Although a spacecraft has not yet been selected, several feasible alternatives have been identified, and a launch in the mid-1980s is planned.

Kniffen, D. A.↗

The 30/20 GHz demonstration system SSUS-D/BSE

The systems consisting of a 30/20 GHz communication satellite featuring a multiple fixed beam and scanning beam antenna, SS-TDMA, onboard processing and high power TWT's and IMPATT amplifiers, a trunking space-diversity Earth station, a customer premise system (CPS) portable Earth station and a Master Control Station. Hardware, software and personnel are included to build and launch one satellite and to carry on a two year experimentation and demonstration period of advanced Ka-band systems concepts and technology. Included are first level plans identifying all tasks, a schedule for system development and an assessment of critical technology and risk and a preliminary experiments plan.

Source record↗

Tactical Surface Metering Procedures for Charlotte Douglas International Airport

NASA has been collaborating with the Federal Aviation Administration (FAA) and aviation industry partners to develop and demonstrate new concepts and technologies for the Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. The primary goal of the ATD-2 project is to improve the predictability and the operational efficiency of the air traffic system in metroplex environments while maintaining or improving throughput by enhancing and integrating arrival, departure and surface prediction, scheduling, and management systems. In the Phase 1 Baseline IADS Demonstration, the tactical surface scheduling capability and the user interfaces for ramp controllers and ramp traffic managers were implemented for ramp operations. The purpose of the tactical surface scheduling capability is to provide the airline ramp controller with aircraft pushback advisories that prevent surface congestion and to respond to surface and airspace constraints that become known over relatively short time horizons. For this purpose, the tactical surface metering tool first estimates the capacity of current and near-future runway resources from flight schedule and surveillance data. With demand forecasts and predicted taxi trajectories, this tool computes an efficient runway schedule of aircraft in the planning horizon based on their readiness, Earliest Off-Block Times (EOBTs), and a ration by schedule (RBS) rule. Details on the implementation of the Tactical Surface Metering tool will be provided in the full paper. Both pushback and recommended hold times advisories provided by this surface metering tool are shown on the user interfaces for the ramp controller and the ramp traffic manager, called Ramp Traffic Console (RTC) and Ramp Manager Traffic Console (RMTC), respectively. There is excess queue time in the system due to demand capacity imbalance, this time can be taken as a hold on the runway queue or at the gate and was referred to as the Metering Value. This metering value can be adjusted by the Ramp Manager in collaboration with Air Traffic Controller-Tower Traffic Management Coordinator (TMC). They selected a set of metering values as default values for the tool during human-in-the-loop simulation. As the metering value increases, there is a decrease in the gate hold and increase in the queue time at the runway. Procedures and Information needs related to managing the surface metering procedures were researched in the simulated environment. These procedures will be compared to the procedures adopted at Charlotte Douglas International Airport when the tools were deployed and adopted in November 2017 for one departure push bank per day. Feedback regarding initial issues, information needs such as the need to see EOBTs on the flight data tags and how they compare to scheduled times will also be discussed in the full paper. Initial results will be provided regarding the choice of the metering value and how it was adjusted on a daily basis and what procedures evolved will also be presented in the paper.

surface metering↗

Monte Carlo Tree Search Methods for the Earth-Observing Satellite Scheduling Problem

This work explores on-board planning for the single spacecraft, multiple ground station Earth-observing satellite scheduling problem through artificial neural network function approximation of state–action value estimates generated by Monte Carlo tree search (MCTS). An extensive hyperparameter search is conducted for MCTS on the basis of performance, safety, and downlink opportunity utilization to determine the best hyperparameter combination for data generation. A hyperparameter search is also conducted on neural network architectures. The learned behavior of each network is explored, and each network architecture’s robustness to orbits and epochs outside of the training distributions is investigated. Furthermore, each algorithm is compared with a genetic algorithm, which serves to provide a baseline for optimality. MCTS is shown to compute near-optimal solutions in comparison to the genetic algorithm. The state–action value networks are shown to match or exceed the performance of MCTS in six orders of magnitude less execution time, showing promise for execution on board spacecraft.

Adam P. Herrmann↗

NASA aerospace pyrotechnically actuated systems: Program plan

The NASA Aerospace Pyrotechnically Actuated Systems (PAS) Program, a focused technology program, is being initiated to enhance the reliability, safety, and performance of pyrotechnically actuated systems. In broad terms, this Program Plan presents the approach that helps to resolve concerns raised by the NASA/DOD/DOE Aerospace Pyrotechnic Steering Committee. This Plan reflects key efforts needed in PAS technology. The resources committed to implement the Program will be identified in the Program Implementation Plan (PIP). A top level schedule is included along with major Program milestones and products. Responsibilities are defined in the PIP. The Plan identifies the goals and detailed objectives which define how those goals are to be accomplished. The Program will improve NASA's capabilities to design, develop, manufacture, and test pyrotechnically actuated systems for NASA's programs. Program benefits include the following: advanced pyrotechnic systems technology developed for NASA programs; hands-on pyrotechnic systems expertise; quick response capability to investigate and resolve pyrotechnic problems; enhanced communications and intercenter support among the technical staff; and government-industry PAS technical interchange. The PAS Program produces useful products that are of a broad-based technology nature rather than activities intended to meet specific technology objectives for individual programs. Serious problems have occurred with pyrotechnic devices although near perfect performance is demanded by users. The lack of a program to address those problems in the past is considered a serious omission. The nature of problems experienced as revealed by a survey are discussed and the origin of the program is explained.

Schulze, Norman R.↗

Space power system scheduling using an expert system

A most pressing problem in space exploration is timely spacecraft power system sequence generation, which requires the scheduling of a set of loads given a set of resource constraints. This is particularly important after an anomaly or failure. This paper discusses the power scheduling problem and how the software program, Plan-It, can be used as a consultant for scheduling power system activities. Modeling of power activities, human interface, and two of the many strategies used by Plan-It are discussed. Preliminary results showing the development of a conflict-free sequence from an initial sequence with conflicts is presented. It shows that a 4-day schedule can be generated in a matter of a few minutes, which provides sufficient time in many cases to aid the crew in the replanning of loads and generation use following a failure or anomaly.

Bahrami, K. A.↗

Ground control system for the midcourse space experiment UTC clock

One goal of the Midcourse Space Experiment (MSX) spacecraft Operations Planning Center is to maintain the onboard satellite UTC clock (UTC(MSX)) to within 1 millisecond of UTC(APL) (the program requirement is 10 msec). The UTC(MSX) clock employs as its time base an APL built 5 MHz quartz oscillator, which is expected to have frequency instabilities (aging rate + drift rate + frequency offset) that will cause the clock to drift approximately two to ten milliseconds per day. The UTC(MSX) clock can be advanced or retarded by the APL MSX satellite ground control center by integer multiples of 1 millisecond. The MSX Operations Planning Center is developing software which records the drift of UTC(MSX) relative to UTC(APL) and which schedules the time of day and magnitude of UTC(MSX) clock updates up to 48 hours in advance. Because of the manner in which MSX spacecraft activities are scheduled, MSX clock updates are planned 24 to 48 hours in advance, and stored in the satellite's computer controller for later execution. Data will be collected on the drift of UTC(MSX) relative to UTC(APL) over a three to five day period. Approximately six times per day, the time offset between UTC(MSX) and UTC(APL) will be measured by APL with a resolution of less than 100 microseconds. From this data a second order analytical model of the clock's drift will be derived. This model will be used to extrapolate the offset of the MSX clock in time from the present to 48 hours in the future. MSX clock updates will be placed on the spacecraft's daily schedule whenever the predicted clock offset exceeds 0.5 milliseconds. The paper includes a discussion of how the empirical model of the MSX clock is derived from satellite telemetry data, as well as the algorithm used to schedule MSX clock updates based on the model.

Dragonette, Richard↗

Integrated payload and mission planning, phase 3. Volume 1: Integrated payload and mission planning process evaluation

The integrated payload and mission planning process for STS payloads was defined, and discrete tasks which evaluate performance and support initial implementation of this process were conducted. The scope of activity was limited to NASA and NASA-related payload missions only. The integrated payload and mission planning process was defined in detail, including all related interfaces and scheduling requirements. Related to the payload mission planning process, a methodology for assessing early Spacelab mission manager assignment schedules was defined.

Sapp, T. P.↗

On-Board Planning for New Millenium Deep Space One Autonomy

The Deep Space One (DS1) mission, scheduled to fly in 1998, will be the first NASA spacecraft to feature an on-board planner. The planner is part of an artificial intelligence based control architecture that comprises the planner/scheduler, a plan execution engine, and a model-based fault diagnosis and reconfiguration engine...This paper describes the on-board planning and scheduling component of the DS1 autonomy architecture.

Deep↗

Scheduling Position, Navigation and Time Service Requests from Non-dedicated Lunar Constellations

This paper presents a centralized scheduler that satisfies user requests for Position, Navigation, and Time (PNT) services from an ad-hoc, non-dedicated orbital constellation around the Moon. Traditional, dedicated GNSS networks provide service 24/7, which allows users to acquire localization services at-will. For ad-hoc networks, a coordinated schedule is needed to ensure Quality of Service (QoS) guarantees for user localization, while satisfying non-dedicated assets’ usage constraints. This scheduler bridges this coordination gap by leveraging Mixed Integer-Linear Programming (MILP) to schedule this “as-needed” localization service while respecting the constraints on each asset. In upcoming decades there is expected to be a substantial increase in Lunar missions. Many of these missions will feature low-cost surface assets near the moon’s polar regions and small-sat science missions in orbit. Most missions need PNT capabilities to ensure safe operations and meet their science objectives, but low-cost missions may not be able to support the large power, mass, and weight that a weak GNSS or DSN based navigation solution would entail. Asset localization has been demonstrated using a decentralized extended Kalman Filter (DEKF) in the previously presented Lunar Autonomous PNT System (LAPS). Within the LAPS simulation environment, a module has been developed to generate the coordinated user-asset schedules described above; this Service Scheduler Module (SSM) allows for complete end-to-end testing of the entire system. Within SSM, a user service request consists of a location on the Lunar surface, a cumulative service duration, and a window in which service must occur. SSM takes as input these requests and the LAPS-predicted positional degree of precision as the QoS for each available set of orbital assets. A simple, baseline MILP model is formulated to provide the highest-precision service balanced across all requests. To reflect the non-dedicated nature of the constellation, this baseline model is augmented with additional asset-specific load capacity constraints or availability constraints. The load capacity constraints limit total time spent providing service, and the availability constraints reflect blockout times or availability windows when the assets are not otherwise occupied. SSM outputs two schedules: the user schedule to indicate their service times and expected QoS, and a satellite schedule to be transmitted to the orbiting constellation, describing when each non-dedicated asset provides PNT service. SSM is predominantly implemented in MATLAB and allows the use of any MILP solver to generate the resulting schedules. This paper describes the SSM - LAPS interface, how the output of LAPS is used to construct the MILP, and how SSM provides user localization service while satisfying constraints. It will also demonstrate the tool’s flexibility for formulating schedules for the end user and the constellation, focusing on scenarios that match real-world proposed missions. It will detail how SSM can be used to compare the addition of load capacity constraints, satellite availability constraints, and QoS guarantees for the users. Finally, we describe how SSM can be used to support the design of the ad-hoc constellation itself. The resulting integrated capability will support the design of future ad-hoc Lunar PNT networks, enabling high-quality, low-cost Lunar exploration

Swarm↗

Holistic fleet optimization incorporating system design considerations

The methodology described in this article enables a type of holistic fleet optimization that simultaneously considers the composition and activity of a fleet through time as well as the design of individual systems within the fleet. Often, real-world system design optimization and fleet-level acquisition optimization are treated separately due to the prohibitive scale and complexity of each problem. Importantly, this means that fleet-level schedules are typically limited to the inclusion of predefined system configurations and are blind to a rich spectrum of system design alternatives. Similarly, system design optimization often considers a system in isolation from the fleet and is blind to numerous, complex portfolio-level considerations. In reality, these two problems are highly interconnected. To properly address this system-fleet design interdependence, we present a general method for efficiently incorporating multi-objective system design trade-off information into a mixed-integer linear programming (MILP) fleet-level optimization. This work is motivated by the authors' experience with large-scale DOD acquisition portfolios. However, the methodology is general to any application where the fleet-level problem is a MILP and there exists at least one system having a design trade space in which two or more design objectives are parameters in the fleet-level MILP.

97 MATHEMATICS AND COMPUTING↗

Production Agency Quality Assurance Management Execution Strategy [Thesis]

There are multiple federal directives that Los Alamos National Laboratory (LANL) must follow for the proper implementation of quality assurance, strategic planning, and execution of manufacturing and surveillance operations. Recent assessments identified that manufacturing in all processing areas is dynamic due to influencing scope changes, design modifications, funding adjustments, and staff attrition. In response, this project was started to develop a comprehensive PAQ execution strategy to support the success of LANL’s manufacturing mission. This project’s method for developing an updated architecture was to create an integrated, flexible, reliable, and agile strategic process. The execution plan has five deliverables: 1) an integrated schedule view of PAQ work scope, 2) a resource management plan that aligns with the required scope, 3) a metrics monitoring dashboard, 4) a project management plan for sustaining NAP 401.1A implementation, and 5) a risk management plan. The research design is a mixed-method approach focused on data collection for each deliverable. The methodology entails qualitative and quantitative research, metrics monitoring, data analysis, and the creation of a dashboard. The qualitative methods used include literature reviews and interviews. The quantitative methods include resource, financial, schedule and survey data analysis. Preliminary and final results were peer reviewed by subject matter experts both within the ALDWP organization and deployed support.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Clearance Analysis of CTC2 (on ELC4) to S-TRRJ HRS Radiator Rotation Envelope

In response to the planned retirement of the Space Shuttle Program, International Space Station (ISS) management began stockpiling spare parts on the ISS. Many of the larger orbital replacement units were stored on the Expedite the Processing of Experiments to Space Station (EXPRESS) Logistics Carriers (ELCs) mounted on the end of the S3 and P3 truss segments, immediately outboard of the Thermal Radiator Rotary Joints (TRRJs) and their attached radiators. In an August 2009 computer-aided design (CAD) assessment, it was determined that mounting the Cargo Transport Container (CTC) 2 on the inboard face of ELC4 as planned would create insufficient clearance between the CTC2 and the rotational envelope of the radiators when the TRRJs were rotated to a gamma angle of 35.0 degrees. The true clearance would depend on how the Unpressurized Cargo Carrier Attachment System (UCCAS) was mounted to the S3 truss and how the ELC4 was attached to it. If the plane of the UCCAS attachment points were tilted even slightly inboard, it would significantly change the clearance between CTC2 and the Starboard TRRJ (S-TRRJ) radiators. Additionally, since CTC2 would be covered in multilayer insulation (MLI), the true outer profile of CTC2 was not captured in the CAD models used for the clearance assessment. It was possible that, even if the S-TRRJ radiators cleared CTC2, they could snag the MLI covering. In the fall of 2010, the Image Science and Analysis Group (ISAG) was asked to perform an on-orbit clearance analysis to determine the location of CTC2 on ELC4 and the S-TRRJ radiators at the angle of closest approach so that a positive clearance could be assured. To provide the measurements as quickly as possible to aid in the assessment, it was decided that the clearance analysis would be broken into two phases. Phase I: The location and orientation of the UCCAS fittings, which support and hold the ELC4 in place, would be measured relative to the ISS Analytical Coordinate System (ISSACS) as defined by nine preexisting Space Vision System (SVS) targets affixed to the forward/zenith side of the S1 and S3 truss segments. The location of the outboard edge of the S-TRRJ radiator would also be measured when positioned at the angle of closest approach to CTC2 (gamma = 35.0 degrees). This data would allow the Digital Pre-Assembly Group to predict how the ELC4 would sit on the UCCAS and how that would translate into the clearance between CTC2 and the S-TRRJ radiators. Phase II: After the ELC4 was delivered and installed into the UCCAS, the position of the CTC2 mounting plate on the inboard face of ELC4, would be measured in the ISSACS coordinate system relative to the SVS control points used in Phase I. Although CTC2 would not yet be mounted on ELC4, the working envelope of CTC2 could be mathematically added to the measured position of ELC4 to produce a best estimate for CTC2's mounted location. Comparing CTC2's best estimated location to the S-TRRJ radiator (measured in Phase I); relative to the ISSACS coordinate system, would provide a direct measurement of the expected clearance. Due to the impending delivery of ELC4 (scheduled for January 2011), planning for the Phase I clearance analysis began immediately. Using the Dynamic Onboard Ubiquitous Graphics (DOUG) program, ISAG designed a way to acquire images of the SVS control points on truss segments S1 and S3, the aft facing edge of the S-TRRJ Heat Rejection Subsystem (HRS) radiator, and the three UCCAS latch mechanisms mounted on the zenith face of the S3 truss using the Space Station Remote Manipulator System (SSRMS). To minimize the number of SSRMS movements, the Special Purpose Dexterous Manipulator (SPDM) would be attached to the SSRMS. This would make it possible to park the SPDM in one position and acquire multiple images by changing the viewing orientation of the SPDM body cameras using the pan/tilt units on which they are mounted. Using this implementation concept, ISAG identified four SSRMS/SPDM positions from which the majority of the needed imagery could be acquired. Five additional images would be acquired using the CP-3 external ISS camera mounted on the S1 truss immediately inboard of ELC4. Based on a photogrammetric simulation, it was estimated that the measured location of the HRS radiator and UCCAS latch points would be accurate to about 0.3 in. in each of the three axes relative to ISSACS. Working with ROBO, ISAG collected 78 images of the ISS December 29, 2010. From this imagery, the best 40 were selected for use in the analysis process. The images were radiometrically enhanced to improve color and contrast and loaded into the FotoG analysis software along with the camera parameters and control data, which consisted of the coordinates for the nine SVS targets on the S1 and S3 trusses in the ISSACS coordinate system.

Liddle, Donn↗

The Composition of the Master Schedule

Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

Thomas, Cynthia C.↗