Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “STARTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Transportation and System Analysis Collaborations in Support of a Federal Consolidated Interim Storage Facility

The U.S. Department of Energy’s Integrated Waste Management (IWM) program under the Office of Nuclear Energy is planning for the future transportation, storage, and eventual disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from nuclear power plant and waste custodian sites across the United States. To better enable informed decision-making regarding the back end of the nuclear fuel cycle, the IWM program has been sponsoring the development and application of system analysis tools capable of analyzing various options for managing SNF and HLW. With these tools, integrated waste management system (IWMS) architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analyses and assessments typically use these modeling and simulation tools to investigate implications of changes in various assumptions and parameters such as acceptance rates, receipt logic, facility capacities and capabilities, use of standardized canisters, start and stop dates of facilities, etc. The Next Generation System Analysis Model (NGSAM) is an agent-based simulation toolkit that is used for a system-level simulation and analysis focused on SNF management in the United States. NGSAM’s primary purpose is to provide a system analyst with capabilities to model the IWMS and gain insights into SNF and HLW management alternatives including the impact of system choices, associated cost estimates, and development of integrated yet flexible approaches. An analyst using NGSAM can define several factors like the number of storage facilities, capacity at each facility, transportation schedules, shipment rates, and other conditions. IWM is also developing the Stakeholder Tool for Assessing Radioactive Transportation (START). START is a web-based geospatial tool developed to provide the visualization and initial evaluation of transportation options associated with future SNF and HLW shipment planning and operations. This includes characterizing safety, economic, and environmental conditions at and in proximity to shipment origins as well as along prospective transportation routes. Information from the START tool can be presented/shared as maps, graphics, geospatial files, and tabular form to enable easy data representation and export functionality. The system analysis, NGSAM, and START teams have been working closely for several years before formalizing this collaboration. START provides the SNF transportation routing information for use in NGSAM. System analysts use the NGSAM tool to generate results (schedule, costs, infrastructure acquisitions, shipment rates, etc.). Subject-matter experts and system analysts work together to inform how NGSAM should model the waste management system. Specifically, this paper discusses the collaborations between the system analysis, NGSAM, and START teams and their accomplishments over the past year. Some examples of these efforts include calibrating and adding data to the START output files to meet NGSAM needs, gaining a better understanding of START data used in NGSAM as well as how updates in START data could result in an improved NGSAM analysis. Detailed examples of various tasks that have been performed by the team will be discussed in the full paper. Continued efforts in this direction are expected in the coming years.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Transportation and Systems Analysis Collaborations in Support of a Federal Consolidated Interim Storage Facility

The U.S. Department of Energy’s Integrated Waste Management (IWM) program under the Office of Nuclear Energy is planning for the future transportation, storage, and eventual disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from nuclear power plant sites across the United States. To better enable informed decision-making regarding the back end of the nuclear fuel cycle, the IWM program has been sponsoring the development and application of system analysis tools capable of analyzing various options for managing SNF and HLW. With these tools, integrated waste management system (IWMS) architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analyses and assessments typically use these modeling and simulation tools to investigate implications of changes in various assumptions and parameters such as acceptance rates, receipt logic, facility capacities and capabilities, use of standardized canisters, start and stop dates of facilities, etc. The Next Generation System Analysis Model (NGSAM) is an agent-based simulation toolkit that is used for a system-level simulation and analysis focused on SNF management in the United States. An analyst using NGSAM has the ability to define several factors like the number of storage facilities, capacity at each facility, transportation schedules, shipment rates, and other conditions. NGSAM’s primary purpose is to provide a system analyst with capabilities to model the IWMS and gain insights into SNF and HLW management alternatives including the impact of system choices, associated cost estimates, and development of integrated yet flexible approaches. IWM is also developing the Stakeholder Tool for Assessing Radioactive Transportation (START). START is a web-based geospatial tool developed to provide visualization and initial evaluation of transportation options associated with future SNF and HLW shipment planning and operations. This includes characterizing safety, economic, and environmental conditions on and in proximity to shipment origins as well as along prospective transportation routes. Information from the START tool can be presented/shared as maps, graphics, geospatial files, and tabular form to enable easy data representation and export functionality. The system analysis, NGSAM, and START teams had been working closely for several years before formalizing this collaboration. START provides the SNF routing information for use in NGSAM. System analysts use the NGSAM tool to generate results (schedule, costs, infrastructure acquisitions, shipment rates, etc.). Subject-matter experts and system analysts work together to inform how NGSAM should model the waste management system. Specifically, this paper discusses the collaborations between the system analysis, NGSAM, and START teams and their accomplishments over the past year. Some examples of these efforts include calibrating and adding data to the START output files to meet NGSAM needs, gaining a better understanding of START data used in NGSAM, as well as how updates in START data could result in an improved NGSAM analysis. Detailed examples of various tasks that have been performed by the team will be discussed in the full paper. Continued efforts in this direction are expected in the coming years.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Backup control airstart performance on a digital electronic engine control-equipped F100-engine

The air start capability of a backup control (BUC) was tested for a digital electronic engine control (DEEC) equipped F100 engine, which was installed in an F-15 aircraft. Two air start schedules were tested. Using the group 1 start schedule, based on a 40 sec timer, an air speed of 300 knots was required to ensure successful 40 and 25% BUC mode spooldown airstarts. If core rotor speed (N2) was less than 40% a stall would occur when the start bleed closed, 40 sec after initiation of the air start. All jet fuel starter (JFS) assisted air starts were successful with the group 1 start schedule. For the group 2 schedule, the time between pressurization and start bleed closure ranged between 50 sec and 72 sec. Idle rps was lower than the desired 65% for air starts at higher altitudes and lower air speeds.

Johnson, J. B.↗

Engine Operating Conditions that Cause Thermal-Fatigue Cracks in Turbojet-Engine Buckets

Five engine tests were conducted to definitely establish the failure mechanism of leading-edge cracking and to determine which conditions of engine operation cause the failures. Five groups of S-616 and M-252 buckets from master lots were run consecutively in the same J47-25 engine. The tests included a steady-state run at full-power conditions, rapid cycling between idle and rated speed, and three different start-stop tests. The first start-stop test consisted of cycles of start and stop with 5 minutes of idle speed before each stop; the second included cycles of start and stop but with 15 minutes of rated speed before each stop; the third consisted of cycles of gradual starts and normal stops with 5 minutes at idle speed before each stop. The test results demonstrated that the primary cause of leading-edge cracking was thermal fatigue produced by repeated engine starts. The leading edge of the bucket experiences plastic flow in compression during starts and consequently is subjected to a tensile stress when the remainder of the bucket becomes heated and expands. Crack initiation was accelerated when rated-speed operation was added to each normal start-stop cycle. This acceleration of crack formation was attributed to localized creep damage and perhaps to embrittlement resulting from overaging. It was demonstrated that leading-edge cracking can be prevented simply by starting the engine gradually.

Johnston, James R.↗

Loop Heat Pipe Startup Behaviors

A loop heat pipe must start successfully before it can commence its service. The start-up transient represents one of the most complex phenomena in the loop heat pipe operation. This paper discusses various aspects of loop heat pipe start-up behaviors. Topics include the four start-up scenarios, the initial fluid distribution between the evaporator and reservoir that determines the start-up scenario, factors that affect the fluid distribution between the evaporator and reservoir, difficulties encountered during the low power start-up, and methods to enhance the start-up success. Also addressed are the thermodynamic constraint between the evaporator and reservoir in the loop heat pipe operation, the superheat requirement for nucleate boiling, pressure spike and pressure surge during the start-up transient, and repeated cycles of loop start-up andshutdown under certain conditions.

Loop Heat Pipes↗

Blackstart of Power Grids with Inverter-Based Resources

This paper presents the findings of our investigation into inverter-based resource-(IBR-) driven blackstart of electric grids. Four potential black-start configurations with different setups are presented. To evaluate the technical feasibility of IBR-driven black start in the four configurations, a behavioral model of inverters that mimics current-limited inverter operation is developed using variable resistors in the MATLAB Simulink/Simscape environment. The inverter model is connected to an induction motor through transformers and a transmission line to simulate its startup. Simulation results show that even with the limited current supply capability of inverters because of their physical constraints, IBRs can black-start a motor under certain conditions. Results also show that by using soft-start techniques, such as ramped supply voltage, inrush currents can be reduced, thereby expanding the conditions under which IBRs can provide black-start support. Simulation results with different scenarios lead to discussions and key takeaways that could be valuable for further IBR-driven black-start research.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Utilization of the CW magnetrons as coherent RF sources for superconducting RF accelerators

CW magnetrons designed and optimized for industrial heaters, driven by an injection-locking signal, were suggested to power Superconducting RF (SRF) cavities. However, the CW magnetrons, which are regenerative generators, are intended to operate in self-excitation mode, so, for reliable starting they use a large regenerative gain, causing a large regenerative instability in operation. Thus, power supply ripple, even shot noise, etc., lead to multiple sidebands forming a quasi-continuous noise spectrum at the carrier frequency. Therefore, in the traditionally used mode of operation and control, such magnetrons are inapplicable for powering high Q-factor SRF cavities. A new approach to operation and control of CW magnetrons considering non-stationary processes during start-up and operation makes it possible to find a mode of almost coherent RF generation of tubes with a significant reduction in regenerative instability and noise and increased efficiency. In our work is presented substantiation for the newly developed mode with an analysis of the new approach based on experimental results. •In this article, for the first time, non-stationary, regenerative processes are considered during the start-up and operation of CW magnetrons for powering high-Q superconducting RF cavities.•An analytical study, confirmed by experiments, showed that the traditionally used modes of starting and operating CW magnetrons are not suitable for powering high-Q superconducting RF cavities.•In fact, to make CW magnetrons suitable for such cavities, the physics of starting and operating CW magnetrons must be changed. This has been demonstrated in our work.•In developing the Stimulated Coherent Generation Mode [NIM A 980 (2020) 164366], we have shown the suitability of this mode for starting and operating CW magnetrons for high-Q superconducting RF cavities.•Analytical analysis, verified experimentally, substantiates in our article the suitability of the “Mode of stimulated coherent generation” of CW magnetrons for powering high-Q superconducting cavities in pulsed and continuous modes.

43 PARTICLE ACCELERATORS↗

FY11 annual Report: PHEV Engine Control and Energy Management Strategy

Objectives are to: (1) Investigate novel engine control strategies targeted at rapid engine/catalyst warming for the purpose of mitigating tailpipe emissions from plug-in hybrid electric vehicles (PHEV) exposed to multiple engine cold start events; and (2) Validate and optimize hybrid supervisory control techniques developed during previous and on-going research projects by integrating them into the vehicle level control system and complementing them with the modified engine control strategies in order to further reduce emissions during both cold start and engine re-starts. Approach used are: (1) Perform a literature search of engine control strategies used in conventional powertrains to reduce cold start emissions; (2) Develop an open source engine controller providing full access to engine control strategies in order to implement new engine/catalyst warm-up behaviors; (3) Modify engine cold start control algorithms and characterize impact on cold start behavior; and (4) Develop an experimental Engine-In-the-Loop test stand in order to validate control methodologies and verify transient thermal behavior and emissions of the real engine when combined with a virtual hybrid powertrain. Some major accomplishments are: (1) Commissioned a prototype engine controller on a GM Ecotec 2.4l direct injected gasoline engine on an engine test cell at the University of Tennessee. (2) Obtained from Bosch (with GM's approval) an open calibration engine controller for a GM Ecotec LNF 2.0l Gasoline Turbocharged Direct Injection engine. Bosch will support the bypass of cold start strategies if calibration access proves insufficient. The LNF engine and its open controller were commissioned on an engine test cell at ORNL. (3) Completed a literature search to identify key engine cold start control parameters and characterized their impact on the real engine using the Bosch engine controller to calibrate them. (4) Ported virtual hybrid vehicle model from offline simulation environment to real-time Hardware-In-the-Loop platform.

33 ADVANCED PROPULSION SYSTEMS↗

Analysis of Modeling Assumptions used in Production Cost Models for Renewable Integration Studies

Renewable energy integration studies have been published for many different regions exploring the question of how higher penetration of renewable energy will impact the electric grid. These studies each make assumptions about the systems they are analyzing; however the effect of many of these assumptions has not been yet been examined and published. In this paper we analyze the impact of modeling assumptions in renewable integration studies, including the optimization method used (linear or mixed-integer programming) and the temporal resolution of the dispatch stage (hourly or sub-hourly). We analyze each of these assumptions on a large and a small system and determine the impact of each assumption on key metrics including the total production cost, curtailment of renewables, CO2 emissions, and generator starts and ramps. Additionally, we identified the impact on these metrics if a four-hour ahead commitment step is included before the dispatch step and the impact of retiring generators to reduce the degree to which the system is overbuilt. We find that the largest effect of these assumptions is at the unit level on starts and ramps, particularly for the temporal resolution, and saw a smaller impact at the aggregate level on system costs and emissions. For each fossil fuel generator type we measured the average capacity started, average run-time per start, and average number of ramps. Linear programming results saw up to a 20% difference in number of starts and average run time of traditional generators, and up to a 4% difference in the number of ramps, when compared to mixed-integer programming. Utilizing hourly dispatch instead of sub-hourly dispatch saw no difference in coal or gas CC units for either start metric, while gas CT units had a 5% increase in the number of starts and 2% increase in the average on-time per start. The number of ramps decreased up to 44%. The smallest effect seen was on the CO2 emissions and total production cost, with a 0.8% and 0.9% reduction respectively when using linear programming compared to mixed-integer programming and 0.07% and 0.6% reduction, respectively, in the hourly dispatch compared to sub-hourly dispatch.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Heavy-Duty Vehicle Activity Updates for MOVES Using NREL Fleet DNA and CE-CERT Data

The U.S. Environmental Protection Agency's (EPA's) Motor Vehicle Emission Simulator (MOVES) is a publicly available tool used by researchers and policymakers to help understand motor vehicle emission sources at a national, county, and project level. Estimates of heavy-duty activity in the most recent version of the model at the time this work was conducted, MOVES2014, was identified as an area in need of improvement. The start activity in MOVES2014 is based on a limited and dated data set. In addition, MOVES2014 relies on drive cycles that represent on-network activity but do not account for idling activity that occurs on off-network roads, such as at a distribution center, while the truck is queuing or during loading and unloading. As a result, MOVES2014 may currently underestimate the number of starts and idle and soak time for heavy-duty trucks in real-world operation. The National Renewable Energy Laboratory (NREL) has previously leveraged its expansive Fleet DNA database of heavy-duty vehicles to idle and start activity for six of the nine heavy-duty vehicle source types of classes in the MOVES model. The data available in Fleet DNA from 416 conventional, diesel-powered vehicles provided activity estimates from more than 120,000 hours of operation throughout 14,682 vehicle days between October 2006 and January 2016. NREL calculated start fraction, starts per day, soak fraction, and idle fraction by hour of the day for each vehicle type, state, and vocation, and provided results in .CSV files that can be translated to MOVES table inputs. The idle and start activity from this initial analysis of Fleet DNA data was used to develop default idle and start data for heavy-duty vehicles in MOVES3. Satisfied with the results from the Fleet DNA data used for MOVES3, the EPA asked NREL to extend this start/soak/idle analysis using additional data from a larger number of vehicles for a potential future update to the MOVES model. Such a data set was achieved from a project led by the University of California at Riverside, College of Engineering, Center for Environmental Research & Technology (CE-CERT) and funded by California Air Resources Board. Specifically, this data set consists of 90 heavy-duty vehicles operated mainly in California, which can be separated into five of the nine heavy-duty vehicle classes in the MOVES model. In addition, the heavy-duty activity database collected by CE-CERT provided activity estimates from more than 44,000 hours of operation throughout 4,724 vehicle days between November 2014 and September 2016. This report details the analysis of the heavy-duty activity database collected from the University of California at Riverside by providing graphical analysis and context for the start, soak, and idle distributions. The comparison of the related results from both the Fleet DNA and CE-CERT data sets are documented as well.

33 ADVANCED PROPULSION SYSTEMS↗

Effect of Propellant and Catalyst Bed Temperatures on Thrust Buildup in Several Hydrogen Peroxide Reaction Control Rockets

An investigation was undertaken to determine the effect of chamber and propellant feed temperatures on the starting characteristics of hydrogen peroxide thrust chambers. Start delay times for two types of thrust chamber designs in the 1- to 24-pound-thrust range were obtained over a range of chamber and propellant feed temperatures from 30 to 100 F. Start delay times obtained during the first minute of catalyst bed life and again after 6 minutes of total accumulated running time are presented as a function of chamber and propellant feed temperatures. The initial cold-start delay time of the hydrogen peroxide thrust chambers investigated was approximately 0.150 second to attain 90 percent of steady-state chamber pressure at chamber and propellant feed temperatures of 70 F and above. Both thrust chamber designs could be started at chamber and propellant feed temperatures as low as 30 F; start delay times did, however, generally increase at low temperatures. When the chamber was at an elevated temperature from a preceding firing, the start delay time was reduced to approximately 0.050 second, indicating a marked effect of chamber temperature at constant propellant feed temperatures. Accumulated run time affected the starting characteristics only when both the chamber and propellant feed temperatures were at reduced levels.

Wanhainen, John P.↗

Methods for the additive manufacturing of semiconductor and crystal materials

A method for the additive manufacturing of inorganic crystalline materials, including: physically combining a plurality of starting materials that are used to form an inorganic crystalline compound to be used as one or more of a semiconductor, scintillator, laser crystal, and optical filter; heating or melting successive regions of the combined starting materials using a directed heat source having a predetermined energy characteristic, thereby facilitating the reaction of the combined starting materials; and allowing each region of the combined starting materials to cool in a controlled manner, such that the desired inorganic crystalline compound results. The method also includes, prior to heating or melting the successive regions of the combined starting materials using the directed heat source, heating the combined starting materials to facilitate initial reaction of the combined starting materials. The method further includes translating the combined starting materials and/or the directed heat source between successive locations. The method still further includes controlling the mechanical, electrical, photonic, and/or optical properties of the inorganic crystalline compound.

36 MATERIALS SCIENCE↗

Blackstart of Power Grids with Inverter-Based Resources: Preprint

This paper presents the findings of our investigation into inverter-based resource- (IBR-) driven blackstart of electric grids. Four potential black-start configurations with different setups are presented. To evaluate the technical feasibility of IBR-driven black start in the four configurations, a behavioral model of inverters that mimics current-limited inverter operation is developed using variable resistors in the MATLAB Simulink/Simscape environment. The inverter model is connected to an induction motor through transformers and a transmission line to simulate its startup. Simulation results show that even with the limited current supply capability of inverters because of their physical constraints, IBRs can black-start a motor under certain conditions. Results also show that by using soft-start techniques, such as ramped supply voltage, inrush currents can be reduced, thereby expanding the conditions under which IBRs can provide black-start support. Simulation results with different scenarios lead to discussions and key takeaways that could be valuable for further IBR-driven black-start research.

14 SOLAR ENERGY↗

Phenology of Photosynthesis in Winter‐Dormant Temperate and Boreal Forests: Long‐Term Observations From Flux Towers and Quantitative Evaluation of Phenology Models

Abstract We examined the seasonality of photosynthesis in 46 evergreen needleleaf (evergreen needleleaf forests (ENF)) and deciduous broadleaf (deciduous broadleaf forests (DBF)) forests across North America and Eurasia. We quantified the onset and end (Start GPP and End GPP ) of photosynthesis in spring and autumn based on the response of net ecosystem exchange of CO 2 to sunlight. To test the hypothesis that snowmelt is required for photosynthesis to begin, these were compared with end of snowmelt derived from soil temperature. ENF forests achieved 10% of summer photosynthetic capacity ∼3 weeks before end of snowmelt, while DBF forests achieved that capacity ∼4 weeks afterward. DBF forests increased photosynthetic capacity in spring faster (1.95% d −1 ) than ENF (1.10% d −1 ), and their active season length (End GPP –Start GPP ) was ∼50 days shorter. We hypothesized that warming has influenced timing of the photosynthesis season. We found minimal evidence for long‐term change in Start GPP , End GPP , or air temperature, but their interannual anomalies were significantly correlated. Warmer weather was associated with earlier Start GPP (1.3–2.5 days °C −1 ) or later End GPP (1.5–1.8 days °C −1 , depending on forest type and month). Finally, we tested whether existing phenological models could predict Start GPP and End GPP . For ENF forests, air temperature‐ and daylength‐based models provided best predictions for Start GPP , while a chilling‐degree‐day model was best for End GPP . The root mean square errors (RMSE) between predicted and observed Start GPP and End GPP were 11.7 and 11.3 days, respectively. For DBF forests, temperature‐ and daylength‐based models yielded the best results (RMSE 6.3 and 10.5 days).

Environmental Sciences & Ecology↗

System-Level Logistics for Dual Purpose Canister Disposal

The analysis presented in this report investigated how the direct disposal of dual purpose canisters (DPCs) may be affected by the use of standard transportation aging and disposal canisters (STADs), early or late start of the repository, and the repository emplacement thermal power limits. The impacts were evaluated with regard to the availability of the DPCs for emplacement, achievable repository acceptance rates, additional storage required at an interim storage facility (ISF) and additional emplacement time compared to the corresponding repackaging scenarios, and fuel age at emplacement. The result of this analysis demonstrated that the biggest difference in the availability of UNF for emplacement between the DPC-only loading scenario and the DPCs and STADs loading scenario is for a repository start date of 2036 with a 6 kW thermal power limit. The differences are also seen in the availability of UNF for emplacement between the DPC-only loading scenario and the DPCs and STADs loading scenario for the alternative with a 6 kW thermal limit and a 2048 start date, and for the alternatives with a 10 kW thermal limit and 2036 and 2048 start dates. The alternatives with disposal of UNF in both DPCs and STADs did not require additional storage, regardless of the repository acceptance rate, as compared to the reference repackaging case. In comparison to the reference repackaging case, alternatives with the 18 kW emplacement thermal limit required little to no additional emplacement time, regardless of the repository start time, the fuel loading scenario, or the repository acceptance rate. Alternatives with the 10 kW emplacement thermal limit and the DPCs and STADs fuel loading scenario required some additional emplacement time. The most significant decrease in additional emplacement time occurred in the alternative with the 6 kW thermal limit and the 2036 repository starting date. The average fuel age at emplacement ranges from 46 to 88 years. The maximum fuel age at emplacement ranges from 81 to 146 years. The difference in the average and maximum age of fuel at emplacement between the DPC-only and the DPCs and STADs fuel loading scenarios becomes less significant as the repository thermal limit increases and as the repository start date increases. In general, the role of STADs is to store young (30 year or younger) high burnup (45 GWD/MTU or higher) fuel. Recommendations for future study include detailed evaluation of the feasible alternatives with regard to the costs and factors not considered in this analysis, such as worker dose, dose to members of the public, and economic benefits to host entities. It is also recommended to conduct an additional analysis to evaluate the assumption regarding the transportability and disposability of DPCs for the next iteration of the direct disposal of DPCs study.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High voltage pulse ignition of mercury discharge hollow cathodes

A high voltage pulse generated by a capacitor discharge into a step-up transformer has been demonstrated capable of consistently igniting hollow cathode mercury discharges at propellant flows and heater power levels much below those required by conventional cathode starting. Results are presented for 3.2-mm diameter enclosed and open keeper cathodes. Starting characteristics are shown to depend on keeper voltage, mercury flow rate, heater power, keeper orifice size, emissive materials, and electrode to which the pulse is applied. This starting technique has been used to start a cathode over 10,000 times without any degradation of starting capability. The starting reliability, propellant and power savings offered by the high voltage pulse start should favorably impact performance of electron bombardment thrusters in missions requiring many on-off duty cycles.

Wintucky, E. G.↗

Advanced transportation system studies technical area 3: Alternate propulsion system concepts. SSME upper stage use

The main objective was to determine viable methods for starting the Space Shuttle Main Engine (SSME) in an altitude environment and restarting it in an orbit environment with minimum changes in utilization of the engine system or hardware. The study concluded that the use of the SSME in an upper stage is feasible with minimal changes to the engine systems. The altitude start case requires only a change in the valve sequencing during start and reorificing of the ASI lines. Inlet pressures can be moderately low at 40 psia for the LOX and 32 psia for the H2. The orbital restart case adds the need to recirculate propellant and thermal control paint (to keep the turbomachinery inlets cold to minimize the tank pressures needed), and the need to heat two small components (to maintain acceptable mixture ratios during the early part of the start). These actions allow start anytime after approximately 120 minutes. Earlier starts (approximately one hour) are also possible but would require additional component heating for mixture ratio control during the early portion of the start sequence.

Strangeland, Eric↗

A Hierarchical Relationship Between the Fluence Spectra and CME Kinematics in Large Solar Energetic Particle Events: A Radio Perspective

We report on further evidence that solar energetic particles are organized by the kinematic properties of coronal mass ejections (CMEs). In particular, we focus on the starting frequency of type II bursts, which is related to the distance from the Sun where the radio emission starts. We find that the three groups of solar energetic particle (SEP) events known to have distinct values of CME initial acceleration, also have distinct average starting frequencies of the associated type II bursts. SEP events with ground level enhancement (GLE) have the highest starting frequency (107 MHz), while those associated with filament eruption (FE) in quiescent regions have the lowest starting frequency (22 MHz); regular SEP events have intermediate starting frequency (81 MHz). Taking the onset time of type II bursts as the time of shock formation, we determine the shock formation heights measured from the Sun center. We find that the shocks form on average closest to the Sun (1.51 Rs) in GLE events, farthest from the Sun in FE SEP events (5.38 Rs), and at intermediate distances in regular SEP events (1.72 Rs). Finally, we present the results of a case study of a CME with high initial acceleration (approx.3 km s-2) and a type II radio burst with high starting frequency (approx. 200 MHz) but associated with a minor SEP event. We find that the relation between the fluence spectral index and CME initial acceleration continues to hold even for this minor SEP event.

Gopalswamy, N.↗