Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SPACE LOGISTICS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Object oriented Simulation of Maintenance and Operations for Space Systems (OSMOSSYS)

This paper describes the NASA/JSC Research Technology Opportunity Program (RTOP) activity to assess the supportability of space systems throughout their life cycles. Supportability analyses for space systems present unique attributes and problems. The OSMOSSYS (Object oriented Simulation of Maintenance and Operations for Space Systems) was developed using object-oriented design concepts to provide NASA an analysis tool which addresses the question `Will a proposed space facility be able to successfully perform the missions for which it is designed?' This model integrates the complete configuration of the system including the reliability and maintainability characteristics of each component, the logistics support, and the mission operations of the facility to assess the success rate of the planned mission(s). Two parallel design processes are being utilized; developing core modules utilizing C++, and incorporating as much code and ideas as possible from existing NASA models. The space station was used as a test case to demonstrate the applicability of the model.

Doran, Linda↗

Numerical Investigation of Heat Transfer and Fluid Flow within Electrochemical Hydrogen Peroxide Generation Unit

Long-term manned space missions require the onboard production of disinfectants essential for maintaining crew health and supporting life systems. Currently, disinfection aboard the International Space Station (ISS) relies on disposable wetted wipes, which are regularly resupplied from Earth. This approach imposes a significant burden on resupply logistics, storage, and waste management. To address these challenges and support future missions, efforts are underway to develop an in-situ solution that electrochemically generates hydrogen peroxide disinfectant using onboard resources. In collaboration with NASA, Faraday Technology, Inc. has advanced this concept through a series of Small Business Innovation Research (SBIR) projects, resulting in the development of a Peroxide Generation Unit (PGU). The PGU can produce up to 3 wt.% hydrogen peroxide on-demand at a rate of 1 liter per day, providing a sustainable alternative to Earth-dependent supplies. The resulting aqueous hydrogen peroxide (H₂O₂) is an effective disinfectant, safe for crew use, compatible with spacecraft systems, and free from volatiles, off-gassing, or residues. This innovation offers a reliable, efficient solution for onboard disinfection, reducing dependence on Earth-based resupply while ensuring the health and safety of space crews. Generating hydrogen peroxide at the required rate needs high voltages and currents, exceeding 20V and 2A respectively, which leads to significant heat generation from Joule heating. This temperature rise poses a risk to sensitive system components, especially critical and expensive membranes that can degrade under thermal stress. To mitigate this risk, the thermal, fluid, and electrical flows within the system are modeled computationally using the commercial software COMSOL. The numerical simulations are validated against experimental data from both sub-scale and alpha-scale systems. Once verified, the model is employed to identify thermal hotspots, investigate their underlying causes, and explore solutions to prevent them.

Life Support Systems (LSS)↗

Systems engineering studies of on-orbit assembly operation

While the practice of construction has a long history, the underlying theory of construction is relatively young. Very little has been documented as to techniques of logistic support, construction planning, construction scheduling, construction testing, and inspection. The lack of 'systems approaches' to construction processes is certainly one of the most serious roadblocks to the construction of space structures. System engineering research efforts at CSC are aimed at developing concepts and tools which contribute to a systems theory of space construction. The research is also aimed at providing means for trade-offs of design parameters for other research areas in CSC. Systems engineering activity at CSC has divided space construction into the areas of orbital assembly, lunar base construction, interplanetary transport vehicle construction, and Mars base construction. A brief summary of recent results is given. Several models for 'launch-on-time' were developed. Launch-on-time is a critical concept to the assembly of such Earth-orbiting structures as the Space Station Freedom, and to planetary orbiters such as the Mars transfer vehicle. CSC has developed a launch vehicle selection model which uses linear programming to find optimal combinations of launch vehicles of various sizes (Atlas, Titan, Shuttles, HLLV's) to support SEI missions. Recently, the Center developed a cost trade-off model for studying on orbit assembly logistics. With this model it was determined that the most effective size of the HLLV would be in the range of 120 to 200 metric tons to LEO, which is consistent with the choices of General Stafford's Synthesis Group Report. A second-generation Dynamic Construction Activities Model ('DYCAM') process model has been under development, based on our past results in interruptability and our initial DYCAM model. This second-generation model is built on the paradigm of knowledge-based expert systems. It is aimed at providing answers to two questions: (1) what are some necessary or sufficient conditions for judging conceptual designs of spacecraft?, and (2) can a methodology be formulated such that these conditions may be used to provide computer-aided tools for evaluating conceptual designs and planning for space assembly sequences? Early simulation results indicate that the DYCAM model has a clear ability to emulate and simulate human orbital construction processes.

Morgenthaler, George W.↗

Evaluation of MPLM Design and Mission 6A Coupled Loads Analyses

Through the development of a space shuttle payload, there are usually several coupled loads analyses (CLA) performed: preliminary design, critical design, final design and verification loads analysis (VLA). A final design CLA is the last analysis conducted prior to model delivery to the shuttle program for the VLA. The finite element models used in the final design CLA and the VLA are test verified dynamic math models. Mission 6A is the first of many flights of the Multi-Purpose Logistics Module (MPLM). The MPLM was developed by Alenia Spazio S.p.A. (an Italian aerospace company) and houses the International Standard Payload Racks (ISPR) for transportation to the space station in the shuttle. Marshall Space Flight Center (MSFC), the payload integrator of the MPLM for Mission 6A, performed the final design CLA using the M6.OZC shuttle data for liftoff and landing conditions using the proper shuttle cargo manifest. Alenia performed the preliminary and critical design CLAs for the development of the MPLM. However, these CLAs did not use the current Mission 6A cargo manifest. An evaluation of the preliminary and critical design performed by Alenia and the final design performed by MSFC is presented.

Bookout, Paul S.↗

Image Analysis for Rapid Assessment and Quality-Based Sorting of Corn Stover

Imaging in the visible spectrum is a low-cost tool that can be readily deployed for in-field or over-belt monitoring of biomass quality for bio-refining operations. Rapid image analysis coupled with innovative preprocessing may reduce the impacts of feedstock variability through identification of contaminants or other material attributes to guide selective sorting and quality management. Image analysis was employed to evaluate the quality of corn stover in red-green-blue (RGB) chromatic space. This study used controlled, bench-scale imaging as a proof-of-concept for rapid quality assessment of corn stover based on variations in material attributes, including chemical and physical attributes, that relate to biological degradation and soil contamination. Additionally, logistic regression-based classification algorithms were used to develop a method for biomass screening as a function of biological degradation or soil contamination. This study demonstrated the use of image analysis to extract features from RGB color space to investigate variations in critical material attributes from chemical composition of corn stover. Fourier transform infrared (FT-IR) suggested a correlation between red band intensity and biological degradation, while detailed surface texture analysis was found to distinguish among variations in ash. These insights offer promise for development of a rapid screening tool that could be deployed by farmers for in-field assessment of biomass quality or biorefinery operators for in-line sorting and process optimization.

09 BIOMASS FUELS↗

How Much Testing is Needed to Manage Supportability Risks for Beyond-LEO Missions?

Supportability will be a significantly greater driver of cost and risk for future deep-space crewed missions than it has been in the past. Spares requirements and maintenance risk mitigation in particular present an unprecedented challenge for missions beyond Low Earth Orbit (LEO), since, for the first time in human spaceflight history, crews will be weeks or months away from resupply or a safe return to Earth in the event of an abort. Under these conditions, failure rates are a critical parameter that must be well-understood in order to manage logistics and risk effectively. However, failure rates cannot be measured directly, and can only be estimated based on past experience and test results. Previous research has shown that International Space Station (ISS) operational experience has provided significant benefits to future missions by reducing uncertainty and improving accuracy in failure rate estimates, resulting in significant reductions in mass and risk for beyond-LEO missions. This paper updates and expands on that research and quantifies the potential value of continued testing for future mission supportability. Frequentist and Bayesian models for evaluating, validating, and updating failure rate estimates are described, and are combined with supportability models to examine potential impacts of additional operating experience for future missions in terms of logistics mass reduction. The implications of these results for technology development, system design, and program planning are discussed along with lessons learned and recommendations for future system development. In the end, there is no simple answer to the question of how much testing is required, but the models described in this paper provide a way to evaluate the potential impacts of testing in order to inform test planning.

Andrew C Owens↗

TQ-bifurcations in discrete dynamical systems: Analysis of qualitative rearrangements of the oscillation mode

A new class of bifurcations is defined in discrete dynamical systems, and methods for their diagnostics and the analysis of their properties are presented. The TQ-bifurcations considered are implemented in discrete mappings and are related to the qualitative rearrangement of the shape of trajectories in an extended space of states. Within the demonstration of the main capabilities of the toolkit, an analysis is carried out of a logistic mapping in a domain to the right of the period-doubling limit point. Five critical values of the parameter are found for which the geometric structure of the trajectories of the mapping experiences a qualitative rearrangement. In addition, an analysis is carried out of the so-called “trace map,” which arises in the problems of quantum-mechanical description of various properties of discrete crystalline and quasicrystalline lattices.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Operations analysis (study 2.1). Volume 1: Executive summary

Subjects related to future STS operations concepts were investigated. The majority of effort was directed at assessing the benefits of automated space servicing concepts as related to improvements in payload procurement and shuttle utilization. Another subject was directed at understanding shuttle upper stage software development and recurring costs relative to total program projections. Space serving of automated payloads is addressed by examining the broad spectrum of payload applications with the belief that shared logistic operations will be a major contributor to reduction of future program costs. However, there are certain requirements for support of payload operations, such as availability of the payload, that may place demands upon the shuttle fleet. Because future projections of the NASA Mission Model are only representative of the payload traffic, it is important to recognize that it is the general character of operations that is significant rather than service to any single payload program.

Wolfe, R. R.↗

The elements of a space operations system

The Space Shuttle has completed its flight test program and is entering operational service with its fifth flight in November 1982. With the completion of Shuttle development, its entry to operational service, and delivery of additional units into field service, it is timely to initiate development of the next elements of the system. The elements of a Space Operations System are the Shuttle, a Station in low earth orbit, and upper stages for low and high energy orbit delivery. To design these elements properly will require a substantial operations analysis effort to characterize the most effective performance tradeoffs among the discrete elements. The Shuttle establishes a new context for the design and execution of operations in space. The components of the Shuttle, Space Station, and upper stages will need to share technology and components to minimize the cost and complexity of the logistics of ownership and operation.

Loftus, J. P., Jr.↗

A comparison of two trusses for the space station structure

The structural performance of two truss configurations, the orthogonal tetrahedral and a Warren-type, are compared using finite element models representing the November Reference Phase 1 Space Station. The truss torsional stiffness properties and fundamental torsion frequency are determined using cantilever truss-beam models. Frequencies, mode shapes, transient response, and truss strut compressive loads are compared for the two space station models. The performance benefit resulting from using a high modulus truss strut is also presented. Finally, assembly and logistics characteristics of the two truss configurations are evaluated.

Sutter, Thomas R.↗

Shuttle bay telerobotics demonstration

A demonstration of NASA's robotics capabilities should be a balanced agenda of servicing and assembly tasks combined with selected key technical experiments. The servicing tasks include refueling and module replacement. Refueling involves the mating of special fluid connectors while module replacement requires an array of robotic technologies such as special tools, the arm of a logistics tool, and the precision mating of orbital replacement units to guides. The assembly task involves the construction of a space station node and truss structure. The technological experiments will focus on a few important issues: the precision manipulation of the arms by a teleoperator, the additional use of several mono camera views in conjunction with the stereo system, the use of a general purpose end effector versus a caddy of tools, and the dynamics involved with using a robot with a stabilizer.

Chun, W.↗

STS-111 Flight Day 4 Highlights Replay

The most significant highlights of flight day 4 of STS-111 are the lifting of the Leonardo Multi Purpose Logistics Module (MPLM) out of Endeavour's payload bay, and its temporary attachment to the Unity module of the International Space Station (ISS). The lifting and attachment are shown. Also shown is the testing of cameras on the CANADARM2 robotic arm on the ISS, an ISS extravehicular activity (EVA) suit, and an interview with the outgoing Expedition 4 crew of the ISS. Earth views include the ISS and Earth limb, and cloud formations.

Source record↗

Precision Closed-Loop Orbital Maneuvering System Design and Performance for the Magnetospheric Multiscale Formation

NASAs Magnetospheric Multiscale (MMS) mission successfully launched on March 13,2015 (UTC) consists of four identically instrumented spin-stabilized observatories that function as a constellation to study magnetic reconnection in space. The need to maintain sufficiently accurate spatial and temporal formation resolution of the observatories must be balanced against the logistical constraints of executing overly-frequent maneuvers on a small fleet of spacecraft. These two considerations make for an extremely challenging maneuver design problem. This paper focuses on the design elements of a 6-DOF spacecraft attitude control and maneuvering system capable of delivering the high-precision adjustments required by the constellation designers specifically, the design, implementation, and on-orbit performance of the closed-loop formation-class maneuvers that include initialization, maintenance, and re-sizing. The maneuvering control system flown on MMS utilizes a micro-gravity resolution accelerometer sampled at a high rate in order to achieve closed-loop velocity tracking of an inertial target with arc-minute directional and millimeter-per second magnitude accuracy. This paper summarizes the techniques used for correcting bias drift, sensor-head offsets, and centripetal aliasing in the acceleration measurements. It also discusses the on-board pre-maneuver calibration and compensation algorithms as well as the implementation of the post-maneuver attitude adjustments.

Maneuver and Attitude Dynamics↗

Precision Closed-Loop Orbital Maneuvering System Design and Performance for the Magnetospheric Multi-Scale Mission (MMS) Formation

NASA's Magnetospheric Multi-Scale (MMS) mission successfully launched on March 13, 2015 (UTC) consists of four identically instrumented spin-stabilized observatories that function as a constellation to study magnetic reconnection in space. The need to maintain sufficiently accurate spatial and temporal formation resolution of the observatories must be balanced against the logistical constraints of executing overly-frequent maneuvers on a small fleet of spacecraft. These two considerations make for an extremely challenging maneuver design problem. This paper focuses on the design elements of a 6-DOF spacecraft attitude control and maneuvering system capable of delivering the high-precision adjustments required by the constellation designers---specifically, the design, implementation, and on-orbit performance of the closed-loop formation-class maneuvers that include initialization, maintenance, and re-sizing. The maneuvering control system flown on MMS utilizes a micro-gravity resolution accelerometer sampled at a high rate in order to achieve closed-loop velocity tracking of an inertial target with arc-minute directional and millimeter-per-second magnitude accuracy. This paper summarizes the techniques used for correcting bias drift, sensor-head offsets, and centripetal aliasing in the acceleration measurements. It also discusses the on-board pre-maneuver calibration and compensation algorithms as well as the implementation of the post-maneuver attitude adjustments.

Determination and Control↗

NASA science utilization plans for the Space Station

The Mir-1 and International Space Station Alpha capabilities present the science community with unique long duration platforms to conduct a wide range of scientific research in the microgravity and life sciences as well as in the observational sciences, NASA is developing plans to use the capabilities of Mir and Space Station as they emerge during the development of the orbital program. In both cases the planned science utilization programs take advantage of the volume, crew, power, microgravity and logistics resupply unique to each phase. The paper will present these utilization plans in the context of an evolving scientific program.

manned↗

Advanced EVA system design requirements study

The results are presented of a study to identify specific criteria regarding space station extravehicular activity system (EVAS) hardware requirements. Key EVA design issues include maintainability, technology readiness, LSS volume vs. EVA time available, suit pressure/cabin pressure relationship and productivity effects, crew autonomy, integration of EVA as a program resource, and standardization of task interfaces. A variety of DOD EVA systems issues were taken into consideration. Recommendations include: (1) crew limitations, not hardware limitations; (2) capability to perform all of 15 generic missions; (3) 90 days on-orbit maintainability with 50 percent duty cycle as minimum; and (4) use by payload sponsors of JSC document 10615A plus a Generic Tool Kit and Specialized Tool Kit description. EVA baseline design requirements and criteria, including requirements of various subsystems, are outlined. Space station/EVA system interface requirements and EVA accommodations are discussed in the areas of atmosphere composition and pressure, communications, data management, logistics, safe haven, SS exterior and interior requirements, and SS airlock.

Woods, T. G.↗

Flashline Mars Arctic Research Station (FMARS) 2009 Expedition Crew Perspectives

The Flashline Mars Arctic Research Station (FMARS), located on the rim of the Haughton Crater on Devon Island in the Canadian Arctic, is a simulated Mars habitat that provides operational constraints similar to those which will be faced by future human explorers on Mars. In July 2009, a six-member crew inhabited the isolated habitation module and conducted the twelfth FMARS mission. The crew members conducted frequent EVA operations wearing mock space suits to conduct field experiments under realistic Mars-like conditions. Their scientific campaign spanned a wide range of disciplines and included many firsts for Mars analog research. Among these are the first use of a Class IV medical laser during a Mars simulation, helping to relieve crew stress injuries during the mission. Also employed for the first time in a Mars simulation at FMARS, a UAV (Unmanned Aerial Vehicle) was used by the space-suited explorers, aiding them in their search for mineral resources. Sites identified by the UAV were then visited by geologists who conducted physical geologic sampling. For the first time, explorers in spacesuits deployed passive seismic equipment to monitor earthquake activity and characterize the planet's interior. They also conducted the first geophysical electromagnetic survey as analog Mars pioneers to search for water and characterize geological features under the surface. The crew collected hydrated minerals and attempted to produce drinkable water from the rocks. A variety of equipment was field tested as well, including new cameras that automatically geotag photos, data-recording GPS units, a tele-presence rover (operated from Florida), as well as MIT-developed mission planning software. As plans develop to return to the Moon and go on to Mars, analog facilities like FMARS can provide significant benefit to NASA and other organizations as they prepare for robust human space exploration. The authors will present preliminary results from these studies as well as their perspectives on topics including human factors, logistics, EVA operations, and the use of social media throughout the mission.

Cusack, Stacy↗

Microwave Plasma Hydrogen Recovery System

A microwave plasma reactor was developed for the recovery of hydrogen contained within waste methane produced by Carbon Dioxide Reduction Assembly (CRA), which reclaims oxygen from CO2. Since half of the H2 reductant used by the CRA is lost as CH4, the ability to reclaim this valuable resource will simplify supply logistics for longterm manned missions. Microwave plasmas provide an extreme thermal environment within a very small and precisely controlled region of space, resulting in very high energy densities at low overall power, and thus can drive high-temperature reactions using equipment that is smaller, lighter, and less power-consuming than traditional fixed-bed and fluidized-bed catalytic reactors. The high energy density provides an economical means to conduct endothermic reactions that become thermodynamically favorable only at very high temperatures. Microwave plasma methods were developed for the effective recovery of H2 using two primary reaction schemes: (1) methane pyrolysis to H2 and solid-phase carbon, and (2) methane oligomerization to H2 and acetylene. While the carbon problem is substantially reduced using plasma methods, it is not completely eliminated. For this reason, advanced methods were developed to promote CH4 oligomerization, which recovers a maximum of 75 percent of the H2 content of methane in a single reactor pass, and virtually eliminates the carbon problem. These methods were embodied in a prototype H2 recovery system capable of sustained high-efficiency operation. NASA can incorporate the innovation into flight hardware systems for deployment in support of future long-duration exploration objectives such as a Space Station retrofit, Lunar outpost, Mars transit, or Mars base. The primary application will be for the recovery of hydrogen lost in the Sabatier process for CO2 reduction to produce water in Exploration Life Support systems. Secondarily, this process may also be used in conjunction with a Sabatier reactor employed to stockpile life-support oxygen as well as propellant and fuel production from Martian atmospheric CO2

Atwater, James↗