Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Reporting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Thermal-Mechanical Stress Analysis of PWR Pressure Vessel and Nozzles under Grid Load-Following Mode: Interim Report on the Effect of Cyclic Hardening Material Properties and Pre-existing Cracks on Stress Analysis Results

This report provides an update on an assessment of environmentally assisted fatigue for light water reactor components under extended service conditions. This report is a deliverable under the work package for environmentally assisted fatigue as part of DOE’s Light Water Reactor Sustainability Program. In a previous report (September 2015), we presented tensile and fatigue test data and related hardening material properties for 508 low-alloys steel base metal and other reactor metals. In this report, we present thermal-mechanical stress analysis of the reactor pressure vessel and its hot-leg and cold-leg nozzles based on estimated material properties. We also present results from thermal and thermal-mechanical stress analysis under reactor heat-up, cool-down, and grid load-following conditions. Analysis results are given with and without the presence of preexisting cracks in the reactor nozzles (axial or circumferential crack). In addition, results from validation stress analysis based on tensile and fatigue experiments are reported.

42 ENGINEERING↗

AGC-2 Specimen Post Irradiation Data Package Report

This report documents results of the post-irradiation examination material property testing of the creep, control, and piggyback specimens from the irradiation creep capsule Advanced Graphite Creep (AGC)-2 are reported. This is the second of a series of six irradiation test trains planned as part of the AGC experiment to fully characterize the neutron irradiation effects and radiation creep behavior of current nuclear graphite grades. The AGC-2 capsule was irradiated in the Idaho National Laboratory Advanced Test Reactor at a nominal temperature of 600°C and to a peak dose of 5 dpa (displacements per atom). One-half of the creep specimens were subjected to mechanical stresses (an applied stress of either 13.8, 17.2, or 20.7 MPa) to induce irradiation creep. All post-irradiation testing and measurement results are reported with the exception of the irradiation mechanical strength testing, which is the last destructive testing stage of the irradiation testing program. Material property tests were conducted on specimens from 15 nuclear graphite grades using a similar loading configuration as the first AGC capsule (AGC-1) to provide easy comparison between the two capsules. However, AGC-2 contained an increased number of specimens (i.e., 487 total specimens irradiated) and replaced specimens of the minor grade 2020 with the newer grade 2114. The data reported include specimen dimensions for both stressed and unstressed specimens to establish the irradiation creep rates, mass and volume data necessary to derive density, elastic constants (Young’s modulus, shear modulus, and Poisson’s ratio) from ultrasonic time-of-flight velocity measurements, Young’s modulus from the fundamental frequency of vibration, electrical resistivity, and thermal diffusivity and thermal expansion data from 100–500°C. No data outliers were determined after all measurements were completed. A brief statistical analysis was performed on the irradiated data and a limited comparison between pre- and post-irradiation properties is presented. A more complete evaluation of trends in the material property changes, as well as irradiation-induced creep due to irradiation, temperature, and applied load on specimens will be discussed in later AGC-2 post-irradiation examination analysis reports.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

2015 Wind Technologies Market Report

This annual report--now in its tenth year--provides a detailed overview of developments and trends in the U.S. wind power market, with a particular focus on 2015. The report begins with an overview of key installation trends and then covers an array of industry and technology trends. The report also discusses project performance, wind turbine prices, project costs, operations and maintenance expenses, and prices paid for wind power in the United States. The report examines policy and market factors impacting the domestic wind power market and provides a preview of possible near-term market developments, expenses, and prices paid for wind power in the United States. The report examines policy and market factors impacting the domestic wind power market and provides a preview of possible near-term market developments.

17 WIND ENERGY↗

Reported Energy and Cost Savings from the DOE ESPC Program: FY 2015

The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy’s Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 151 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

2016 Inspection and Annual Site Status Report for the Site A/Plot M, Illinois, Decommissioned Reactor Site July 2016

The Site A/Plot M, Illinois, Decommissioned Reactor Site was inspected on May 17, 2016. The site, located within Cook County forest preserve that is open to the public, was found to be in good condition with one exception. Erosion on top of the grass-covered mound at Plot M continues to be a concern as presented in previous inspections. Ruts form in the soil on top of Plot M as a result of bike traffic using the open field as a pass thru between established bike trails within the forest preserve. Argonne National Laboratory (ANL) who is contracted directly from U.S. Department of Energy (DOE) has filled in the ruts with top soil and reseeding remains an ongoing process. Reseeded areas from 2015 are progressing nicely. No cause for a follow-up inspection was identified. In 2015, ANL plugged and abandoned 8 of 25 monitoring wells (BH41, BH51, BH52, BH54, DH9, DH10, DH13, and DH17). The 17 groundwater monitoring wells remaining at the site were inspected to confirm that they were locked and in good condition. Preliminary environmental monitoring results for 2015 are provided in a draft report titled Surveillance of Site A and Plot M, Report for 2015, prepared by ANL. The report also contains results of an independent analysis conducted by the Illinois Emergency Management Agency on some of the samples collected by ANL in 2015. The draft report states that the results of the surveillance program continue to indicate that the impact of radioactivity at Site A/Plot M is very low and does not endanger the health of those living in the area or visiting the site. The ANL monitoring report will be made available to the public on the DOE Office of Legacy Management public website when it is issued as final. A new county forest preserve campsite opened in 2015 at Bull Frog Lake, which is east of Plot M. Hiking trails connect Bull Frog Lake with Site A/Plot M. The site might receive more traffic from forest preserve visitors now that this new campsite is opened.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada: For Calendar Year 2016, Revision 0

This report covers the reporting period calendar year 2016 and the fourth quarter of 2015 (October 2015 through December 2016). This change to the reporting periods (i.e., fiscal to calendar) is to gain efficiencies during report development and to better align with other environmental report schedules.

54 ENVIRONMENTAL SCIENCES↗

The PIP-II Reference Design Report

The Proton Improvement Plan-II (PIP-II) is a high-intensity proton facility being developed to support a world-leading neutrino program over the next two decades at Fermilab. PIP-II is an integral part of the U.S. Intensity Frontier Roadmap as described in the Particle Physics Project Prioritization Panel (P5) report of May 2014 [1]. As an immediate goal PIP-II is focused on upgrades to the Fermilab accelerator complex capable of providing a beam power in excess of 1 MW on target at the initiation of LBNF [1,2] operations. PIP-II is a part of a longer-term concept for a sustained campaign of upgrades and improvements to achieve multi-MW capabilities at Fermilab. PIP-II is based on three major thrusts. They are (1) the recently completed upgrades to the Recycler and Main Injector (MI) for the NOvA experiment, (2) the Proton Improvement Plan [3] currently underway, and (3) the Project X Reference Design [4]. Note that: The Proton Improvement Plan (PIP) consolidates a set of improvements to the existing Linac, Booster, and Main Injector (MI) aimed at supporting 15 Hz Booster beam operation. In combination, the NOvA upgrades and PIP create a capability of delivering 700 kW beam power from the Main Injector at 120 GeV; The scope of the Project X Reference Design Report was aimed well beyond PIP. It described a complete concept for a multi-MW proton facility that could support a broad particle physics program based on neutrino, kaon, muon, and nucleon experiments [5,6]. The Project X conceptual design has evolved over a number of years, incorporating continuous input on physics research goals and advances in the underlying technology development programs [7,8,9]. PIP-II, to high degree, inherits these goals as the goals for future developments and upgrades. This document (PIP-II Reference Design Report) describes an initial step in the development of the Fermilab accelerating complex. The plan described in this Report balances the far-term goals of the Laboratory's long baseline neutrino mission with the near- and mid-term goals identified at the Snowmass workshop [10] and endorsed by the P5 report [1].

43 PARTICLE ACCELERATORS↗

FY17 Status Report on the Initial EPP Finite Element Analysis of Grade 91 Steel

This report describes a modification to the elastic-perfectly plastic (EPP) strain limits design method to account for cyclic softening in Gr. 91 steel. The report demonstrates that the unmodified EPP strain limits method described in current ASME code case is not conservative for materials with substantial cyclic softening behavior like Gr. 91 steel. However, the EPP strain limits method can be modified to be conservative for softening materials by using softened isochronous stress-strain curves in place of the standard curves developed from unsoftened creep experiments. The report provides softened curves derived from inelastic material simulations and factors describing the transformation of unsoftened curves to a softened state. Furthermore, the report outlines a method for deriving these factors directly from creep/fatigue tests. If the material softening saturates the proposed EPP strain limits method can be further simplified, providing a methodology based on temperature-dependent softening factors that could be implemented in an ASME code case allowing the use of the EPP strain limits method with Gr. 91. Finally, the report demonstrates the conservatism of the modified method when applied to inelastic simulation results and two bar experiments.

36 MATERIALS SCIENCE↗

Initial 1.5D BISON Simulation Verification and Validation CASL FY17 Letter Report

This milestone report describes the current efforts to improve the usability of the recently developed 1.5 dimensional capability in BISON, the initial verification of this BISON capability, and initial validation of the 1.5 dimensional models against existing 2 dimensional axisymmetric full length light water reactor (LWR) fuel rods. The 1.5 dimensional (1.5D) capability in BISON was developed to enable the simulation of LWR fuel rods in a less computationally demanding simulation formulation while retaining key physics of interest. BISON was originally developed to solve 2D axisymmetric and 3D models, and this original development focus allows BISON to examine a wider range of fuel types and geometrically complexity than can be solved with lower dimensional frameworks. As the set of problems which BISON is used to solve expands, the software design requirements continue to evolve. Coupling physics in a higher dimensional geometry is not always required to resolve the physics of interest, such as the modeling of radial heat transfer and radial displacement. BISON, built on the dimension-agnostic MOOSE framework, is able to solve problems in 3D, 2D, and 1D with only minor modifications to the material definition code so that the appropriate geometrical representation can be applied in different problems of interest. The motivation for the development and validation of the BISON 1.5D capability is the CASL program's need for a simplified and computationally efficient version of BISON for use in the large multi-physics VERA simulations which include hundreds of individual fuel rods. The original development of the BISON 1.5D simulation capability is described in the CASL FY17 Letter Report from January 2017, and this report documents the continuing work identified in the previous report. The improvements to the usability of the 1.5D capability through input file simplifications, the results of the verification simulations, the results of the initial validation against the 2D assessment cases in BISON, and the future development needs are included within this report.

1.5D Capability↗

Sighten Final Technical Report DEEE0006690 Deploying an integrated and comprehensive solar financing software platform

Over the project, Sighten built a comprehensive software-as-a-service (Saas) platform to automate and streamline the residential solar financing workflow. Before the project period, significant time and money was spent by companies on front-end tools related to system design and proposal creation, but comparatively few resources were available to support the many back-end calculations and data management processes that underpin third party financing. Without a tool like Sighten, the solar financing processes involved passing information from the homeowner prospect into separate tools for system design, financing, and then later to reporting tools including Microsoft Excel, CRM software, in-house software, outside software, and offline, manual processes. Passing data between tools and attempting to connect disparate systems results in inefficiency and inaccuracy for the industry. Sighten was built to consolidate all financial and solar-related calculations in a single software platform. It significantly improves upon the accuracy of these calculations and exposes sophisticated new analysis tools resulting in a rigorous, efficient and cost-effective toolset for scaling residential solar. Widely deploying a platform like Sighten’s significantly and immediately impacts the residential solar space in several important ways: 1) standardizing and improving the quality of all quantitative calculations involved in the residential financing process, most notably project finance, system production and reporting calculations; 2) representing a true step change in terms of reporting and analysis capabilities by maintaining more accurate data and exposing sophisticated tools around simulation, tranching, and financial reporting, among others, to all stakeholders in the space; 3) allowing a broader group of developers/installers/finance companies to access the capital markets by providing an out-of-the-box toolset that handles the execution of running investor capital through a rooftop solar financing program. Standardizing and improving all calculations, improving data quality, and exposing new analysis tools previously unavailable affects investment in the residential space in several important ways: 1) lowering the cost of capital for existing capital providers by mitigating uncertainty and de-risking the solar asset class; 2) attracting new, lower cost investors to the solar asset class as reporting and data quality resemble standards of more mature asset classes; 3) increasing the prevalence of liquidity options for investors through back leverage, securitization, or secondary sale by providing the tools necessary for lenders, ratings agencies, etc. to properly understand a portfolio of residential solar assets. During the project period, Sighten successfully built and scaled a commercially ready tool for the residential solar market. The software solution built by Sighten has been deployed with key target customer segments identified in the award deliverables: solar installers, solar developers/channel managers, and solar financiers, including lenders. Each of these segments greatly benefits from the availability of the Sighten toolset.

14 SOLAR ENERGY↗

Discharge Permit-1845 Quarterly Status Report April 2018

Discharge Permit (DP)-1845 was issued by the New Mexico Environment (NMED) Ground Water Quality Bureau (GWQB) for discharges via up to three injection wells in a phased Treatability Study of in-situ bioremediation of groundwater at Sandia National Laboratories, New Mexico, Technical Area-V Groundwater Area of Concern. This report fulfills the quarterly reporting requirements set forth in DP-1845, Section IV.B, Monitoring and Reporting. This reporting period is October 1st through December 31st, 2017. The report is due to NMED GWQB by May 1st, 2018.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada: For Calendar Year 2017, Revision 0

This report serves as the combined annual report for post-closure activities for the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; and, CAU 112, Area 23 Hazardous Waste Trenches. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted annually at CAUs 90, 91, and 112; semiannually at CAUs 92 and 110; and quarterly at CAU 111. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 1.0 inches in a 24-hour period and at CAU 111 if precipitation occurs in excess of 1.0 inch in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. At CAU 110, soil moisture monitoring, vegetation evaluations, and subsidence surveys are conducted in addition to the visual inspections. At CAU 111, soil moisture monitoring, vegetation evaluations, subsidence surveys, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are conducted. This report will address all monitoring items notes above except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. Revision 4 of Permit NEV HW0101 was issued effective December 10, 2015, and remains in effect until December 10, 2020.

54 ENVIRONMENTAL SCIENCES↗

4th Quarter and Annual Transportation Report FY2018

This report satisfies the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary of waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) in Area 5. This report summarizes the fourth quarter of fiscal year (FY) 2018 and serves as an annual report for the following types of shipments: Low-Level Radioactive Waste (LLW); Mixed Low-Level Radioactive Waste (MLLW); Classified Non-Radioactive (CNR) Waste; Classified Non-Radioactive Hazardous (CNRH) Waste; Tabular summaries are provided that include the following: Number and external volume of LLW, MLLW, and CNR/CNRH shipments; Waste generators for LLW, MLLW, and CNR/CNRH shipments to and on the NNSS; Carriers for LLW, MLLW, and CNR/CNRH shipments to and on the NNSS; Waste generator shipments by quarter; Highway routes used by carriers; Incident and accident data applicable to LLW, MLLW, and CNR/CNRH shipments. In this report, shipments are accounted for upon arrival at the NNSS, while disposal volumes are accounted for upon waste burial. Volume reports showing cubic feet (ft 3 ) generated using the Low-Level Waste Information System may vary slightly due to rounding conventions for conversions from cubic meters to cubic feet. Shipments are transported by motor carriers that are either identified on the U.S. Department of Energy (DOE) Motor Carrier Evaluation Program (MCEP) list, have been evaluated in a manner similar to the MCEP process, or are government vehicles. Government vehicles are not evaluated using the MCEP process but are fully compliant with all transportation regulations and requirements.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Inventory and Waste Characterization Status Report and OWL Update.

This report represents completion of milestone deliverable M2SF-18SNO10309013 "Inventory and Waste Characterization Status Report and OWL Update that reports on FY2018 activities for the work package (WP) SF-18SNO1030901. This report provides the detailed final information for completed FY2018 work activities for WP SF-18SN01030901, and a summary of priorities for FY2019. This status report on FY2018 activities includes evaluations of waste form characteristics and waste form performance models, updates to the OWL development, and descriptions of the two planned management processes for the OWL. Updates to the OWL include an updated user's guide, additions to the OWL database content for wastes and waste forms, results of the Beta testing and changes implemented from it. There are two processes being planned in FY2018, which will be implemented in FY2019. One process covers methods for interfacing with the DOE SNF DB (DOE 2007) at INL on the numerous entries for DOE managed SNF, and the other process covers the management of updates to, and version control/archiving of, the OWL database. In FY2018, we have pursued three studies to evaluate/redefine waste form characteristics and/or performance models. First characteristic isotopic ratios for various waste forms included in postclosure performance studies are being evaluated to delineate isotope ratio tags that quantitatively identify each particular waste form. This evaluation arose due to questions regarding the relative contributions of radionuclides from disparate waste forms in GDSA results, particularly, radionuclide contributions of DOE-managed SNF vs HLW glass. In our second study we are evaluating the bases of glass waste degradation rate models to the HIP calcine waste form. The HIP calcine may likely be a ceramic matrix material, with multiple ceramic phases with/without a glass phase. The ceramic phases are likely to have different degradation performance from the glass portion. The distribution of radionuclides among those various phases may also be a factor in the radionuclide release rates. Additionally, we have an ongoing investigation of the performance behavior of TRISO particle fuels and are developing a stochastic model for the degradation of those fuels that accounts for simultaneous corrosion of the silicon carbide (SiC) layer and radionuclide diffusion through it. The detailed model of the TRISO particles themselves, will be merged with models of the degradation behavior(s) of the graphite matrix (either prismatic compacts or spherical "pebbles") containing the particles and the hexagonal graphite elements holding the compacts.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Mechanistic Models of Creep-Fatigue Interactions for Gas Turbine Components (Final Report)

This report documents activities for DE-FE0011796 New Mechanistic Models of Creep-Fatigue Interactions for Gas Turbine Components. As part of the computational mechanics work two rate dependent strain gradient plasticity models are developed. One model is an extension of the Norton model and the other model an extension of the Kocks-Mecking model of unified viscoplasticity. Both models are used to compute results for time dependent deformation problems (gradient creep, void growth, a rotating turbine disk). Detailed numerical verification studies are reported. A plasticity model appointing for the strength differential effect in IN 718 is implemented and employed to analyze indentation experiments. Crack growth simulations are conducted with a cohesive zone model approach combining a rate independent fatigue damage component with a time dependent damage model. Crack growth simulations reported for several combinations of the cohesive zone model with the strain gradient plasticity formulations. Plastic strain gradients lead to local suppression of plastic strain which alters the fatigue crack growth response and crack tip fields locally. It also contributes to the condition of crack deflection and bifurcation at interfaces and interlayers as relevant for the understanding of the crack growth response in certain conditions of IN 718 manufactured additively. IN 718 from a conventional and additive manufacturing route (including a HIP process) are considered. Detailed microstructure characterization is reported. Fatigue crack growth at room temperature and at 650°C are reported for all three material variants, and microscale mechanisms are described.

36 MATERIALS SCIENCE↗

Report on the completion of the development of processing map from as-cast Alloy 709 materials

This report provides details on the completion of the development of the processing map from the as-cast Alloy 709 materials. The report is a Level 4 deliverable in FY18 (M4NT18AN050502012), under the Work Package NT-18AN05050201, “A709 Development” performed by Argonne National Laboratory, as part of Advanced Structural Materials Program for the Advanced Reactor Technologies (ART). The report describes the development of a processing map to guide the development of hot work regimens for A709. The maps combine high-temperature flow stress measurements, described in a companion report by Oak Ridge National Laboratory, and metallographic observations, described here, into a single diagram that can be used to select hot working parameters to avoid regions of plastic instability and to avoid the development of unfavorable microstructures. This report describes the process of creating the map, provides the final map for A709, and uses the processing map to describe two potential hot work regimens that could be used in processing a DOE round ingot into bar stock.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Discharge Permit DP-1845 Quarterly Report (July — September 2018)

Discharge Permit (DP)-1845 was issued by the New Mexico Environment (NMED) Ground Water Quality Bureau (GWQB) for discharges via up to three injection wells in a phased Treatability Study of in-situ bioremediation of groundwater at the Sandia National Laboratories, New Mexico, Technical Area-V Groundwater Area of Concern. This report fulfills the quarterly reporting requirements set forth in DP-1845, Section IV.B, Monitoring and Reporting. This reporting period is July 1 through September 30, 2018. The report is due to NMED GWQB by February 1, 2019.

54 ENVIRONMENTAL SCIENCES↗

Foothill Transit Agency Battery Electric Bus Progress Report, Data Period Focus: Jul. 2018 through Dec. 2018

This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in the San Gabriel Valley area of Los Angeles. Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The focus of this evaluation is to compare the performance and the operating costs of the BEBs to that of conventional technology buses and to track progress over time. Previous reports documented results from April 2014 through June 2018. This report extends the data analysis through the end of 2018. The data period focus of this report is July 2018-December 2018. NREL plans to publish progress reports on the Foothill Transit fleet every 6 months through 2020.

33 ADVANCED PROPULSION SYSTEMS↗