How Successful Site Preparation Work at a Large, Commercial, Hazardous and Toxic Waste Site Can Benefit DOE Cleanup Projects - 18111

Jacobs recently completed site preparation work supporting the private commercial development of a world-scale petrochemical complex (an 'ethylene cracker' to produce the primary building block for many forms of plastic) in Monaca, Pennsylvania - the first major U.S. project of its kind outside the Gulf Coast region in 20 years and one of the largest (multi-billion dollar) construction projects in the eastern U.S. Prior to beginning construction on the petrochemical complex, the site's previous large, industrial zinc smelter operations had to be decommissioned and the facilities had to be removed. During the previous 80 years, the smelting operations at the site were used to produce zinc, lead, mercury, and sulfuric acid (a by-product of smelting). The smelting operations left landfills and industrial soil over a large area that had to be removed or closed under regulatory review to allow development across the 81,000 m{sup 2} (200-acre) industrial site located near a major river and local populations. In order to meet Pennsylvania's site-specific Land Recycling Program (commonly referred to as 'Act 2') legislative requirements, the direct contact pathway for landfill soil and slag was removed or mitigated. The site preparation work, or 'Early Works', started in January 2015. As the selected Early Works overall Engineering, Procurement, and Construction Management (EPCM) contractor, Jacobs performed the front end engineering and design. Subsequently, Jacobs had overall responsibility for procurement, construction management, health and safety, quality, security, and environmental services for the entire site and all contractors. The Early Works project included eight separate work scope packages: 1) Site Preparation, 2) Site Development, 3) Marine Works, 4) Rail Works, 5) Road Works and Offsite Utilities, 6) Site Security, 7) Construction Facilities, and 8) High Voltage Line Relocation. The Early Works scope was successfully completed in 2017. The challenges faced by this privately funded commercial project have much in common with large DOE and government construction projects. This paper explores lessons learned from the project and compares how project challenges were addressed on this private commercial project with those anticipated at large DOE/government construction and remediation sites, particularly those in the areas of Safety, Logistics, Infrastructure, and Stakeholder Involvement. The identification of best practices demonstrated on this successful project are shared for the purpose of bringing outside, commercial perspectives to ongoing or planned DOE/government construction projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PIP-II Project Overview and Status

The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab’s particle accelerator complex to enable the world’s most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come. PIP-II will deliver 1.2 MW of proton beam power from the Main Injector, upgradeable to multi-MW capability. The central element of PIP-II is an 800 MeV superconducting radio frequency (SRF) linac, which comprises a room temperature front end followed by an SRF section. The SRF section consists of five different flavors of cavities/cryomodules, including Half Wave Resonators (HWR), Single Spoke and elliptical resonators operating at, or above, state-of-the-art parameters. The first two PIP-II cryomodules, Half Wave Resonator (HWR) and Single Spoke Resonator 1 (SSR1) were installed in the PIP-II Injector Test facility (PIP2IT) and have accelerated beam to above 17 MeV. PIP-II is the first U.S. accelerator project that will be constructed with significant contributions from international partners, including India, Italy, France, United Kingdom and Poland. The project was baselined in April 2022, and the construction phase is underway.

43 PARTICLE ACCELERATORS↗

K25/K27 Characterization for Demonstrating Criticality Incredibility K-25 / K-27 D and D Project

The K-25 and K-27 Buildings are currently undergoing decontamination and decommissioning (D and D) as part of a non-time critical removal action. When the enrichment process was shut-down, the process gas equipment and piping was purged to remove UF{sub 6}, but the process gas system was not generally chemically treated to remove solid holdup. Generally, chemical treatment was completed it was not very effective in removing the larger deposits. Because of this, uranium deposits continue to reside throughout the process gas system. There is the potential for unreacted UF{sub 6} to be present, as well. A key part of this project is to locate the remaining significant uranium deposits and manage them appropriately. Since some process gas components in the K-25 and K-27 Buildings contain enriched uranium holdup, it is important to ensure nuclear criticality safety during demolition or subsequent loading and transport of waste. Therefore, a major task in preparation for demolition is to demonstrate that 'criticality is incredible (CI)' in each building area. The U.S. Department of Energy (DOE) and Bechtel Jacobs Company LLC (BJC) are in agreement that proper and thorough characterization of fissile holdup material in the K-25 and K-27 process gas components is a key element in achieving and demonstrating that criticality is incredible, as well as in management of demolition wastes and collection of holdup material. While the classic project scheduling wisdom may indicate that performing all of the data quality objectives (DQO) and planning before the field work starts, the size of the K-25 / K-27 D and D Project combined with the evolving decommissioning plans and re-plans have indicated that a fresh look at what further characterization data are needed to meet the current project requirements. Performing a DQO in the middle of the project allowed a much greater degree of accuracy of the real project data needs than was possible even 22 months ago. The outcome of the DQO work led to development of the project characterization and criticality incredibility project plan, which will close any data gaps to support the implementation of the re-planned project during the next few years, results from the characterization will support not only the criticality incredible decision(s), but also waste management and disposal along with environmental release requirements.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Electrochemical oxygen pumps. Final CRADA report.

All tasks of the Work Plan of ISTC Project 2277p have been completed, thus: (1) techniques of chemical synthesis were developed for more than ten recipes of electrolyte based on cerium oxide doped with 20 mole% of gadolinium (CeGd)O{sub 2}, doped by more than 10 oxide systems including 6 recipes in addition to the Work Plan; (2) electric conductivity and mechanical strength of CeGd specimens with additions of oxide systems were performed, two candidate materials for the electrolyte of electrochemical oxygen pump (pure CeGd and CeGd doped by 0.2 wt% of a transition metal) were chosen; (3) extended studies of mechanical strength of candidate material specimens were performed at room temperature and at 400, 600, 800 C; (4) fixtures for determination of mechanical strength of tubes by external pressure above 40 atmospheres at temperature up to 700 C were developed and fabricated; and (5) technology of slip casting of tubes from pure (Ce,Gd)O{sub 2} and of (Ce,Gd)O{sub 2} doped by 0.2 wt% of a transition metal, withstanding external pressure of minimum 40 atmospheres at temperature up to 700 C was developed, a batch of tubes was sent for testing to Argonne National Laboratory; (6) technology of making nanopowder from pure (Ce,Gd)O{sub 2} was developed based on chemical synthesis and laser ablation techniques, a batch of nanopowder with the weight 1 kg was sent for testing to Argonne National Laboratory; (7) a business plan for establishing a company for making powders of materials for electrochemical oxygen pump was developed; and (8) major results obtained within the Project were reported at international conferences and published in the Russian journal Electrochemistry. In accordance with the Work Plan a business trip of the following project participants was scheduled for April 22-29, 2006, to Tonawanda, NY, USA: Manager Victor Borisov; Leader of technology development Gennady Studenikin; Leader of business planning Elena Zadorozhnaya; Leader of production Vasily Lepalovsky; and Translator Vladimir Litvinov. During this trip project participants were to discuss with the project Technical Monitor J.D. Carter and representative of Praxair Inc. J. Chen the results of project activities (prospects of transition metal-doped material application in oxygen pumps), as well as the prospects of cooperation with Praxair at the meeting with the company management in the following fields: (1) Deposition of thin films of oxide materials of complex composition on support by magnetron and ion sputtering, research of coatings properties; (2) Development of block-type structure technology (made of porous and dense ceramics) for oxygen pump. The block-type structure is promising because when the size of electrolyte block is 2 x 2 inches and assembly height is 10 inches (5 blocks connected together) the area of active surface is ca. 290 square inches (in case of 8 slots), that roughly corresponds to one tube with diameter 1 inch and height 100 inches. So performance of the system made of such blocks may be by a factor of two or three higher than that of tube-based system. However one month before the visit, J. Chen notified us of internal changes at Praxair and the cancellation of the visit to Tonawanda, NY. During consultations with the project Technical Monitor J.D. Carter and Senior Project Manager A. Taylor a decision was made to extend the project term by 2 quarters to prepare proposals for follow-on activities during this extension (development of block-type structures made of dense and porous oxide ceramics for electrochemical oxygen pumps) using the funds that were not used for the trip to the US.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

High-Burnup Spent Fuel Data Project: Sister Rod Final Phase II Test Plan

The Sibling Pin test campaign is a Department of Energy (DOE) research activity within the Spent Fuel and Waste Science and Technology (SFWST) program that is tasked with characterization of high burnup (HBU) fuel in support of the High Burnup Spent Fuel Data Project. Of the 25 fuel rods in the Sibling Pin inventory, approximately 9 rod lengths have been consumed during the first phase (Phase I) of the test campaign leaving approximately 16 rod lengths for the second phase (Phase II) of testing. This plan outlines the Phase II testing and the motivations for performing these tests. Priorities for Phase II testing are based on previously identified knowledge gaps, lessons-learned from Phase I work, the original objectives of the High Burnup Spent Fuel Data Project and the Sibling Pin test campaign, and input from external stakeholders. The priorities for Phase II testing are to obtain data to characterize the effects of annealing on cladding mechanical properties and fuel rod performance, to quantify the creep behavior of cladding materials and fuel rods and the effects of creep deformations on the performance of cladding and fuel rods, and to gather data to support the final closure of the hydride reorientation and radial hydride induced embrittlement gap for HBU fuel rods.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Final Scientific / Technical Report: Enabling Technologies for Heavy-Duty Vehicles – Cummins 55BTE

The Cummins 55% BTE (55BTE) program has completed the planned technical work on the project. This work includes the planned engine system demonstration in pursuit of the goal of demonstrating a peak system brake thermal efficiency (BTE) of 55%. The engine system included a high efficiency diesel engine integrated with a state-of-the-art waste heat recovery (WHR) system and an advanced aftertreatment system capable of meeting the current emissions standards. While the ultimate program goal of 55% BTE was not fully achieved due to hardware issues during the final testing phase, the program demonstrated a significant increase in reported engine system BTE for a heavy duty sized engine. The previous demonstrations in the Department of Energy funded SuperTruck 1 programs ranged between 50% - 51% BTE. The Cummins 55% BTE program demonstrated 54% BTE. Additionally, the program established a revised path-to-target showing how the system could be improved to reach the ultimate program goal of 55% BTE with some minor modification to the engine system. The changes in the revised path-to-target were unable to be completed during the course of this program due to time and money constraints placed on the program. The program’s goals were challenging in both scope and timing. Although the program’s goal can be simply stated in terms of demonstrating a system efficiency of 55%, the achievement of a heavy-duty diesel engine capable of full torque curve operation, adequate transient performance, low emissions and high brake thermal efficiency (>51% BTE) had not been previously demonstrated in a heavy-duty engine. The closest efforts to date included the SuperTruck 1 programs referenced earlier. The program made several advancements in all system areas. The combustion system was re-designed for a shorter combustion duration and lower in-cylinder heat loss. This was achieved through optimization of the fuel injection rate shape, number of spray holes, piston bowl shape, compression ratio, piston oil cooling, heat flow through the piston and in-cylinder charge motion. The air handling system was re-designed to provide cooled EGR at virtually no pumping penalty. This was achieved through implementation of a dual loop EGR system, reduction of EGR system pressure drop, and implementation of advanced turbocharger efficiency technologies. The engine friction and parasitic signature was dramatically reduced by the program through adoption of variable flow pumps, advanced rings and coatings, rollerized valvetrain, adoption of low viscosity lubricants and reduction in cylinder line bore distortion. The aftertreatment system was optimized through use of low dP substrates and an ammonia gas injection system. The WHR system development included the use of a dual-entry turbine and a mixed charger cooler. Finding and implementing these solutions in a short two-year program at the budgeted funding provided the greatest challenge for the program.

33 ADVANCED PROPULSION SYSTEMS↗

Development and Demonstration of Advanced Engine and Vehicle Technologies For Class 8 Heavy Duty Vehicle (Supertruck II)

The PACCAR SuperTruck II program has completed the planned technical work on the project. This work includes the planned vehicle demonstrator showing a greater than 100% improvement in vehicle freight efficiency (on a ton-mile-per-gallon basis) relative to a 2009 baseline, and an engine system demonstration achieving a greater than 55% engine brake thermal efficiency at a 65-mph cruise point on a dynamometer. Both program targets were exceeded by PACCAR with robust margins. Finally, PACCAR used technologies that have a possible route to production, with no specialty or unrealistic solutions proposed.

33 ADVANCED PROPULSION SYSTEMS↗

Safety of Decommissioning of Nuclear Facilities

Full text of publication follows: ensuring safety during all stages of facility life cycle is a widely recognised responsibility of the operators, implemented under the supervision of the regulatory body and other competent authorities. As the majority of the facilities worldwide are still in operation or shutdown, there is no substantial experience in decommissioning and evaluation of safety during decommissioning in majority of Member States. The need for cooperation and exchange of experience and good practices on ensuring and evaluating safety of decommissioning was one of the outcomes of the Berlin conference in 2002. On this basis during the last three years IAEA initiated a number of international projects that can assist countries, in particular small countries with limited resources. The main IAEA international projects addressing safety during decommissioning are: (i) DeSa Project on Evaluation and Demonstration of Safety during Decommissioning; (ii) R{sup 2}D{sup 2}P project on Research Reactors Decommissioning Demonstration Project; and (iii) Project on Evaluation and Decommissioning of Former Facilities that used Radioactive Material in Iraq. This paper focuses on the DeSa Project activities on (i) development of a harmonised methodology for safety assessment for decommissioning; (ii) development of a procedure for review of safety assessments; (iii) development of recommendations on application of the graded approach to the performance and review of safety assessments; and (iv) application of the methodology and procedure to the selected real facilities with different complexities and hazard potentials (a nuclear power plant, a research reactor and a nuclear laboratory). The paper also outlines the DeSa Project outcomes and planned follow-up activities. It also summarises the main objectives and activities of the Iraq Project and introduces the R{sup 2}D{sup 2} Project, which is a subject of a complementary paper.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Land of Opportunity: Potential for Renewable Energy on Federal Lands

Renewable energy (RE) in the United States has historically been deployed primarily on private lands, but the growing interest in RE development, generally across the country and specifically on federal lands, raises questions about the potential for RE on public lands. This study seeks to estimate RE technical potential on federal lands and project the amount of RE to be developed on federal lands under decarbonization scenarios for the contiguous United States. The study applied a combination of high-resolution geospatial analysis and power sector modeling and relied on multiple partner federal agencies and land administrators from the Bureau of Land Management, the U.S. Fish and Wildlife Service, the U.S. Forest Service, the U.S. Department of Defense, and the U.S. Department of Energy. In our reference siting access case, we estimate 44 million acres of federal land across the contiguous United States is potentially suitable for UPV development, which corresponds to a capacity technical potential of 5,750 gigawatts (GW) (Figure ES-1). Federal land area available for wind development is similar to UPV but wind’s generating capacity technical potential is lower (875 GW). The technical potential is estimated for two geothermal technologies, hydrothermal and enhanced geothermal systems (EGS), both of which have a smaller amount of federal land available for development (12 and 27 million acres, respectively). However, in terms of capacity, the technical potential for EGS (975 GW) is approximately equal to wind’s technical potential and there is an estimated 130 GW of hydrothermal potential. We also developed cases with more-limited land available for UPV and wind (for federal and non-federal lands) resulting in 96% reduction of wind capacity potential and 70% reduction for UPV. In a case with additional constraints applied to non-federal lands only (Limited Private), the overall (federal and non-federal) technical potential declines but the share of that technical potential on federal lands is higher than in the other siting cases. The technical potential is the maximum amount that could be developed, but only a small fraction would be developed or needed in the future. Across seven scenarios that achieve 100% carbon-free electricity by 2035, we estimate 26 GW to 270 GW of RE capacity could be deployed on federal lands by 2035. The three central scenarios have 51–84 GW of RE deployed by 2035 and requiring about 500,000 to 1,000,000 acres of total land area. Direct land consumption is less than total land use required, thus enabling co-use opportunities. The large technical potential estimates and the increasing deployment projections from the collection of scenarios show the opportunities for RE development on federal lands. Capturing these opportunities-while minimizing conflicts with other land uses, federal department or agency missions, and public interest, and simultaneously maximizing the economic, grid, and social value of the projects-would require collaborative planning among federal land administrators, grid planners, project developers, the public, and other stakeholders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

CleanStart DERMS: Modeling Effort Update

This document describes the model conversion approach taken to transform the Synergee distribution feeder models received from Riverside Public Utility (RPU) to GridLAB-D models. The document briefly introduces the tools and software applications used in this process. Then, the model validation results acquired from GridLAB-D simulations are shown. Finally, several test-cases are presented that the research teams are planning to implement with the GridLAB-D models. The document presents the current state of the project and the planned next steps.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Stormwater Pollution Prevention Plan (SWPPP) for Coal Storage Area Stabilization Project

The scope of this project is to stabilize the abandoned coal storage area and redirect the storm water runoff from sanitary sewer system to the storm drain system. Currently, the existing storm water runoff is directed to a perimeter concrete drainage swale and collected in a containment basin. The collected water is then pumped to a treatment facility and after treatment, is discharged to the Y-12 sanitary sewer system. The existing drainage swale and collection basin along with silt fencing will be used during aggregate placement and grading to provide erosion and sediment control. Inlet protection will also be installed around existing structures during the storm water diversion construction. This project scope will include the installation of a non-woven geotextile fabric and compacted mineral aggregate base (paving optional) to stabilize the site. The geotextile specifications are provided on the vendor cut sheets in Appendix B. The installation of a storm water collection/retention area will also be installed on the southern side of the site in accordance with EPA Technical Guidance on Implementing the Stormwater Runoff Requirements for federal Projects under Section 438 of the Energy Independence and Security Act. The total area to be disturbed is approximately 2.5 acres. The order of activities for this Stormwater Pollution Prevention Plan (SWPPP) will be: (1) post notice of coverage (NOC) in a prominent display near entrance of the site; (2) install rain gauge on site or contact Y-12 Plant Shift Superintendent daily for Met tower rain gauge readings; (3) install stabilized construction exit on site; (4) install silt fencing along perimeter as indicated on the attached site plan; (5) regrade site; (6) install geotextile fabric and compacted mineral aggregate base; (7) install catch basin inlet protection where required; (8) excavate and lower existing catch basin tops, re-grade and asphalt to drain; and (9) when all disturbed areas are re-stabilized, remove silt fencing and any other temporary erosion control.

01 COAL, LIGNITE, AND PEAT↗

ESM data downscaling: a comparison of super-resolution deep learning models

Abstract Climate projections at fine spatial resolutions are required to conduct accurate risk assessment for critical infrastructure and design adaptation planning. Generating these projections using advanced Earth system models (ESM) requires significant computational resources. To address this issue, various statistical downscaling techniques have been introduced to generate fine-resolution data from coarse-resolution simulations. In this study, we evaluate and compare five deep learning-based downscaling techniques, namely, super-resolution convolutional neural networks, fast super-resolution convolutional neural network ESM, efficient sub-pixel convolutional neural network, enhanced deep residual network (EDRN), and super-resolution generative adversarial network (SRGAN). These techniques are applied to a dataset generated by the Energy Exascale Earth System Model (E3SM), focusing on key surface variables such as surface temperature, shortwave heat flux, and longwave heat flux. Models are trained and validated using paired fine-resolution (0.25 $$^{\circ }$$ ∘ ) and coarse-resolution (1 $$^{\circ }$$ ∘ ) monthly data obtained from a 9-year simulation. Next, blind testing is performed using monthly data obtained from two different years outside of the training and validation set. To evaluate the efficiency of each technique, different statistical metrics are used, including mean squared error (MSE), peak signal-to-noise ratio (PSNR), structural similarity index measure (SSIM), and learned perceptual image patch similarity (LPIPS). The results show that EDRN outperforms other algorithms in terms of PSNR, SSIM, and MSE, but struggles to capture fine-scale features in the data. In contrast, SRGAN, a generative model that uses perceptual loss, excels in capturing fine details at boundaries and internal structures, resulting in lower LPIPS than other methods.

Pawar, Nikhil M. (ORCID:0000000211613289)↗

Methodology Paper for Lower and Upper Cretaceous Characterization (SECARB Phase III Work Product 1.4.a)

This document serves as the SECARB Phase III work product 1.4.a “Methodology Paper for Lower and Upper Cretaceous Characterization.” The product summarizes the Project Team’s plans for Phase III assessment of the Upper and Lower Cretaceous Saline Reservoirs CO 2 storage capacity. The Project Team will concentrate on potential geologic CO 2 storage reservoirs of the Lower and Upper Cretaceous formations in the Southeast Regional Carbon Sequestration Partnership (SECARB) along the eastern Gulf Coast region. This work will involve assembly of regional geologic cross sections to better define the stratigraphic framework for this high priority, regionally significant geological formation in the SECARB region. Best available well log data and all available core data will be incorporated into the regional analysis to assess reservoir properties and the geologic framework for storage reservoir characteristics. Regional structure maps and reservoir thickness maps will be compiled. Detailed structure maps will be created to assess the suitability of specific storage sites and to assess the potential impact of significant structural features on storage reservoir and confining unit integrity. Of importance will be incorporating the new information being developed from the Phase II and Phase III CO2 storage field projects that will be assessing this formation for storage of CO 2 . The primary deliverable will be input into the next update of the “Regional Atlas”.

54 ENVIRONMENTAL SCIENCES↗

Status of the SPARC-X Project

SPARC-X is a two branch project consisting in the SPARC test facility dedicated to the development and test of critical subsystems such as high brightness photoinjector and a modular expandable undulator for SASE-FEL experiments at 500 nm with seeding, and the SPARX facility aiming at generation of high brilliance coherent radiation in the 1.5-13 nm range, based on the achieved expertise. The projects are supported by MIUR (Research Department of Italian Government) and Regione Lazio. SPARC has completed the commissioning phase of the photoinjector in November 2006. The achieved experimental results are here summarized together with the status of the second phase commissioning plans. The SPARX project is based on the generation of ultra high peak brightness electron beams at the energy of 1 and 2 GeV generating radiation in the 1.5-13 nm range. The construction is at the moment planned in two steps starting with a 1 GeV Linac. The project layout including both RF-compression and magnetic chicane techniques has been studied.

43 PARTICLE ACCELERATORS↗

Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - FY 2015 First Quarterly Report

During the first quarter of FY 2015, the following technical progress has been made toward project milestones: 1) Autodesk delivered a new research version of ASMI to PNNL. This version includes the improved 3D fiber orientation solver, and the reduced order model (ROM) for fiber length distribution using the proper orthogonal decomposition (POD) implemented in the mid-plane, dual-domain and 3D solvers. 2) Autodesk coordinated a conference paper with PNNL reporting ASMI mid-plane fiber orientation predictions compared with the measured data for two PlastiComp plaques. This paper was accepted for presentation at the 2015 Society for Plastics Engineers (SPE) ANTEC conference. 3) The University of Illinois (Prof. Tucker) assisted team members from Purdue with fiber orientation measurement techniques, including interpretation of off-axis cross sections. 4) The University of Illinois assisted Autodesk team members with software implementation of the POD approach for fiber length modeling, and with fiber orientation modeling. 5) The University of Illinois co-authored in the SPE ANTEC paper, participated with the team in discussions of plaque data and model results, and participated in the definition of go/no-go experiments and data. 6) Purdue University (Purdue) conducted fiber orientation measurements for 3 PlastiComp plaques: fast-fill 30wt% LCF/PP center-gated, fast-fill 50wt% LCF/PA66 edge-gated and fast-fill 50wt% LCF/PA66 center-gated plaques, and delivered the fiber orientation data for these plaques at the selected locations (named A, B, and C) to PNNL. However, the data for the fast-fill 50wt% LCF/PA66 edge-gated plaque exhibited unusual variations and could not be used for the model validation. Purdue will re-measure fiber orientation for this plaque. 7) Based on discussions with the University of Illinois Purdue explained the ambiguity in the measurements of the fiber orientation components. 8) PNNL discussed with team members to establish a go/no-go decision plan for the project and submitted the established plan to DOE. 9) PNNL performed ASMI mid-plane analyses for the fast-fill center-gated 30wt% LCF/PP and 50wt% LCF/PA66 plaques and compared the predicted fiber orientations with the measured data provided by Purdue at Locations A, B, and C on these plaques. 10) Based on discussions with the University of Illinois and Autodesk, PNNL proposed a procedure to adjust fiber orientation data for Location A of the center-gated plaques so that the data can be expressed and interpreted in the flow/cross-flow direction coordinate system. 11) PNNL tested the new ASMI version received from Autodesk, examined and discussed 3D fiber orientation predictions for PlastiComp plaques. 12) PlastiComp, Inc. (PlastiComp), Toyota Research Institute North America (Toyota) and Magna Exteriors and Interiors Corp. (Magna) participated in discussions with team members on the go/no-go plan and the issues related to fiber length measurements. Toyota continued the discussion with Magna on tool modification for molding the complex part in order to achieve the target fiber length in the part.

42 ENGINEERING↗

L-325 Sagebrush Habitat Mitigation Project: FY2008 Compensation Area Monitoring Report

This document provides a review and status of activities conducted in support of the Fluor Daniel Hanford Company (Fluor) Mitigation Action Plan (MAP) for Project L-325, Electrical Utility Upgrades. It includes time-zero monitoring results for planting activities conducted in January 2008, annual survival monitoring for all planting years (2007 and 2008), and recommendations for the successful completion of DOE habitat mitigation commitments for this project.

54 ENVIRONMENTAL SCIENCES↗

Z Facility Sustainment Status (September FY2023) [Slides]

FY23 Sustainment, performed from 1 March through 30 September, completed with Cumulative Costs at 69% and combined Costs plus Commitments at 87%. Nineteen projects were completed in FY23. Eleven projects continue to close out purchasing activities or will roll over into FY24 projects. Two projects have been placed on hold and will be reevaluated for potential future consideration. Diagnostics projects issued all planned FY23 purchases and finished FY23 with 78% cumulative costs and combined costs and commitments at 102%. FY24 Sustainment Project identification, definition and prioritization was completed. Once the budget is finalized, project selection will quickly be set and projects kicked off.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The status of the LANSCE refurbishment project (LANSCE-R)

The Los Alamos Neutron Science Center (LANSCE) accelerator is an 800-MeV proton linac that drives user facilities for isotope production, proton radiography, ultra-cold neutrons, weapons neutron research and various sciences using neutron scattering. The LANSCE Refurbishment Project (LANSCE-R) is an ambitious project to refurbish key elements of the LANSCE accelerator that are becoming obsolete or nearing end-of-life. The conceptual design phase for the project is funded and underway. The 5 year, $170M (US) project will enable future decades of reliable, high-performance operation. It will replace a substantial fraction of the radio-frequency power systems (gridded tubes and klystrons) with modern systems, completely refurbish the original accelerator control and timing systems, replace obsolete diagnostic devices, and modernize other ancillary systems. An overview of the LANSCE-R project will be presented. The functional and operating requirements will be discussed, the proposed technical solutions presented, and the plan for successful project execution while meeting annual customer expectations for beam delivery will be reviewed.

43 PARTICLE ACCELERATORS↗