Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Practice Guidelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Building America Case Study: Construction Guidelines for High R-Value Walls without Exterior Rigid Insulation, Cold Climate Region

High-R wall assemblies (R-40 and above) are gaining popularity in the market due to programs like the DOE's Zero Energy Ready Home program, Passive House (PH), Net Zero Energy Home (NZEH) challenges in several states, and highly incentivized retrofit programs. In response to this demand, several builders have successfully used 'double wall' systems to more practically achieve higher R-values in thicker, framed walls. To builders of conventional stick-framed homes, often one of the most appealing features of double wall systems is that there are very few new exterior details. Exterior sheathing, structural bracing, house wrap or building paper, window and door flashing, and siding attachment are usually identical to good details in conventional framed wall systems. The information presented in this guide is intended to reduce the risk of failure in these types of assemblies, increase durability, and result in a reduction of material brought to landfills due to failures and resulting decay. While this document focuses on double wall framing techniques, the majority of the information on how to properly construct and finish high R-value assemblies is applicable to all wall assemblies that do not have foam insulation installed on the exterior of the structural sheathing. The techniques presented have been shown through field studies to reduce the likelihood of mold growth and moisture related damage and are intended for builders, framing contractors, architects, and consultants involved in designing and building super insulated homes.

air tight construction↗

NASA's Software Safety Standard

NASA relies more and more on software to control, monitor, and verify its safety critical systems, facilities and operations. Since the 1960's there has hardly been a spacecraft launched that does not have a computer on board that will provide command and control services. There have been recent incidents where software has played a role in high-profile mission failures and hazardous incidents. For example, the Mars Orbiter, Mars Polar Lander, the DART (Demonstration of Autonomous Rendezvous Technology), and MER (Mars Exploration Rover) Spirit anomalies were all caused or contributed to by software. The Mission Control Centers for the Shuttle, ISS, and unmanned programs are highly dependant on software for data displays, analysis, and mission planning. Despite this growing dependence on software control and monitoring, there has been little to no consistent application of software safety practices and methodology to NASA's projects with safety critical software. Meanwhile, academia and private industry have been stepping forward with procedures and standards for safety critical systems and software, for example Dr. Nancy Leveson's book Safeware: System Safety and Computers. The NASA Software Safety Standard, originally published in 1997, was widely ignored due to its complexity and poor organization. It also focused on concepts rather than definite procedural requirements organized around a software project lifecycle. Led by NASA Headquarters Office of Safety and Mission Assurance, the NASA Software Safety Standard has recently undergone a significant update. This new standard provides the procedures and guidelines for evaluating a project for safety criticality and then lays out the minimum project lifecycle requirements to assure the software is created, operated, and maintained in the safest possible manner. This update of the standard clearly delineates the minimum set of software safety requirements for a project without detailing the implementation for those requirements. This allows the projects leeway to meet these requirements in many forms that best suit a particular project's needs and safety risk. In other words, it tells the project what to do, not how to do it. This update also incorporated advances in the state of the practice of software safety from academia and private industry. It addresses some of the more common issues now facing software developers in the NASA environment such as the use of Commercial-Off-the-Shelf Software (COTS), Modified OTS (MOTS), Government OTS (GOTS), and reused software. A team from across NASA developed the update and it has had both NASA-wide internal reviews by software engineering, quality, safety, and project management. It has also had expert external review. This presentation and paper will discuss the new NASA Software Safety Standard, its organization, and key features. It will start with a brief discussion of some NASA mission failures and incidents that had software as one of their root causes. It will then give a brief overview of the NASA Software Safety Process. This will include an overview of the key personnel responsibilities and functions that must be performed for safety-critical software.

Ramsay, Christopher M.↗

Review of Safety and Exposure Limits of Electromagnetic Fields (EMF) in Wireless Electric Vehicle Charging (WEVC) Applications

This study reviews the exposure limits and safety of intermediate frequency (IF) electromagnetic field (EMF) emissions for wireless electric vehicle charging (WEVC) applications. A review of the electromagnetic field exposure limits identified in international guidelines are presented. An overview of the electromagnetic field shielding technologies is provided including recommended geometries, materials, and performances of the methods available in the literature. Available laboratory results of EMF emissions are summarized considering several wireless power transfer studies in different power levels. Possible EMF reduction techniques are discussed with shielding practices and ORNL case studies. Also, living object detection (LOD) and foreign object detection (FOD) methods are reviewed from a safety aspect.

Asa, Erdem↗

Biomass Carbon Removal and Storage (BiCRS)

To achieve the ambitious net-zero emission goal by 2050, it is vital to explore practical approaches for removing carbon dioxide from the air. One promising method is Biomass Carbon Removal and Storage (BiCRS). BiCRS combines the natural ability of plants to convert carbon dioxide into biomass with human engineering to store the biomass, or derived products (char), belowground where it won't decompose. By securely storing these materials underground, we can trap the carbon dioxide absorbed by the plants during their growth, thus aiding in carbon removal from the atmosphere. BiCRS not only addresses carbon emissions but also has co-benefits such as wildfire risk reduction by utilizing forest residues. It is essential to establish best practices to ensure accurate measurements of net carbon dioxide removed by BiCRS for policymakers, businesses and communities. Presently, there is a lack of consistent methods for calculating these removals, considering variables like plant type, storage conditions, and conditions for converting the biomass to other products for storage like char. This project develops guidelines for monitoring and reporting BiCRS activities, offering a dependable framework for measuring carbon dioxide removal, enabling adoption of transparent BiCRS approaches for making significant contributions to reducing carbon dioxide levels in the atmosphere.

biomass carbon removal and storage↗

A Numerical Study of Factors Affecting Fracture-Fluid Cleanup and Produced Gas/Water in Marcellus Shale: Part II

Horizontal wells combined with successful multi-stage hydraulic fracture treatments are currently the most established method for effectively stimulating and enabling economic development of gas bearing organic-rich shale formations. Fracture cleanup in the Stimulated Reservoir Volume (SRV) is critical to stimulation effectiveness and long-term well performance. However, fluid cleanup is often hampered by formation damage, and post-fracture well performance frequently falls below expectations. A systematic study of the factors that hinder fracture fluid cleanup in shale formations can help optimize fracture treatments and better quantify long term volumes of produced water and gas. Fracture fluid cleanup is a complex process influenced by multi-phase flow through porous media (relative permeability hysteresis, capillary pressure etc.), reservoir rock and fluid properties, fracture fluid properties, proppant placement, fracture treatment parameters, and subsequent flowback and field operations. Changing SRV and fracture conductivity as production progresses further adds to the complexity of this problem. Numerical simulation is the best, and most practical approach to investigate such a complicated blend of mechanisms, parameters, their interactions, and subsequent impact on fracture fluid cleanup and well deliverability. In this paper, a 3-dimensional, 2-phase, dual-porosity model was used to investigate the impact of multiphase flow, proppant crushing, proppant diagenesis, shut-in time, reservoir rock compaction, gas slippage, and gas desorption on fracture fluid cleanup, and well performance in Marcellus shale. The research findings have shed light on the factors that substantially constrains efficient fracture fluid cleanup in gas shales, and provided guidelines for improved fracture treatment designs and water management.

58 GEOSCIENCES↗

Ultraviolet Fluorescence Imaging for Photovoltaic Module Metrology: Best Practices and Survey of Features Observed in Fielded Modules

As the photovoltaics (PV) industry grows in sophistication, so must the extent to which systems are characterized. UV Fluorescence (UVF) imaging is a valuable, easy-to-perform, high-throughput, nonintrusive technique for characterizing modules in the field and in the lab. However, UVF is still a relatively new technique, and many in the PV industry are still unaware of its potential. We provide a guideline for obtaining, processing, and interpreting UVF images. We have provided a list of considerations for imaging hardware and settings, a suggested pipeline for image processing, and details on a survey of features shown in UVF images. As a result, a new database with UVF images of 7190 modules and another database curated by BrightSpot Automation are publicly available.

14 SOLAR ENERGY↗

WE-F-201-01: Identify Key Clinical Applications Needing Advanced Dose Calculation in Brachytherapy

With the recent introduction of heterogeneity correction algorithms for brachytherapy, the AAPM community is still unclear on how to commission and implement these into clinical practice. The recently-published AAPM TG-186 report discusses important issues for clinical implementation of these algorithms. A charge of the AAPM-ESTRO-ABG Working Group on MBDCA in Brachytherapy (WGMBDCA) is the development of a set of well-defined test case plans, available as references in the software commissioning process to be performed by clinical end-users. In this practical medical physics course, specific examples on how to perform the commissioning process are presented, as well as descriptions of the clinical impact from recent literature reporting comparisons of TG-43 and heterogeneity-based dosimetry. Learning Objectives: Identify key clinical applications needing advanced dose calculation in brachytherapy. Review TG-186 and WGMBDCA guidelines, commission process, and dosimetry benchmarks. Evaluate clinical cases using commercially available systems and compare to TG-43 dosimetry.

60 APPLIED LIFE SCIENCES↗

WE-F-201-03: Evaluate Clinical Cases Using Commercially Available Systems and Compare to TG-43 Dosimetry

With the recent introduction of heterogeneity correction algorithms for brachytherapy, the AAPM community is still unclear on how to commission and implement these into clinical practice. The recently-published AAPM TG-186 report discusses important issues for clinical implementation of these algorithms. A charge of the AAPM-ESTRO-ABG Working Group on MBDCA in Brachytherapy (WGMBDCA) is the development of a set of well-defined test case plans, available as references in the software commissioning process to be performed by clinical end-users. In this practical medical physics course, specific examples on how to perform the commissioning process are presented, as well as descriptions of the clinical impact from recent literature reporting comparisons of TG-43 and heterogeneity-based dosimetry. Learning Objectives: Identify key clinical applications needing advanced dose calculation in brachytherapy. Review TG-186 and WGMBDCA guidelines, commission process, and dosimetry benchmarks. Evaluate clinical cases using commercially available systems and compare to TG-43 dosimetry.

60 APPLIED LIFE SCIENCES↗

Impact of domain analysis on reuse methods

The SPS is performing a study for the U.S. Army CECOM on the impact of domain analysis on reuse methods. Domain analysis is the first activity that should be performed in the development of reusable software. It identifies the commonalities between systems within a given problem (such as navigation systems or database management). In the software arena these commonalities are implemented as software components that can be reused by new systems within that application domain. The objectives of the study are to develop an approach that makes domain analysis practical and effective for the Army, to reinforce the importance of domain analysis for software reuse programs, and to summarize and coalesce domain analysis information into a single reference source. Existing methods and tools are being analyzed, critical issues identified, and key automation issues addressed. Based on these, a methodology and set of guidelines for domain analysis are being developed. Potential automated tools will be identified for each activity in the methodology.

Gilroy, Kathy↗

Failure Analysis for Molten Salt Thermal Energy Storage Tanks for In-Service CSP Plants

Thermal Energy Storage (TES) is a fundamental component in concentrating solar power (CSP) plants to increase the plant's dispatchability, capacity factor, while reducing the levelized cost of electricity. In central receivers CSP plants, nitrate molten salts have been used for several years for operation temperatures of up to 565 degrees C. Despite many efforts to advance nitrate salt to higher operation temperatures (even considering a replacement with molten chloride salts) to achieve higher energy conversion efficiencies, the 565 degrees C temperature is currently considered the state-of-the art. Although molten salt tanks have been broadly deployed in commercial CSP plants worldwide, several failures have been reported in these tanks after a few months or years of operation, causing significant economic loss and mistrust in CSP technologies. Most of these failures are associated with the infancy of the technology and multiple issues related to tank design, fabrication, commissioning, and aggressive operation. A technical standard dedicated to the design and fabrication of molten nitrate TES tanks does not exist today. Current in-service molten salt tanks have been generally designed based on the American Petroleum Institute's (API) 650 and ASME Section II standards. The API 650 code provides guidelines for dimensions and fabrication for oil storage tanks up to 260 degrees C. The ASME standard provides allowable stress values for various materials at a range of temperatures and conditions. Both standards seem to be limited for molten salt TES tanks where high temperatures, thermal cycling, and transient conditions are expected. In 2020, NREL released the Concentrating Solar Power Best Practices Study (NREL/TP-5500-75763) that summarized multiple issues in CSP plants, along with potential alternatives and recommendations to address those issues based on information collected from participants representing about 80% of operating CSP plants in the world. One of the recommendations from this study was the development of accurate and validated models to evaluate the plant's transient operation, capable of capturing the effect of short-term clouds and operator response, while being flexible in being adapted to various spatial and temporal resource data. The "Failure Analysis for Molten Salt Thermal Energy Tanks for In-Service CSP Plants" project was inspired on this recommendation and was focused on (1) the development and validation of a physics-based model for a representative, commercial-scale molten salt tank, (2) performing simulations to evaluate the behavior of the tank as a function of typical plant operation conditions, (3) understanding tank failures mechanisms, (4) determining the residual stress and distortion in the tank floor after welding fabrication and evaluating their impact in the stresses developed in the tank during operation, (5) assessing the impact of key operation parameters on the temperature and stress distribution, (6) conduct a preliminary evaluation of design features to reduce stress and improve tank's reliability, and (7) estimate the tank's service life based on the stress developed under diverse operation scenarios. From the analysis conducted in the project and presented in this report, it was found that maximum stresses surpassing the yield strength point of the stainless steel (SS) 347H are developed on the tank floor near the perimeter. These large stresses are strongly influenced by the initial residual stresses and distortion of the tank floor after welding fabrication. During operation, large stresses are developed in the tank floor at high operation temperatures with large salt inventory levels during transient operation. High stresses are also related to elevated temperature gradients in the tank floor that could be attributed to insufficient mixing within the salt inflow and the salt inventory. Based on the analysis, creep is the predominant failure mechanism. However, the large stress levels could favor the plastic deformation into buckles, and crack formation due to stress relaxation cracking during cycle operation. A lifetime below 3 years was estimated for the typical plant operation conditions and a specific initial residual stress and deformation distribution of the tank floor. The estimated life agrees with the service time to failure reported in several commercial molten salt tanks. Desing and operation guidelines can be extracted from the analysis presented in this report, which could be adopted by tank manufacturers and CSP operators to advance toward an ultimate solution for tank failures by reducing residual and operational stresses to achieve a tank service life of more than 30 years. Addressing failures in molten salt TES tanks is fundamental for the CSP industry's survivability, but it is also important for other industrial and power generation applications using this technology, including nuclear and concentrating solar thermal.

14 SOLAR ENERGY↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

Cockpit Adaptive Automation and Pilot Performance

The introduction of high-level automated systems in the aircraft cockpit has provided several benefits, e.g., new capabilities, enhanced operational efficiency, and reduced crew workload. At the same time, conventional 'static' automation has sometimes degraded human operator monitoring performance, increased workload, and reduced situation awareness. Adaptive automation represents an alternative to static automation. In this approach, task allocation between human operators and computer systems is flexible and context-dependent rather than static. Adaptive automation, or adaptive task allocation, is thought to provide for regulation of operator workload and performance, while preserving the benefits of static automation. In previous research we have reported beneficial effects of adaptive automation on the performance of both pilots and non-pilots of flight-related tasks. For adaptive systems to be viable, however, such benefits need to be examined jointly in the context of a single set of tasks. The studies carried out under this project evaluated a systematic method for combining different forms of adaptive automation. A model for effective combination of different forms of adaptive automation, based on matching adaptation to operator workload was proposed and tested. The model was evaluated in studies using IFR-rated pilots flying a general-aviation simulator. Performance, subjective, and physiological (heart rate variability, eye scan-paths) measures of workload were recorded. The studies compared workload-based adaptation to to non-adaptive control conditions and found evidence for systematic benefits of adaptive automation. The research provides an empirical basis for evaluating the effectiveness of adaptive automation in the cockpit. The results contribute to the development of design principles and guidelines for the implementation of adaptive automation in the cockpit, particularly in general aviation, and in other human-machine systems. Project goals were met or exceeded. The results of the research extended knowledge of automation-related performance decrements in pilots and demonstrated the positive effects of adaptive task allocation. In addition, several practical implications for cockpit automation design were drawn from the research conducted. A total of 12 articles deriving from the project were published.

Parasuraman, Raja↗

Performance of Virtual Current Meters in Hydroelectric Turbine Intakes

Standards provide recommendations for the best practices in the installation of current meters for measuring fluid flow in closed conduits. These include PTC-18 and IEC-41 . Both of these standards refer to the requirements of the ISO Standard 3354 for cases where the velocity distribution is assumed to be regular and the flow steady. Due to the nature of the short converging intakes of Kaplan hydroturbines, these assumptions may be invalid if current meters are intended to be used to characterize turbine flows. In this study, we examine a combination of measurement guidelines from both ISO standards by means of virtual current meters (VCM) set up over a simulated hydroturbine flow field. To this purpose, a computational fluid dynamics (CFD) model was developed to model the velocity field of a short converging intake of the Ice Harbor Dam on the Snake River, in the State of Washington. The detailed geometry and resulting wake of the submersible traveling screen (STS) at the first gate slot was of particular interest in the development of the CFD model using a detached eddy simulation (DES) turbulence solution. An array of virtual point velocity measurements were extracted from the resulting velocity field to simulate VCM at two virtual measurement (VM) locations at different distances downstream of the STS. The discharge through each bay was calculated from the VM using the graphical integration solution to the velocity-area method. This method of representing practical velocimetry techniques in a numerical flow field has been successfully used in a range of marine and conventional hydropower applications. A sensitivity analysis was performed to observe the effect of the VCM array resolution on the discharge error. The downstream VM section required 11–33% less VCM in the array than the upstream VM location to achieve a given discharge error. In general, more instruments were required to quantify the discharge at high levels of accuracy when the STS was introduced because of the increased spatial variability of the flow velocity.

13 HYDRO ENERGY↗

Standard of Practice for the Interventional Management of Isolated Iliac Artery Aneurysms

Isolated iliac artery aneurysms are uncommon, comprising less than 2% of all abdominal aneurysmal disease. Although they have a fairly innocuous natural history, when they have attained a large size they carry a significant risk of rupture. Rupture is associated with significant morbidity and mortality. Therefore, an early diagnosis and treatment are crucial. Over the last decade, interventional treatment options have become established alternatives to open surgical repair. These guidelines aim to review the pathogenesis, natural history, and presentation of isolated iliac artery aneurysms including a description of imaging and interventional treatment strategies.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Design guide: Designing and building high voltage power supplies, volume 1

This report contains an accumulation of publications and analyses aimed at developing guidelines for improving both high voltage and low voltage power supplies for the U.S. Air Force systems command. It is the intent of the report to supply good design and manufacturing techniques for the packaging and the building of high quality, reliable, long-life power supplies. These data are based on the wealth of engineering practices established by design and manufacturing engineers.

William G Dunbar↗

Design guide: Designing and building high voltage power supplies, volume 2

This report contains an accumulation of publications and analyses aimed at developing guidelines for improving both high voltage and low voltage power supplies for the U.S. Air Force systems command. It is the intent of the report to supply good design and manufacturing techniques for the packaging and the building of high quality, reliable, long-life power supplies. These data are based on the wealth of engineering practices established by design and manufacturing engineers. The contents are: Fundamentals of Insulation: Gases, Liquid Dielectrics, Solid Insulation; Environment: Pressure, Particulates, Environmental Interactions with Space Power Systems, Surface Charging, System Design Criteria; Configuration and Design Data: Designs, Transients, Grounding and Bonding, Thermal Control; Materials and Processes: Insulation, Processes, Process Variables; Manufacturing: Yield, Government and Industrial Survey, Analysis, Problem Areas and Suggested Solutions, Designs That Have Worked in High Voltage Equipment, Manufacturing Summary; and Tests: Performance, Insulation Tests, Materials Testing, Component and Equipment Tests, Performance Testing, Facility and Environment, Accelerated Life Test; Maintenance and Repair: Maintenance, Test Sets, Pilots and Crewmen, Air Logistic Centers, Design Problem Recommendations.

W G Dunbar↗

Maximizing the Scientific Return of Low Cost Planetary Missions Using Solar Electric Propulsion(abstract)

After many years of development, solar electric propulsion is now a practical low cost alternative for many planetary missions. In response to the recent Discovery AO, we and a number of colleagues have examined the scientific return from a missioon to map the Moon and then rendezvous with a small body. In planning this mission, we found that solar electric propulsion was quite affordable under the Discovery guidelines, that many targets could be reached more rapidly with solar electric propulsion than chemical propulsion, that a large number of planetary bodies were accessible with modest propulsion systems, and that such missions were quite adaptable, with generous launch windows which minimized mission risks. Moreover, solar electric propulsion is ideally suited for large payloads requiring a large amount of power.

solar electric propulsion low cost missions ion th↗

Challenges and Practical Solutions for Conducting Structural MARSSIM Surveys in Elevated Radon Environments - 20413

The Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) [1] provides comprehensive guidance for the development and implementation of radiological surveys conducted to demonstrate compliance with a dose- or risk-based cleanup goal during final status survey. The MARSSIM methodology follows an integrated strategy combining direct measurements and sampling to assess uniform residual contamination, and scanning surveys to identify localized areas of elevated activity. Building surveys assessing residual surface contamination present unique challenges from reliance on field measurements that may be subject to less than ideal environmental conditions. Additionally, limited characterization and excessive conservatism incorporated into the conceptual site model may result in derived concentration guideline levels (DCGL) and, as a consequence of relatively inefficient field instrumentation, corresponding attributable count rates generally comparable to background. The presence of elevated ambient radon concentrations and associated progeny deposition both exacerbate these intrinsic survey challenges and introduce a series of technical, logistic, and administrative obstacles that can wreak havoc on the statistical legitimacy of each component of the MARSSIM process. Short-lived radon progeny including polonium-218, lead-214, bismuth-214, and polonium-214 produce excessive alpha and beta radiation that may decrease instrument sensitivity through an increase in background count rates, and, at worst, may result in incorrect survey unit failure through the simulation of residual surface activity. Aside from the obvious solution of exhaustive radon mitigation, the primary objectives are to distinguish between radon progeny deposition and actual surface activity, and collect sufficient defensible data. The following is a technical discussion of the consequences of performing building MARSSIM surveys in the presence of elevated ambient radon atmospheres, conceptual examples, and an overview of practical strategies to minimize the effects of radon interference while collecting sufficient defensible data to complete the survey. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗