Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Power Plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Modeling and Power-Hardware-in-the-Loop Validation of Synchronous Wind: An Inverterless Grid-Forming Wind Power Plant

Grid-forming (GFM) control of Type-3 and Type-4 wind turbine generators (WTGs) has attracted substantial attention in power systems research; however, the limited overcurrent capability of power electronics converters continues to deteriorate the grid strength of the evolving power systems. Synchronous wind, also known as a Type-5 WTG, offers a unique GFM solution to address grid integration and grid strength issues by keeping the grid largely synchronous at very high integration levels of renewable generation. A Type-5 WTG interfaces with the electric grid via a synchronous generator driven by a variable-speed hydraulic torque converter; hence, the wind rotor operates in variable-speed mode for maximum power generation, and the generator shaft remains synchronous to the grid. This paper develops and tests a high-fidelity model of a Type-5 WTG in a power-hardware-in-the-loop (PHIL) testing environment. The PHIL demonstration shows that a Type-5 WTG inherently behaves as a GFM unit and can obtain similar performance in terms of power responses, wind rotor dynamics, and efficiency compared to a Type-3 WTG in high-wind conditions. The developed model provides further insight into how Type-5 WTGs can benefit the smooth transition to power systems with high integration levels of inverter-based resources.

grid strength↗

A free-flying power plant for a manned space station

The 0.1 Hz fundamental structural frequency anticipated for the large solar array panels required to power manned space stations is close to the attitude control system bandwidth, and within the bandwidth of crew motion disturbances. Attention is presently given to a detachment of the solar panel system to create a free-flying powerplant for the space station, and to the control system that will maintain its attitude and position relative to the space station by means of thrusters that are supplied with space station state data by a laser/optical sensor system. Power transmission alternatives for this free-flying power system are discussed.

Paluszek, M.↗

Modeling and Power-Hardware-in-the-Loop Validation of Synchronous Wind: An Inverterless Grid-Forming Wind Power Plant: Preprint

Grid-forming (GFM) control of Type-3 and Type-4 wind turbine generators has attracted substantial attention in power systems research; however, the limited over-current capability of power electronics converters continues to deteriorate the grid strength of the evolving power systems. Synchronous wind, also known as Type-5 wind turbine generator (WTG), offers a unique GFM solution to address grid integration and grid strength issues by keeping the grid largely synchronous at very high penetration levels of renewable generation. A Type-5 WTG interfaces to the electric grid via a synchronous generator (SG) driven by a variable-speed hydraulic torque converter; hence, the wind rotor operates in variable-speed mode for maximum power generation and the generator shaft remains synchronous to the grid. This paper developed and tested a high-fidelity model of Type-5 WTG under power-hardware-in-the-loop (PHIL) testing environment. The PHIL demonstration showed that a Type-5 WTGs inherently behaves as a GFM unit and can obtain similar performance in terms of power responses, wind rotor dynamics, and efficiency compared to Type-3 WTG in high wind conditions. The developed model also provides further insight on how Type-5 WTGs can benefit the smooth transition to power systems with high integration level of inverter-based resources.

grid strength↗

The mutual action of airplane body and power plant

The present report concerns the development of general propeller performance and r.p.m. curves which, combined with the general curve of the power required for level flight, presents a complete picture of the performance.

Schrenk, Martin↗

Nuclear power plants for mobile applications

Mobile nuclear powerplants for applications other than large ships and submarines will require compact, lightweight reactors with especially stringent impact-safety design. The technical and economic feasibility that the broadening role of civilian nuclear power, in general, (land-based nuclear electric generating plants and nuclear ships) can extend to lightweight, safe mobile nuclear powerplants are examined. The paper discusses technical experience, identifies potential sources of technology for advanced concepts, cites the results of economic studies of mobile nuclear powerplants, and surveys future technical capabilities needed by examining the current use and projected needs for vehicles, machines, and habitats that could effectively use mobile nuclear reactor powerplants.

Anderson, J. L.↗

Using Concentrating Solar Power to Create a Geological Thermal Energy Reservoir for Seasonal Storage and Flexible Power Plant Operation

Abstract We propose a hybrid renewable energy system—a geothermal energy storage system (GeoTES) with solar—to provide low-cost dispatchable power at various timescales from daily, to weekly, to seasonally. GeoTES with solar uses a concentrating solar power collector field to produce hot water that is injected into a sedimentary basin to create a synthetic geothermal resource. The stored geothermal heat can then be dispatched when required by the electrical grid. GeoTES is particularly valuable for a grid with a high penetration of non-flexible renewable technologies such as photovoltaic and wind power. In this work, a sophisticated hybrid model is developed to assess the technical and economic potential of GeoTES by combining IPSEpro, which is a power-cycle simulation tool, and SAM, an economic analysis tool by National Renewable Energy Laboratory (NREL). The analysis shows with proper initial charging period that the heat loss in storage is almost negligible and is a suitable technology for long-term energy storage. Various power-cycle options are evaluated, and the most suitable power cycle is selected for further study. Annual calculations of the GeoTES system indicate that a levelized cost of storage (LCOS) of 12.4 ¢/kWh e can be achieved for seasonal storage of 4000 h; this value is much lower than the existing long-term storage. The LCOS of GeoTES is insensitive to the storage duration above 8 h, unlike battery and molten-salt thermal storage systems. This result demonstrates that GeoTES can be a competitive seasonal storage technology in the future electricity market. The levelized cost of electricity of the GeoTES system is also carefully analyzed and can vary between 10.0 and 16.4 ¢/kWh e , depending on solar-collector prices.

25 ENERGY STORAGE↗

Optimization of the Post-Operational Phase on Two Belgian Multi-Unit Nuclear Power Plants: the Case of the Non-Fissile Irradiated Core Items - 20156

The current legal framework in Belgium foresees the progressive phase out of nuclear power between October 2022 (Doel 3) and December 2025 (Doel 2). Upon its definitive shutdown, each unit of the Tihange and Doel sites will enter a Post-Operational Phase (POP) and be prepared for its Decontamination and Decommissioning (D and D). Prior to obtaining the D and D license, the Operator Electrabel is legally required to remove any non-fissile irradiated core items stored in the deactivation pools. The non-fissile irradiated core items consist essentially of control rods, poison rods and source thimbles as well as thimble plugs and foreign materials irradiated during operation: - Their significant content in highly radiant radionuclides (up to 6 TBq of Co-60 per kg of irradiated material) renders all existing operational waste management processes inadequate due to insufficient biological shielding; - Their high concentrations in long-lived radionuclides call for their disposal in a geological repository for which no final design nor waste acceptance criteria are expected prior to 2050. Uncertainties in the Belgian energy supply and security, however, require the Operator to be prepared for a partial nuclear phase out, where one or more units would benefit from lifetime extension while the remaining units would undergo decommissioning. The present paper aims at presenting how Electrabel, in partnership with Tractebel, addressed this challenge by maximizing the use of synergies within the respective sites as well as between both sites themselves, all the while accounting for site specificities. The most recent results and state of progress of the project will be detailed and the first lessons learned will be shared. The project has been split in multiple tasks and phased as follows: - An inventory phase aimed at mapping the contents, origin, composition and history of the non-fissile irradiated core items; - A pre-characterization phase based on neutron activation models; - A waste sorting phase aimed at separating waste forms for which an evacuation route exists from those for which such route does not exist; - A feasibility phase aimed at exploring all possible scenarios for the management of non-fissile irradiated core items and identifying the optimal feasible solution for each site; - A preparation phase (currently ongoing), developing further the optimal solution and ensuring that back-up solutions are available for any foreseeable change of context (licensing issue, modification in the nuclear phase-out program, etc.) and initiating early contacts with potential subcontractors for segmentation works and cask manufacturers, as well as the Belgian regulatory body and waste management agency. This phase also foresees the investigation of destructive and non-destructive radiological measurements to support the detailed characterization of the waste forms; - A realization phase (future work). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Technoeconomic Analysis of High-Temperature Particle Conveyance Components for a 100 MW e Concentrating Solar Power Plant

Levelized costs of electricity (LCOE) approaching the U.S. Department of Energy Solar Energy Technologies Office 2030 goal of 0.05 $/kWh may be achievable using Brayton power cycles that use supercritical CO2 as the working fluid and flowing solid particles with temperatures >700° C as the heat transfer media. The handling and conveyance of bulk solid particles at these temperatures in an insulated environment is a critical technical challenge that must be solved for this approach to be used. A design study was conducted at the National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories in Albuquerque, NM, with the objective of identifying the technical readiness level, performance limits, capital and O&M costs, and expected thermal losses of particle handling and conveyance components in a particle-based CSP plant. Key findings indicated that chutes can be a low-cost option for particle handling but uncertainties in tower costs make it difficult to know whether they can be cost effective in areas above the receiver if tower heights must then be increased. Skips and high temperature particle conveyance technology are available for moving particles up to 640° C. This limits the use of mechanical conveyance above the heat exchanger and suggests vertical integration of the hot storage bin and heat exchanger to facilitate direct gravity fed handling of particles.

14 SOLAR ENERGY↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2020

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While many projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2020, as well as data on "completed" and "withdrawn" projects for five of the ISOs (CAISO, ISO-NE, MISO, NYISO, PJM). We find that the total capacity active in the queues is growing year-over-year, with over 750 GW of generation and an estimated 200 GW of storage capacity as of the end of 2020. Solar (462 GW) accounts for a large – and growing – share of generator capacity in the queues. Substantial wind (209 GW) capacity is also in development, 29% of which is for offshore projects (61 GW). In total, about 680 GW of zero-carbon capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 159 GW of solar hybrids (primarily solar+battery) and 13 GW of wind hybrids are currently active in the queues. However, much of this proposed capacity will not ultimately be built. Among a subset of queues for which data are available, only 24% of the projects seeking connection from 2000 to 2015 have subsequently been built. Completion percentages appear to be declining, and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: in four ISOs, the typical duration from connection request to commercial operation increased from ~1.9 years for projects built in 2000-2009 to ~3.5 years for those built in 2010-2020. There are growing calls for queue reform to reduce cost, lead times, and speculation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2021 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2021, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 1,400 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 90% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (676 GW) and battery storage (~420 GW) are – by far – the fastest growing resources in the queues; combined they accounted for nearly 85% of new capacity entering the queues in 2021. Substantial wind (247 GW) capacity is also seeking interconnection, 31% of which is for offshore projects (77 GW). In total, about 930 GW of zero-carbon generating capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 286 GW of solar hybrids (primarily solar+battery) and 19 GW of wind hybrids are currently active in the queues; nearly half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 23% of the projects seeking connection from 2000 to 2016 have subsequently been built. Completion percentages appear to be declining and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: for the regions with available data, the typical duration from connection request to commercial operation increased from ~2.1 years for projects built in 2000-2010 to ~3.7 years for those built in 2011-2021.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2022, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 2,000 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (947 GW) and battery storage (~680 GW) are – by far – the fastest growing resources in the queues; combined they accounted for over 80% of new capacity entering the queues in 2022. Substantial wind (300 GW) capacity is also seeking interconnection, 38% of which is for offshore projects (113 GW). In total, about 1,250 GW of zero-carbon generating capacity is currently seeking transmission access, as is 82 GW of natural gas capacity. Hybrids projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 457 GW of solar hybrids (primarily solar+battery) and 24 GW of wind hybrids are currently active in the queues; over half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 21% of the projects (and 14% of capacity) seeking connection from 2000 to 2017 have been built as of the end of 2022. Additionally, interconnection wait times are on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to nearly 4 years for those built in 2018-2022 (with a median of 5 years for projects built in 2022).

24 POWER TRANSMISSION AND DISTRIBUTION↗

The 40-kw field test power plant modification and development, phase 2

Progression on the design and development of a 40 KW fuel cell system for on-site installation for providing both thermal and electrical power is reported. Development of the steam reformer fuel processor, power section, inverter, control system, and thermal management and water treatment systems is described.

Source record↗

Power conditioning subsystems for photovoltaic central-station power plants - State-of-the-art and advanced technology

An overview is given of the technical and near-term cost requirements that must be met to develop economically viable power conditioning subsystems (PCS) for large-scale, central photovoltaic power stations. Various commercially available PCS hardware suitable for use in today's central photovoltaic power stations are also surveyed. Federal and industrial activities in the research and development of advanced PCSs that will contribute to the attainment of fully competitive, large-scale photovoltaic power stations are reviewed. The status of the DOE central station PCS program is discussed.

Bulawka, A.↗

A Conceptual Design Study on the Application of Liquid Metal Heat Transfer Technology to the Solar Thermal Power Plant

Alkali metal heat transfer technology was used in the development of conceptual designs for the transport and storage of sensible and latent heat thermal energy in distributed concentrator, solar Stirling power conversion systems at a power level of 15 kWe per unit. Both liquid metal pumped loop and heat pipe thermal transport were considered; system configurations included: (1) an integrated, focal mounted sodium heat pipe solar receiver (HPSR) with latent heat thermal energy storage; (2) a liquid sodium pumped loop with the latent heat storage, Stirling engine-generator, pump and valves located on the back side of the concentrator; and (3) similar pumped loops serving several concentrators with more centralized power conversion and storage. The focus mounted HPSR was most efficient, lightest and lowest in estimated cost. Design confirmation testing indicated satisfactory performance at all angles of inclination of the primary heat pipes to be used in the solar receiver.

Zimmerman, W. F.↗

Comparison of electrochemical and thermal storage for hybrid parabolic dish solar power plants

The economic and operating performance of a parabolic point focus array of solar electricity generators combined with either battery or thermal energy storage are examined. Noting that low-cost, mass-producible power generating units are under development for the point focus of distributed dishes, that Zn-Cl battery tests will begin in 1981 and a 100 kWh Na-S battery in 1983, the state of thermal storage requires acceleration to reach the prototype status of the batteries. Under the assumptions of 10,000 units/yr with an expected 30 yr lifetime, cost comparisons are developed for 10 types of advanced batteries. A 5 MWe plant with full thermal or 80% battery storage discharge when demand occurs in conditions of no insolation is considered, specifically for Fe-Cr redox batteries. A necessity for the doubling of fuel prices from 1980 levels by 1990 is found in order to make the systems with batteries economically competitive.

Steele, H. L.↗

Thermionic topping for central station power plants

This paper describes recent results of the second phase of system analyses on the thermionic topping cycle. A comparison is made among various thermionic heat-exchanger (THX) geometries. Two methods of transferring electric power are considered. In the first, power is provided at relatively high voltages by coupling it out inductively via transformers built into the THX modules. In the second method, converter cells are series-connected within a THX module and external power conditioning is used. The results show that the use of a thermionic topping cycle can result in significant improvements in overall system efficiency.

Britt, E. J.↗

Techno-Economic Analysis of a Concentrating Solar Power Plant Using Redox-Active Metal Oxides as Heat Transfer Fluid and Storage Media

We present results for a one-dimensional quasi-steady-state thermodynamic model developed for a 111.7 MW e concentrating solar power (CSP) system using a redox-active metal oxide as the heat storage media and heat transfer agent integrated with a combined cycle air Brayton power block. In the energy charging and discharging processes, the metal oxide CaAl 0.2 Mn 0.8 O 2.9-δ (CAM28) undergoes a reversible, high temperature redox cycle including an endothermic oxygen-releasing reaction and exothermic oxygen-incorporation reaction. Concentrated solar radiation heats the redox-active oxide particles under partial vacuum to drive the reduction extent deeper for increased energy density at a fixed temperature, thereby increasing storage capacity while limiting the required on sun temperature. Direct counter-current contact of the reduced particles with compressed air from the Brayton compressor releases stored chemical and sensible energy, heating the air to 1,200°C at the turbine inlet while cooling and reoxidizing the particles. The cool oxidized particles recirculate through the solar receiver subsystem for another cycle of heating and reduction (oxygen release). We applied the techno-economic model to 1) size components, 2) examine intraday operation with varying solar insolation, 3) estimate annual performance characteristics over a simulated year, 4) estimate the levelized cost of electricity (LCOE), and 5) perform sensitivity analyses to evaluate factors that affect performance and cost. Simulations use hourly solar radiation data from Barstow, California to assess the performance of a 111.7 MW e system with solar multiples (SMs) varying from 1.2 to 2.4 and storage capacities of 6–14 h. The baseline system with 6 h storage and SM of 1.8 has a capacity factor of 54.2%, an increase from 32.3% capacity factor with no storage, and an average annual energy efficiency of 20.6%. Calculations show a system with an output of 710 GWh e net electricity per year, 12 h storage, and SM of 2.4 to have an installed cost of $329 million, and an LCOE of 5.98 ¢/kWh e . This value meets the U.S. Department of Energy’s SunShot 2020 target of 6.0 ¢/kWh e ( U. S Department of Energy, 2012 ), but falls just shy of the 5.0 ¢/kWh e 2030 CSP target for dispatchable electricity ( U. S Department of Energy, 2017 ). The cost and performance results are minimally sensitive to most design parameters. However, a one-point change in the weighted annual cost of capital from 8 to 7% (better understood as a 12.5% change) translates directly to an 11% decrease (0.66 ¢/kWhe) in the LCOE.

Gorman, Brandon T.↗