Results for “PERMITTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

2014 Annual Industrial Wastewater Reuse Report for the Idaho National Laboratory Site’s Materials and Fuels Complex Industrial Waste Ditch and Industrial Waste Pond

This report describes conditions, as required by the state of Idaho Industrial Wastewater Reuse Permit (WRU-I-0160-01, formerly LA 000160 01), for the wastewater reuse site at the Idaho National Laboratory Site’s Materials and Fuels Complex Industrial Waste Ditch and Industrial Waste Pond from November 1, 2013 through October 31, 2014. The report contains the following information; Facility and system description; Permit required effluent monitoring data and loading rates; Groundwater monitoring data; Status of special compliance conditions; Noncompliance issues; and Discussion of the facility’s environmental impacts During the 2014 reporting year, an estimated 10.11 million gallons of wastewater were discharged to the Industrial Waste Ditch and Pond which is well below the permit limit of 17 million gallons per year. The concentrations of all permit-required analytes in the samples from the down gradient monitoring wells were below the applicable Idaho Department of Environmental Quality’s groundwater quality standard levels.

2014 Annual Industrial Wastewater Reuse Report for↗

Mock Inspection Exercise Materials- Example For Training Purposes Only, Version 3

New Mexico Environmental Department (NMED) is providing statewide training to all entities that are currently or expecting to be covered by a National Pollutant Discharge Elimination System (NPDES) Multi-Sector General Permit (MSGP). The purpose of the training is to educate facility personnel on permit requirements and methods to stay compliant with a permit. NMED has invited personnel from Los Alamos National Laboratory Environmental Protection & Compliance – Environmental Compliance Programs to assist with the statewide training by developing training materials and assist NMED in presenting the training sessions. The attached map mock-up and photos are intended as training materials for a mock MSGP routine facility inspection. In this exercise, participants will use the map and photos for a simulated field walk-down of a fictitious facility, the XYZ Widget Company’s Production Complex. Participants will learn elements of storm water flow paths, how to identify potential storm water issues, and document their findings in order to meet permit requirements.

54 ENVIRONMENTAL SCIENCES↗

MSGP Stormwater Pollution Prevention Plan for: TA-60-01 Heavy Equipment Shop, Triad National Security, LLC (Triad), Los Alamos National Laboratory, January 2019, Revision 0

This Stormwater Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the United States Environmental Protection Agency (EPA) National Pollutant Discharge Elimination System (NPDES) Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity (MSGP) (U.S. EPA, June 2015) issued by EPA, and using the industry specific permit requirements for Sector P – Land Transportation & Warehousing as a guide. The applicable stormwater discharge permit is EPA General Permit Tracing Number NMR050013 [Triad National Security, LLC (Triad)]. This SWPPP applies to discharges of stormwater from the operational areas of the TA-60-01 Heavy Equipment Shop at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Triad. Throughout this document, the term “facility” refers to the TA-60-01 Heavy Equipment Shop (HES). The current MSGP expires at midnight on June 4, 2020.

54 ENVIRONMENTAL SCIENCES↗

MSGP Stormwater Pollution Prevention Plan for: TA-03-22 Power and Steam Plant, Triad National Security, LLC (Triad), Los Alamos National Laboratory, January 2019, Revision 0

This Stormwater Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the United States Environmental Protection Agency (EPA) National Pollutant Discharge Elimination System (NPDES) Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity (MSGP) (U.S. EPA, June 2015) issued by EPA, and using the industry specific permit requirements for Sector O-Steam Electric Generating Facilities as a guide. The applicable stormwater discharge permit is EPA General Permit Tracing Number NMR050013 [Triad National Security, LLC (Triad)]. This SWPPP applies to discharges of stormwater from the operational areas of the TA-03-22 Power and Steam Plant at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Triad. Throughout this document, the term “facility” refers to the TA-03-22 Power and Steam Plant (PSP). The current MSGP expires at midnight on June 4, 2020.

54 ENVIRONMENTAL SCIENCES↗

MSGP Stormwater Pollution Prevention Plan for: TA-03-38 Carpentry and Metal Fabrication Shops, Triad National Security, LLC (Triad), Los Alamos National Laboratory, January 2019, Revision 0

This Stormwater Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the United States Environmental Protection Agency (EPA) National Pollutant Discharge Elimination System (NPDES) Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity (MSGP) (U.S. EPA, June 2015) issued by EPA, and using the industry specific permit requirements for Sector A-Timber Products and Sector AA-Fabricated Metal Products as a guide. The applicable stormwater discharge permit is EPA General Permit Tracing Number NMR050013 [Triad National Security, LLC (Triad)]. This SWPPP applies to discharges of stormwater from the operational areas of the TA-03-38 Carpentry and Metal Fabrication Shops (38 Shops) at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Triad. Throughout this document, the term “facility” refers to the TA-03-38 Carpentry Shop (CS) and/or the Metal Fabrication Shop (MFS). The current MSGP expires at midnight on June 4, 2020.

54 ENVIRONMENTAL SCIENCES↗

MSGP Stormwater Pollution Prevention Plan TA-60 Material Recycling Facility

This Stormwater Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the United States Environmental Protection Agency (EPA) National Pollutant Discharge Elimination System (NPDES) Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity (MSGP) (U.S. EPA, June 2015) issued by EPA, and using the industry specific permit requirements for Sector N: Scrap Recycling and Waste Recycling Facilities as a guide. The applicable stormwater discharge permit is EPA General Permit Tracing Number NMR050013 [Triad National Security, LLC (Triad)]. This SWPPP applies to discharges of stormwater from the operational areas of the TA- 60 Material Recycling Facility at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Triad. Throughout this document, the term “facility” refers to the TA-60 Material Recycling Facility. The current MSGP expires at midnight on June 4, 2020.

54 ENVIRONMENTAL SCIENCES↗

MSGP Stormwater Pollution Prevention Plan TA-60 Roads and Grounds Facility, Sigma Mesa Staging Areas, and Asphalt Batch Plant

This Stormwater Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the United States Environmental Protection Agency (EPA) National Pollutant Discharge Elimination System (NPDES) Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity (MSGP) (U.S. EPA, June 2015) issued by EPA, and using the industry specific permit requirements for Sector P: Land Transportation and Warehousing and Sector D: Asphalt Paving and Roofing Material and Lubricant Manufacturing as a guides. The applicable stormwater discharge permit is EPA General Permit Tracing Number NMR050013 [Triad National Security, LLC (Triad)]. This SWPPP applies to discharges of stormwater from the operational areas of the TA-60 Roads and Grounds Facility, Sigma Mesa Staging Areas, and Asphalt Batch Plant at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Triad. Throughout this document, the term “facilities” refers to the TA-60 Roads and Grounds Facility, Sigma Mesa Staging Areas, and Asphalt Batch Plant. The current MSGP expires at midnight on June 4, 2020.

54 ENVIRONMENTAL SCIENCES↗

Submittal of Solid Waste Management Units and Areas of Concern Annual Long-Term Monitoring and Maintenance Report for Calendar Year 2017

This SWMU and AOC Annual Long-Term Monitoring and Maintenance (LTMM) Report for Calendar Year 2017 (Annual LTMM Report) details the measures performed for 21 Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) at Sandia National Laboratories/New Mexico (SNL/NM) in accordance with the requirements of the “Long-Term Monitoring and Maintenance [LTMM] Plan for SWMUs and AOCs Granted Corrective Action Complete with Controls” in Attachment M of the Resource Conservation and Recovery Act Facility Operating Permit (Permit), which took effect February 26, 2015. This Annual LTMM Report does not present the measures for SWMU 76, Mixed Waste Landfill (MWL), as the applicable MWL reporting adheres to the approved MWL LTMM Plan, Section 4.8.1 and requires a separate annual report which will be submitted to the New Mexico Environment Department by June 30, 2018. Measures at these SWMUs and AOCs include surveillance of site conditions and maintenance of institutional controls. Conditions requiring maintenance or repair activities were identified at three of the inspected SWMUs and AOCs (SWMUs 45, 46, and 87) during the Permit-required annual site inspections. One SWMU identification sign located at SWMU 46 and two identification signs located at SWMU 87 were replaced due to weathered lettering. Evidence of erosion was observed at SWMU 45 during the annual site inspection; erosion controls will be implemented as needed to prevent the inadvertent exposure of hazardous wastes or hazardous waste constituents. SWMU 45 is located on the sloped border of Tijeras Arroyo south of Technical Area-IV. The erosion controls planned for the Tijeras Arroyo Escarpment will address not only SWMU 45, but also SWMUs 46 and 229 as a best management practice. SNL/NM personnel plan to complete this work in calendar year 2018. The status and progress of this project will be reported in the 2018 Annual SWMUs and AOCs Annual LTMM Report for Calendar Year 2018 to be submitted to the New Mexico Environment Department on March 31, 2019, as required by the Permit. Based upon the inspections performed and site conditions observed, the administrative and physical institutional controls in place at the SWMUs and AOCs are effectively providing continued protection of human health and the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Storm Water Pollution Prevention Plan TA-60 Material Recycling Facility

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. The applicable stormwater discharge permit is EPA General Permit Registration Number NMR053915 (Los Alamos National Security (LANS) (U.S. EPA, June 2015).

54 ENVIRONMENTAL SCIENCES↗

Storm Water Pollution Prevention Plan TA-60 Roads and Grounds Facility and Associated Sigma Mesa Staging Area

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. The applicable stormwater discharge permit is EPA General Permit Registration Number NMR053915 (Los Alamos National Security (LANS) (U.S. EPA, June 2015).

54 ENVIRONMENTAL SCIENCES↗

Storm Water Pollution Prevention Plan TA-60 Asphalt Batch Plant

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. The applicable stormwater discharge permit is EPA General Permit Registration Number NMR053915 (Los Alamos National Security (LANS) (U.S. EPA, June 2015).

54 ENVIRONMENTAL SCIENCES↗

Y-12 Groundwater Protection Program CY 2018 Triennial Report of the Monitoring Well Inspection and Maintenance Program Y-12 National Security Complex Oak Ridge, Tennessee

This document is the Triennial Report for the Well Inspection and Maintenance Program of the Y-12 National Security Complex (Y-12) Groundwater Protection Program (GWPP) at U.S. Department of Energy (DOE) Y-12 and includes monitoring well inspections and well maintenance activities performed at Y-12 during calendar years (CYs) 2016 through 2018. This report formally documents well inspections completed by GWPP on active and inactive groundwater monitoring wells that are part of the Y-12 monitoring network and includes well inspections performed by URS|CH2M Oak Ridge, L.L.C. (UCOR), which administers the DOE Office of Environmental Management Y-12 Water Resources Restoration Program (WRRP). The WRRP includes wells that are utilized for the regulatory monitoring of Resource Conservation and Recovery Act (RCRA) post-closure permits and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Remedial Effectiveness and Records of Decision and Solid Waste Disposal Facility (Landfill) permits and includes monitoring wells located at the CERCLA Environmental Management Waste Management Facility. Beginning in 2018, UCOR terminated three of their RCRA post-closure permits and is monitoring the former RCRA-permitted facilities under CERCLA. Consequently, the number of monitoring wells in the Y-12 network that receive UCOR-performed inspections has decreased significantly.

54 ENVIRONMENTAL SCIENCES↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Southeast Carbon Sequestration Partnership (SECARB) Phase III Anthropogenic Test at Citronelle Field, Mobile Co., AL Surface and Shallow Subsurface Monitoring

The Southeast Carbon Sequestration Partnership Phase III Anthropogenic Test at Citronelle Field is one of the United States’ largest demonstrations of CO 2 capture, transportation, injection, storage and monitoring using CO 2 derived from a coal-fired electric generating unit. This report summarizes the background and initial injection phase groundwater and soil flux monitoring results. The purpose of the groundwater monitoring program, as prescribed in the Underground Injection Control (UIC) permits is to assure that the project’s activities do not harm Underground Sources of Drinking Water (USDWs). In particular, the objective of the program is to monitor for the release of injected CO2 into groundwater aquifers at the project site. Three shallow USDW monitoring wells were installed as part of the groundwater monitoring program. In addition, a water supply well located near the project’s deep characterization well was utilized for monitoring. Seventeen metals, general chemistry and field parameters (e.g. pH, specific conductance, turbidity) were sampled three times prior to injection and quarterly during the injection period to date. Changes in groundwater geochemistry potentially attributable to a release of carbon dioxide into the USDW from the injection activities are decreasing pH and increasing TIC. The change in pH may also accompany the mobilization of certain metals within the groundwater, but the changes are likely site-specific, based on the natural aquifer mineralogy (Wilkin and Diguilio, 2010). At this time, no downward trends for pH and increasing trends for TIC have been statistically determined in the monitor wells. Valid detections exceeding both the UIC discharge limit and the range of background concentrations observed as of the N=11 event include: Exceedance of the UIC permit discharge limit of manganese at D-9-7 MW-2S and D-9-9 MW-1, and exceedance of the UIC permit discharge limit of iron at D-9-9 MW-1. In addition, a statistically significant increase of barium and manganese has been observed at D-9-9 MW-1. However, Additional lines of evidence (namely, expected shifts in TIC or pH, per the research cited above) to interpret the cause (e.g., potential carbon dioxide influence) of the statistically determined exceedances and/or increases are absent at this time. Quarterly groundwater sampling and analysis will continue throughout the project. The UIC permit requires that soil CO 2 flux shall be monitored at the land surface at the injection site and at nearby locations. Twelve locations were chosen for surveys including a mix of near wellbore and offset locations. To date, 24 surveys have taken place with 12 occurring prior to the onset of injection operations in August 2012. Soil CO 2 flux appears to positively covary with soil temperature. A notably high soil CO 2 flux value (21 µmol/m 2 /sec) was observed from the D-9-9 #2 chamber location during sampling event #24 (9/24/2014). As a result of this finding, the frequency of soil CO 2 flux monitoring events will be increased to twice-monthly until this anomaly can be confirmed or determined to be an outlier. Soil CO 2 flux monitoring will continue for the duration of the project.

01 COAL, LIGNITE, AND PEAT↗

SECARB-USA: Needs Assessment Framework for Storage Complexes (Task 2.1.b)

A team of SECARB storage experts examined 63 formations at 39 sites that were selected to represent the range of diversity of newly assessed, as well as well-advanced, storage prospects in the SECARB region. We inventoried the data needs triggered by the requirements to obtain a Class VI UIC storage permit, the data needs that results from the requirement to create geocellular fluid flow models to support that permit, and by pragmatic and best practice inputs such as public acceptance, regulatory readiness, and pore space leasing. We anchored both the needs inventory and the processes for and cost of meeting the needs with data from 9 sites in in the SECARB area that have advanced far in characterization. Results show that the total cost of characterization prior to obtaining a permit is convergent, because the permit and modeling requirements drive projects to obtain the same types of data for all cases. The high cost data that control cost are 1) drilling, coring, core-testing, logging, sampling and testing a characterization well and 2) collection of a 3-D seismic survey to map reservoir and confining system properties over the area of the plume or the area of elevated pressure. In 5 of our case study sites we determined that one or both of these costs could be avoided because the needs are met by available data.

54 ENVIRONMENTAL SCIENCES↗

PILOT PEAT-BED TREATMENT SYSTEM FOR NPDES OUTFALL H-12

A National Pollutant Discharge Elimination System (NPDES) Permit was issued to the Savannah River Site (SRS) by the South Carolina Department of Health and Environmental Control (SCDHEC) and became effective on December 1, 2003. The new permit contained revised limits for copper and zinc derived by adjusting the South Carolina aquatic life water quality standards in accordance with dissolved metals criteria. The new copper and zinc limits are very low and may not be met consistently at Outfall H-12. The outfall has periodically exceeded the new 6 {micro}g/l (0.006 mg/L) monthly average limit and the 8 {micro}g/l (0.008 mg/L) maximum limit for copper and recently has begun exceeding the 100 {micro}g/l (0.100 mg/L) limit for zinc. The compliance date for Outfall H-12 is November 1, 2008. A study was conducted on this outfall and other outfalls to evaluate possible alternatives for meeting the new permit limits (Shipman and Bugher 2004). The study team recommended construction of a peat bed for treatment of the Outfall H-12 effluent. This recommendation was repeated by a second alternatives study team in 2007 (WSRC 2007). A bench-scale laboratory study demonstrated the feasibility of peat-bed treatment for Outfall H-12 effluent, with the peat demonstrating excellent removal of copper (Nelson and Specht 2005). An additional study was performed in 2006 and early 2007 using vertical-flow peat columns to investigate the influence of water retention time (contact time) on the removal of copper and zinc from the water (Nelson 2007c). Analytical results indicated that copper removal was very high at each of the three retention times tested, ranging from 99.6% removal at five and three hours to 98.8% removal at one hour. Effluent copper levels from these studies were much lower than the new compliance limit for the outfall. Most divalent metals, including zinc, were removed to below their normal reporting detection limit. The H-Area Material Disposition organization requested a larger-scale study to investigate key design and operation parameters/issues, such as the possibility of rapid plugging of the piping or clogging of the peat bed, the effectiveness of the treatment, hydraulic conductivity, etc. The resulting pilot-scale facility was constructed adjacent to Outfall H-12 with SCDHEC approval (Mullinax 2007). The pilot-scale study was performed by the Savannah River National Laboratory's (SRNL) Environmental Science and Biotechnology Directorate personnel. Since the construction and operation of the pilot-scale peat bed facility, however, a new strategy for achieving compliance of Outfall H-12 effluent with the new permit limits has been selected. This new strategy incorporates a variety of efforts including source reduction, recalculation of limits using an aquatic species that is indigenous to the area instead of a standard species, and dissolved organic carbon addition to reduce copper toxicity. This report documents the construction and operation of the pilot-scale treatment system, the results obtained, and recommendations on the usefulness of this technology for Outfall H-12 or other outfalls at SRS.

01 COAL, LIGNITE, AND PEAT↗

Annual Site Environmental Report: 2006

This report provides information about environmental programs during the calendar year (CY) of 2006 at the Stanford Linear Accelerator Center (SLAC), Menlo Park, California. Activities that span the calendar year; i.e., stormwater monitoring covering the winter season of 2006/2007 (October 2006 through May 2007), are also included. Production of an annual site environmental report (ASER) is a requirement established by the United States Department of Energy (DOE) for all management and operating (M&O) contractors throughout the DOE complex. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. SLAC continued to follow the path to self-declare an environmental management system under DOE Order 450.1, 'Environmental Protection Program' and effectively applied environmental management in meeting the site's integrated safety and environmental management system goals. For normal daily activities, all SLAC managers and supervisors are responsible for ensuring that proper procedures are followed so that Worker safety and health are protected; The environment is protected; and Compliance is ensured. Throughout 2006, SLAC focused on these activities through the SLAC management systems. These systems were also the way SLAC approached implementing 'greening of the government' initiatives such as Executive Order 13148. The management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. The SLAC Office of Assurance was created during 2006 in response to DOE Order 226.1. During 2006, there were no reportable releases to the environment from SLAC operations, and there were no Notice of Violations issued to SLAC from any of the regulatory agencies that oversee SLAC. In addition, many improvements in waste minimization, recycling, stormwater drain system, groundwater restoration, and SLAC's chemical management system (CMS) were continued during 2006 to better manage chemical use. Program-specific details are discussed below. SLAC operates its air quality management program in compliance with its established permit conditions. The Bay Area Air Quality Management District (BAAQMD) did not conduct a facility inspection of SLAC during 2006, though it did visit the site on four different occasions. The BAAQMD did compliment SLAC for the overall configuration of SLAC's gasoline dispensing facility and of SLAC's asbestos/demolition notification program during two of the visits. DOE awarded SLAC the 2006 Best in Class for Pollution Prevention and Environmental Stewardship Accomplishment in recognition of SLAC's CMS program which manages the procurement and use of chemicals. As an example of the efficiency of the CMS, SLAC reviewed its use of gases and associated tanks and phased out numerous gas tanks that were no longer needed or were not acceptable for long-term storage, in turn, reducing SLAC's on-site chemical inventory. As part of SLAC's waste minimization and management efforts, more than one thousand tons of municipal solid waste was recycled by SLAC during 2006. SLAC operates its industrial and sanitary wastewater management program in compliance with established permit conditions. During 2006, SLAC obtained a new facility-wide wastewater discharge permit which replaced four separate permits that were previously issued to SLAC. In 2006, no radiological incidents occurred that increased radiation levels or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. SLAC has implemented programs and systems to ensure compliance with all radiological requirements related to the environment. The Environmental Restoration Program continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil. SLAC is regulated under a site cleanup requirements order (board order) issued by the California Regional Water Quality Control Board, San Francisco Bay Region (RWQCB) for the investigation and remediation of impacted soil and groundwater at SLAC. The new board order lists specific tasks and deadlines for groundwater and soil remedial investigation. All 2006 submittals to the board were completed on time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EBR-II Primary Tank Wash-Water Alternatives Evaluation

The EBR-II reactor at Idaho National Laboratory was a liquid sodium metal cooled reactor that operated for 30 years. It was shut down in 1994; the fuel was removed by 1996; and the bulk of sodium metal coolant was removed from the reactor by 2001. Approximately 1100 kg of residual sodium remained in the primary system after draining the bulk sodium. To stabilize the remaining sodium, both the primary and secondary systems were treated with a purge of moist carbon dioxide. Most of the residual sodium reacted with the carbon dioxide and water vapor to form a passivation layer of primarily sodium bicarbonate. The passivation treatment was stopped in 2005 and the primary system is maintained under a blanket of dry carbon dioxide. Approximately 670 kg of sodium metal remains in the primary system in locations that were inaccessible to passivation treatment or in pools of sodium that were too deep for complete penetration of the passivation treatment. The EBR-II reactor was permitted by the Idaho Department of Environmental Quality (DEQ) in 2002 under a RCRA permit that requires removal of all remaining sodium in the primary and secondary systems by 2022. The proposed baseline closure method would remove the large components from the primary tank, fill the primary system with water, react the remaining sodium with the water and dissolve the reaction products in the wash water. This method would generate a minimum of 100,000 gallons of caustic, liquid, low level radioactive, hazardous waste water that must be disposed of in a permitted facility. On February 19-20, 2008, a workshop was held in Idaho Falls, Idaho, to look at alternatives that could meet the RCRA permit clean closure requirements and minimize the quantity of hazardous waste generated by the cleanup process. The workshop convened a panel of national and international sodium cleanup specialists, subject matter experts from the INL, and the EBR-II Wash Water Project team that organized the workshop. The workshop was conducted by a trained facilitator using Value Engineering techniques to elicit the most technically sound solutions from the workshop participants. The path forward includes developing the OBA into a well engineered solution for achieving RCRA clean closure of the EBR-II Primary Reactor Tank system. Several high level tasks are also part of the path forward such as reassigning responsibility of the cleanup project to a dedicated project team that is funded by the DOE Office of Environmental Management, and making it a priority so that adequate funding is available to complete the project. Based on the experience of the sodium cleanup specialists, negotiations with the DEQ will be necessary to determine a risk-based de minimus quantity for acceptable amount of sodium that can be left in the reactor systems after cleanup has been completed.

42 ENGINEERING↗