Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Implementation and Operation of Power Flow Control Solutions for Transmission Systems

Power-flow controls (PFCs) technologies provide a suite of alternatives to more-efficiently direct the flow of power on the grid, improving flexibility and enabling the grid to be more responsive and resilient. PFCs can be used in many cases to mitigate overloads and consequently defer the installation of grid-expansion projects. They can also be suitable options in situations where new transmission lines cannot be built because of environmental constraints, land use, or other types of restrictions. Other uses include mitigation of loop or unintended flows, forcing of contractual or scheduled flows, reduction of congestion, and mitigation solutions during large maintenance or construction projects. While many studies have demonstrated the potential economic benefits of PFC for different types of applications, the implementation implications of using multiple PFCs for system operation and reliability have not been analyzed in detail. The lack of information and practical experience on these aspects hinders adoption of this technology. One use case would be that multiple PFCs are required to coordinate congestion management. In such cases, multiple PFCs are deployed in a meshed power system to control power flows across a wide area. The challenges are associated with PFC interaction—namely, the self and mutual power-flow sensitivity of each PFC, which must be accounted for in the calculation of the respective operating setpoints. This report analyzes implementation and operation that must be considered in evaluating transmission solutions using PFCs. The report first analyzes attributes with which PFC-based solutions should comply, based on the objective and characteristics of each particular use case. It then describes different approaches for coordinated control of multiple PFC devices for different applications, including options to avoid adverse interactions and reduce risks due to inappropriate coordination. Control and operation are illustrated through case studies performed on both generic and actual power system models. This report provides insights for transmission planners and operation engineers about the implementation of PFC-based transmission solutions; consequently, it will help them make informed decisions about the adoption of the technology.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impacts of Alternative Operations and Renewable Energy Deployment on Columbia River Hydropower

The Columbia River Treaty Tribes in the Pacific Northwest - the Nez Perce, Umatilla, Warm Springs, and Yakama - hold treaty-reserved fishing rights for the Columbia River, one of the world's most productive salmon rivers and a critical resource for these tribes. However, the tribes have expressed that current operating regimes of hydropower dams throughout the Columbia River Basin (CRB) do not fully account for tribal fishing rights and have negatively impacted fish populations. Four tribes acting together through the Columbia River Inter-Tribal Fish Commission (CRITFC)'s 2022 Energy Vision stated that current power system models often do not fully account for the many constraints faced by hydropower facilities in the CRB. As the deployment of variable renewable energy (VRE) like solar and wind continues to increase, power system flexibility will become increasingly important. As a result, there is a growing need to better understand the true capabilities of the hydropower generation fleet while accurately accounting for ecological constraints (Northwest Power and Conservation Council 2022). Understanding hydropower's role in a future grid with a higher share of VRE can inform water resources planning to address ecological needs. The goal of this study is to examine the impacts of alternative hydropower operation rules and weather variability on hydropower generation and grid operations in VRE and transmission infrastructure deployment scenarios. The study evaluates how hydropower scheduling practices can reduce ecological impacts to the region's salmon populations. More specifically, the study examines the impact of today's dam water release rules (called "adjusted base water rules" in this study) and new, ecologically informed water release rules (called "ecosystem water rules" in this study) on two VRE scenarios (current renewable energy levels and higher renewable energy levels) using six weather years for each scenario (2008-2013). CRITFC developed the ecosystem water rules, which capture a portion of the changes they recommend for CRB hydropower operations. These analyses use a water resource planning model (OASIS) and a production cost model (PLEXOS) to simulate CRB reservoir cascade and Western Interconnection power grid operation.

13 HYDRO ENERGY↗

Operational Parameter Database for Molten Salt Thermal Energy Storage Tank Modeling

The second generation of concentrated solar power (CSP) plants is characterized by the use of a central receiver (either cavity or external), two molten nitrate salt tanks (60 wt.% NaNO 3 and 40 wt.% KNO 3 ), and a steam Rankine power-generation cycle connected through a primary heat exchanger. Molten salt thermal energy storage (TES) tanks have been widely deployed in commercial CSP plants worldwide and have been essential for increasing plant dispatchability and capacity factor, while also reducing the levelized cost of electricity (LCOE). These systems enable energy storage at the gigawatt-hour scale, typically providing 6 to 17 hours of storage duration. Despite being a commercial technology, the multiple failures observed after only a few months or years of operation in plants around the world demonstrate the technology's relative infancy and highlight the need for further research to improve its reliability. The National Laboratory of the Rockies (NLR), in collaboration with industry partners and academic and research institutions, has been leading multiple projects funded by the U.S. Department of Energy (DOE). These projects focus on addressing molten salt tank failures by improving tank design and welding fabrication practices, evaluating new alloys and weld fillers, and providing guidelines for tank commissioning and safe operation. In particular, this report presents modeling results on the effect of key tank operation parameters during 60 minutes of operation, including the mass flow rate and temperature of the salt inflow, tank salt inventory temperature, and inventory level for a representative molten salt tank design. These results form a database of tank operation behaviors that captures the effects of each specific parameter during charging, charging/discharging, and discharging processes.

14 SOLAR ENERGY↗

Enhanced Component Performance Study: Motor-Operated Valves 1998-2024

This report presents an enhanced performance evaluation of motor-operated valves (MOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2024 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MOV failure modes considered are fail to open or close (FTOC), fail to operate or control (FTOP), and spurious operation (SO). The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following increasing trend was identified for MOVs for the most recent 10-year period: • Low-demand MOV frequency of FTOC demands (demands per reactor year). The following decreasing trends were identified for MOVs for the most recent 10-year period: • Low-demand MOV FTOC failure probability • High-demand MOV SO failure rate • Low-demand MOV frequency of FTOC events (failures per reactor year) • High-demand MOV frequency of SO events (failures per reactor year).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Operating Experience Data Analysis for Digital Instrumentation and Control System Reliability and Risk Assessment in Nuclear Power Plants

The implementation of advanced digital instrumentation and control (DI&C) systems in U.S. nuclear power plants (NPPs) can bring significant advancements in reliability, monitoring, and control capabilities. However, these systems also introduce new challenges, particularly in assessing risks such as common-cause failures (CCFs) and establishing robust reliability estimates for DI&C components. Addressing these challenges is critical for ensuring the safe and efficient operation of NPPs. Recently, Idaho National Laboratory was tasked by the U.S. Nuclear Regulatory Commission (NRC) to conduct a DI&C reliability study using operating experience data from the nuclear industry. The two operating experience data sources for the study are the Institute of Nuclear Power Operations’ Industry Reporting and Information System (IRIS) and the NRC’s Licensee Event Report database which is hosted at Idaho National Laboratory at https://lersearch.inl.gov/LERSearchCriteria.aspx. This report provides a comprehensive examination of DI&C systems, including their architecture, operational advantages, and associated challenges. It reviews existing industry DI&C studies and failure mode taxonomies, along with reliability data from various industries. Through a detailed analysis of these databases, the study provides insights into DI&C system performance. Considerations should be given to incorporate DI&C failure data into the NRC's Integrated Data Collection and Coding System and updating the Reliability and Availability Data System to support ongoing DI&C reliability studies. Recommendations are also provided for modeling DI&C reliability and CCF in probabilistic risk assessment, thereby supporting risk-informed decision-making and enhancing the reliability and safety of NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Optimal Operator Training Reference Models for Human-in-the-loop Systems

The human operator is an integral part of a stable and safe power system. While there is increasing attention paid to automation improvements, the importance of understanding and training human operators may be understated. This paper discusses a project to enhance operator training programs by evaluating human performance relative to a reference operator model identified using optimal control theory. Along with establishing a simple computer-based operator workstation for future training purpose, this paper describes the optimal control response design methodology for a human-in-the-loop power system experiment. The overall system model is presented. An optimal controller synthesis methodology is applied to the model system and the optimal controller is designed. The performance of the optimal controller is then compared to human subject performance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Simulation Results of a Thermal Power Dispatch System from a Generic Pressurized Water Reactor in Normal and Abnormal Operating Conditions

Amid economic pressures in the U.S. electricity market, nuclear utilities are exploring new revenue streams, including hydrogen production. A generic pressurized water reactor simulator was modified to incorporate a novel design for a TPD system coupled to a hydrogen production plant. Standard malfunctions were included in the simulation design, including steam line breaks at various system locations and flow interruptions in the hydrogen plant due to multiple faults, reflecting anticipated operational challenges. It is imperative that the TPD system operation has a minimal effect on the reactor power, primary coolant system, and turbine system operation and performance. Due to the specific design and application of this TPD system, with the proposed turbine control system changes, the overall impact on the existing plant systems is low. Normal TPD operating scenarios resulted in minor effects on the existing plant systems: reactor power changes by at most 0.2%, and gross generator output changes by 20.5 MWe from 100 MWt of TPD. The most severe malfunction analyzed in this work is a full TPD steam line break downstream of the extraction location, which results in an increase in reactor power of about 0.5%. The gross generator output decreases by 36 MWe, a total decrease of 60 MWe from the full power steady state (FPSS) condition. These results indicate that an industrial hydrogen production plant could be coupled thermally to a nuclear power plant with limited effects on the existing system operation and safety.

08 HYDROGEN↗

High-Performance Computing for Real-Time Grid Analysis and Operation

Power grids worldwide are undergoing an unprecedented transition as a result of grid evolution meeting information revolution. The grid evolution is largely driven by the desire for green energy. Emerging grid technologies such as renewable generation, smart loads, plug-in hybrid vehicles, and distributed generation provide opportunities to generate energy from green sources and to manage energy use for better system efficiency. With utility companies actively deploying these technologies, a high level of penetration of these new technologies is expected in the next 5-10 years, bringing in a level of intermittency, uncertainties, and complexity that the grid did not see nor design for. On the other hand, the information infrastructure in the power grid is being revolutionized with large-scale deployment of sensors and meters in both the transmission and distribution networks. The future grid will have two-way flows of both electrons and information. The challenge is how to take advantage of the information revolution: pull the large amount of data in, process it in real time, and put information out to manage grid evolution. Without addressing this challenge, the opportunities in grid evolution will remain unfulfilled. This transition poses grand challenges in grid modeling, simulation, and information presentation. The computational complexity of underlying power grid modeling and simulation will significantly increase in the next decade due to an increased model size and a decreased time window allowed to compute model solutions. High-performance computing is essential to enable this transition. The essential technical barrier is to vastly increase the computational speed so operation response time can be reduced from minutes to seconds and sub-seconds. The speed at which key functions such as state estimation and contingency analysis are conducted (typically every 3-5 minutes) needs to be dramatically increased so that the analysis of contingencies is both comprehensive and real time. An even bigger challenge is how to incorporate dynamic information into real-time grid operation. Today’s online grid operation is based on a static grid model and can only provide a static snapshot of current system operation status, while dynamic analysis is conducted offline because of low computational efficiency. The offline analysis uses a worst-case scenario to determine transmission limits, resulting in under-utilization of grid assets. This conservative approach does not necessarily lead to reliability. Many times, actual power grid scenarios are not studied, and they will push the grid over the edge and resulting in outages and blackouts. This chapter addresses the HPC needs in power grid analysis and operations. Example applications such as state estimation and contingency analysis are given to demonstrate the value of HPC in power grid applications. Future research directions are suggested for high performance computing applications in power grids to improve the transparency, efficiency, and reliability of power grids.

Contingency Analysis↗

Potential of Wind Power to Provide Flexible Ramping Products and Operating Reserve: Preprint

With increasing penetration levels of variable renewable energy sources, such as wind and solar, electric power systems need flexible resources that can provide fast-response ramping capabilities to counter the variability and uncertainty of renewable generation. Although the California Independent System Operator and Midcontinent System Operator have lauched ramp products, determining how wind power can participate using their flexible ramping models is still largely unclear. This paper proposes a security-constrained unit commitment (SCUC) model considering a flexible ramping constraint representing the system's flexible ramping requirements that account for the net load probabilistic forecast uncertainty. Through this explicit modeling of the uncertainty, the true cost of the flexible ramp service can be determined after solving the SCUC problem. In addition, the potential of wind power to provide operating reserves is analyzed. Numerical case studies demonstrate that with wind power providing both flexible ramping products and operating reserve, the system operating costs and ramp shortages will be reduced significantly.

17 WIND ENERGY↗

How Wrong Can the Operational AEP Uncertainty Estimate Be When We Ignore the Correlations Between the Uncertainty Components?

Calculations of wind farm annual energy production (AEP) on operational data are essential for a variety of financial transactions during the life of wind plants. The AEP estimate is associated with an uncertainty value, which is calculated by combining contributions connected to on-site measurements, long-term reference measurements, losses, regression, windiness adjustment, and wind resource interannual variability. Although very limited documentation on the topic exists, the conventional approach currently used by the wind energy community to assess the uncertainty connected to the operational AEP estimate assume that the different uncertainty components are uncorrelated and therefore calculates the overall uncertainty with a sum of squares approach. In this analysis, we contrast the traditional technique to estimate the overall AEP uncertainty by ignoring the correlation between its different components with a novel Monte Carlo based approach, which can instead take into account the correlation between different uncertainty categories. We consider monthly operational data from 472 wind farms from the Energy Information Administration (EIA) 923 database to assess the difference between the two approaches. Long-term wind speed data needed for the AEP assessment are taken from three reanalysis products: the Modern-Era Retrospective analysis for Research and Applications v2 (MERRA-2), the European Reanalysis Interim (ERA-interim), and the National Centers for Environmental Prediction v2 (NCEP-2). The results of the Monte Carlo approach show that three pairs of AEP uncertainty components do show a statistically significant correlation: the uncertainty connected with wind resource inter-annual variability is positively correlated with the one related to the windiness correction and negatively correlated with the one due to the regression, and the wind measurement uncertainty is positively correlated with the regression uncertainty. All these correlations, which are found between uncertainty components which are not only part of an operational analysis, but also of a wind resource assessment, are currently ignored in the conventional techniques used as industry standard. We further investigate the causes of these correlations, in terms of common dependencies of different uncertainty components on wind resource variability, number of data points, and quality of the regression between wind speed and energy production data. Next, we quantify the error in the current industry standard technique, in terms of the percentage difference in total uncertainty calculated with the two considered approaches, for all the analyzed wind farms. We find a mean absolute percentage difference of about 6%, with the largest differences being greater than 20%. The data clearly confirm that ignoring the actual correlation between the uncertainty components can lead to large errors in the assessment of the operational AEP uncertainty, and the proposed Monte Carlo approach should be preferred.

Monte Carlo↗

Design of a Non-PLL Grid-Forming Inverter for Smooth Microgrid Transition Operation: Preprint

This paper develops a non-phase-locked loop (PLL) grid-connected inverter that can improve the microgrid’s transients during transition operation. By emulating the operation of a synchronous machine, the inverter generates its own voltage and frequency during startup, synchronizes and connects to the grid, then operates in reactive power mode (grid-feeding) with self-generated voltage and frequency, and switches to voltage-frequency mode to establish system voltage and frequency (grid-forming) when the microgrid disconnects from the main grid, and vice versa. To enable fast synchronization, active synchronization control is adopted both during inverter startup and microgrid reconnection operation. The simulation results show that the developed non-PLL grid-connected inverter works effectively to synchronize the inverter and microgrid to the grid and avoids a phase jump during microgrid transition operation. Thus, the microgrid’s transients are significantly improved with the proposed control technique.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Enhancing the Operational Resilience of Advanced Reactors with Digital Twins by Recurrent Neural Networks

Because of a lack of operation data during abnormal and accident scenarios, along with the existence of uncertainty in the evaluation model for transient and accident analysis, the established abnormal and emergency operating procedures can be biased in characterizing the reactor states and ensuring operational resilience. To improve state awareness and ensure operational flexibility for minimizing effects on the system due to anomaly, digital twin (DT) technology is suggested to support operator's decision-making by effectively extracting and using knowledge of the current and future plant states from the knowledge base. To demonstrate DT's capability for recovering the complete states of reactors and for predicting the future reactor behaviors, this paper develops and assesses both the diagnosis and prognosis DTs in a nearly autonomous management and control system for an Experimental Breeder Reactor-II simulator during different loss-of-flow scenarios.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Cybersecurity for System Operators

SERC's System Operator Conference is an annual education and sustainment training for electric power system operators across the southeastern United States. In recognition of the growing importance of cybersecurity for energy systems, a block of instruction on cybersecurity concepts was included for this year's conferences. This presentation provides an overview of the need for and general approach used in the DOE CESER-sponsored Cybersecurity for the Operational Technology Environment (CyOTE) program, tailored for electric power system operators. NERC's updated Cyber Intrusion Guide for System Operators is reviewed, explaining how it is an operationalization of some of CyOTE's principles and approach.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Addressing Consequence within Operational Risk: An Approach for Understanding an Organization’s Unique Infrastructure Environment

The endeavor of tackling operational risk focused on consequences is challenging even for the most resourced entity but can be advanced though a simplified approach: identifying, binning, and prioritizing the infrastructure environment. While no two entities within a single element of the 16 critical infrastructure sectors are exactly alike when it comes to risk, there is a basic process to move toward a greater understanding of operational risk through becoming more informed about the infrastructure landscape in which the entity exists. The process starts with bringing internal and external stakeholders and subject matter experts together to analyze key areas such as Information Technology (IT) and Operational Technology (OT) components and points of convergence, analyzing internal and external cyber and physical dependencies, accounting for explosive growth in devices and wireless technology, and leveraging the contributions of people inside and outside the operational environment. Attaining a common understanding of the infrastructure landscape as part of addressing consequences within operational risk is not easy to do or resource light, but the process outlined provides the framework to further any entity’s efforts in this space.

99 GENERAL AND MISCELLANEOUS↗

EPRI Guidance for Transitioning from Operation to Decommissioning at Nuclear Power Plants - 17438

A wide range of key activities are necessary after permanent shutdown of a nuclear power plant and before active dismantlement of the plant can begin. This period between permanent shutdown and the start of active dismantlement is typically referred to as the transition period (or the post-operational phase). In some cases, these transition activities may be prescribed by regulation or performed in the absence of regulations, while in other cases they may be more practically driven or even optional. In either case, it is often unclear what activities are needed and when/how those activities should be conducted to most efficiently transition from operational to decommissioning status while maintaining radiological safety and the protection of the public. The Electric Power Research Institute has prepared a report that presents experiences and guidance for transitioning from an operational to decommissioning status based on US and international decommissioning regulations and plant experiences. Regulations and experiences in a number of countries were considered, including US, Germany, France, Spain, and Switzerland. Best practices and lessons learned related to transitioning to decommissioning are identified, and guidance is presented for developing a plan to transition from normal operations to decommissioning for several scenarios, including: - Transition to DECON (immediate dismantling) for a planned shutdown; - Transition to SAFSTOR (deferred dismantling) for a planned shutdown; - Transition to DECON (immediate dismantling) for an unplanned shutdown; - Transition to SAFSTOR (deferred dismantling) for an unplanned shutdown. Further, the EPRI report contains guidance for currently operating plants that do not anticipate permanent shutdown in the near future to help minimize the cost and impact of an unexpected permanent shutdown if such a scenario were to occur. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimizing Short-Term Operation of a FIRES-like Industrial Heat Supply Thermal Energy Storage System

The Firebrick Resistance-heated Energy-storage System (FIRES) is under development at MIT for two applications: (1) integration with the Nuclear Air-Brayton Combined Cycle (NACC), a high-performance power conversion system (PCS) that may be used with high- temperature advanced reactors; and (2) industrial heat supply. This paper describes some key features of FIRES and equivalent systems configured for industrial heat supply and presents an assessment of the revenue achievable by a system operating under the conditions expected for early demonstration FIRES installations. The greatest technical challenge of the 21. century is likely to be the effort to minimize the damage caused by global climate change. This effort will require massive reductions in greenhouse gas (GHG) emissions throughout our economy and a transition to an electric power system driven entirely by very-low-carbon generators. Many investigators agree that this will require a substantial increase in electricity generation and in the use of nuclear power, and there is growing awareness that this will also require new technologies and systems for managing and storing energy and matching intermittent supply of renewable resources with electricity demand. Thermal energy storage systems (TESS) will, in some applications, be much more cost effective than the more popular and widely discussed battery electric storage systems and may provide unique capabilities. The Firebrick Resistance-heated Energy-storage System (FIRES) is under development at MIT for two applications: (1) integration with the Nuclear Air-Brayton Combined Cycle (NACC), a high-performance power conversion system (PCS) that may be used with high-temperature advanced reactors like the Fluoride-salt-cooled High-temperature Reactor (FHR), molten salt reactor (MSR) and sodium-cooled fast reactors (SFR); and (2) industrial heat supply. FIRES installations include a stack of refractory firebrick with imbedded electric heaters and airflow channels, a compressor or air blower, and a duct system to connect the firebrick with the heat demand (turbine or industrial customer). Analysis of the FIRES design space has shown that the concept is suitable for a wide range of peak operating temperatures (from about 200 deg.C up to at least 1800 deg. C) and pressures (from ambient to at least 20 atmospheres) and offers very high energy density (up to 1 MWh per cubic meter of firebrick for high temperature systems) at very low cost (as low as $5/kWh). These results favor early demonstration of FIRES. If the cost target of $5/kWh for FIRES systems were achieved, even the lowest expected operating income calculated here could cover the capital cost of a 10 MWh system in a single year. If the FIRES system were assumed to operate for at least 10 years, this level of operating income could readily recover a capital investment up to $50/kWh, which is simultaneously much cheaper than the costs expected for near-future battery systems (in excess of $200/kWh) and much more expensive than the small, low temperature firebrick systems already available for domestic heating. This provides a large margin for unexpected development costs and other uncertainties. FIRES would set a minimum price of electricity near that of natural gas-improving nuclear, wind, and solar economics while reducing greenhouse gas emissions from the industrial sector. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Plant Operation and Control Strategy for the PGSFR

The plant operating strategy and control system design for the PGSFR plant are being developed to meet functional and design requirements for the plant. The functional requirements are derived from the mission of the reactor while the design requirements are related to the reactor technologies that underlie the PGSFR. This paper describes the operation and control strategy developed to meet these requirements and the implementation of that strategy. Representative results are presented for the dynamic behavior of the nuclear steam supply system (NSSS) during operational transients. A supervisory control system has been designed for the PGSFR for Startup, Reactor Leading, and Load Following modes and it performance assessed for operational transients in the Load Following mode. The control system extends into the balance of plant to include regulation of turbine inlet pressure and steam generator pressure and includes a feedwater pump with prototypic operating characteristics. The results indicate a very stable plant response with minimal deviation from quasi-static conditions for the transients simulated. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Concept of Operations for Advanced Reactor Spent Nuclear Fuel Management

This presentation presents a preliminary description of a concept of operations to incorporate advanced-reactor spent nuclear fuel (SNF) into an integrated waste-management system (IWMS). The evaluation includes SNF from four advanced-reactor concepts with the following fuel types: (1) small modular reactors using oxide fuels, (2) tristructural-isotropic (TRISO) fuels, (3) metallic fuels, and (4) fuel salts. To provide context for the proposed concept of operations for advanced reactors, a comparison is made with traditional light-water reactors (LWRs) to identify potential gaps in the IWMS. The technical differences between advanced reactors and LWRs are assessed to determine the feasibility of managing advanced-reactor waste streams using existing operations and technology. This presentation emphasizes fuel types from Advanced Reactor Demonstration Program reactors: Xe 100, which uses TRISO fuel and Natrium, with its metallic fuels while also analyzing management options for molten-salt reactors and advanced light-water reactors (ALWRs). Understanding the storage, transportation, and disposal requirements of SNF is dependent on both the quantity and characteristics of the SNF generated by nuclear reactors. This presentation provides a high level overview, comparing the anticipated concept of operations for different SNFs from advanced reactors. The IWMS includes at-reactor storage, transportation, potential off-site storage, potential treatment, and disposition. To assess the potential effect of advanced-reactor concept of operations on the IWMS, estimates were made for fuel characteristics that contribute to storage, transportation, disposal, and possible treatment of advanced-reactor SNF. These include canister heat load, dose rates, and criticality-control limits, which are important for determining the condition and configuration of the advanced reactor SNF. At-reactor storage of LWR SNF traditionally involves a spent-fuel pool (SFP) before transfer to an independent spent-fuel storage installation. However, some advanced-reactor concepts, particularly those using TRISO and salt fuels, do not anticipate the use of an SFP. This difference in at-reactor storage could impact the IWMS. Additionally, transportation of advanced-reactor SNF may include additional processes tied to potential off gassing, and transportation of microreactor SNF may occur within the reactor vessel. Some advanced-reactor SNF could also undergo treatment to meet requirements of an acceptable waste form for disposition, and the treatment location will be a major contributor to efficiently performing IWMS responsibilities. Moreover, the quantity of SNF generated is an important consideration for IWMS because it could affect the size of the transportation fleet and potential off-site storage requirements. Additionally, volume and heat load are the primary drivers for SNF disposition. This presentation compares potential packaging options for advanced reactor SNF with traditional LWR packaging to provide a high-level comparison for the needs of the IWMS for advanced-reactor SNF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗