Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “OUTAGES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Adaptive Load Shedding as Part of Primary Frequency Response To Support Networked Microgrid Operations

Global changes in the deployment of distributed energy resources, control and communications technologies, business models, and regulatory policy are increasing the operational options for future distribution systems. One such option is the coordinated operation of distributed resources to form microgrids and networks of microgrids to support traditional bulk power systems during normal operations and critical end-use loads during outages. While individual standalone microgrids have been extensively studied and deployed, the coordinated operation of networked microgrids is operationally more challenging due to the dynamic boundaries and changing mix of generation resources. Here, this paper presents a method of using a distributed control architecture to support primary frequency response in networked microgrids operations. The support of primary frequency response is accomplished using the Open Field Message Bus reference architecture and Grid Friendly Appliance controllers.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Real-Time Detection and Localization of Line Trip Event Via Relative Phase Angles

Line trip events widely exist in power systems. They can result in power outages and a huge economic loss if not promptly detected and localized. To provide a fast and precise solution, this paper presents a Complete Coverage of Voltage Measurement (CCVM)-based line trip event detection algorithm and a Relative Phase Angle (RPA)-based line trip event localization algorithm. First, frequency and relative phase angle features during a line trip event are calculated. Then, the CCVM-based algorithm is proposed from both frequency and rate of change of frequency estimation algorithm aspects. Additionally, the RPA-based algorithm is presented, and two cases are studied to demonstrate the uniqueness of the proposed algorithm. Various experiments are conducted, where the simulation results demonstrate that the proposed CCVM-based algorithm can detect a line trip event as short as 2.07 ms. In addition, the RPA-based algorithm has 1.26 times higher localization accuracy compared with the frequency magnitude-based and phase angle-based algorithms. In conclusion, the experiment results on the examples from two interconnected power systems in the U.S. verified the performance of the proposed algorithms in wide-area power systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resilient Distribution System by Microgrids Formation After Natural Disasters

Microgrids with distributed generation provide a resilient solution in the case of major faults in a distribution system due to natural disasters. This paper proposes a novel distribution system operational approach by forming multiple microgrids energized by distributed generation from the radial distribution system in real-time operations, to restore critical loads from the power outage. Specifically, a mixed-integer linear program (MILP) is formulated to maximize the critical loads to be picked up while satisfying the self-adequacy and operation constraints for the microgrids formation problem, by controlling the ON/OFF status of the remotely controlled switch devices and distributed generation. A distributed multi-agent coordination scheme is designed via local communications for the global information discovery as inputs of the optimization, which is suitable for autonomous communication requirements after the disastrous event. The formed microgrids can be further utilized for power quality control and can be connected to a larger microgrid before the restoration of the main grids is complete. Numerical results based on modified IEEE distribution test systems validate the effectiveness of our proposed scheme.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Defining and Enabling Resiliency of Electric Distribution Systems With Multiple Microgrids

This paper presents a method for quantifying and enabling the resiliency of a power distribution system (PDS) using analytical hierarchical process and percolation theory. Using this metric, quantitative analysis can be done to analyze the impact of possible control decisions to pro-actively enable the resilient operation of distribution system with multiple microgrids and other resources. Developed resiliency metric can also be used in short term distribution system planning. The benefits of being able to quantify resiliency can help distribution system planning engineers and operators to justify control actions, compare different reconfiguration algorithms, develop proactive control actions to avert power system outage due to impending catastrophic weather situations or other adverse events. Validation of the proposed method is done using modified CERTS microgrids and a modified industrial distribution system. Furthermore, simulation results show topological and composite metric considering power system characteristics to quantify the resiliency of a distribution system with the proposed methodology, and improvements in resiliency using two-stage reconfiguration algorithm and multiple microgrids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-Time Step Service Restoration for Advanced Distribution Systems and Microgrids

Modern power systems are facing increased risk of disasters that can cause extended outages. The presence of remote control switches (RCSs), distributed generators (DGs), and energy storage systems (ESS) provides both challenges and opportunities for developing post-fault service restoration methodologies. Inter-temporal constraints of DGs, ESS, and loads under cold load pickup (CLPU) conditions impose extra complexity on problem formulation and solution. In this paper, a multi-time step service restoration methodology is proposed to optimally generate a sequence of control actions for controllable switches, ESSs, and dispatchable DGs to assist the system operator with decision making. The restoration sequence is determined to minimize the unserved customers by energizing the system step by step without violating operational constraints at each time step. The proposed methodology is formulated as a mixed-integer linear programming (MILP) model and can adapt to various operation conditions. Furthermore, the proposed method is validated through several case studies that are performed on modified IEEE 13-node and IEEE 123-node test feeders.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resilient Disaster Recovery Logistics of Distribution Systems: Co-Optimize Service Restoration With Repair Crew and Mobile Power Source Dispatch

Repair crews (RCs) and mobile power sources (MPSs) are critical resources for distribution system (DS) outage management after a natural disaster. However, their logistics have not been well investigated. We propose a resilient scheme for disaster recovery logistics to co-optimize DS restoration with the dispatch of RCs and MPSs. A novel co-optimization model is formulated to route RCs and MPSs in the transportation network, schedule them in the DS, and reconfigure the DS for microgrid formation coordinately, etc. The model incorporates different timescales of DS restoration and RC/MPS dispatch, the coupling of transportation and power networks, etc. To ensure radiality of the DS with variable physical structure and MPS allocation, we also model topology constraints based on the concept of spanning forest. The model is convexified equivalently and linearized into a mixed-integer linear programming. To reduce its computation time, preprocessing methods are proposed to preassign a minimal set of repair tasks to depots and reduce the number of candidate nodes for MPS connection. Resilient recovery strategies thus are generated to enhance service restoration, especially by dynamic formation of microgrids that are powered by MPSs and topologized by repair actions of RCs and network reconfiguration of the DS. Case studies demonstrate the proposed methodology.

Disaster recovery logistics↗

Resilience-Motivated Distribution System Restoration Considering Electricity-Water-Gas Interdependency

A major outage in the electricity distribution system may affect the operation of water and natural gas supply systems, leading to an interruption of multiple services to critical customers. Therefore, enhancing resilience of critical infrastructures requires joint efforts of multiple sectors. In this paper, a distribution system service restoration method considering the electricity-water-gas interdependency is proposed. The objective is maximizing the supply of electricity, water, and gas to critical customers after an extreme event. The operational constraints of electricity, water, and natural gas networks are considered. Additionally, the characteristics of electricity-driven coupling components, including water pumps and gas compressors, are also modeled. Relaxation techniques are applied to non convex constraints posed by physical laws of those networks. Consequently, the restoration problem is formulated as a mixed-integer second-order cone program, which can readily be solved by the off-the-shelf solvers. The proposed method is validated by numerical simulations on an electricity-water-gas integrated system, developed based on benchmark models of the subsystems. The results indicate that considering the interdependency refines the allocation of limited generation resources and demonstrate the exactness of the proposed convex relaxation

24 POWER TRANSMISSION AND DISTRIBUTION↗

DC Circuit Breakers: A Technology Development Status Survey

DC circuit breakers (DCCBs) play a significant role in obtaining the reliability and stability of DC power systems. Selective and fast isolating of faults minimizes the power supply outages to end electricity users and protects the power converters implemented in the DC system. During the last decades, DCCBs have been deeply investigated in industry and academia. There has been impressive progress in terms of efficiency, response time, power-density, lifetime, and electrical operating ratings. Introducing wide bandgap (WBG) devices further has motivated researchers to propose more efficient and novel topologies. This paper provides a point of reference and a background review for DCCBs from novel aspects, fulfilling absent parts in the literature. The elaborated subjects include current commutation circuitry, DCCBs trip-curves developments, newly added functions to DCCBs, as well as marketing analysis. The advancements of DCCBs are surveyed and development needs are recognized. This paper aims to identify the future research needs of DCCBs for emerging DC power systems.

42 ENGINEERING↗

A Distributionally Robust Resilience Enhancement Strategy for Distribution Networks Considering Decision-Dependent Contingencies

When performing the resilience enhancement for distribution networks, there are two obstacles to reliably model the uncertain contingencies: 1) decision-dependent uncertainty (DDU) due to various line hardening decisions, and 2) distributional ambiguity due to limited outage information during extreme weather events (EWEs). Here, to address these two challenges, this paper develops scenario-wise decision-dependent ambiguity sets (SWDD-ASs), where the DDU and distributional ambiguity inherent in EWE-induced contingencies are simultaneously captured for each possible EWE scenario. Then, a two-stage tri-level decision-dependent distributionally robust resilient enhancement (DD-DRRE) model is formulated, whose outputs include the optimal line hardening, distributed generation (DG) allocation, and proactive network reconfiguration strategy under the worst-case distributions in SWDD-ASs. Subsequently, the DD-DRRE model is equivalently recast to a mixed-integer linear programming (MILP)-based master problem and multiple scenario-wise subproblems, facilitating the adoption of a customized column-and-constraint generation (C&CG) algorithm. Finally, case studies demonstrate a remarkable improvement in the out-of-sample performance of our model, compared to its prevailing stochastic and robust counterparts. Moreover, the potential values of incorporating the ambiguity and distributional information are quantitatively estimated, providing a useful reference for planners with different budgets and risk-aversion levels.

decision-dependent uncertainty↗

Distribution System Blackstart and Restoration Using DERs and Dynamically Formed Microgrids

Extreme weather events have led to long-duration outages in the distribution system (DS), necessitating novel approaches to blackstart and restore the system. Existing blackstart solutions utilize blackstart units to establish multiple microgrids (MGs), sequentially energize non-blackstart units, and restore loads. However, these approaches often result in isolated MGs. In DERs-aided blackstart, the continuous operation of these MGs is limited by the finite energy capacity of commonly used blackstart units like battery energy storage (BES)-based gridforming inverters (GFMIs). To address this issue, this article proposes a holistic blackstart and restoration framework that incorporates synchronization between dynamic MGs and the entire DS with the transmission grid (TG). To support synchronization, we leveraged virtual synchronous generator-based control for GFMIs to estimate their frequency response to load pick-up events using only initial/final quasi-steady-state points. Subsequently, a synchronization switching condition is developed to model synchronizing switches, aligning them seamlessly with a linearized branch flow problem. Finally, we designed a bottomup blackstart and restoration framework that considers the switching structure of the DS, energizing/synchronizing switches, DERs with grid-following inverters, and BES-based GFMIs with frequency security constraints. In conclusion, the proposed framework is validated in IEEE-123-bus system, considering cases with two and four GFMIs under various TG recovery instants.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Incorporating Uncertainty of Wind Power Generation Forecast into Power System Operation, Dispatch, and Unit Commitment Procedures

An approach to evaluate the uncertainties of the balancing capacity, ramping capability, and ramp duration requirements is proposed. The approach includes three steps: forecast data acquisition, statistical analysis of retrospective information, and prediction of grid balancing requirements for a specified time horizon and a given confidence level. An assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on histogram analysis, incorporating sources of uncertainty - both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures). A new method called the 'flying-brick' technique is developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation process is used to validate the accuracy of the confidence intervals. To demonstrate the validity of the developed uncertainty assessment methods and its impact on grid operation, a framework for integrating the proposed methods with an EMS system is developed. Demonstration through EMS integration illustrates the applicability of the proposed methodology and the developed tool for actual grid operation and paves the road for integration with EMS systems in control rooms.

17 WIND ENERGY↗

Endogenous Assessment of the Capacity Value of Solar PV in Generation Investment Planning Studies

There exist several different reliability-and approximation-based methods to determine the contribution of solar resources toward resource adequacy. However, most of these approaches require knowing in advance the installed capacities of both conventional and solar generators. This is a complication since generator capacities are actually decision variables in capacity planning studies. In this paper, we study the effect of time resolution and solar PV penetration using a planning model that accounts for the full distribution of generator outages and solar resource variability. We also describe a modification of a standard deterministic planning model that enforces a resource adequacy target through a reserve margin constraint. Our numerical experiments show that at least 50 days worth of data are necessary to approximate the results of the full-resolution model with a maximum error of 2.5% on costs and capacity. We also show that the amount of displaced capacity of conventional generation decreases rapidly as the penetration of solar PV increases. We find that using an exogenously defined and constant capacity value based on time-series data can yield relatively accurate results for small penetration levels. For higher penetration levels, the modified deterministic planning model better captures avoided costs and the decreasing value of solar PV.

14 SOLAR ENERGY↗

Integrating Transactive Energy into Reliability Evaluation for a Self-healing Distribution System with Microgrid

Non-utility owned distributed energy resources (DERs) are mostly untapped currently, but they can provide many grid services such as voltage regulation and service restoration, if properly controlled, and can improve the distribution systems reliability when coordinated with utility-owned assets such as self-healing control and microgrids. This paper integrates transactive energy control into the distribution system reliability evaluation to quantitatively assess the impact of non-utility owned DERs on reliability improvement. Here, a transactive reactive power control strategy is designed to incentivize the DERs to provide reactive power support for improving voltage profiles thus enabling additional customer load restoration during an outage. Also, an operational sequence to coordinate the non-utility owned DERs with the utility owned self-healing control and utility owned microgrids is designed and integrated into the service restoration process with the operational constraints guaranteed by checking the three-phase unbalanced power flow for post-fault network reconfiguration. The reliability indices are then calculated through a Monte Carlo simulation. The transactive reactive power control strategy is tested on a four-feeder distribution system operated by Duke Energy in the U.S. Results demonstrate that the non-utility owned DERs with the transactive control improve the reliability of both the system and critical loads by more than 30%.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Quantitative Metrics for Grid Resilience Evaluation and Optimization

Power system resilience has become a critical topic in recent years because of the increasing trend of extreme events and the growing integration of intermittent renewable energy sources. To enhance grid resilience against high-impact, low-frequency events, two questions should be answered: how to quantify the resilience of a given grid and how to incorporate the quantification into power system planning, operation, and restoration. Here this paper develops a new set of quantitative metrics with clear physical interpretation to comprehensively evaluate power system resilience. Using microgrids as an example, an event-based corrective scheduling (ECS) model and an online model predictive control (OMPC) model are developed to integrate the proposed quantitative resilience metrics into power system optimization models for resilience enhancement. The ECS model employs extreme event data to investigate the optimal restoration solution and to help microgrid operators prepare to respond to similar events. The OMPC model provides online decision-making support for operators to handle ongoing outages in the most resilient fashion. The effectiveness and superiority of the proposed quantitative resilience metrics and the resilience enhancement models are demonstrated through simulations and comparative studies on an IEEE test feeder and a real distribution feeder in Southern California.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Secure and Adaptive Hierarchical Multi-Timescale Framework for Resilient Load Restoration Using a Community Microgrid

Distribution system integrated community microgrids (CMGs) can partake in restoring loads during extended duration outages. At such times, the CMGs are challenged with limited resource availability, absence of robust grid support, and heightened demand-supply uncertainty. Here, this paper proposes a secure and adaptive three-stage hierarchical multi-timescale framework for scheduling and real-time (RT) dispatch of CMGs with hybrid PV systems to address these challenges. The framework enables the CMG to dynamically expand its boundary to support the neighboring grid sections and is adaptive to the changing forecast error impacts. The first stage solves a stochastic extended duration scheduling (EDS) problem to obtain referral plans for optimal resource rationing. The intermediate near-real-time (NRT) scheduling stage updates the EDS schedule closer to the dispatch time using new obtained forecasts, followed by the RT dispatch stage. To make the decisions more secure and robust against forecast errors, a novel concept called delayed recourse is designed. The approach is evaluated via numerical simulations on a modified IEEE 123-bus system and validated using OpenDSS and hardware-in-loop simulations. The results show superior performance in maximizing load supply and continuous secure distribution network operation under different operating scenarios.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Special Issue: Thermal Energy Storage for Buildings

This special issue (SI) of the ASME Journal of Engineering for Sustainable Buildings and Cities (JESBC) features peer-reviewed papers specific to technologies and applications of thermal energy storage (TES) for buildings. TES systems store energy in materials as a heat source or a cold sink and then discharge the stored energy hours or weeks later to enhance thermal comfort or reduce utility bills [1]. As buildings and cities are facing increasing energy consumption and extreme weather events, TES offers a powerful solution to balance supply and demand, reduce operational energy costs, and strengthen energy resilience during power outages.

25 ENERGY STORAGE↗

Benchmark Accelerated Aging of Harvested Hypalon/Epr and Cspe/Xlpe Power and I&C Cable in Nuclear Power Plants

As part of the Light Water Reactor and Sustainability (LWRS) program in the U.S. Department of Energy (DOE) Office of Nuclear Energy, material aging and degradation research is currently geared to support the long-term operation of existing nuclear power plants (NPPs) as they move beyond their initial 40 year licenses. The goal of this research is to provide information so that NPPs can develop aging management programs (AMPs) to address replacement and monitoring needs as they look to operate for 20 years, and in some cases 40 years, beyond their initial operating lifetimes. For cable insulation and jacket materials that support instrument, control, and safety systems, accelerated aging data are needed to determine priorities in cable aging management programs. Before accelerated thermal and radiation aging of harvested, representative cable insulation and jacket materials, the benchmark performance of a new test capability at Oak Ridge National Laboratory (ORNL) was evaluated for temperatures between 70 and 135°C, dose rates between 100 and 500 Gy/h, and accumulated doses up to 20 kGy, Samples that were characterized and are representative of current materials in use were harvested from the Callaway NPP near Fulton, Missouri, and the San Onofre NPP north of San Diego, California. From the Callaway NPP, a multiconductor control rod cable manufactured by Boston Insulated Wire (BIW), with a Hypalon/ chorolosulfonated polyethylene (CSPE) jacket and ethylene-propylene rubber (EPR) insulation, was harvested from the auxiliary space during a planned outage in 2013. This cable was placed into service when the plant was started in 1984. From the San Onofre NPP, a Rockbestos Firewall III (FRIII) cable with a Hypalon/ CSPE jacket with cross-linked polyethylene (XLPE) insulation was harvested from an on-site, climate-controlled storage area. This conductor, which was never placed into service, was procured around 2007 in anticipation of future operation that did not occur. Benchmark aging for both jacket and insulation material was carried out in air at a temperature of 125°C or in uniform 140 Gy/h gamma irradiation over a period of 60 days. Their mechanical properties over the course of their exposures were compared with reference data from comparable cable jacket/insulation compositions and aging conditions. For both accelerated thermal and radiation aging, it was observed that the mechanical properties for the Callaway BIW control rod cable were consistent with those previously measured. However, for the San Onofre Rockbestos FRIII, there was an observable functional difference for accelerated thermal aging at 125°C. Details on possible sources for this difference and plans for resolving each source are given in this paper.

aging↗