Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mars 2020”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Assessing Relay Communications for Mars Sample Return Surface Mission Concepts

The Mars Sample Return (MSR) Campaign would be a 3-mission campaign concept supported by NASA and ESA to return samples from the Mars surface. MSR would, for the first time ever, present a need to communicate with multiple surface assets that are co-located on Mars in a coordinated effort to accomplish the unified objective of fetching, transporting, and returning samples from Mars. Currently, Mars surface assets relay data to and from Earth using a number of orbiters in what’s known as the Mars Relay Network (MRN). This network is characterized by a small number of surface assets distributed across the Martian globe and a larger number of orbiters to provide relay services. As of June 2020, there are two surface assets for which five orbiters are providing relay. During the MSR Campaign, there would be two rovers and a lander that all would require relay communication from a small number of Mars orbiters to meet the aggressive MSR timeline. The inversion of the current MRN paradigm, a system of many surface assets requiring relay and few orbiters to provide relay, necessitates the unique challenge of optimally allocating relay passes to maximize the operational capability of all assets. The allocation must consider a large number of trade variables including Mars asset operational requirements and Earth ground system constraints, including staffing schedules, operations planning across time zones, and more. To address these telecommunication challenges, the Mars Asset Relay Mission Link Allocation Design Environment (MARMLADE) tool was developed. It is a MATLAB-based tool to assign orbiter passes or Direct-From-Earth (DFE) links to each of the three surface assets and quantify the operational efficiency of each surface asset.MARMLADE uses a data set of simulated Mars relay orbiter geometry and telecommunication capabilities provided by JPL’s Telecom Orbit Analysis and Simulation Tool (TOAST) software to compute which asset should get each pass based on a series of heuristics and predictions of all assets’ states. Within MARMLADE, the user can provide inputs including the option for time-based pass splitting, fixed FWD data rate capabilities, DFE communication capabilities, and link parameters allowing for the assessment of complex operations and hardware trades using surface mission operational efficiency as a primary figure of merit. As the MSR mission concepts continue to mature, MARMLADE is being used to assess ability of all MSR elements to meet the surface mission timeline requirements and to provide relay link allocations to each of the MSR surface assets.This paper will describe the motivation and design of the MARMLADE tool and how it is being used to perform campaign and mission level trades, generate requirements, and support development of the MSR surface mission scenarios.

Lee, Charles↗

Detection of the third class of gamma-ray bursts:magnetar giant flares.

Around 11.4 million years ago a young, highly magnetized neutron star called magnetar, in theSculptor galaxy released an enormous amount of energy in the form of a giant flare. On April15th 2020, some of the emitted photons were detected by a number of gamma-ray telescopes around Earth and Mars. While the analysis of this event, GRB 200415A, was interesting in its own right, it resulted in broader implications for both magnetar and gamma-ray burst (GRB)science. The resulting population study of magnetar giant flares (MGFs), led to the unambiguous identification of a distinct population of 4 local (<5Mpc) short GRBs. While identified solely based on alignment to nearby star-forming galaxies, their rise time and isotropic energy release are independently inconsistent with the larger short GRB population at >99.9% confidence.These properties, the host galaxies, and non-detection in gravitational waves all point to an extra galactic MGF origin.

Michela Negro↗

Understanding Workforce Agility at NASA Kennedy Space Center

NASA leads the world in space research and provides other government agencies, educational institutions, and companies opportunities to explore, launch, and conduct research in and around space. NASA has 11 formal locations based around the United States, and each has different goals and objectives to help NASA meet its overall mission. 2004, President George Bush announced a new vision for the Space Exploration program. During his grand announcement, he discussed that the Space Shuttles would retire due to the 2003 Space Shuttle Columbia accident, where the crew and the space vehicle were lost. The Kennedy Space Center (KSC) would no longer manage the day-to-day operations of maintaining the US Space Shuttle fleet. Our NASA teams would continue working to finish the Space Shuttle program's mission to build the International Space Station. Afterward, NASA would transition to develop and test a new spacecraft, the Crew Exploration Vehicle. The third goal was to return to the moon by 2020 as the launching point for missions beyond, to get humans from lower Earth orbit to the moon and Mars. (Secretary, 2004) The KSC engineering workforce had to prepare to transition from Operational support of the Space Shuttle program to the design and development of over 50 subsystems for the future SLS and Orion Launch Systems at the Kennedy Space Center. These subsystems developed at the Kennedy Space Center Engineering Directorate followed a comprehensive design process that required several different product deliverables during various phases for each subsystem. (Schafer et al., 2013) What allowed these systems to be successful? What enabled NASA KSC to complete over 130 Artemis 1 Design Certification and System Acceptance Reviews, closing over 21,656 Requirements to deem the Artemis 1 rocket ready for launch? Little is known about the NASA engineering workforce agility characteristics that enabled the organization to transition from the Space Shuttle program that ended in 2011 and launch the Artemis Program's SLS rocket on November 16, 2022.

Workforce Agility↗

The 2020 Low Energy Gold Run in the Injectors

During Run 20 the injectors provided Gold to RHIC at four different energies (3.85, 4.59, 5.75, and 7.3 GeV). The majority of the run was spent providing 4.59 and 5.75 GeV beams. The RHIC physics program using 5.75 GeV beam took place from Dec. 10, 2019 to Feb. 24, 2020, although there was a period of about 2 weeks (Jan. 27 th to Feb. 10 th ) where 7.3 and 4.59 GeV were used. The 4.59 GeV program took place from Feb. 24. 2020 to Sept.1 2020. Data taking for the 4.59 GeV program was interrupted by the COVID-19 shutdown which lasted about 3 months, from Mar. 20 to June 21. So, the 5.75 GeV program was about 2 months long and the 4.59 GeV program was about 3 months long. There were also other short periods where 7.3 GeV beam was provided to RHIC for CeC development and fixed target data taking. 3.85 GeV beam was also provided near the end of the run in preparation for next year (Sept. 2-11).

43 PARTICLE ACCELERATORS↗

Model Design and Pre-Test CFD Analysis for a Supersonic Retropropulsion Wind Tunnel Test

Future Mars human lander missions will require using powered descent beginning at supersonic conditions, something which has never been done before at Mars. Significant aerosciences challenges exist due to interactions between the retrorocket exhaust plumes and the freestream flow that alter the aerodynamic behavior of the powered descent vehicle. Historically, wind tunnel tests have been used to study supersonic retropropulsion with inert gas exhaust simulants. Also, SpaceX has successfully decelerated the Falcon 9 first stage numerous times by using powered flight at supersonic conditions. On the computational side, Reynolds-Averaged Navier-Stokes flowfield simulations are regularly completed at full-scale conditions. However, the available ground and flight data do not provide a basis for calibrating the computational uncertainties for aerodynamic interference forces and moments on proposed Mars descent vehicles, either because of insufficient data or dissimilar vehicles geometries and/or conditions. Thus, additional ground testing is needed to continue addressing the aerosciences risks for large-scale human Mars landers. To that end, a retropropulsion wind tunnel test will be conducted in the NASA Langley Unitary Plan Wind Tunnel in 2020. The test is designed to improve upon similar past tests, both in terms of model design and measured data. The test campaign will use subscale model geometries derived from the two current NASA powered descent reference vehicles: a blunt low lift-to-drag vehicle and a more slender geometry. This paper covers the reference vehicles, test objectives, model design, scaling parameters, test matrix, and computational analysis to date.

Karl T Edquist↗

Assessing Relay Communications for Mars Sample Return Surface Mission Concepts

The Mars Sample Return (MSR) Campaign is a 3-mission campaign concept supported by NASA and ESA to return samples from the Mars surface. MSR will, for the firsttime ever, present a need to communicate with multiple surfaceassets that are co-located on Mars in a coordinated effort toaccomplish the unified objective of fetching, transporting, andreturning samples from Mars. Currently, Mars surface assetsrelay data to and from Earth using a number of orbiters inwhat’s known as the Mars Relay Network (MRN). This networkis characterized by a small number of surface assets distributedacross the Martian globe and a larger number of orbiters toprovide relay services. As of June 2020, there are two surfaceassets for which five orbiters are providing relay. During theMSR Campaign, there will be two rovers and a lander that allwill require relay communication from a small number of Marsorbiters to meet the aggressive MSR timeline. The inversion ofthe current MRN paradigm, a system of many surface assetsrequiring relay and few orbiters to provide relay, necessitatesthe unique challenge of optimally allocating relay passes tomaximize the operational capability of all assets. The allocationmust consider a large number of trade variables includingMars asset operational requirements and Earth ground systemconstraints, including staffing schedules, operations planningacross time zones, and more. To address these telecommunicationchallenges, the Mars Asset Relay Mission Link AllocationDesign Environment (MARMLADE) tool was developed. Itis a MATLAB-based tool to assign orbiter passes or Direct-From-Earth (DFE) links to each of the three surface assets andquantify the operational efficiency of each surface asset.MARMLADE uses a data set of simulated Mars relay orbitergeometry and telecommunication capabilities provided by JPL’sTelecom Orbit Analysis and Simulation Tool (TOAST) softwareto compute which asset should get each pass based on a seriesof heuristics and predictions of all assets’ states. WithinMARMLADE, the user can provide inputs including the optionfor time-based pass splitting, fixed FWD data rate capabilities,DFE communication capabilities, and link parameters allowingfor the assessment of complex operations and hardware tradesusing surface mission operational efficiency as a primary figureof merit. As the MSR mission concepts continue to mature,MARMLADE is being used to assess ability of all MSR elementsto meet the surface mission timeline requirements and to provide relay link allocations to each of the MSR surface assets.

Lee, Charles↗

Aseptic Operations for Post DHMR Processing of MOMA Mass Spectrometer

Mars Organic Molecule Analyzer - Mass Spectrometer (MOMA-MS) is an instrument in the MOMA instrument suite for the European Space Agency (ESA) ExoMars 2020 Rover. The rover is Planetary Protection Mission Category IVb, the first IVb mission since the Viking missions in the 1970s. Within the sample path of the MOMA instrument suite, the hardware surfaces of the must be sanitized to a level of less than 0.03 spore/m sq. To meet this requirement, the MS sample path was subjected to Dry Heat Microbial Reduction (DHMR) to decrease the number of viable spores by 4 orders of magnitude from a measured 88 spores/m sq to 0.009 spores/m sq. Before DHMR, the hardware is handled using standard cleanroom practices. After DHMR, planetary protection filters protect the sample path for most of integration, but when sample path exposure is required, aseptic operations are instituted and exposure times are kept to an absolute minimum. The surface area of exposure is also taken into account to determine safe exposure times. Before work begins, the ISO class 5 aseptic workspace is cleaned and tested for surface and airborne bioburden, and all tools that will contact or be used near sample path surfaces are sterilized. During the exposure activity, sterile garments are worn, sterile gloves are changed as often as necessary, and the environment is monitored with active and passive fallout for bioburden and real time airborne particle counts. Sterile tools are handled by a two person team so that the operator touches only the tool and not the exterior surfaces of the sterilization pouch, and a sterile operating field is established as a safe place to organize tools or parts during the aseptic operations. In cases where aseptic operations are not feasible, localized DHMR is used after exposure. Any breach in the planetary protection cleanliness can necessitate repeating instrument level DHMR, which not only has significant cost and schedule implications, it also become a risk to hardware that is not rated for repeated long exposures to high temperatures.

Spacecraft Design↗

Concepts for Phased Development of a Lunar Surface Base

Several design concepts were studied in 2019 and 2020 to explore a range of possibilities for development of a base on the surface of the Moon in preparation for ongoing missions to Mars. The studies included phasing approaches for life support systems to accommodate initial short-term missions under 60 days with eventual ongoing missions with crew rotations every 180 days. The approach presented is not currently in the NASA plans but is one of many approaches that could be considered as a reference for future development by government, commercial, and international partners. Included in the paper are conceptual layouts, life support phasing approaches, and mass properties for a variety of modules leading toward a permanent base on the surface of the Moon that is also applicable to a base development on the surface of Mars.

David Smitherman↗

The International Space Station: Unique In-Space Testbed as Exploration Analog

Final assembly of the International Space Station (ISS) was completed in 2011. As articulated in the 2011 NASA Strategic Plan, the Agency's first goal is to extend and sustain human activities across the solar system. Thus, the emerging NASA vision is to launch a bold and ambitious new space initiative to enable human space exploration beyond low-Earth orbit to Lagrange points, the moon, near-Earth asteroids (NEAs), and Mars and its environs. To accomplish this vision, it is necessary to develop and validate innovative exploration technologies and operational concepts. With the extended life of the ISS to 2020 and possibly 2028, NASA has a mandate to maximize the potential of the Nation's newest National Laboratory. Exploration and ISS teams within NASA's Human Exploration and Operations Mission Directorate (HEOMD) have initiated a cooperative effort: the ISS Testbed for Analog Research (ISTAR), a high-fidelity operational analog that complements existing NASA terrestrial laboratory and field testing. To maximize use of the ISS platform to evaluate new exploration technologies, capabilities, and operational concepts to better comprehend and mitigate human spaceflight risks, ISTAR seeks out and encourages investigations dubbed "exploration detailed test objectives" (xDTOs). These xDTOs, building blocks of ISTAR missions, develop and optimize the operations concepts and the use of new technologies that should reduce risks and challenges facing astronauts on long exploration spaceflight voyages. In this paper, we describe (1) the rationale behind ISTAR, (2) a five-year strategic plan, (3) the approach for mission formulation, development, integration, and execution, (4) concepts for near-term missions that implement a phased approach for using ISS as an exploration testbed, and (5) the planned Mars mission simulation using the ISS. This paper will also document several challenges ISTAR must address to execute its missions.

Analog Mission↗

Space Launch System Accelerated Booster Development Cycle

With the retirement of the Space Shuttle, NASA is seeking to reinvigorate the national space program and recapture the public s interest in human space exploration by developing missions to the Moon, near-earth asteroids, Lagrange points, Mars, and beyond. The would-be successor to the Space Shuttle, NASA s Constellation Program, planned to take humans back to the Moon by 2020, but due to budgetary constraints was cancelled in 2010 in search of a more "affordable, sustainable, and realistic" concept2. Following a number of studies, the much anticipated Space Launch System (SLS) was unveiled in September of 2011. The SLS core architecture consists of a cryogenic first stage with five Space Shuttle Main Engines (SSMEs), and a cryogenic second stage using a new J-2X engine3. The baseline configuration employs two 5-segment solid rocket boosters to achieve a 70 metric ton payload capability, but a new, more capable booster system will be required to attain the goal of 130 metric tons to orbit. To this end, NASA s Marshall Space Flight Center recently released a NASA Research Announcement (NRA) entitled "Space Launch System (SLS) Advanced Booster Engineering Demonstration and/or Risk Reduction." The increased emphasis on affordability is evident in the language used in the NRA, which is focused on risk reduction "leading to an affordable Advanced Booster that meets the evolved capabilities of SLS" and "enabling competition" to "enhance SLS affordability. The purpose of the work presented in this paper is to perform an independent assessment of the elements that make up an affordable and realistic path forward for the SLS booster system, utilizing advanced design methods and technology evaluation techniques. The goal is to identify elements that will enable a more sustainable development program by exploring the trade space of heavy lift booster systems and focusing on affordability, operability, and reliability at the system and subsystem levels5. For this study, affordability is defined as lifecycle cost, which includes design, development, test, and engineering (DDT&E), production and operational costs (P&O). For this study, the system objectives include reducing DDT&E schedule by a factor of three, showing 99.9% reliability, flying up to four times per year, serving both crew and cargo missions, and evolving to a lift capability of 130 metric tons.3 After identifying gaps in the current system s capabilities, this study seeks to identify non-traditional and innovative technologies and processes that may improve performance in these areas and assess their impacts on booster system development. The DDT&E phase may be improved by incorporating incremental development testing and integrated demonstrations to mitigate risk. To further reduce DDT&E, this study will also consider how aspects of the booster system may have commonality with other users, such as the Department of Defense, commercial applications, or international partners; by sharing some of the risk and investment, the overall development cost may be reduced. Consideration is not limited to solid and liquid rocket boosters. A set of functional performance characteristics, such as engine thrust, specific impulse (Isp), mixture ratio, and throttle range are identified and their impacts on the system are evaluated. This study also identifies how such characteristics affect overall life cycle cost, including DDT&E and fixed and variable P&O.

Arockiam, Nicole↗

Development and Implementation of Aseptic Operations for the MOMA-Mass Spectrometer

The ExoMars 2020 Rover is a life detection mission, and is classified as Planetary Protection (PP) Mission Category IVb, the first IVb mission since the Viking missions. Mars Organic Molecule Analyzer Mass Spectrometer (MOMA-MS) is a life detection instrument for the rover. To meet the stringent bioburden requirement of 0.03 spore/m2, the MS is subjected to Dry Heat Microbial Reduction (DHMR) to decrease the bioburden from a measured 88 spores/m2 to 0.009 spores/m2. After DHMR, exposure of the sample path must be kept to an absolute minimum and requires aseptic operations. Aseptic operations include determining the safe exposure time based on the surface area of exposure and particle fallout expected in the aseptic ISO class 5 workspace, preparing an aseptic ISO class 5 workspace, and using sterile garments and tools. During the exposure activity the environment is monitored with active and passive fallout for bioburden and real time airborne particle counts. Sterile tools are handled by a two person team so the operator touches only the tool and not the exterior surfaces of the sterilization pouch, and a sterile operating field is established as a safe place to organize tools or parts during the aseptic operations. In cases where aseptic operations are not feasible, localized DHMR is used after exposure. Any breach in the PP cleanliness can necessitate repeating instrument level DHMR, which not only has significant cost and schedule implications, but also is a risk to hardware that is not rated for repeated long exposures to high temperatures.

Aseptic processing↗

Mars Sample Return Science Planning Group Phase 2 (MSPG2): Overview & Interim Report

Mars Sample Return (MSR) has been a high priority of the international planetary science community for decades. In recent years, significant programmatic advances have brought MSR closer to becoming a reality. In 2018, NASA and the European Space Agency (ESA) signed a joint Statement of Intent to continue defining respective roles and responsibilities in the flight missions required to realize MSR. In October 2020, NASA and ESA formalized this partnership with the signature of a Memorandum of Understanding for the MSR flight elements. The MSR campaign consists of M2020, two MSR flight elements and the ground-based infrastructure to receive, handle and curate the samples from Mars. In an engineering sense, MSR consists of a linked set of missions, and a concluding set of ground-based activities, that we refer to as the MSR Campaign.

G. Kminek↗

Transport vehicle for manned Mars missions powered by inertial confinement fusion

Inertial confinement fusion (ICF) is an ideal engine power source for manned spacecraft to Mars because of its inherently high power-to-mass ratios and high specific impulses. In this paper a concept is produced for a vehicle powered by ICF and utilizing a magnetic thrust chamber to avoid plasma thermalization with wall structures and the resultant degradation of specific impulse, that are unavoidable with the use of mechanical thrust chambers. This vehicle is capable of 100-day manned Mars missions with a 100-metric-ton payload and a total vehicle launch mass near 6000 metric tons, based on advanced technology assumed to be available by A.D. 2020.

Orth, Charles D.↗

Curating NASA's Astromaterials Collections: Past, Present, and Future

Planning for the curation of samples from future sample return missions must begin during the initial planning stages of a mission. Waiting until the samples have been returned to Earth, or even when you begin to physically build the spacecraft is too late. A lack of proper planning could lead to irreversible contamination of the samples, which in turn would compromise the scientific integrity of the mission. For example, even though the Apollo missions first returned samples in 1969, planning for the curation facility began in the early 1960s, and construction of the Lunar Receiving Laboratory was completed in 1967. In addition to designing the receiving facility and laboratory that the samples will be characterized and stored in, there are many aspects of contamination that must be addressed during the planning and building of the spacecraft: planetary protection (both outbound and inbound); cataloging, documenting, and preserving the materials used to build spacecraft (also known as coupons); near real-time monitoring of the environment in which the spacecraft is being built using witness plates for critical aspects of contamination (known as contamination control); and long term monitoring and preservation of the environment in which the spacecraft is being built for most aspects of potential contamination through the use of witness plates (known as contamination knowledge). The OSIRIS REx asteroid sample return mission, currently being built, is dealing with all of these aspects of contamination in order to ensure they return the best preserved sample possible. Coupons and witness plates from OSIRIS REx are currently being studied and stored (for future studies) at the Johnson Space Center. Similarly, planning for the clean room facility at Johnson Space Center to house the OSIRIS-REx samples is well advanced, and construction of the facility should begin in early 2017 (despite a nominal 2023 return date for OSIRIS-REx samples). Similar development is being done, in concert with JAXA, for the return of Hayabusa 2 samples (nominally in 2020). We are also actively developing advanced techniques like cold curation and organically clean curation in anticipation of future sample return missions such as comet nucleus sample return and Mars sample return.

Zeigler, Ryan↗

Trade Space Analyses: Balancing Crew and Mission Design Parameters

In 2020, the Associate Administrator for Human Exploration and Operations and the Agency’s Federated Board requested an assessment to develop a methodology for trade space analysis comparing crew size for Mars missions against mission design parameters. The NASA Engineering and Safety Center (NESC) conducted an assessment to develop a methodology for systematic, repeatable trade space analysis for crew size and developed an initial set of human performance models and a list of candidate crew tasks for NASA’s first mission to Mars. This report contains the results of the NESC assessment.

Humans to Mars↗

The Icebreaker Mission to Search for Life on Mars

The search for evidence of life on Mars is the ultimate motivation for its scientific exploration. The results from the Phoenix mission indicate that the high N. latitude ice-rich regolith at low elevations is likely to be a recently habitable place on Mars [Stoker et al., 2010]. The near-surface ice likely provided adequate water activity during periods of high obliquity, 3 to 10 Myr ago. Carbon dioxide and nitrogen are present in the atmosphere, and nitrates may be present in the soil. Together with iron in basaltic rocks and perchlorate in the soil they provide carbon and energy sources, and oxidative power to drive metabolism. Furthermore, the presence of organics is possible, as thermally reactive perchlorate would have prevented their detection by Viking and Phoenix. The Mars Icebreaker Life mission [McKay et al., 2013] focuses on the following science goals: (1) Search for biomolecular evidence of life; (2) Search for organic matter from either exogeneous or endogeneous sources using methods that are not effected by the presence of perchlorate; (3) Characterize oxidative species that produced reactivity of soils seen by Viking; and 4) Assess the habitability of the ice bearing soils. The Icebreaker Life payload (Figure 1) includes a 1-m rotary percussive drill that brings cuttings samples to the surface where they are delivered to three instruments (Fig. 1), the Signs of Life Detector (SOLID) [Parro et al., 2011] for biomolecular analysis, Laser Desorption Mass Spectrometer (LDMS) [??? 2015]) for broad spectrum organic analysis, and Wet Chemistry Laboratory (WCL) [Hecht et al., 2009] for detecting soluble species of nutrients and reactive oxidants. The Icebreaker payload fits on the Phoenix spacecraft and can land at the well-characterized Phoe-nix landing site in 2020 in a Discovery-class mission.

Carbon dioxide and nitrogen↗

Nuclear Thermal Propulsion (NTP): A Proven Growth Technology for Human NEO/Mars Exploration Missions

The nuclear thermal rocket (NTR) represents the next "evolutionary step" in high performance rocket propulsion. Unlike conventional chemical rockets that produce their energy through combustion, the NTR derives its energy from fission of Uranium-235 atoms contained within fuel elements that comprise the engine s reactor core. Using an "expander" cycle for turbopump drive power, hydrogen propellant is raised to a high pressure and pumped through coolant channels in the fuel elements where it is superheated then expanded out a supersonic nozzle to generate high thrust. By using hydrogen for both the reactor coolant and propellant, the NTR can achieve specific impulse (Isp) values of ~900 seconds (s) or more - twice that of today s best chemical rockets. From 1955 - 1972, twenty rocket reactors were designed, built and ground tested in the Rover and NERVA (Nuclear Engine for Rocket Vehicle Applications) programs. These programs demonstrated: (1) high temperature carbide-based nuclear fuels; (2) a wide range of thrust levels; (3) sustained engine operation; (4) accumulated lifetime at full power; and (5) restart capability - all the requirements needed for a human Mars mission. Ceramic metal "cermet" fuel was pursued as well, as a backup option. The NTR also has significant "evolution and growth" capability. Configured as a "bimodal" system, it can generate its own electrical power to support spacecraft operational needs. Adding an oxygen "afterburner" nozzle introduces a variable thrust and Isp capability and allows bipropellant operation. In NASA s recent Mars Design Reference Architecture (DRA) 5.0 study, the NTR was selected as the preferred propulsion option because of its proven technology, higher performance, lower launch mass, versatile vehicle design, simple assembly, and growth potential. In contrast to other advanced propulsion options, no large technology scale-ups are required for NTP either. In fact, the smallest engine tested during the Rover program - the 25,000 lbf (25 klbf) "Pewee" engine is sufficient when used in a clustered engine arrangement. The "Copernicus" crewed spacecraft design developed in DRA 5.0 has significant capability and a human exploration strategy is outlined here that uses Copernicus and its key components for precursor near Earth object (NEO) and Mars orbital missions prior to a Mars landing mission. The paper also discusses NASA s current activities and future plans for NTP development that include system-level Technology Demonstrations - specifically ground testing a small, scalable NTR by 2020, with a flight test shortly thereafter.

Borowski, Stanley K.↗