The challenges of manufacturing graphite-epoxy structural columns for space platforms
A description is given of the manufacturing processes developed for large-quantity production of space structure graphite/epoxy composite tubes. The tubes are to be delivered to orbit by the Space Shuttle and assembled by astronaut-assisted assembly machines. The tooling and manufacturing system uses a novel method of dry fiber placement which carefully controls fiber position and orientation and a non-autoclave cure for the epoxy resin. The means of dimensional tolerance control over differential thermal expansion between metal tooling and graphite tubes, resin shrinkage during cure, hot pressurized resins in close tolerance tooling, and tool wear, are examined in detail. A successful pilot production program is also reported.