Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Hydro”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Small Windowed PDV Slab Shot Verification

Windowed PDV probes are used as a time of arrival diagnostic where conventional PDV measurements cannot be made with accuracy i.e., measurements where the surface measured is bare HE or the surface measured does not provide quality optical return for PDV directly. Often hydro experiments require that these diagnostics be minimally invasive, so their installation does not negatively impact the device performance or the overall experiments goals. In this report we build 3 mm diameter windowed probes and show that they give an error that is still within the error of piezo pins.

13 HYDRO ENERGY↗

Magnetic Gears: The Key to Robust, Cost-Effective Hydropower Drivetrains

Based on previous demonstrated success at fabricating 5 and 10 kW scale magnetic gearbox (MGB) prototypes, Emrgy and its partners (the project team) proposed to design and construct a 100 kW scale MGB with a 30:1 gear ratio for the low-head hydro applications. The Statement of Project Objectives included tasks covering: 1) Market Applicability; 2) Technical Metrics; 3) Design (initial); 4) Electromagnetic (EM) Load and Structural Analysis; 5) Modal Analysis; 6) Sealing Design and 7) Final Design during Budget Period 1. Budget Period 2 included tasks covering: 1) Materials Procurement and Test Plan Development; 2) Assembly; and 3) Testing. The Market Applicability study (Task 1) led to a clear conclusion and recommendation toward “Low Head” technologies for maximum market share of both New Stream Reach development as well as powering Non-Powered Dams. The findings of this study also identified the opportunity for a larger scale magnetic gearbox-based drive train as a function of increased torque, as opposed to increased speed. The Technical Metrics Study (Task 2) concluded a horizontal orientation was preferred, examined potential loss mechanisms, concluded that a Halbach Array magnetic design was preferred, established a 30:1 gear ratio as optimal, and established a power rating of 100 kW as optimal. The subsequent initial and final detailed design process included electro-magnetic (EM) load and structural analysis (Task 4), a Modal analysis (for vibration) (Task 5), and a sealing design (Task 6) to assure water impermeability. The final design package (Task 7) included 729 individual parts, 117 unique part numbers, and 15 assemblies. In order to facilitate procurement, the full bill of materials was broken down into several sub-components: 1) custom magnetic parts; 2) custom machined parts; 3) custom casted parts; and 4) commercial off the shelf (COTS) parts. The casted parts were fabricated by Oak Ridge National Laboratory (ORNL) via a Cooperative Research and Development Agreement (CRADA) with Emrgy and funded by the Advanced Manufacturing Office (AMO). The procurement effort (Task 8) ultimately covered three time periods based on challenges encountered in meeting the budgeted cost for the prototype. Following the first effort in the early stages of Budget Period 2 in 2017, a no-cost time extension was granted to seek alternative fabrication and procurement options. The project was re-booted in 2020 based on the new ORNL CRADA that would focus on five (5) of the more difficult and expensive parts using their advanced manufacturing expertise. Procurement efforts for the other custom machined parts resulted in quotations that still exceeded the budget by more than $\$$100k. This was, in part, also due to the concurrent COVID-19 pandemic that caused both supply chain disruptions and labor shortages. As the project continued, pricing and availability degraded further. In Q2 FY’22, it was decided to not proceed with the fabrication of the prototype (Task 9) based on budgetary limitations. Outcomes included a full and detailed design of a 100 kW magnetic gearbox and associated indented bill of materials (BOM) and CAD drawings, a full assembly instruction manual with an associated BOM for materials necessary to support assembly, the fabrication of the double Halbach magnetic array for the rotor/stator system, fabrication of five (5) sand-casted/machined parts (via CRADA with ORNL) and an initial draft of a comprehensive testing plan. The most significant non-outcome was the actual fabrication and testing of the prototype gearbox based on budget limitations. Lessons learned included the need for an Application / Design / Cost trade analysis to better elucidate the cost potential of the MGB in the projected volumes anticipated for future demand. This would better establish the efficacy of the original cost target ($\$$0.80/Watt) and/or the need for reconsideration of designs and applications. Likewise, additional consideration of the prototype nature of the gearbox – single use, short lifetime, etc. - either as a separate exercise or in place of the design process completed, to reduce the cost of the demonstration prototype device. Additionally, project continuity was cited as a significant risk based on the loss of the primary design engineering firm after Budget Period 1. A design analysis exercise was conducted at the conclusion of the project to identify potential areas for cost reduction. One concept considered was the removal of the inner ring of magnets (with associated changes in the outer ring magnets) to enable a horizontal collapse of the design. It was estimated this could reduce cost by 10-25% without impacting performance.

13 HYDRO ENERGY↗

Hydropower Value Drivers

Conventional hydro resources generate the majority of their value by providing energy under most conditions, but the relative fraction of value generated by providing ancillary services and capacity increases with increasing penetration of resources with zero fuel costs. Pumped storage hydropower resources generate the majority of their value by providing capacity under most conditions, but the relative fraction of value generated by providing energy increases with increasing penetration of resources with zero fuel costs. The total value of conventional hydropower generally decreases in systems with increasing penetration of resources with zero fuel costs; this is largely due to the associated decrease in average energy prices. The total value of pumped storage generally increases in systems with increasing penetration of resources with zero fuel costs, largely due to opportunities to operate in pumping mode when energy prices are low or even negative. Energy storage representation must be enhanced to ensure that models accurately capture system value streams for these resources. Current power system models have a limited ability to capture the price dynamics of ancillary services, and it is still challenging to assess the role and magnitude of ancillary service value streams in future systems. Power systems are currently in a state of rapid and dramatic evolution due to a number of different factors, including the increasing penetration of variable renewable energy (VRE) sources, such as wind and solar, and battery energy storage systems (BESS). This evolution will change the way power systems are fundamentally planned and operated. Some of these changes may be incremental, while others may be more significant, but the result will likely be parallel evolution in the definition and requirement of different grid services and therefore a subsequent shift in their relative values. This report presents a framework developed to identify such system value drivers and quantify their relative impact on several different value streams, with a specific focus on implications for conventional hydropower and pumped storage hydropower (PSH) resources. This value drivers framework (VDF) encompasses five core analytical steps: 1. Identify potential drivers and develop scenarios, 2. Execute production cost models, 3. Calibrate prices, 4. Optimize hydropower operations, and 5. Quantify value drivers.

13 HYDRO ENERGY↗

A Component-Level Bottom-Up Cost Model for Pumped Storage Hydropower

Pumped Storage Hydropower (PSH) is currently the largest source of utility-scale electricity storage in the U.S. and worldwide. As the accelerating deployment of variable renewable technologies creates opportunity and value for energy storage, it has become increasingly important to characterize PSH costs to understand how it competes. Site-specific considerations and limited cost data in the public domain make it difficult to estimate capital costs for potential new PSH sites. This report documents a spreadsheet-based tool that addresses this challenge and creates a component-level bottom-up cost model for PSH that can be made publicly available for widespread use. It uses detailed site-level physical characteristics and design specifications to calculate key performance and cost parameters for individual components and the project as a whole. The model was developed in consultation with HDR, Inc. and Small Hydro Consulting to ensure it aligns with industry expectations. It enables PSH cost exploration across a wide range of system assumptions and could be customized or extended for the needs of a variety of users.

cost model↗

Energy Transitions Initiative Partnership Project: City and Borough of Sitka, Alaska - Modeling and Controls Assistance and Renewable Energy Resource Assessment [Slides]

This presentation provides a summary of the ETIPP project objectives and findings for Sitka, Alaska, including sizing of wind penetration, dynamic models, and analysis of efficiency of load control, stability and grid control impacts of wind capacity expansions and locations, and wind-hydro control coordination.

17 WIND ENERGY↗

Utility of Big Area Additive Manufacturing for Part Production for Low-Head Hydropower

ORNL worked with Cadens, LLC to explore the use of additive manufacturing (AM) for the production of low-cost parts for low-head hydropower systems. Cadens develops design optimization software that leverages the flexible, low-cost, high-strength benefits of AM and composite materials, and operates a micro-hydro lab to test AM components in controlled environments. Until now Cadens’ tests have been limited in size to components that they can cost-effectively manufacture using local commercial systems. This project provided an opportunity for Cadens to scale up their modular AM hydropower parts using the capabilities of Big Area Additive Manufacturing (BAAM). This project was a success and resulted in the design and fabrication of several end use parts of a hydropower system using a Big Area Additive Manufacturing (BAAM) system. The fabricated parts include draft tube, thimble, runner housing mold, PVC end fitting and two PVC pipe supports. The components have been in use for more than three years without a 3D printed component failing.

13 HYDRO ENERGY↗

A Framework for Addressing Hydropower Modeling Gaps in Electric Grid Planning and Operational Studies [Slides]

Realistic representation of hydropower in power system planning and operation studies is extremely important as it helps in avoiding under/over-estimation of the services the hydro power units can provide. A framework and tools have been developed to account for hydrological conditions and modify power system models accordingly. For example, HyDat – data and AI driven platform, that provides that data required for editing the power system model files Collaborative effort with V&R Energy. Also, development of POM based tools have been performed, a) Tool1: editing .raw files with realistic current and maximum hydrogeneration and redispatch of other units, and b) Tool2: Editing .dyr files to represent water head, current and maximum generation. Finally the framework, HASP framework combines HyDat and V&R energy tools to produce modified power system model files. Key Take-away points from contingency analysis studies include a) the number of critical contingencies increases as the water levels are reduced (70%>75%>80%), and b) both the extent and the quality of dynamic response of the Hydropower unit is different with varying water head levels.

13 HYDRO ENERGY↗

Towards machine-learning a fully-coupled constitutive model for thermal-hydraulic fracture in geothermal systems: phase I (Final Report)

This project, entitled “Towards machine-learning a fully-coupled constitutive model for thermal-hydraulic fracture in geothermal systems: phase I,” addresses challenges in understanding and controlling subsurface fracture networks, which are crucial for applications like deep geothermal heat mining and deep-crustal minerals/metals/hydrogen extraction. The research focuses on advancing the understanding of coupled thermal-hydro-mechanical-chemical (THMC) processes in geologic materials, particularly under the high temperature and pressure conditions found in the deep crust. This seed grant focused specifically on thermal cracking and the development of new constitutive models. Significant progress was made in both experimental and theoretical domains. To study micro-scale fracture formation, the project demonstrated the ability to create thermal cracking under stress in granite samples using a Paterson Gas-medium Deformation Apparatus.

15 GEOTHERMAL ENERGY↗

Control Co-Design Framework for Joint Optimization of PID Governor and Hydraulic Dynamics for a Hydropower Plant

This paper presents a control co-design (CCD) framework tailored to the hydraulic and mechanical subsystems of hydropower systems, aimed at enhancing their dynamic performance and responsiveness to grid demands. Conventional sequential design approaches often fall short in capturing the coupled interactions between plant dynamics and control objectives. The proposed CCD methodology enables simultaneous optimization of key hydro plant parameters - such as governor settings, penstock characteristics, and valve control - with the control system architecture. Results indicate that both CCD and sequential design approaches achieve comparable transient and steady-state performance, with minor discrepancies arising from differences in their optimized parameters. However, CCD demonstrates a distinct advantage by tripling the water time constant (Tw) while maintaining similar dynamic performance to the sequential approach. This increase in Tw enables optimization of penstock dimensions, as it is directly influenced by penstock design, thereby contributing to overall cost optimization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Large Power Transformer Supply Chain Gap Analysis and Domestic Content Strategies for Hydropower Rehabilitation: Supplemental Report

Large Power Transformers (LPTs) are indispensable to U.S. hydropower operations, serving as generator step-up (GSU) units that interconnect hydro facilities to the transmission grid. Yet the LPT supply chain faces mounting stress from aging infrastructure, limited domestic production, and long lead times. Currently, more than 80% of LPT demand is met through imports, with primary suppliers including Mexico, South Korea, Brazil, Austria, and Canada. Domestic manufacturers supply only about 20% of units, constrained by bottlenecks in high-grade Grain-Oriented Electrical Steel (GOES), copper conductors, bushings, and on-load tap changers (OLTCs). Hydropower rehabilitation projects in particular face additional challenges due to custom design requirements, remote siting, and regulatory needs around domestic content. Regional cost disparities, driven by transportation logistics, labor markets, and import price volatility, further exacerbate project risks. To address these vulnerabilities, coordinated action is required: strengthening domestic capacity for GOES and secondary components, developing near-site assembly hubs, and leveraging IRS domestic content safe harbors to incentivize U.S. manufacturing. This addendum refines the 2024 NREL Hydropower Supply Chain Gap Analysis by focusing specifically on critical issues related to LPT domestic manufacturing capacity and key considerations for hydropower developers and asset owners.

13 HYDRO ENERGY↗

Cle Elum Supplementation and Research Facility : Monthly Progress Report : December 1, 2008 - December 31, 2008.

FISH PRODUCTION: Brood year 2008 production and experimental hatchery & supplemental crossed eggs continue to be incubated and chilled water at 380 Fahrenheit for the month. Temperature units are {approx}960 TU's at the end of the month. Hatching was observed at {approx}900 temperature units (TU's). The 2007 Brood year (BY) has approximately 773,477 juveniles on hand at the end of December, averaging 30.6 fish per pound. Fish tagging operations wrapped up on the 5th. Transportation of fish to acclimation sites is tentatively scheduled to begin January 12th. FISH CULTURE: Production pond cleaning continues on a weekly basis, and feeding continues to be performed two days per week due to the colder river water temperatures. Eggs in the incubation continue to be tempered in 38 degree water and temperature units recorded daily. On the 20th the river became too inclement for normal operations as the intake screens were covered with ice, at that time we shutdown two river pumps and turned on wells four and six to get 6,825 gallons of water. This was the operation at the facility for twenty-four hours at which point we were able to get back to normal operations. WATER PRODUCTION: The current combined well and river water supply to the complex is 14,756 gallons/min. The river pumps are supplying 13,571 gallons per minute. Well pumps No.2 and No.4 are operating and supplying 1,185 gallons/min. More on well pumps in the well field maintenance section of this report. ACCLIMATION SITES: Preparation of acclimation sites for fish transfer was the main focus for the month of December. Each week thermographs that record water temperature have the data disc changed at the acclimations sites. Ford Excavation with assistance from YKFP maintenance has started clearing snow out of the Easton acclimation site. VEHICLE MAINTENANCE: The snowmobiles were taken in to have annual maintenance performed. The full-size John Deere tractor needed and was taken to Barnet Implement in Yakima. The tractor needed a new clutch installed and was picked up on the 31st. SHOP BUILDING MAINTENANCE: On the 12th the facility domestic water hydro pneumatic tank and its system malfunctioned. The problem persisted and had to be dealt with multiple times; first it caused the tank to over flow and floods the shop. Wallace Electric was called and after extensive monitoring of the tank, compressor and electrical operations an electrical relay switch was replaced. Weekly cleaning and tool inventory continues to be a priority. The shop is home to our liberation truck along with fish transfer equipment, fish pump and seine nets. ELECTRICAL BUILDING MAINTENANCE: The large generator is located in the electrical building and is checked daily for routine inspections. HATCHERY BUILDING MAINTENANCE: The incubation building is being used to clean and repair isolation buckets, egg incubation baskets and troughs. An experiment involving remote site incubators (RSI's) continued through the month. Chad Stockton, WDFW, records flows and monitors emergence of fry on a daily basis. Chad is working with Steve S. and Curt K. on the RSI's research along with spawning channel fry emergence. RIVERWATER COOLING FACILITY: The one pump in operation in this building is checked daily during our routine inspections, the variable pump is supplying water to the artificial spawning channel. RIVER PUMP STATION MAINTENANCE: All four river pumps are in operation and pumping {approx}13,571 gallons/min to the facility. The building is cleaned monthly and the air burst system is cycled daily during the morning checks. The crew continued weekly changing of the graph paper on the river temperature thermograph throughout the month, continuing this activity as part of the daily checks routine. WELL FIELD MAINTENANCE: Wells No.1 and No.4 were in operation and supplying 1,185 gallons/minute to the facility and incubation building. Weekly test well readings are recorded and sent via fax to CH2MHILL. Also weekly well meter readings are recorded. Well No.5 had been determined to have a faulty drain valve while trying to operate the pump for emergency water usage. It was determined that water was not able to drain and began to flow out from the test hole (TH9). Charlie and Simon pumped out the remaining water from the test hole prior to replacing the valve. The valve was subsequently dug up, replaced and tested for operation. SAFETY AND TRAINING: The winter season has approached and conditions can be hazardous as Cle Elum staff stress safety while working and preparing acclimation sites for upcoming fish transfer. Some examples include wearing proper clothing, extra caution while driving and plowing snow. GROUNDS: Linda Lamebull of fisheries and personnel from Tribal Purchasing came to the hatchery to inventory two way radios.

13 HYDRO ENERGY↗

Grande Ronde Basin Fish Habitat Enhancement Project : 2007 Annual Report.

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources are the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and coordinated by the Grande Ronde Model Watershed Program (Project. No.199202601). Work undertaken during 2007 included: (1) Starting 1 new fencing project in the NFJD subbasin that will protect an additional 1.82 miles of stream and 216.2 acres of habitat; (2) Constructing 0.47 miles of new channel on the Wallowa River to enhance habitat, restore natural channel dimensions, pattern and profile and reconnect approximately 18 acres of floodplain and wetland habitat; (3) Planting 22,100 plants along 3 streams totaling 3.6 stream miles; (4) Establishing 34 new photopoints on 5 projects and retaking 295 existing photopoint pictures; (5) Monitoring stream temperatures at 10 locations on 5 streams and conducting other monitoring activities; (6) Completing riparian fence, water gap and other maintenance on 116.8 miles of project fences; (7) Initiated writing of a comprehensive project summary report that will present a summary of conclusions of the benefits to focal species and management recommendations for the future. Since initiation of this program 56 individual projects have been implemented, monitored and maintained along 84.8 miles of anadromous fish bearing streams that protect and enhance 3,501 acres of riparian and instream habitat.

13 HYDRO ENERGY↗

Grand Ronde Basin Fish Habitat Enhancement Project, 2008 Annual Report.

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing the opportunities for natural fish production within the basin. This project originally provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented under revisions of the Fish and Wild Program as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires considerable time be spent developing rapport with landowners to gain acceptance, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources, is the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and coordinated by the Grande Ronde Model Watershed Program (Project. No. 199202601). Work undertaken during 2008 included: (1) completing 1 new fencing project in the North Fork John Day subbasin that protects 1.82 miles of stream and 216.2 acres of habitat, and 1 fencing project in the Wallowa subbasin that protects an additional 0.59 miles of stream and 42.5 acres of habitat; (2) constructing 0.47 miles of new channel on the Wallowa river to enhance habitat, restore natural channel dimensions, pattern and profile and reconnect approximately 18 acres of floodplain and wetland habitat; (3) planting 10,084 plants along 0.5 miles of the Wallowa Riverproject; (4) establishing 34 new photopoints on 5 projects and retaking 295 existing photopoint pictures; (5) monitoring stream temperatures at 10 locations on 5 streams and conducting other monitoring activities; (6) completing riparian fence, water gap and other maintenance on 116.8 miles of project fences; and (7) completed a comprehensive project summary report to the Independent Scientific Review panel (ISRP) that provided our conclusions regarding benefits to focal species, along with management recommendations for the future. Since initiation of this program 57 individual projects have been implemented, monitoring and maintained along 84.9 miles of anadromous fish bearing streams, that protect and enhance 3,564 acres of riparian and instream habitat.

13 HYDRO ENERGY↗

Model Development and Loads Analysis of an Offshore Wind Turbine on a Tension Leg Platform with a Comparison to Other Floating Turbine Concepts: April 2009

This report presents results of the analysis of a 5-MW wind turbine located on a floating offshore tension leg platform (TLP) that was conducted using the fully coupled time-domain aero-hydro-servo-elastic design code FAST with AeroDyn and HydroDyn. The report also provides a description of the development process of the TLP model. The model has been verified via comparisons to frequency-domain calculations. Important differences have been identified between the frequency-domain and time-domain simulations, and have generated implications for the conceptual design process. An extensive loads and stability analysis for ultimate and fatigue loads according to the procedure of the IEC 61400-3 offshore wind turbine design standard was performed with the verified TLP model. This report compares the loads for the wind turbine on the TLP to those of an equivalent land-based turbine. Major instabilities for the TLP are identified and described.

17 WIND ENERGY↗

Updated Baseline Cost Model for Hydropower (2023)

The "Updated Baseline Cost Model (BCM) for Hydropower" is an empirical model for estimating the costs of US hydropower projects in six categories (Non-Powered Dam (NPD), New Stream Development (NSD), Canal/Conduit, Pumped Storage Hydro (PSH), Capacity Expansion, Generator Rewind). The model equations have been estimated with data on existing or planned projects obtained from various sources. NOTE: This is a macro-enabled workbook, so Excel may block it on the first opening. In that case: 1. Save the workbook to a local directory 2. Right-click on the workbook in the local directory and select “Properties” 3. Then check “Unblock” at the bottom of the “General” tab.

13 HYDRO ENERGY↗

Hydropower Capacity Factor Trends & Analytics for the United States

This data repository contains all code, input data, and data generated for Turner et al. (2024)—“Hydropower capacity factors trending down in the United States”. File descriptions: – hydro-cf-trends-inputs.zip: Full set of input data used in this study, organized for direct entry into “/data” directory of hydro-cf-trends data processing pipeline. – hydro-cf-trends.zip: Full data processing pipeline, coded using the R {targets} framework. This is a snapshot release (v1.0) of the code repository stored at https://code.ornl.gov/turnersw/hydro-cf-trends/. – hydro-cf-trends-results.zip: Provides all dam level results required to reproduce results and graphics in Turner et al. (2024). Dams are identified by the “complxID” (root of the hydropower plant ID in the Existing Hydropower Assets Database, inherited from HILARRI). Results include: • dam_CF_trends.csv: Table of long-term trends in annualized capacity factors for 610 dams and modeled annualized capacity factors for 362 modeled dams (naturalized and assimilated flows). • dam_annualized_CF_gen.csv: Annualized time series of the following variables for each of 610 hydropower dams with nameplate > 5MW – Reported nameplate capacity (MW) – Implied maximum annual generation (MWh) – Reported net generation (MWh) – Computed annual capacity factor – Modeled annual capacity factor (362 modeled plants only)

13 HYDRO ENERGY↗

CMIP6-based Multi-model Hydroclimate Projection over the Conterminous US

We present a suite of high-resolution downscaled hydro-climate projections over the conterminous United States (CONUS) based on a six-member General Climate Model (GCM) ensemble from the Coupled Models Intercomparison Project phase 6 (CMIP6). The CMIP6 GCMs are downscaled using two different downscaling approaches (statistical-based DBCCA & dynamical-based RegCM) based on two meteorological reference observations (Daymet & Livneh), and then fed to two calibrated hydrologic models (VIC & PRMS) to simulate projected future hydrologic responses. Each ensemble member covers 1980–2019 in the historic period and 2020–2059 in the near-term future period under the high-end (SSP585) emission scenario. Major variables such as daily maximum temperature (tmax), daily minimum temperature (tmin), daily total precipitation (prcp), daily average wind speed (wind), and daily total runoff (runoff) at 1/24° (~4 km) spatial resolution across the CONUS are provided through this data portal. This dataset is derived to support the SECURE Water Act Section 9505 Assessment for the US Department of Energy (DOE) Water Power Technologies Office (WPTO). Further details of this dataset can be referred to Kao et al. (2022) and Rastogi et al. (2022).

13 HYDRO ENERGY↗