Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Generation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Certifying Auto-Generated Flight Code

Model-based design and automated code generation are being used increasingly at NASA. Many NASA projects now use MathWorks Simulink and Real-Time Workshop for at least some of their modeling and code development. However, there are substantial obstacles to more widespread adoption of code generators in safety-critical domains. Since code generators are typically not qualified, there is no guarantee that their output is correct, and consequently the generated code still needs to be fully tested and certified. Moreover, the regeneration of code can require complete recertification, which offsets many of the advantages of using a generator. Indeed, manual review of autocode can be more challenging than for hand-written code. Since the direct V&V of code generators is too laborious and complicated due to their complex (and often proprietary) nature, we have developed a generator plug-in to support the certification of the auto-generated code. Specifically, the AutoCert tool supports certification by formally verifying that the generated code is free of different safety violations, by constructing an independently verifiable certificate, and by explaining its analysis in a textual form suitable for code reviews. The generated documentation also contains substantial tracing information, allowing users to trace between model, code, documentation, and V&V artifacts. This enables missions to obtain assurance about the safety and reliability of the code without excessive manual V&V effort and, as a consequence, eases the acceptance of code generators in safety-critical contexts. The generation of explicit certificates and textual reports is particularly well-suited to supporting independent V&V. The primary contribution of this approach is the combination of human-friendly documentation with formal analysis. The key technical idea is to exploit the idiomatic nature of auto-generated code in order to automatically infer logical annotations. The annotation inference algorithm itself is generic, and parametrized with respect to a library of coding patterns that depend on the safety policies and the code generator. The patterns characterize the notions of definitions and uses that are specific to the given safety property. For example, for initialization safety, definitions correspond to variable initializations while uses are statements which read a variable, whereas for array bounds safety, definitions are the array declarations, while uses are statements which access an array variable. The inferred annotations are thus highly dependent on the actual program and the properties being proven. The annotations, themselves, need not be trusted, but are crucial to obtain the automatic formal verification of the safety properties without requiring access to the internals of the code generator. The approach has been applied to both in-house and commercial code generators, but is independent of the particular generator used. It is currently being adapted to flight code generated using MathWorks Real-Time Workshop, an automatic code generator that translates from Simulink/Stateflow models into embedded C code.

Denney, Ewen↗

Off-Gas Generation Rate during Chemical Cleaning Operations at the Savannah River Site - 12499

The enhanced chemical cleaning process (ECC) is being developed at the Savannah River Site (SRS) to remove the residual radioactive sludge heel that remains in a liquid waste storage tank. Oxalic acid is the chemical agent utilized for this purpose. However, the acid also corrodes the carbon steel tank wall and cooling coils. If the oxalic acid has little interaction with the sludge, hydrogen gas could conceivably evolve at cathodic areas due to the corrosion of the carbon steel. Scenarios where hydrogen evolution could occur during ECC include the initial filling of the tank prior to agitation and near the end of the process when there is little or no sludge present. The purpose of this activity was to provide a bounding estimate for the hydrogen generation rate during the ECC process. Sealed vessel coupon tests were performed to estimate the hydrogen generation rate due to corrosion of carbon steel by oxalic acid. These tests determined the maximum instantaneous hydrogen generation rate, the rate at which the generation rate decays, and the total hydrogen generated. The tests were performed with polished ASTM A285 Grade C carbon steel coupons. This steel is representative of the Type I and II waste tanks at SRS. Bounding conditions were determined for the solution environment. The oxalic acid concentration was 2.5 wt.% and the test temperature was 75 deg. C. The test solution was agitated and contained no sludge simulant. Duplicate tests were performed and showed excellent reproducibility for the hydrogen generation rate and total hydrogen generated. The results showed that the hydrogen generation rate was initially high, but decayed rapidly within a couple of days. A statistical model was developed to predict the instantaneous hydrogen generation rate as a function of exposure time by combining both sets of data. An upper bound on the maximum hydrogen generation rate was determined from the upper 95% confidence limit. The upper bound limit on the maximum instantaneous generation rate at 5 hours was 6.1 x 10{sup -5} m{sup 3}/m{sup 2}/minute. After two and five days the upper bound limit decayed to 7.9 x 10{sup -6} and 1.3 x 10{sup -6} m{sup 3}/m{sup 2}/minute, respectively. The total volume of hydrogen gas generated during the test was calculated from the model equation. An upper bound on the total gas generated was determined from the upper 95% confidence limit. The upper bound limit on the total hydrogen generated during the 163 hour test was 0.101 m{sup 3}/m{sup 2}. Corrosion rates were determined from the coupon tests and also calculated from the measured hydrogen generation rates. Excellent agreement was achieved between the time averaged corrosion rate calculated from the hydrogen generation rates and the corrosion rates determined from the coupon tests. The corrosion rates were on the order of 0.45 mmpy. Good agreement was also observed between the maximum instantaneous corrosion rate as calculated from the hydrogen generation rate and the corrosion rate determined by previous electrochemical tests. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DWPF CATALYTIC HYDROGEN GENERATION PROGRAM - REVIEW OF CURRENT STATUS

Significant progress has been made in the past two years in improving the understanding of acid consumption and catalytic hydrogen generation during the Defense Waste Processing Facility (DWPF) processing of waste sludges in the Sludge Receipt and Adjustment Tank (SRAT) and Slurry Mix Evaporator (SME). This report reviews issues listed in prior internal reviews, describes progress with respect to the recommendations made by the December 2006 external review panel, and presents a summary of the current understanding of catalytic hydrogen generation in the DWPF Chemical Process Cell (CPC). Noble metals, such as Pd, Rh, and Ru, are historically known catalysts for the conversion of formic acid into hydrogen and carbon dioxide. Rh, Ru, and Pd are present in the DWPF SRAT feed as by-products of thermal neutron fission of {sup 235}U in the original waste. Rhodium appears to become most active for hydrogen as the nitrite ion concentration becomes low (within a factor of ten of the Rh concentration). Prior to hydrogen generation, Rh is definitely active for nitrite destruction to N{sub 2}O and potentially active for nitrite to NO formation. These reactions are all consistent with the presence of a nitro-Rh complex catalyst, although definite proof for the existence of this complex during Savannah River Site (SRS) waste processing does not exist. Ruthenium does not appear to become active for hydrogen generation until nitrite destruction is nearly complete (perhaps less nitrite than Ru in the system). Catalytic activity of Ru during nitrite destruction is significantly lower than that of either Rh or Pd. Ru appears to start activating as Rh is deactivating from its maximum catalytic activity for hydrogen generation. The slow activation of the Ru, as inferred from the slow rate of increase in hydrogen generation that occurs after initiation, may imply that some species (perhaps Ru itself) has some bound nitrite on it. Ru, rather than Rh, is primarily responsible for the hydrogen generation in the SME cycle when the hydrogen levels are high enough to be noteworthy. Mercury has a role in catalytic hydrogen generation. Two potentially distinct roles have been identified. The most dramatic effect of Hg on hydrogen generation occurs between runs with and without any Hg. When a small amount of Hg is present, it has a major inhibiting effect on Rh-catalyzed H{sub 2} generation. The Rh-Ru-Hg matrix study showed that increasing mercury from 0.5 to 2.5 wt% in the SRAT receipt total solids did not improve the inhibiting effect significantly. The next most readily identified role for Hg is the impact it has on accelerating NO production from nitrite ion. This reaction shifts the time that the ideal concentration of nitrite relative to Rh occurs, and consequently causes the most active nitro-Rh species to form sooner. The potential consequences of this shift in timing are expected to be a function of other factors such as amount of excess acid, Rh concentration, etc. Graphical data from the Rh-Ru-Hg study suggested that Hg might also be responsible for partially inhibiting Ru-catalysis initially, but that the inhibition was not sustained through the SRAT and SME cycles. Continued processing led to a subsequent increase in hydrogen generation that was often abrupt and that frequently more than doubled the hydrogen generation rate. This phenomenon may have been a function of the extent of Hg stripping versus the initial Ru concentration in these tests. Palladium is an active catalyst, and activates during (or prior to) nitrite destruction to promote N{sub 2}O formation followed by a very small amount of hydrogen. Pd then appears to deactivate. Data to date indicate that Pd should not be a species of primary concern relative to Rh and Ru for hydrogen generation. Pd was a very mild catalyst for hydrogen generation compared to Rh and Ru in the simulated waste system. Pd was comparable to Rh in enhancing N{sub 2}O production when present at equal concentration. Pd, however, is almost always present at less than a quarter of the Rh concentration in SRS sludge waste. Ag did not appear to ever become active for hydrogen generation. Data from two tests spiked with silver were comparable to the data from two tests with no noble metals. All significant technical gaps and inconsistencies with historical data in the prior two internal reviews of catalytic hydrogen generation work at SRS have been resolved. About 90% of the recommended work from the external technical review panel has been completed. Work planned or in progress could bring progress on the review panel recommendations up to about 95% by the end of calendar 2009. This primarily covers the sludge simulant matrix study on bulk compositional factors plus some follow-up work on X-ray absorption spectroscopy and improved acid equations.

08 HYDROGEN↗

Dynamic Braking System of a Tidal Generator

Renewable energy generation has experienced significant cost reductions during the past decades, and it has become more accepted by the global population. In the beginning, wind generation dominated the development and deployment of renewable energy; however, during recent decades, photovoltaic (PV) generation has grown at a very significant pace due to the tremendous decrease in the cost of PV modules. The focus on renewable energy generation has now expanded to include new types with promising future applications, such as river and tidal generation. The input water flow to these types of resources is more predictable than wind or solar generation. The data used in this paper is representative of a typical river or tidal generator. The analysis is based on a generator with a power rating of 40 kW. The tidal generator under consideration is driven by two sets of helical turbines connected to each side of the generator located in between the turbines. The generator is operated in variable speed, and it is controlled to maximize the energy harvested as well as the operation of the turbine generator. The electrical system consists of a three-phase permanent magnet generator connected to a three-phase passive rectifier. The output of the rectifier is connected to a DC-DC converter to match the rectifier output to the DC bus voltage of the DC-AC inverter. The three-phase inverter is connected to the grid, and it is controlled to provide a good interface with the grid. One important aspect of river and tidal generation is the braking mechanism. In a tidal generator, the braking mechanism is important to avoid a runaway condition in case the connection to the grid is lost when there is a fault in the lines. A runaway condition may lead to an overspeed condition and cause extreme stresses on the turbine blade structure and eventual disintegration of the mechanical structure. In this paper, the concept of the dynamic braking system is developed and investigated for normal and abnormal operations. The main objective is to optimize the performance under emergency braking while designing the system to be as simple as possible to avoid overdesigning the power electronics or exceeding the target budget.

13 HYDRO ENERGY↗

Wind Energy Management System EMS Integration Project: Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind and solar power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation), and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind/solar forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. To improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. Currently, uncertainties associated with wind and load forecasts, as well as uncertainties associated with random generator outages and unexpected disconnection of supply lines, are not taken into account in power grid operation. Thus, operators have little means to weigh the likelihood and magnitude of upcoming events of power imbalance. In this project, funded by the U.S. Department of Energy (DOE), a framework has been developed for incorporating uncertainties associated with wind and load forecast errors, unpredicted ramps, and forced generation disconnections into the energy management system (EMS) as well as generation dispatch and commitment applications. A new approach to evaluate the uncertainty ranges for the required generation performance envelope including balancing capacity, ramping capability, and ramp duration has been proposed. The approach includes three stages: forecast and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence levels. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis, incorporating all sources of uncertainties of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the “flying brick” technique has been developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation algorithm has been developed to validate the accuracy of the confidence intervals.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wind Energy Management System Integration Project Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation) and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. In order to improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively, by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. In this report, a new methodology to predict the uncertainty ranges for the required balancing capacity, ramping capability and ramp duration is presented. Uncertainties created by system load forecast errors, wind and solar forecast errors, generation forced outages are taken into account. The uncertainty ranges are evaluated for different confidence levels of having the actual generation requirements within the corresponding limits. The methodology helps to identify system balancing reserve requirement based on a desired system performance levels, identify system “breaking points”, where the generation system becomes unable to follow the generation requirement curve with the user-specified probability level, and determine the time remaining to these potential events. The approach includes three stages: statistical and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence intervals. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis incorporating all sources of uncertainty and parameters of a continuous (wind forecast and load forecast errors) and discrete (forced generator outages and failures to start up) nature. Preliminary simulations using California Independent System Operator (California ISO) real life data have shown the effectiveness of the proposed approach. A tool developed based on the new methodology described in this report will be integrated with the California ISO systems. Contractual work is currently in place to integrate the tool with the AREVA EMS system.

17 WIND ENERGY↗

Brigham City Hydro Generation Project

Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicated that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and the U.S. Fish and Wildlife Services (USFWS) concurring with the National Environmental Policy Act of 1969 (NEPA) It was determined that Brigham City’s Upper Hydroelectric Power Plant upgrade would have no effect to federally listed or candidate species. However Brigham City has contributed a onetime lump sum towards Bonneville cutthroat trout conservation in the Northern Bonneville Geographic Management Unit with the intention to offset any impacts from the Upper Hydro Project needed to move forward with design and construction and is sufficient for NEPA compliance. No work was done in the river or river bank. During construction, the penstock was disconnected and water was diverted through and existing system around the powerhouse and back into the water system. The penstock, which is currently a 30-inch steel pipe, would be removed and replaced with a new section of 30-inch pipe. Brigham City worked with the DOE and was awarded a new modification and the permission to proceed with Phase III of our Hydro Project in Dec. 2013; with the exception to the modification of the award for the construction phase. Brigham City developed and issued a Request for Proposal for Engineer and Design vendor. Sunrise Engineering was selected for the Design and throughout the Construction Phase of the Upper Hydroelectric Power Plant. Brigham City conducted a Kickoff Meeting with Sunrise June 28, 2013 and received a Scope of Work Brigham City along with engineering firm sent out a RFP for Turbine, Generator and Equipment for Upper Hydro. We select Turbine/Generator Equipment from Canyon Industries located in Deming, WA. DOE awarded Brigham City a new modification and the permission to proceed with Phase III Construction of our Hydro Project. Brigham City Crews removed existing turbine/generator and old equipment alone with feeder wires coming into the building basically giving Caribou Construction an empty shell to begin demolition. Brigham City contracted with Caribou Construction from Jerome, Idaho for the Upper Power Plant construction. A kickoff meeting was June 24, 2014 and demolition was immediately started on building. Because of a delivery delay of Turbine, Generator and Equipment from Canyon Brigham City had to request another extension for the final date of completion. DOE awarded modification (.007) to Brigham City with a new completion date of August 1, 2015. The Turbine has had a few adjustments to help with efficiency; but the Generator had a slight vibration when generator got hot so Canyon Industries had U S Motor’s that manufactured the generator come to check out the issue. The other Equipment seems to be running normal. Brigham City, Sunrise Engineering and Canyon Industries met to determine what the vibration in the generator was and how to solve the issue Us Motor’s found some welds that failed: they have been repaired. U S Motor’s delivered the repaired generator Feb. 17, 2015. Canyon Industries arranged for a crane to installed generator in Power Plant. U S Motor’s balanced and wired generator. Plant Operators put the generator back on line. Canyon Industries returned and gave their approval to keep Hydro online. After Hydro was put back into operations it kept going off line because of overheating issues. Canyon Industries returned and replaced sensors and adjusted them to the proper settings for normal operations. Brigham City added additional steel screens to windows to increase air flow in Power Plant Building. After construction phase of the Upper Hydro Plant some landscaping has been restored around the building additional gravel brought in and leveled out and the road that was cut through for conduits to run wires. A retaining wall was installed to protect penstock. The Upper Hydro Plant is complete and in full operations. The final reimbursement was submitted.

13 HYDRO ENERGY↗

Assessment of Methane Generation from the Thermolysis of Organics in Caustic Waste

Methane generation has been detected during thermolytic Hydrogen Generation Rate (HGR) testing of SRS tank waste and in simulant samples. Simulant testing has shown methane generation in the presence of trimethylsilanol (TMS) and radioactive sample testing has shown methane generation in presence of methylmercury, both of which are found within SRS waste tanks. The 2019 report Evaluation of the Current State of Knowledge for Thermolysis of Organics within SRS Waste Forming Volatile Organic Compounds (VOCs) reviewed historical data and assessed literature pertaining to thermolytic methane generation. That review recommended undertaking thermolysis studies on simulated waste to detect and quantify VOCs. The purpose of this assessment is to review chemistry and current knowledge of organics in SRS waste to recommend which organics in SRS waste tanks, if any, should be tested for thermolytic methane generation. An evaluation of observed methane generation rates has been performed to assess the implication for current CSTF controls. Based on the inputs used in this report, it was concluded that no methane generation data observed to date has challenged the existing 5% organic contribution to the Composite Lower Flammability Limit (CLFL) assumption in the CSTF tank farm at temperatures below 100 °C. Evidence shows that thermolytic pathways to methane generation become significant at temperatures >100 °C in caustic waste. Currently, the influences of thermolytic methane production on the flammability of vessels at >100 °C (e.g., evaporators) is unclear. It is recommended that testing should be undertaken using the HGR experimental approach for methane generation. The initial simulant testing should obtain quantitative methane generation rates at elevated temperatures for methylated siloxanes/silanes and methylmercury with the goal of determining the current mechanism for thermolytic methane generation seen in SRS tank waste. The results of this testing should then be compiled and analyzed to ascertain the risk of challenging the current projected organic contribution of 5% to the CLFL at elevated temperatures. Following this testing, an evaluation of possible flammable gas generation in the 2H and 3H Evaporators should be performed to assess the risk of methane generation at the high temperatures employed by the evaporators.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reassessing the MCNP Random Number Generator

Random number generators are integral components to Monte Carlo codes. They provide the pseudorandom number sequence used to actually sample the distributions of interest. As a result, they are one of the most important components to the software. The current recommended MCNP random number generator is a 63-bit linear congruential generator (LCG). This generator is quite fast, but it has some drawbacks. First, it only has a period of 2 63 . Due to the necessarily non-optimal usage of random numbers to ensure parallel reproducibility, this amount is too few to guarantee random number sequences are not reused in all configurations the code runs under. As simulation size increases, users will need to be aware of the limitations of the generator and tune configuration variables to best suit their simulations, or they will need to assume that reuse is not negatively affecting their answers. Neither of these are optimal. Second, small LCGs are fairly weak in bit generation quality, and this can have an unknown impact on the quality of the simulation. This paper is an investigation into whether or not more modern random number generators can supersede the current ones. The goal is to find a generator that is similar or superior in speed to the LCGs, has a state space large enough to make strong guarantees about random number reuse, and passes all modern random number test suites. If such a generator is found, it would eliminate the need for the user to even be aware of the limitations of the random number generator and would simplify the use of the code. This paper will be broken into several parts. Sec. 2 will discuss the evolution of the random number generator within the MCNP code. Sec. 3 will go over what a Monte Carlo code needs from a generator to be reproducible and portable and how the current generator behaves in that light. Sec. 4 goes through how each generator was tested. Finally, Sec. 5 will discuss improvements that could be made to the code.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Design Evolution and Verification of the A-3 Chemical Steam Generator

Following is an overview of the Chemical Steam Generator system selected to provide vacuum conditions for a new altitude test facility, the A-3 Test Stand at Stennis Space Center (SSC) in Bay St. Louis, MS. A-3 will serve as NASA s primary facility for altitude testing of the J-2X rocket engine, to be used as the primary propulsion device for the upper stages of the Ares launch vehicles. The Chemical Steam Generators (CSGs) will produce vacuum conditions in the test cell through the production and subsequent supersonic ejection of steam into a diffuser downstream of the J-2X engine nozzle exit. The Chemical Steam Generators chosen have a rich heritage of operation at rocket engine altitude test facilities since the days of the Apollo program and are still in use at NASA White Sands Test Facility (WSTF) in New Mexico. The generators at WSTF have been modified to a degree, but are still very close to the heritage design. The intent for the A-3 implementation is to maintain this heritage design as much as possible, making minimal updates only where necessary to substitute for obsolete parts and to increase reliability. Reliability improvements are especially desired because the proposed system will require 27 generators, which is nine times the largest system installed in the 1960s. Improvements were suggested by the original design firm, Reaction Motors, by NASA SSC and NASA WSTF engineers, and by the A-3 test stand design contractor, Jacobs Technology, Inc. (JTI). This paper describes the range of improvements made to the design to date, starting with the heritage generator and the minor modifications made over time at WSTF, to the modernized configuration which will be used at A-3. The paper will discuss NASA s investment in modifications to SSC s E-2 test facility fire a full-scale Chemical Steam Generator in advance of the larger steam system installation at A-3. Risk mitigation testing will be performed in early 2009 at this test facility to verify that the CSGs operate as expected. The generator which will undergo this testing is of the most recent A-3 configuration, and will be instrumented far in excess of what is normally required for operation. The extra data will allow for easier troubleshooting and more complete knowledge of expected generator performance. In addition, the early testing will give SSC personnel experience in operating the CSG systems, which will expedite the process of installation and activation at A-3. Each Chemical Steam Generator is supported by a complement of valves, instruments, and flow control devices, with the entire assembly called a "module." The generators will be installed in groups of three, historically called "units". A module is so called because of its modular ability to be replaced or serviced without disturbing the other two modules installed on the same unit. A module is pictured in Figure 1, shown with its generator secured by white bands in its shipping (vs. installed) configuration. The heritage system at WSTF is composed of a single unit (three generator modules), pictured in Figure 2 as it was installed in 1965. In contrast, A-3 will have nine units operating in parallel to achieve vacuum conditions appropriate for testing the J-2X engine. Each of the combustors operates in two modes and achieves the so-called "full-steam" mode after all three of its stages ignite. Ignition of the first stage is achieved by exciting a spark plug; the second stage and main stage are lit by the flame front of the previous stage. The main stage burns approximately 97% of the total propellant flow and uses the heat energy to vaporize water into superheated steam. While the main stage remains unlit, the combustor is in so-called "idle" mode. In the WSTF system, this idle mode is not optimized for water usage, and does not need to be, as the water is pumped from a large reservoir. The water supply at A-3 will be contained in tanks with finite volume, so water optimization is preferred for the modnized configuration. Multiple solutions for this issue have been proposed, with the leading concept being a change to the operational definition of "idle mode," with the generator running in a lower heat flux condition.

Kirchner, Casey K.↗

Application of Spatial Data Modeling and Geographical Information Systems (GIS) for Identification of Potential Siting Options for Various Electrical Generation Sources

Oak Ridge National Laboratory (ORNL) initiated an internal National Electric Generation Siting Study, which is an ongoing multiphase study addressing several key questions related to our national electrical energy supply. This effort has led to the development of a tool, OR-SAGE (Oak Ridge Siting Analysis for power Generation Expansion), to support siting evaluations. The objective in developing OR-SAGE was to use industry-accepted approaches and/or develop appropriate criteria for screening sites and employ an array of Geographic Information Systems (GIS) data sources at ORNL to identify candidate areas for a power generation technology application. The initial phase of the study examined nuclear power generation. These early nuclear phase results were shared with staff from the Electric Power Research Institute (EPRI), which formed the genesis and support for an expansion of the work to several other power generation forms, including advanced coal with carbon capture and storage (CCS), solar, and compressed air energy storage (CAES). Wind generation was not included in this scope of work for EPRI. The OR-SAGE tool is essentially a dynamic visualization database. The results shown in this report represent a single static set of results using a specific set of input parameters. In this case, the GIS input parameters were optimized to support an economic study conducted by EPRI. A single set of individual results should not be construed as an ultimate energy solution, since US energy policy is very complex. However, the strength of the OR-SAGE tool is that numerous alternative scenarios can be quickly generated to provide additional insight into electrical generation or other GIS-based applications. The screening process divides the contiguous United States into 100 x 100 m (1-hectare) squares (cells), applying successive power generation-appropriate site selection and evaluation criteria (SSEC) to each cell. There are just under 700 million cells representing the contiguous United States. If a cell meets the requirements of each criterion, the cell is deemed a candidate area for siting a specific power generation form relative to a reference plant for that power type. Some SSEC parameters preclude siting a power plant because of an environmental, regulatory, or land-use constraint. Other SSEC assist in identifying less favorable areas, such as proximity to hazardous operations. All of the selected SSEC tend to recommend against sites. The focus of the ORNL electrical generation source siting study is on identifying candidate areas from which potential sites might be selected, stopping short of performing any detailed site evaluations or comparisons. This approach is designed to quickly screen for and characterize candidate areas. Critical assumptions supporting this work include the supply of cooling water to thermoelectric power generation; a methodology to provide an adequate siting footprint for typical power plant applications; a methodology to estimate thermoelectric plant capacity while accounting for available cooling water; and a methodology to account for future ({approx}2035) siting limitations as population increases and demands on freshwater sources change. OR-SAGE algorithms were built to account for these critical assumptions. Stream flow is the primary thermoelectric plant cooling source evaluated in this study. All cooling was assumed to be provided by a closed-cycle cooling (CCC) system requiring makeup water to account for evaporation and blowdown. Limited evaluations of shoreline cooling and the use of municipal processed water (gray) cooling were performed. Using a representative set of SSEC as input to the OR-SAGE tool and employing the accompanying critical assumptions, independent results for the various power generation sources studied were calculated.

01 COAL, LIGNITE, AND PEAT↗

Modeling the Impacts of Solar Distributed Generation on U.S. Water Resources

Distributed electric power generation technologies typically use little or no water per unit of electrical energy produced; in particular, renewable energy sources such as solar PV systems do not require cooling systems and present an opportunity to reduce water usage for power generation. Within the US, the fuel mix used for power generation varies regionally, and certain areas use more water for power generation than others. The need to reduce water usage for power generation is even more urgent in view of climate change uncertainties. In this paper, we present an example case within the state of Tennessee, one of the top four states in water consumption for power generation and one of the states with little or no potential for developing centralized renewable energy generations. The potential for developing PV generation within Knox County, Tennessee, is studied, along with the potential for reducing water withdrawal and consumption within the Tennessee Valley stream region. Electric power generation plants in the region are quantified for their electricity production and expected water withdrawal and consumption over one year, where electrical generation data is provided over one year and water usage is modeled based on the cooling system(s) in use. Potential solar PV electrical production is modeled based on LiDAR data and weather data for the same year. Our proposed methodology can be summarized as follows: First, the potential solar generation is compared against the local grid demand. Next, electrical generation reductions are specified that would result in a given reduction in water withdrawal and a given reduction in water consumption, and compared with the current water withdrawal and consumption rates for the existing fuel mix. The increase in solar PV development that would produce an equivalent amount of power, is determined. In this way, we consider how targeted local actions may affect the larger stream region through thoughtful energy development. This model can be applied to other regions, other types of distributed generation, and used as a framework for modeling alternative growth scenarios in power production capacity in addition to modeling adjustments to existing capacity.

distributed energy generation↗

Advances in Parallelization for Large Scale Oct-Tree Mesh Generation

Despite great advancements in the parallelization of numerical simulation codes over the last 20 years, it is still common to perform grid generation in serial. Generating large scale grids in serial often requires using special "grid generation" compute machines that can have more than ten times the memory of average machines. While some parallel mesh generation techniques have been proposed, generating very large meshes for LES or aeroacoustic simulations is still a challenging problem. An automated method for the parallel generation of very large scale off-body hierarchical meshes is presented here. This work enables large scale parallel generation of off-body meshes by using a novel combination of parallel grid generation techniques and a hybrid "top down" and "bottom up" oct-tree method. Meshes are generated using hardware commonly found in parallel compute clusters. The capability to generate very large meshes is demonstrated by the generation of off-body meshes surrounding complex aerospace geometries. Results are shown including a one billion cell mesh generated around a Predator Unmanned Aerial Vehicle geometry, which was generated on 64 processors in under 45 minutes.

O'Connell, Matthew↗

Demonstration of variable speed permanent magnet generator at small, low-head hydro site

Small hydro developers face a limited set of bad choices when choosing a generator for a small low-head hydro site. Direct drive synchronous generators are expensive and technically complex to install. Simpler induction generators are higher speed, requiring a speed increaser, which results in inefficiencies and maintenance problems. In addition, both induction and synchronous generators turn at a fixed speed, causing the turbine to run off its peak efficiency curve whenever the available head is different than the designed optimum head.The solution to these problems is the variable speed Permanent Magnet Generators (PMG). At the Weisenberger Mill in Midway, KY, a variable speed Permanent Magnet Generator has been installed and demonstrated. This new PMG system replaced an existing induction generator that had a HTD belt drive speed increaser system. Data was taken from the old generator before it was removed and compared to data collected after the PMG system was installed. The new variable speed PMG system is calculated to produce over 96% more energy than the old induction generator system during an average year. This significant increase was primarily due to the PMG generator operating at the correct speed at the maximum head, and the ability for the PMG generator to reduce its speed to lower optimum speeds as the stream flow increased and the net head decreased.This demonstration showed the importance of being able to adjust the speed of fixed blade turbines. All fixed blade turbines with varying net heads could achieve higher efficiencies if the speed can be matched to the optimum speed as the head changes. In addition, this demonstration showed that there are many potential efficiencies that could be realized with variable speed technology at hydro sites where mismatched turbine and generator speeds result in lower power output, even at maximum head. Funding for this project came from the US Dept. of Energy, through Award Number DE-EE0005429.

13 HYDRO ENERGY↗

Modular Stirling Radioisotope Generator

High-efficiency radioisotope power generators will play an important role in future NASA space exploration missions. Stirling Radioisotope Generators (SRGs) have been identified as a candidate generator technology capable of providing mission designers with an efficient, high-specific-power electrical generator. SRGs high conversion efficiency has the potential to extend the limited Pu-238 supply when compared with current Radioisotope Thermoelectric Generators (RTGs). Due to budgetary constraints, the Advanced Stirling Radioisotope Generator (ASRG) was canceled in the fall of 2013. Over the past year a joint study by NASA and the Department of Energy (DOE) called the Nuclear Power Assessment Study (NPAS) recommended that Stirling technologies continue to be explored. During the mission studies of the NPAS, spare SRGs were sometimes required to meet mission power system reliability requirements. This led to an additional mass penalty and increased isotope consumption levied on certain SRG-based missions. In an attempt to remove the spare power system, a new generator architecture is considered, which could increase the reliability of a Stirling generator and provide a more fault-tolerant power system. This new generator called the Modular Stirling Radioisotope Generator (MSRG) employs multiple parallel Stirling convertor/controller strings, all of which share the heat from the General Purpose Heat Source (GPHS) modules. For this design, generators utilizing one to eight GPHS modules were analyzed, which provided about 50 to 450 W of direct current (DC) to the spacecraft, respectively. Four Stirling convertors are arranged around each GPHS module resulting in from 4 to 32 Stirling/controller strings. The convertors are balanced either individually or in pairs, and are radiatively coupled to the GPHS modules. Heat is rejected through the housing/radiator, which is similar in construction to the ASRG. Mass and power analysis for these systems indicate that specific power may be slightly lower than the ASRG and similar to the Multi-Mission Radioisotope Thermoelectric Generator (MMRTG). However, the reliability should be significantly increased compared to ASRG.

Modules↗

Protein disulfide isomerase enhances tissue factor-dependent thrombin generation

Protein disulfide isomerase (PDI) plays an important role in fibrin generation in vivo, but the underlying mechanism remains largely unknown. In this study, using thrombin generation assay (TGA), we investigated whether PDI contributes to tissue factor (TF)-mediated thrombin generation. Human peripheral blood mononuclear cells (PBMCs) were treated with 100 ng/ml lipopolysaccharide (LPS), the expression of TF on cell surface was analyzed by flow cytometry. After incubation with an inhibitory anti-TF antibody, recombinant PDI protein or a PDI inhibitor PACMA31, LPS-stimulated human PBMCs were incubated with human plasma, and thrombin generation was assessed by Ceveron Alpha TGA and a fluorescent thrombin substrate. Bone marrow mononuclear cells isolated from PDI-knockout and wild-type mice were stimulated by LPS, followed by measurement of thrombin generation. LPS stimulation increased expression of TF on PBMCs, and thrombin generation. Inhibitory anti-TF antibody almost completely suppressed thrombin generation of LPS-stimulated PBMCs, suggesting that thrombin generation was TF-dependent. Recombinant PDI protein increased thrombin generation, while PACMA31 attenuated thrombin generation. Compared with control cells, PDI-deficient marrow mononuclear cells had less capacity in thrombin generation. Taken together, these data suggest that PDI enhances TF-dependent thrombin generation.

60 APPLIED LIFE SCIENCES↗

The effects of in utero bisphenol A exposure on reproductive capacity in several generations of mice

In utero bisphenol A (BPA) exposure affects reproductive function in the first generation (F1) of mice; however, not many studies have examined the reproductive effects of BPA exposure on subsequent generations. In this study, pregnant mice (F0) were orally dosed with vehicle, BPA (0.5, 20, and 50 μg/kg/day) or diethylstilbestrol (DES; 0.05 μg/kg/day) daily from gestation day 11 until birth. F1 females were used to generate the F2 generation, and F2 females were used to generate the F3 generation. Breeding studies at the ages of 3, 6, and 9 months were conducted to evaluate reproductive capacity over time. Further, studies were conducted to evaluate pubertal onset, litter size, and percentage of dead pups; and to calculate pregnancy rate, and mating, fertility, and gestational indices. The results indicate that BPA exposure (0.5 and 50 μg/kg/day) significantly delayed the age at vaginal opening in the F3 generation compared to vehicle control. Both DES (0.05 μg/kg/day) and BPA (50 μg/kg/day) significantly delayed the age at first estrus in the F3 generation compared to vehicle control. BPA exposure reduced gestational index in the F1 and F2 generations compared to control. Further, BPA exposure (0.5 μg/kg/day) compromised the fertility index in the F3 generation compared to control. Finally, in utero BPA exposure reduced the ability of female mice to maintain pregnancies as they aged. Collectively, these data suggest that BPA exposure affects reproductive function in female mice and that some effects may be transgenerational in nature. - Highlights: • In utero BPA delayed vaginal opening in the F3 generation compared to control. • In utero BPA delayed estrus in the F3 generation compared to control. • In utero BPA reduced the ability of F1 and F2 female mice to maintain pregnancies. • In utero BPA compromised the ability of F3 female mice to become pregnant. • Some effects of in utero BPA may be transgenerational in nature.

60 APPLIED LIFE SCIENCES↗

Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine (Final Report)

As the nation continues to encourage, through market structures and financial incentives, the proliferation of intermittent renewable electricity, how to optimize the ever-changing electric grid and identify means to retain and improve resilience, while ensuring continued reductions in GHG emissions, will be critical. According to Bloomberg, wind & solar generated 10.5% of US electricity in 2020 and that percentage continues to grow. In support of expanding renewable energy use, and to address its intermittent nature, this project will develop the Hydrogen Storage for Flexible Fossil Fuel Power Generation platform that is dispatchable, reliable, repeatable and have the ability to produce zero or negative carbon power while interfacing with geology capable of CO2 and hydrogen storage. GTI Energy (GTIE) and team members Illinois State Geological Survey (ISGS), Mitsubishi Heavy Industries America (MHIA), Ameren Illinois, Hexagon Purus, and the Low Carbon Resources Initiative (LCRI) completed a Phase I Conceptual Study under contract DE-FE0032012 for Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine. The Hydrogen Storage for Flexible Fossil Fuel Power Generation platform addresses the intermittent nature of the expanding use of Variable Renewable Energy (VRE) generation. The low cost of the electricity (COE) generated results in greater dispatch and more operation at higher power levels (higher efficiency), fewer short intervals, and fewer start/stop cycles. The reliable, resilient system can produce zero carbon power and store hydrogen. It will demonstrate hydrogen storage in geologic formations like those used in natural gas underground storage thus enabling large scale storage of hydrogen in sedimentary strata across the United States rather than in geographically restricted salt caverns. The Phase I study confirmed the system is feasible and generates power at lower cost than other low carbon approaches. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production. The study advanced the maturity of the H 2 storage-based system with flexible power generation by completing a Pre-FEED study (Phase II). The Pre-FEED focused on the selected Energy Farm on the University of Illinois Urbana-Champaign (UIUC) site that includes above ground and underground hydrogen storage, low-carbon hydrogen production (GTI’s Compact Hydrogen Generator, CHG) with underground CO2 sequestration, and a 40-MW class gas turbine. The Pre-FEED addressed the entire system and its interconnection to the natural gas and electric grid and mitigation of key risks, such as storage behavior, load-following, and system operation. During Phase 1 of the project, the team completed key tasks, which moved the entire demonstration project, specific components and approaches closer to commercialization. These Phase I Accomplishments include: Completing System Requirements Review; Completing System Layout and Modeling - Heat & Mass Balance and Process Flow Diagram; Completing modelling of 9 turbine performance cases; Evaluating rock strata for underground storage of hydrogen and sequestration of carbon dioxide; Completing initial modelling of underground storage of hydrogen and withdrawal with evaluation of loss and water production; Identifying roadable storage for above ground hydrogen storage; Identifying existing electrical infrastructure for receiving/delivering electricity; Identifying existing gas supply infrastructure for receiving natural gas; Document concept design/development plans in required reports. Conclusions: The 12-month Feasibility study in Phase I study was completed and confirmed the system is feasible and generates power at lower cost than other low carbon approaches and even lower cost than the reference NGCC plant without carbon capture when taking advantage of 45Q carbon credits. The study enabled the fidelity of the concept to be improved and allowed identification of the requirements for the system. Defining the individual system and component requirements was performed via the system requirements review with the whole team. These requirements were then incorporated into and iterated with our Heat & Mass Balance process model and process flow diagrams were generated to reflect the overall system. This information was then used to complete the TEA and show economic feasibility. Large scale non-salt geologic storage of hydrogen is an enabling technology for a hydrogen-fired turbine that can be retrofitted into large-scale electric generating units (EGU). Our demonstration will include 428 MWh or ~4 hours full load of hydrogen storage (above and underground). Carbon capture inherent to the CHG process can capture 90% CO 2 (with upgrades to >98%). This system provides a COE of 23% savings relative to an NGCC with a post combustion amine system. Our proposed storage system decouples carbon capture and hydrogen production from power production; therefore, we expect our proposed system’s efficiency and variable COE to be superior resulting in overall higher dispatch and reduced deep cycling. Our demonstration will be full to multi-day hydrogen storage and has the potential for longer (seasonal) duration commercially. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production.

03 NATURAL GAS↗