Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Data Qualification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Java Tool Framework for Automation of Hardware Commissioning and Maintenance Procedures

The National Ignition Facility (NIF) is a 192-beam laser system designed to study high energy density physics. Each beam line contains a variety of line replaceable units (LRUs) that contain optics, stepping motors, sensors and other devices to control and diagnose the laser. During commissioning and subsequent maintenance of the laser, LRUs undergo a qualification process using the Integrated Computer Control System (ICCS) to verify and calibrate the equipment. The commissioning processes are both repetitive and tedious when we use remote manual computer controls, making them ideal candidates for software automation. Maintenance and Commissioning Tool (MCT) software was developed to improve the efficiency of the qualification process. The tools are implemented in Java, leveraging ICCS services and CORBA to communicate with the control devices. The framework provides easy-to-use mechanisms for handling configuration data, task execution, task progress reporting, and generation of commissioning test reports. The tool framework design and application examples will be discussed.

42 ENGINEERING↗

A status review of photovoltaic power conversion equipment reliability, safety, and quality assurance protocols

Data indicate that the inverter is the element of the photovoltaic plant that has the highest number of service calls and the greatest operation and maintenance cost burden. This paper describes the projects and relevant background needed in developing design qualification standards that would serve to establish a minimum level of reliability, along with a review of photovoltaic inverter quality and safety standards, most of which are in their infancy. We compare stresses and levels for accelerated testing of inverters proposed in the standard drafts, and those proposed by manufacturers and purchasers of inverters. We also review bases for the methods, stress types, and stress levels for durability testing of key inverter components. Many of the test protocols appear to need more comprehensive inclusion of stress factors existing in the natural environment such as wind driven rain, dust, and grid disturbances. Further understanding of how temperature, humidity ingress, and voltage bias affect the inverters and their components is also required. We provide data indicating inconsistent quality of the inverters and the durability of components leading to greater cost for the photovoltaic plant operator. Accordingly, the recommendation for data collection within quality standards for obtaining cost of ownership metrics is made. Design validation testing using realistic operation, environmental, and connection conditions, including under end-use field conditions with feedback for continuous improvement is recommended for inclusion within a quality standard.

14 SOLAR ENERGY↗

Data Compilation for AGR-3/4 Matrix Ring Blank Lot ARB-B1

This document is a compilation of compacting and characterization data for the matrix ring blank set ARB-B1. These ring blanks were made using a graphite/resin blend of natural and synthetic graphite flake mixed with Hexion SD-1708 novolac resin (Blend I). The Blend I material was provided to Oak Ridge National Laboratory (ORNL) by Babcock & Wilcox (B&W). Thirty of the 26 mm diameter, 63 mm long solid cylindrical ring blanks were shipped from ORNL to Idaho National Laboratory (INL) for machining and possible insertion into the Advanced Gas Reactor Fuel Development and Qualification (AGR) program’s third irradiation test (AGR-3/4). A previous batch of ring blanks (lot RDKRS), made from an ORNL produced graphite/resin blend of natural and synthetic graphite flake mixed with Hexion SC-1008 resole resin, has also been shipped from ORNL to INL (see data compilation report ORNL/TM-2011/127).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Qualification of the Savannah River National Laboratories Coulometer, Model SRNL-Rev. 2 (Serial # SRNL-003 Coulometer) for use in Process 3401a, Plutonium Assay by Controlled Coulometer

This report discusses the process used to prove in the SRNL-Rev.2 coulometer for isotopic data analysis used in the special plutonium material project. In May of 2012, the PAR 173 coulometer system that had been the workhorse of the Plutonium Assay team since the early 1970s became inoperable. A new coulometer system had been purchased from Savannah River National Laboratory (SRNL) and installed in August of 2011.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Design, analysis and test verification of advanced encapsulation systems

An analytical methodology for advanced encapsulation designs was developed. From these methods design sensitivities are established for the development of photovoltaic module criteria and the definition of needed research tasks. Analytical models were developed to perform optical, thermal, electrical and analyses on candidate encapsulation systems. From these analyses several candidate systems were selected for qualification testing. Additionally, test specimens of various types are constructed and tested to determine the validity of the analysis methodology developed. Identified deficiencies and/or discrepancies between analytical models and relevant test data are corrected. Prediction capability of analytical models is improved. Encapsulation engineering generalities, principles, and design aids for photovoltaic module designers is generated.

Garcia, A., III↗

Incorporating Vibration Test Results for the Advanced Stirling Convertor into the System Dynamic Model

The U.S. Department of Energy (DOE), Lockheed Martin Corporation (LM), and NASA Glenn Research Center (GRC) have been developing the Advanced Stirling Radioisotope Generator (ASRG) for use as a power system for space science missions. As part of the extended operation testing of this power system, the Advanced Stirling Convertors (ASC) at NASA GRC undergo a vibration test sequence intended to simulate the vibration history that an ASC would experience when used in an ASRG for a space mission. During these tests, a data system collects several performance-related parameters from the convertor under test for health monitoring and analysis. Recently, an additional sensor recorded the slip table position during vibration testing to qualification level. The System Dynamic Model (SDM) integrates Stirling cycle thermodynamics, heat flow, mechanical mass, spring, damper systems, and electrical characteristics of the linear alternator and controller. This Paper presents a comparison of the performance of the ASC when exposed to vibration to that predicted by the SDM when exposed to the same vibration.

Meer, David W.↗

Development of the Orion Crew-Service Module Umbilical Retention and Release Mechanism

The Orion CSM umbilical retention and release mechanism supports and protects all of the cross-module commodities between the spacecrafts crew and service modules. These commodities include explosive transfer lines, wiring for power and data, and flexible hoses for ground purge and life support systems. The mechanism employs a single separation interface which is retained with pyrotechnically actuated separation bolts and supports roughly two dozen electrical and fluid connectors. When module separation is commanded, either for nominal on-orbit CONOPS or in the event of an abort, the mechanism must release the separation interface and sever all commodity connections within milliseconds of command receipt. There are a number of unique and novel aspects of the design solution developed by the Orion mechanisms team. The design is highly modular and can easily be adapted to other vehiclesmodules and alternate commodity sets. It will be flight tested during Orions Exploration Flight Test 1 (EFT-1) in 2014, and the Orion team anticipates reuse of the design for all future missions. The design packages fluid, electrical, and ordnance disconnects in a single separation interface. It supports abort separations even in cases where aerodynamic loading prevents the deployment of the umbilical arm. Unlike the Apollo CSM umbilical which was a destructive separation device, the Orion design is resettable and flight units can be tested for separation performance prior to flight.Initial development testing of the mechanisms separation interface resulted in binding failures due to connector misalignments. The separation interface was redesigned with a robust linear guide system, and the connector separation and boom deployment were separated into two discretely sequenced events. These changes addressed the root cause of the binding failure by providing better control of connector alignment. The new design was tuned and validated analytically via Monte Carlo simulation. The analytical validation was followed by a repeat of the initial test suite plus test cases at thermal extremes and test cases with imposed mechanical failures demonstrating fault tolerance. The mechanism was then exposed to the qualification vibration environment. Finally, separation testing was performed at full speed with live ordnance.All tests of the redesigned mechanism resulted in successful separation of the umbilical interface with adequate force margins and timing. The test data showed good agreement with the predictions of the Monte Carlo simulation. The simulation proved invaluable due to the number of variables affecting the separation and the uncertainty associated with each. The simulation allowed for rapid assessment of numerous trades and contingency scenarios, and can be easily reconfigured for varying commodity sets and connector layouts.

Separation↗

Conditioning and Requalification of Legacy Waste Packages - 18648

In most German interim storage facilities, hundreds of waste packages are waiting for re-conditioning and qualification to comply with the waste acceptance criteria (WAC) for the Konrad repository. Especially the waste classification as well as some characteristics and the description of the material composition in its current state do not comply with the Konrad requirements since the conditioning of these waste packages took place up to 40 years ago. The German name for these waste packages is 'Altgebinde', hereafter referred to as 'legacy waste packages'. The present article will provide an overview of the measures for the qualification of these legacy waste packages to fulfill the Konrad requirements. The following measures, when necessary, are carried out for the qualification of legacy waste packages: - Collection and evaluation of all documents related to the primary conditioning process, e. g. the used equipment, documented waste and packaging properties, conditioning and radiology, if available (hereafter 'old documents'). - Preparation of a conceptual report and a process control quality plan based on existing data, with appropriate measures to qualify the waste packages. Assessment and approval of the process control quality plan by the competent authority. - Characterization of the waste and packaging properties by visual inspection or tomography, recording or updating of dose rate, contamination and mass, verification of product stability, for example by gas analysis of the interior atmosphere of the container. - Characterization of the nuclide inventory by gammas scans, sample taking to analyze nuclides which can not be measured by means of in-situ gamma spectrometry, and for material declaration. - Qualification or post-conditioning of the legacy waste packages if necessary, e. g. by drying the waste packages and packaging them in containers approved for disposal. - Compilation of all results of the above mentioned tests and steps to create a waste package documentation, including the calculations for the nuclide inventory and the description of the material composition of the waste packages. - Receiving approval by the competent authority after evaluation of the final documentation. The aim behind this structured approach is to prevent additional, unnecessary measures and treatment of the waste. Consequently, the additional characterization is preferably carried out on the basis of the available documents. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of the Intel 386 and i486 microprocessors for the Space Station Freedom Data Management System

The feasibility is analyzed of upgrading the Intel 386 microprocessor, which has been proposed as the baseline processor for the Space Station Freedom (SSF) Data Management System (DMS), to the more advanced i486 microprocessors. The items compared between the two processors include the instruction set architecture, power consumption, the MIL-STD-883C Class S (Space) qualification schedule, and performance. The advantages of the i486 over the 386 are (1) lower power consumption; and (2) higher floating point performance. The i486 on-chip cache does not have parity check or error detection and correction circuitry. The i486 with on-chip cache disabled, however, has lower integer performance than the 386 without cache, which is the current DMS design choice. Adding cache to the 386/386 DX memory hierachy appears to be the most beneficial change to the current DMS design at this time.

Liu, Yuan-Kwei↗

Analysis of the Intel 386 and i486 microprocessors for the Space Station Freedom Data Management System

The feasibility is analyzed of upgrading the Intel 386 microprocessor, which has been proposed as the baseline processor for the Space Station Freedom (SSF) Data Management System (DMS), to the more advanced i486 microprocessors. The items compared between the two processors include the instruction set architecture, power consumption, the MIL-STD-883C Class S (Space) qualification schedule, and performance. The advantages of the i486 over the 386 are (1) lower power consumption; and (2) higher floating point performance. The i486 on-chip cache does not have parity check or error detection and correction circuitry. The i486 with on-chip cache disabled, however, has lower integer performance than the 386 without cache, which is the current DMS design choice. Adding cache to the 386/387 DX memory hierarchy appears to be the most beneficial change to the current DMS design at this time.

Liu, Yuan-Kwei↗

Mercury Conditions for the MESSENGER Mission Simulated in High- Solar-Radiation Vacuum Tests

The MESSENGER (Mercury Surface, Space Environment, Geochemistry, and Ranging) spacecraft, planned for launch in March 2004, will perform two flybys of Mercury before entering a year-long orbit of the planet in September 2009. The mission will provide opportunities for detailed characterization of the surface, interior, atmosphere, and magnetosphere of the closest planet to the Sun. The NASA Glenn Research Center and the MESSENGER spacecraft integrator, the Johns Hopkins University Applied Physics Laboratory, have partnered under a Space Act Agreement to characterize a variety of critical components and materials under simulated conditions expected near Mercury. Glenn's Vacuum Facility 6, which is equipped with a solar simulator, can simulate the vacuum and high solar radiation anticipated in Mercury orbit. The MESSENGER test hardware includes a variety of materials and components that are being characterized during the Tank 6 vacuum tests, where the hardware will be exposed to up to 11 suns insolation, simulating conditions expected in Mercury orbit. In 2002, ten solar vacuum tests were conducted, including beginning of life, end of life, backside exposure, and solar panel thermal shock cycling tests. Components tested include candidate solar array panels, sensors, thermal shielding materials, and communication devices. As an example, for the solar panel thermal shock cycling test, two candidate solar array panels were suspended on a lift mechanism that lowered the panels into a liquid-nitrogen-cooled box. After reaching -140 C, the panels were then lifted out of the box and exposed to the equivalent of 6 suns (8.1 kilowatts per square meters). After five cold soak/heating cycles were completed successfully, there was no apparent degradation in panel performance. An anticipated 100-hr thermal shield life test is planned for autumn, followed by solar panel flight qualification tests in winter. Glenn's ongoing support to the MESSENGER program has been instrumental in identifying design solutions and validating thermal performance models under a very aggressive development schedule. The test data have assisted Johns Hopkins engineers in selecting a flight solar array vendor and a thermal shield design. MESSENGER is one in a series of missions in NASA's Discovery Program. Infrared thermography provides data on the thermal gradients in the MESSENGER components during high solar insolation vacuum testing.

Wong, Wayne A.↗

Integrated Waste Feed Qualification Program for Direct LAW Feed to WTP - 16421

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is a one-of-a-kind facility being designed and constructed for DOE by Bechtel National, Inc. (BNI) and principal subcontractor URS, to process and vitrify radioactive waste stored in underground tanks at the Hanford Site. The Tank Operations Contractor (TOC), Washington River Protection Solutions (WRPS), has the responsibility to retrieve, stage, pretreat, and deliver feed directly to the WTP Low Activity Waste (LAW) Vitrification Facility. The Direct Feed LAW (DFLAW) scenario is being considered by DOE as a strategy to treat Hanford tank wastes as soon as practicable. Extensive planning is underway by One System, an effort with joint participation by WTP and TOC personnel. The initial focus of One System is to achieve the required integration to ensure the waste feed meets acceptance requirements for processing in the TOC Low Activity Waste Pretreatment System (LAWPS) and WTP LAW facilities. The integrated waste feed qualification program approach for DFLAW was defined by One System during a four-day workshop. The effort resulted in a feasible approach for integrating LAWPS and LAW feed acceptance requirements to vitrify low-activity waste while complying with facility design basis, safety basis, waste acceptance criteria, and glass product compliance. The defined qualification program will provide a systematic approach to test newly staged feed campaigns at bench-scale using actual tank waste samples. The required integration and basis for obtaining sufficient and necessary data to qualify the feed for DFLAW facilities are discussed in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilizing 3D-DIC on Mars 2020 Rover Wheel Assembly: Test-Analysis Correlation

Following the successful implementation of full-field photogrammetry, more specifically three-dimensional Digital Image Correlation (3D-DIC), on the Mars 2020 Heat Shield Structural Failure Review assessment, 3D-DIC was selected as one of the primary measurement techniques for the Mars 2020 Rover wheel assembly qualification test at the NASA Jet Propulsion Laboratory (JPL). To validate the Rover wheel landing loads simulations, it was extremely important to have high confidence in the wheel models. Due to the large deformations and strains that the wheel would be subject to during landing, traditional instrumentation such as linear variable displacement transducers (LVDTs), electrical-resistance strain gages and string potentiometers, would not be sufficient on their own to provide all the necessary validation data. Therefore, the NASA Engineering and Safety Center (NESC) provided the 3D-DIC expertise and support to measure the high deformation and strain in the wheel flexures and qualify the overall structural response of the Mars 2020 rover wheel assembly. There were two key objectives for the photogrammetry technique: (1) monitor the wheel response in real-time, guarding against anomalous behavior and failure, and (2) provide test data for test-analysis correlation to validate and/or improve the high-fidelity computational model. The contents of this paper will focus on the challenges of applying 3D-DIC to the Mars 2020 Rover wheel assembly and how these challenges were overcome. Examples of test-analysis correlation during the stiffness characterization and structural qualification will be presented and discussed in detail. Experimental results were compared with the analysis and showed excellent agreement between the predicted behavior and helped validate the high-fidelity models.

Mars 2020 Rover Wheel↗

Condition Monitoring of Cables Task 3 Report: Condition Monitoring Techniques for Electric Cables

For more than 20 years the NRC has sponsored research studying electric cable aging degradation, condition monitoring, and environmental qualification testing practices for electric cables used in nuclear power plants. This report summarizes several of the most effective and commonly used condition monitoring techniques available to detect damage and measure the extent of degradation in electric cable insulation. The technical basis for each technique is summarized, along with its application, trendability of test data, ease of performing the technique, advantages and limitations, and the usefulness of the test results to characterize and assess the condition of electric cables.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of Computational Materials Workflows for Additively Manufactured Metallic Materials to Enable Accelerated Prediction of Fatigue Performance

The maturation of computational materials approaches for fatigue performance prediction in a qualification and certification process is stifled by the ability to validate complex, microstructure-based simulations. Such a validation strategy bears immediate challenges including generating accurate virtual microstructures, efficiently solving physics-based mechanical simulations over relevant spatial and temporal scales, and acquiring high-fidelity calibration and validation data at the appropriate length scale. This presentation will overview these common challenges and present a case study to demonstrate a computational materials workflow for additively manufactured metallic materials. In this study, process-specific defects are characterized using segmented X-Ray micro-computed tomography measurements and overlaid on virtual microstructures. Accelerated crystal plasticity-based fatigue simulations are performed to demonstrate cyclic evolution and localization of mechanical fields in the vicinity of defects in response to their precise spatial configuration. An example of how this computational materials workflow may support next-generation qualification is discussed.

computational materials↗

Sample Results from the Interim Salt Disposition Program Macrobatch 8 Tank 21H Qualification Samples

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 8 for the Interim Salt Disposition Program (ISDP). An Actinide Removal Process (ARP) and several Extraction-Scrub- Strip (ESS) tests were also performed. This document reports characterization data on the samples of Tank 21H as well as simulated performance of ARP and the Modular Caustic Side Solvent Extraction (CSSX) Unit (MCU). No issues with the projected Salt Batch 8 strategy are identified. A demonstration of the monosodium titanate (MST) (0.2 g/L) removal of strontium and actinides provided acceptable average decontamination factors for plutonium of 2.62 (4 hour) and 2.90 (8 hour); and average strontium decontamination factors of 21.7 (4 hour) and 21.3 (8 hour). These values are consistent with results from previous salt batch ARP tests. The two ESS tests also showed acceptable performance with extraction distribution ratios (D(Cs)) values of 52.5 and 50.4 for the Next Generation Solvent (NGS) blend (from MCU) and NGS (lab prepared), respectively. These values are consistent with results from previous salt batch ESS tests. Even though the performance is acceptable, SRNL recommends that a model for predicting extraction behavior for cesium removal for the blended solvent and NGS be developed in order to improve our predictive capabilities for the ESS tests.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Sample results from the Interim Salt Disposition Program Macrobatch 8 Tank 21H qualification samples

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 8 for the Interim Salt Disposition Program (ISDP). An Actinide Removal Process (ARP) and several Extraction-Scrub-Strip (ESS) tests were also performed. This document reports characterization data on the samples of Tank 21H as well as simulated performance of ARP and the Modular Caustic Side Solvent Extraction (CSSX) Unit (MCU). No issues with the projected Salt Batch 8 strategy are identified. A demonstration of the monosodium titanate (MST) (0.2 g/L) removal of strontium and actinides provided acceptable average decontamination factors for plutonium of 2.62 (4 hour) and 2.90 (8 hour); and average strontium decontamination factors of 21.7 (4 hour) and 21.3 (8 hour). These values are consistent with results from previous salt batch ARP tests. The two ESS tests also showed acceptable performance with extraction distribution ratios (D (Cs) ) values of 52.5 and 50.4 for the Next Generation Solvent (NGS) blend (from MCU) and NGS (lab prepared), respectively. These values are consistent with results from previous salt batch ESS tests. Even though the performance is acceptable, SRNL recommends that a model for predicting extraction behavior for cesium removal for the blended solvent and NGS be developed in order to improve our predictive capabilities for the ESS tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reliability of Ceramic Column Grid Array Interconnect Packages Under Extreme Temperatures

A paper describes advanced ceramic column grid array (CCGA) packaging interconnects technology test objects that were subjected to extreme temperature thermal cycles. CCGA interconnect electronic package printed wiring boards (PWBs) of polyimide were assembled, inspected nondestructively, and, subsequently, subjected to ex - treme-temperature thermal cycling to assess reliability for future deep-space, short- and long-term, extreme-temperature missions. The test hardware consisted of two CCGA717 packages with each package divided into four daisy-chained sections, for a total of eight daisy chains to be monitored. The package is 33 33 mm with a 27 27 array of 80%/20% Pb/Sn columns on a 1.27-mm pitch. The change in resistance of the daisy-chained CCGA interconnects was measured as a function of the increasing number of thermal cycles. Several catastrophic failures were observed after 137 extreme-temperature thermal cycles, as per electrical resistance measurements, and then the tests were continued through 1,058 thermal cycles to corroborate and understand the test results. X-ray and optical inspection have been made after thermal cycling. Optical inspections were also conducted on the CCGA vs. thermal cycles. The optical inspections were conclusive; the x-ray images were not. Process qualification and assembly is required to optimize the CCGA assembly, which is very clear from the x-rays. Six daisy chains were open out of seven daisy chains, as per experimental test data reported. The daisy chains are open during the cold cycle, and then recover during the hot cycle, though some of them also opened during the hot thermal cycle..

Ramesham, Rajeshuni↗