Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DECOMMISSIONING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Assessment of Reactor BN-350 Impact on the Environment During Its Operation Period

Fast neutron reactor BN-350 was designed for dual purposes: steam production and plutonium generation. The steam produced in the reactor was used to generate electricity (150 MW) and desalination of seawater (up to 120 000 tons/day). The BN-350 reactor began operating in July 1973 with a design lifetime of 20 years. After the end of the reactor design lifetime in July 1993, its further operation was managed on the basis of annual decisions taken to extend the operating life for one year. The reactor was in downtime beginning in December 1998 and on 22 April 1999 the RK Government Resolution no. 456 'About decommissioning of the BN-350 reactor in Aktau, Mangistau region' was adopted. Thus, the total actual reactor operational period was more than 25 years. In the framework of work under the approved 'Plan of priority measures for decommissioning of the BN-350 reactor in Aktau', the specialists of the Institute of Nuclear Physics (INP) and the Mangystau Nuclear Power Complex performed a radiation survey of the plant area, the sanitary protection zone and reactor BN-350 monitoring area. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of Plug-and-Play Interchangeable Components for Unmanned Aerial System with Mobile Manipulation Capability

The safe cleanup of the environmental legacy brought about from decades of nuclear weapons development and government-sponsored nuclear energy research is of vital importance. The sites of U.S. Department of Energy hold 6.5 trillion liters of contaminated groundwater and 40 million cubic meters of soil and debris contaminated with radionuclides, metals, and organics. The deactivation and decommissioning process (D and D) involves conversion of active, excess, and/or abandoned facilities to a final disposition. Because of residual radioactivity and dangerous chemicals, and the physical condition of these facilities, D and D presents unique hazards that must be addressed from safety, environmental, programmatic, and technological standpoints. This problem calls for development of informed D and D strategies including in-situ decommissioning, efficacy of D and D operations, productivity and personnel safety of D and D operation, facilitation of acceptable facility end-states, and independent verification. To identify and address D and D risks and challenges, innovative applications and timely insertion of existing commercially available technologies, processes and robotics or remote hardware are necessary. Aerial robotic unmanned autonomous systems (UAS) enable remote sensing operations. To address the needs of UAS-based sensing and sampling applications, we are developing plug-and-play interchangeable components for integration into the UAS: a neutron/gamma radiation sensor, a gas sensor for detection of vapors in air, and a miniature manipulator. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Consideration for Implementing the Safety Regulation Plans on Permanent Shut-own NPP during Transition Period in Korea

Recently the Korean regulatory body has been reviewing the change of permission on permanent shutdown Kori NPP (Nuclear Power Plant) unit 1, since the licensee (KHNP, Korea Hydro and Nuclear Power Co. Ltd) decided the permanent shut-down in June 2015 and applied the amendment of its licensing basis documents in June 2016. Although our institute with technical authority, the KINS (Korea Institute of Nuclear Safety), had performed the peer reviews for the construction permits of 3 NPPs and operating licenses of 25 NPPs, the safety control of permanent shut-down NPP and the transition activities including deactivation and decommissioning preparation are still in early stages and challenging fields. Currently the operation/only-possession system under defueled condition were defined through the peer review of fully revised documents and the major issues which concerned with the rearrangement of safety class or function based on new accident analysis results were produced. And also various transition activities were drawn as reflecting the decommissioning strategy on Kori unit 1. In this study, we described the status and problem of safety regulation based on our subordinate statute for permanent shut-down and transition activities. And then the detail implementation plans or the alternatives will be provided and discussed in order to solve the lack of regulatory experience and guide.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Preliminary Dose Assessment during Dismantling Biological Shield of Kori Unit-1

After Fukushima nuclear power plant accident at 2011, many counties decided to limit or hold operation and construction of nuclear power plant (NPP). Kori NPP unit-1, which was commissioned at 1978 and expected to operate until June 2017, was decided to stop its operation considering design life, political and public aspect in Korea while it was thought to be one of the reactors which had been affected by such nuclear accident. Accordingly, Korea Hydro and Nuclear Power Company, who is owner of Kori NPP unit-1, decided not to apply its life extension and is planning to prepare for the decommissioning. To establish decommissioning plan, it is needed to evaluate and secure the various safety factors including radiological safety. The biological shield has been neutron-activated by fission reaction during the operation of the reactor and various kinds of radionuclide including {sup 3}H, {sup 60}Co, {sup 55}Fe, and {sup 152}Eu are generated in the concrete. Thus, the biological shield dismantling worker will be exposed due to radiation from radioactive concrete and aerosol from its cutting. In this paper, the effective dose of the worker expected to dismantle biological shield is analyzed preliminarily. The dose assessment is analyzed on the external exposure from direct radiation and internal exposure due to inhalation and ingestion for the workers divided into three types.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Nuclear Analysis of ITER - Paper 129

The world record fusion power production is 16.1 MW (5.7x10{sup 18} n/s). This was achieved at JET in 1995. The neutron budget during that experimental campaign was 2.5x10{sup 20} neutrons. In the first few seconds of an ITER full power pulse, the neutron production will exceed that the total from the entire history of previous controlled fusion experiments. It is envisaged that ITER should produce as much as 700 MW of fusion power. (This is the maximum envisaged power production from the plasma and does not include power multiplication in the blankets or shielding). This equates to the production of 2.48x10{sup 20} 14-MeV neutrons/s which will give an uncollided flux at the first wall of approximately 4x10{sup 13} n/cm{sup 2}/s and a total with the addition of the collided flux of some 10{sup 14} n/cm{sup 2}/s. For safety and licensing purposes it is the responsibility of ITER to satisfy the host state regulations and must limit doses to the public and staff. Furthermore, sufficient shielding must be provided to ensure that all components function adequately; and for decommissioning, ITER has a responsibility to reduce the volume and radio-toxicity of waste. The construction, operational and decommissioning phases of ITER are expected to last in excess of 30 years and the nuclear issues will be of critical importance throughout this time. The huge leap in neutron production in fusion experiments means that extensive nuclear analysis is required for ITER and it is the thesis of this paper that it is required at an unprecedented level. This is because of the combination of the large physical size of the installation, the variety of radiation sources, the attenuation required, the complexity of the geometry and the complexity of the sources and level of detail required. As a result of this unprecedented challenge the latest techniques for analysis, variance reduction and data display are being employed and in some cases being specifically developed. In this paper a few of the many representative examples of nuclear analysis will illustrate the thesis. The paper includes an examination of areas where further development could be made in the areas of radiation shield and nuclear analysis. Extensive nuclear analysis is required at ITER and the combination of the large physical size of the installation, the variety of radiation sources, the attenuation required, the complexity of the geometry, and the complexity of the sources mean that analysis is required at an unprecedented level of detail and quality. The latest techniques for analysis, variation reduction and data display are being employed and in some cases being specifically developed. Developments are required in areas of analysis, data visualization and experimental verification. (author)

61 RADIATION PROTECTION AND DOSIMETRY↗

Representability evaluation of fuel debris nuclear characteristics by heterogeneous core of Stacy - 14581

Decommissioning is underway in the Fukushima Daiichi Nuclear Power Station (1FNPS). Criticality control is one of the important safety issues in the decommissioning, especially during fuel debris removal. In 1FNPS, part of fuel debris might be in the form of molten-core-concrete-interaction (MCCI) product. It has been shown that the MCCI product can be critical not only under water but even with water bound in concrete. Further study of criticality characteristics by computation is being conducted to clarify its criticality risk. Furthermore, the risk assessment by computation needs validation by experiment. Japan Atomic Energy Agency is preparing critical experiments with simulated fuel debris in the Static Experiment Critical Facility (STACY), whose solution core will be converted into a new core using fuel rods and light-water moderator. It is difficult to build core configurations composed of water and fuel rods which contain homogeneous mixtures of uranium dioxide (UO{sub 2}) and structural materials of boiling light water reactors. In the modified STACY, it is being planned to simulate fuel debris by arranging UO{sub 2} fuel rods and structural material rods in water. In this study, difference in heterogeneity between the experimental core and possible fuel debris conditions is evaluated by comparing infinite multiplication factors and neutron energy spectra. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

PARTNERSHIP FOR THE DEVELOPMENT OF NEXT GENERATION SIMULATION TOOLS TO EVALUATE CEMENTITIOUS BARRIERS AND MATERIALS USED IN NUCLEAR APPLICATION - 8388

The US DOE has initiated a multidisciplinary cross cutting project to develop a reasonable and credible set of tools to predict the structural, hydraulic and chemical performance of cement barriers used in nuclear applications over extended time frames (e.g., > 100 years for operating facilities and > 1000 years for waste management). A partnership that combines DOE, NRC, academia, private sector, and international expertise has been formed to accomplish the project objectives by integrating existing information and realizing advancements where necessary. The set of simulation tools and data developed under this project will be used to evaluate and predict the behavior of cementitious barriers used in near surface engineered waste disposal systems, e.g., waste forms, containment structures, entombments and environmental remediation, including decontamination and decommissioning (D&D) activities. The simulation tools will also support analysis of structural concrete components of nuclear facilities (spent fuel pools, dry spent fuel storage units, and recycling facilities, e.g., fuel fabrication, separations processes). Simulation parameters will be obtained from prior literature and will be experimentally measured under this project, as necessary, to demonstrate application of the simulation tools for three prototype applications (waste form in concrete vault, high level waste tank grouting, and spent fuel pool). Test methods and data needs to support use of the simulation tools for future applications will be defined. This is a national issue that affects all waste disposal sites that use cementitious waste forms and structures, decontamination and decommissioning activities, service life determination of existing structures, and design of future public and private nuclear facilities. The problem is difficult because it requires projecting conditions and responses over extremely long times. Current performance assessment analyses show that engineered barriers are typically the primary control to prevent the release of radionuclides from nuclear facilities into the environment. In the absence of an adequate predictive tool, assessments cannot fully incorporate the effectiveness of the concrete barriers, and the inventory of radionuclides (especially the long-lived radionuclides) that may be safely disposed of in shallow land disposal and the predicted service life of operating nuclear facilities. This project is 5 year effort focused on reducing uncertainties associated with current methodologies for assessing cementitious barrier performance and increasing the consistency and transparency of the assessment process. The results of this project will enable improved risk-informed, performance-based decision making, and supports several of the strategic initiatives in the DOE-EM Engineering & Technology Roadmap.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Characterization of Pu-238 heat source granule containment

The Milliwatt Radioisotopic Thermoelectric Generator (RTG) provides power for permissive-action links. These nuclear batteries convert thermal energy to electrical energy using a doped silicon-germanium thermopile. The thermal energy is provided by a heat source made of {sup 238}Pu, in the form of {sup 238}PuO{sub 2} granules. The granules are contained in 3 layers of encapsulation. A thin T-111 liner surrounds the {sup 238}PuO{sub 2} granules and protects the second layer (strength member) from exposure to the fuel granules. The T-111 strength member contains the fuel under impact condition. An outer clad of Hastelloy-C protects the T-111 from oxygen embrittlement. The T-111 strength member is considered the critical component in this {sup 238}PuO{sub 2} containment system. Any compromise in the strength member is something that needs to be characterized. Consequently, the T-111 strength member is characterized upon it's decommissioning through Scanning Electron Microscopy (SEM), and Metallography. SEM is used in Secondary Electron mode to reveal possible grain boundary deformation and/or cracking in the region of the strength member weld. Deformation and cracking uncovered by SEM are further characterized by Metallography. Metallography sections are mounted and polished, observed using optical microscopy, then documented in the form of photomicrographs. SEM may further be used to examine polished Metallography mounts to characterize elements using the SEM mode of Energy Dispersive X-ray Spectroscopy (EDS). This paper describes the characterization of the metallurgical condition of decommissioned RTG heat sources.

36 MATERIALS SCIENCE↗

DETERMINING THE EFFECTS OF RADIATION ON AGING CONCRETE STRUCTURES OF NUCLEAR REACTORS

The U.S. Department of Energy Office of Environmental Management (DOE-EM) is responsible for the Decontamination and Decommissioning (D&D) of nuclear facilities throughout the DOE Complex. Some of these facilities will be completely dismantled, while others will be partially dismantled and the remaining structure will be stabilized with cementitious fill materials. The latter is a process known as In-Situ Decommissioning (ISD). The ISD decision process requires a detailed understanding of the existing facility conditions, and operational history. System information and material properties are need for aged nuclear facilities. This literature review investigated the properties of aged concrete structures affected by radiation. In particular, this review addresses the Savannah River Site (SRS) isotope production nuclear reactors. The concrete in the reactors at SRS was not seriously damaged by the levels of radiation exposure. Loss of composite compressive strength was the most common effect of radiation induced damage documented at nuclear power plants.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

CHARACTERIZATION OF RADIOACTIVITY IN THE REACTOR VESSEL OF THE HEAVY WATER COMPONENT TEST REACTOR

The Heavy Water Component Test Reactor (HWCTR) facility is a pressurized heavy water reactor that was used to test candidate fuel designs for heavy water power reactors. The reactor operated at nominal power of 50 MW{sub th}. The reactor coolant loop operated at 1200 psig and 250 C. Two isolated test loop were designed into the reactor to provide special test conditions. Fig. 1 shows a cut-away view of the reactor. The two loops are contained in four inch diameter stainless steel piping. The HWCTR was operated for only a short duration, from March 1962 to December 1964 in order to test the viability of test fuel elements and other reactor components for use in a heavy water power reactor. The reactor achieved 13,882 MWd of total power while testing 36 different fuel assemblies. In the course of operation, HWCTR experienced the cladding failures of 10 separate test fuel assemblies. In each case, the cladding was breached with some release of fuel core material into the isolated test loop, causing fission product and actinide contamination in the main coolant loop and the liquid and boiling test loops. Despite the contribution of the contamination from the failed fuel, the primary source of radioactivity in the HWCTR vessel and internals is the activation products in the thermal shields, and to a lesser degree, activation products in the reactor vessel walls and liner. A detailed facility characterization report of the HWCTR facility was completed in 1996. Many of the inputs and assumptions in the 1996 characterization report were derived from the HWCTR decommissioning plan published in 1975. The current paper provides an updated assessment of the radioisotopic characteristics of the HWCTR vessel and internals to support decommissioning activities on the facility.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

DRAINING HAZARDOUS FLUIDS DURING BUILDING 221-1F DEACTIVATION AT THE SAVANNAH RIVER SITE

Several years ago, SRS completed a four year mission to decommission {approx}250 excess facilities. As part of that effort, SRS deactivated multiple facilities (e.g. Building 247-F, Naval Fuels Facility, and Building 211-F, Outside Facilities for F-Canyon) that contained extensive piping systems filled with hazardous material (e.g. nitric acid). Draining of hazardous materials from piping was successfully completed in all facilities without incident. In early 2009, the decommissioning program at SRS was restarted as a result of funding made available by the American Recovery & Reinvestment Act (ARRA). Under ARRA, draining of piping containing hazardous material was initiated in multiple facilities including Building 221-1F (or A-Line). This paper describes and reviews the draining of piping containing hazardous materials at A-Line, with emphasis on an incident involving the draining of nitric acid. The paper is intended to be a resource for engineers, planners, and project managers, who face similar draining challenges.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nondestructive assay holdup measurements with the Ortec detective

Wing 4 of the Chemistry and Metallurgy Research facility at Los Alamos National Laboratory is to be downgraded from a Hazard Category 2 Nuclear Facility to a Hazard Category 3 Radiological Facility. Survey and holdup measurements are used to ensure that the total contamination levels present in the facility do not contribute enough activity to go above the Hazard Category 3 threshold quantities. Additionally, the measurement information provides an understanding of the cleanup and the equipment removal needs for the next step of decontaminating and decommissioning of the site. The Chemistry and Metallurgy Research (CMR) facility has been housing the research and experimental activities for analytical chemistry, plutonium and uranium chemistry, and metallurgy since the start of the Los Alamos National Laboratory. It is currently being replaced by the new Chemistry and Metallurgy Research Replacement facilities. As a result, the CMR is gradually closing and/or downgrading to a nonnuclear facility. In 2008, the Safeguards Science and Technology group, N-1, was assigned the task of doing survey and holdup measurements of Wing 4 of the CMR. The goal of the measurements is to provide defensible measurement data for Wing 4 of the CMR Building to be downgraded from a Hazard Category 2 Nuclear Facility to below a Hazard Category 3 Radiological Facility. In addition, the measurement information would provide an understanding of the cleanup and the equipment removal needs for the next step of decontaminating and decommissioning the site. The large areal olume of the site and the high intensity of the high-energy gamma rays of thorium, either from the background or the contaminated objects in the measured room or the adjacent rooms, present some challenges in the holdup measurements. Typical holdup techniques of point source, line, or area measurement do not work well. In order to speed up the measurement time and to accuralely account for all the isotopes present in the facility, we used a new technique that we tentatively named 'Room Holdup Measurement' to do holdup measurements of the site. This technique uses the portable, electric-cooled high-purity germanium detectors from Ortec (the Detectives) to measure the activities of the isotopes.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Best practices for predictions of radionuclide activity concentrations and total absorbed dose rates to freshwater organisms exposed to uranium mining/milling

Predictions of radionuclide dose rates to freshwater organisms can be used to evaluate the radiological environmental impacts of releases from uranium mining and milling projects. These predictions help inform decisions on the implementation of mitigation measures. The objective of this study was to identify how dose rate modelling could be improved to reduce uncertainty in predictions to non-human biota. For this purpose, we modelled the activity concentrations of 210 Pb, 210 Po, 226 Ra, 230 Th, and 238 U downstream of uranium mines and mills in northern Saskatchewan, Canada, together with associated weighted absorbed dose rates for a freshwater food chain using measured activity concentrations in water and sediments. Differences in predictions of radionuclide activity concentrations occurred mainly from the different default partition coefficient and concentration ratio values from one model to another and including all or only some 238 U decay daughters in the dose rate assessments. Consequently, we recommend a standardized best-practice approach to calculate weighted absorbed dose rates to freshwater biota whether a facility is at the planning, operating or decommissioned stage. At the initial planning stage, the best-practice approach recommend using conservative site-specific baseline activity concentrations in water, sediments and organisms and predict conservative incremental activity concentrations in these media by selecting concentration ratios based on species similarity and similar water quality conditions to reduce the uncertainty in dose rate calculations. At the operating and decommissioned stages, the best-practice approach recommends relying on measured activity concentrations in water, sediment, fish tissue and wholebody of small organisms to further reduce uncertainty in dose rate estimates. This approach would allow for more realistic but still conservative dose assessments when evaluating impacts from uranium mining projects and making decision on adequate controls of releases.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

How fast can one resize a distributed file system?

Efficient resource utilization becomes a major concern as large-scale distributed computing infrastructures keep growing in size. Malleability, the possibility for resource managers to dynamically increase or decrease the amount of resources allocated to a job, is a promising way to save energy and costs. However, state-of-the-art parallel and distributed storage systems have not been designed with malleability in mind. The reason is mainly the supposedly high cost of data transfers required by resizing operations. Nevertheless, as network and storage technologies evolve, old assumptions about potential bottlenecks can be revisited. In this study, we evaluate the viability of malleability as a design principle for a distributed storage system. We specifically model the minimal duration of the commission and decommission operations. To show how our models can be used in practice, we evaluate the performance of these operations in HDFS, a relevant state-of-the-art distributed file system. We show that the existing decommission mechanism of HDFS is good when the network is the bottleneck, but can be accelerated by up to a factor 3 when storage is the limiting factor. We also show that the commission in HDFS can be substantially accelerated. With the highlights provided by our model, we suggest improvements to speed both operations in HDFS. We discuss how the proposed models can be generalized for distributed file systems with different assumptions and what perspectives are open for the design of efficient malleable distributed file systems.

97 MATHEMATICS AND COMPUTING↗

Challenges and Opportunities Specific to Microreactors: Compact and Light-Weight Shielding During Operation and Transportation

The problem of designing a shield for a mobile microreactor has been addressed. The principal challenges encountered in this endeavor are the dual goals of increasing radiation protection and decreasing weight. It is recognized that these two goals are contradictory. Increasing shielding naturally increases weight. Conversely, decreasing weight naturally calls for decreasing material inventory, including possibly decreasing shield mass. The operational and regulatory drivers for shielding and transportation constraints are identified and summarized. The main constraints pertain to volume, mass, radiation dose, material feasibility and availability, and decommissioning expectations. The latter are limits on residual contamination and dose rates after the reactor is removed. Progress toward solving the challenge of shielding a transportable microreactor is made by considering a tungsten tetraboride (WB4) shell surrounding the reactor vessel. The shield and a generic microreactor were modeled using the MCNP code. It was determined that the presence of a 16-cm-thick WB4 shield reduces the dose equivalent rate during operations to 3.6 mrem/h just outside of a concrete vault and dome and soil berm surrounding the reactor, which is very near the occupational dose rate limits. Without the WB4 layer, the dose rate at the same location outside the berm would be 120 mrem/h. Most importantly, the presence of the WB4 shield substantially protects the surrounding concrete and soil from activation, thus decreasing the duration of administrative control for the site following removal of the reactor from 16 to 3.4 years. At that point, the site may be decommissioned and returned to unrestricted public access. A limitation on the incorporation of a WB4 shield as an intrinsic component of a microreactor is that it results in a design that is transportable only by using the largest road conveyances and that the load would require special permits for transit through the U.S. highway system. New directions for further improvements and possibly more effective solutions to the shielding problem of a mobile microreactor are discussed in the conclusion section.

Microreactor↗

Monte Carlo simulations of photoneutron activation in a medical LINAC

The first step of the present study was to simulate the γ-radioactivity produced by photoneutrons in the treatment head of a decommissioned medical LINAC. These results, obtained with MCNPX and CINDER'90, are then compared with γ-ray spectrometric measurements of parts of the treatment head. Our ultimate objective is to simulate the associated production by photonuclear reactions of pure β-emitters, which are more difficult to access experimentally than the γ-ray emitters. (authors)

43 PARTICLE ACCELERATORS↗

Energy Return On Investment of Engineered Geothermal Systems Data

The project provides an updated Energy Return on Investment (EROI) for Enhanced Geothermal Systems (EGS). Results incorporate Argonne National Laboratory's Life Cycle Assessment and base case assumptions consistent with other projects in the Analysis subprogram. EROI is a ratio of the energy delivered to the consumer to the energy consumed to build, operate, and decommission the facility. EROI is important in assessing the viability of energy alternatives. Currently EROI analyses of geothermal energy are either out-of-date, of uncertain methodology, or presented online with little supporting documentation. This data set is a collection of files documenting data used to calculate the Energy Return On Investment (EROI) of Engineered Geothermal Systems (EGS) and erratum to publications prior to the final report. Final report is available below, or from the OSTI web site (http://www.osti.gov/geothermal/). Data in this collections includes the well designs used, input parameters for GETEM, a discussion of the energy needed to haul materials to the drill site, the baseline mud program, and a summary of the energy needed to drill each of the well designs. EROI is the ratio of the energy delivered to the customer to the energy consumed to construct, operate, and decommission the facility. Whereas efficiency is the ratio of the energy delivered to the customer to the energy extracted from the reservoir.

15 GEOTHERMAL ENERGY↗

2010 Idaho National Laboratory Water Use Report and Comprehensive Well Inventory (Revision 19)

This 2010 Idaho National Laboratory Water Use Report and Comprehensive Well Inventory (Revision 19) provides water use information (monthly annual average and total annual volume) for production and potable water wells at the Idaho National Laboratory for Calendar Year 2010. It also provides detailed information for new, modified, and abandoned (decommissioned) wells and holes. Five new wells were drilled and completed in the latter part of Calendar Years 2009 and 2010. Two wells were modified in Calendar Year 2010 and 66 wells and boreholes reported as abandoned (decommissioned). Detailed construction information for the new and modified wells, along with abandonment information for older wells, is provided. Location maps are provided if survey information was available. This report is being submitted in accordance with the Water Rights Agreement between the State of Idaho and the United States, for the United States Department of Energy (dated 1990) and the subsequent Partial Decree for Water Right 34-10901 issued June 20, 2003.

99 GENERAL AND MISCELLANEOUS↗