Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Cost”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Life cycle cost assessment of material recovery from perovskite solar cells

Perovskite photovoltaic (PV) cells have created a significant interest over the last few years due to their low-cost and high-power conversion efficiencies. While perovskite PVs are still under development, we analyze cost of alternative sustainable end-of-life management for perovskite PV cells; this allows to reuse economically valuable materials and prevent environmental contamination. Here, we studied the life cycle cost assessment of recovering metals such as lead, aluminum, gold, nickel, and silver and other valuable materials such as glass from waste perovskite PVs. We also developed a recycling scheme to optimize the material recovery and determine the economically feasible ways to separate the cells layer-by-layer. Further, we assessed the cost and the net cost of the perovskite PV recycling processes. We found that the most feasible recycling technique’ cost is $\$$10.70 and its net cost is $\$$– 2.95 per 1 m 2 module. These values could be further improved by optimizing and reusing chemicals involved in process. These results indicate that the cost of perovskite PV recycling is economically feasible and there is potentional to gain benefit from sustainable end-of-life management of perovskite PVs.

14 SOLAR ENERGY↗

Understanding the Costs and Barriers of Residential Electrical Panel and Service Upgrades

Upgrading electrical panels and services in U.S. homes represents a significant barrier to building modernization, imposing considerable costs, delays, and procedural uncertainties on homeowners, contractors, utilities, and building departments. Although cost databases document individual infrastructure activities, they rarely capture the integrated, whole-project perspective required to understand how electrical upgrades are planned, executed, and regulated. Existing research is often geographically constrained, narrowly scoped, or derived from limited samples, leaving significant knowledge gaps unaddressed. This study examines the timelines and costs associated with residential electrical panel and service upgrades using data from a national cross- sectional survey conducted in summer 2025. The survey captured responses from 140 stakeholders across 34 states, including building industry professionals, utility staff, and building department staff. Findings indicate that project duration and cost increase substantially with building size though patterns vary by infrastructure type. Most single-family and small multifamily projects were completed within 30 days, whereas medium and large multifamily buildings show longer and less predictable timelines. Service rating increases modestly extend project duration, but building type and size were the primary determinants of delays. Cost patterns were similar: customer-side equipment and panel replacements scale predictably with building size, while utility-side costs are highly variable, often triggered by threshold-driven infrastructure upgrades such as transformer replacements. Permit fees vary considerably between jurisdictions but generally represent a minor proportion of total project costs. These findings identify electrical upgrades as a significant barrier to residential building costs and highlight the need for improved stakeholder coordination, streamlined permitting, and strategies that reduce upgrade requirements while maintaining safety and code compliance.

Casquero-Modrego, Nuria↗

Innovative Feed-In Tariff Designs that Limit Policy Costs

Feed-in tariffs (FITs) are the most prevalent renewable energy policy used globally to date, and there are many benefits to the certainty offered in the marketplace to reduce development risks and associated financing costs and to grow the renewable energy industry. However, concerns over escalating costs in jurisdictions with FIT policies have led to increased attention on cost control inrenewable energy policy design. In recent years, policy mechanisms for containing FIT costs have become more refined, allowing policymakers to exert greater control on policy outcomes and on the resulting costs to ratepayers. As policymakers and regulators in the United States begin to explore the use of FITs, careful consideration must be given to the ways in which policy design can be used tobalance the policies' advantages while bounding its costs. This report explores mechanisms that policymakers have implemented to limit FIT policy costs. If designed clearly and transparently, such mechanisms can align policymaker and market expectations for project deployment. Three different policy tools are evaluated: (1) caps, (2) payment level adjustment mechanisms, and (3) auction-baseddesigns. The report employs case studies to explore the strengths and weaknesses of these three cost containment tools. These tools are then evaluated with a set of criteria including predictability for policymakers and the marketplace and the potential for unintended consequences.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Manufacturing Cost Analysis for YSZ-Based FlexCells at Pilot and Full Scale Production Scales

Significant reductions in cell costs must be achieved in order to realize the full commercial potential of megawatt-scale SOFC power systems. The FlexCell designed by NexTech Materials is a scalable SOFC technology that offers particular advantages over competitive technologies. In this updated topical report, NexTech analyzes its FlexCell design and fabrication process to establish manufacturing costs at both pilot scale (10 MW/year) and full-scale (250 MW/year) production levels and benchmarks this against estimated anode supported cell costs at the 250 MW scale. This analysis will show that even with conservative assumptions for yield, materials usage, and cell power density, a cost of $\$$35 per kilowatt can be achieved at high volume. Through advancements in cell size and membrane thickness, NexTech has identified paths for achieving cell manufacturing costs as low as $\$$27 per kilowatt for its FlexCell technology. Also in this report, NexTech analyzes the impact of raw material costs on cell cost, showing the significant increases that result if target raw material costs cannot be achieved at this volume.

30 DIRECT ENERGY CONVERSION↗

nuSTORM Costing document

Detailed costing of the nuSTORM conventional facilities has been done by the Fermilab Facilities Engineering Services Section (FESS) and is reported on in the nuSTORM Project Definition Report (PDR) 6-13-1. Estimates for outfitting the primary proton beam line, the target station, the pion capture/transport line and decay ring are based on either experience from existing Fermilab infrastructure (NuMI) or is based on the detailed costing exercises for DOE CD-1 approval for future experiments (mu2e and LBNE). The detector costing utilized the Euronu costing for the Neutrino Factory Magnetized Iron Neutrino Detector (MIND), extrapolations from MINOS as-built costs and from recent vendor quotes. Costs included all manpower and are fully burdened (FY2013 dollars). The costs are not escalated, however, beyond the 5-year project timeline, since a project start for nuSTORM is unknown. Escalation can be estimated from various models (see Figure 1). LBNE has used the Jacob’s model to determine their cost escalation.

Bross, Alan D.↗

Construction Cost Growth for New Department of Energy Nuclear Facilities

Cost growth and construction delays are problems that plague many large construction projects including the construction of new Department of Energy (DOE) nuclear facilities. A study was conducted to evaluate cost growth of large DOE construction projects. The purpose of the study was to compile relevant data, consider the possible causes of cost growth, and recommend measures that could be used to avoid extreme cost growth in the future. Both large DOE and non-DOE construction projects were considered in this study. With the exception of Chemical and Metallurgical Research Building Replacement Project (CMRR) and the Mixed Oxide Fuel Fabrication Facility (MFFF), cost growth for DOE Nuclear facilities is comparable to the growth experienced in other mega construction projects. The largest increase in estimated cost was found to occur between early cost estimates and establishing the project baseline during detailed design. Once the project baseline was established, cost growth for DOE nuclear facilities was modest compared to non-DOE mega projects.

42 ENGINEERING↗

Scale-up of Novel Low-Cost Carbon Fibers Leading to High-Volume Commercial Launch

The project started in September, 2012 with the goal of scaling up from the existing laboratory scale process for producing carbon fiber (CF) from polyolefin (PO) based precursor fiber using a Dow proprietary sulfonation-desulfonation stabilization process. The award was used to develop a process that was capable of producing market development quantities of CF from PO precursor fiber at a rate of 4 kg/h of CF. The CF would target properties that met or exceeded the Department of Energy (DOE) Vehicles Technology [1] standard; i.e., 172 GPa modulus and 1.72 GPa strength at greater than or equal to 1% strain. The Dow proprietary process was capable of meeting and exceeding these targets properties. Project DE-EE0005760 resulted from a Collaborative Research and Development Agreement (CRADA) between Dow and Oak Ridge National Laboratory (ORNL) with support from the Michigan Economic Development Corporation (MEDC) and DOE. In the first budget period, the main goal was to design a sulfonation-desulfonation market development plant capable of stabilizing PO precursor fiber at a rate of 5 kg/h using a sulfonation solution. The detailed design, location, and cost estimate were determined as scheduled in the Project Management Plan (PMP). In parallel with this DOE award project was a fundamentals and economic evaluation funded by The Dow Chemical Company (Dow). The goal of the Dow sponsored project was to finalize the mass balances, energy balances, and levelized cost to produce CF using the Dow process. A Go-No-Go decision was scheduled in June, 2013 based on the findings of the DOE sponsored scale up project and the Dow sponsored project. In June, 2013, Dow made the No-Go decision to halt and abandon the Dow proprietary sulfonation-desulfonation process for stabilizing PO precursor fibers for the manufacturing of CF. This No-Go decision was identified in the original proposal and at the start of this project, and the decision was made as scheduled. The decision was based on the high levelized economic cost of the process relative to the manufacture of CF from polyacrylonitrile (PAN) precursor fibers. The capital required to sulfonate the fibers adds a significant cost to the process due to the need for investment in a sulfuric acid recovery plant. This high additional capital over the capital for a PAN based CF plant, reduces the levelized economic cost to slightly advantaged over PAN based CF. The sulfonation-desulfonation stabilization route failed to meet the Dow’s return on investment criterion and the cost advantage target set forth for the DOE project. The DOE and Dow decided to halt spending on the project until a new PO fiber stabilization process could be identified that met the DOE physical properties standard and the levelized economic cost constraints of Dow. When the new technology was developed, then award DE-EE0005760 would be re-started with the same goals of the development of a market development plant capable of producing CF at 4 kg/h with the properties that met or exceed those set forth by the Department of Energy Vehicles Technology standard. Progress on the development of the new process has been slow and thus has delayed the scale up project. Dow’s efforts to date have not progressed to the point of demonstrating a commercially-viable process for production of low cost CF from PO precursors for Dow’s rigorous economic constraints. After extensive discussions within Dow and consultation with DOE’s Advanced Manufacturing Office (AMO) Headquarters and Golden Field Office teams, Dow has decided to proceed with the formal recommendation to terminate subject project. DOE’s AMO Headquarters and Golden Field Office teams agreed with the termination of the project.

36 MATERIALS SCIENCE↗

The Cost of Enforcing Building Energy Codes: Phase 1

The purpose of this literature review is to summarize key findings regarding the costs associated with enforcing building energy code compliance—primarily focusing on costs borne by local government. The review takes into consideration over 150 documents that discuss, to some extent, code enforcement. This review emphasizes those documents that specifically focus on costs associated with energy code enforcement. Given the low rates of building energy code compliance that have been reported in existing studies, as well as the many barriers to both energy code compliance and enforcement, this study seeks to identify the costs of initiatives to improve compliance and enforcement. Costs are reported primarily as presented in the original source. Some costs are given on a per home or per building basis, and others are provided for jurisdictions of a certain size. This literature review gives an overview of state-based compliance rates, barriers to code enforcement, and U.S. Department of Energy (DOE) and key stakeholder involvement in improving compliance with building energy codes. In addition, the processes and costs associated with compliance and enforcement of building energy codes are presented. The second phase of this study, which will be presented in a different report, will consist of surveying 34 experts in the building industry at the national and state or local levels in order to obtain additional cost information, building on the findings from the first phase, as well as recommendations for where to most effectively spend money on compliance and enforcement.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Scalable Light Module for Low-Cost, High-Efficiency Light- Emitting Diode Luminaires

During this two-year program Cree developed a scalable, modular optical architecture for low-cost, high-efficacy light emitting diode (LED) luminaires. Stated simply, the goal of this architecture was to efficiently and cost-effectively convey light from LEDs (point sources) to broad luminaire surfaces (area sources). By simultaneously developing warm-white LED components and low-cost, scalable optical elements, a high system optical efficiency resulted. To meet program goals, Cree evaluated novel approaches to improve LED component efficacy at high color quality while not sacrificing LED optical efficiency relative to conventional packages. Meanwhile, efficiently coupling light from LEDs into modular optical elements, followed by optimally distributing and extracting this light, were challenges that were addressed via novel optical design coupled with frequent experimental evaluations. Minimizing luminaire bill of materials and assembly costs were two guiding principles for all design work, in the effort to achieve luminaires with significantly lower normalized cost ($/klm) than existing LED fixtures. Chief project accomplishments included the achievement of >150 lm/W warm-white LEDs having primary optics compatible with low-cost modular optical elements. In addition, a prototype Light Module optical efficiency of over 90% was measured, demonstrating the potential of this scalable architecture for ultra-high-efficacy LED luminaires. Since the project ended, Cree has continued to evaluate optical element fabrication and assembly methods in an effort to rapidly transfer this scalable, cost-effective technology to Cree production development groups. The Light Module concept is likely to make a strong contribution to the development of new cost-effective, high-efficacy luminaries, thereby accelerating widespread adoption of energy-saving SSL in the U.S.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Structural Health and Prognostics Management for Offshore Wind Turbines: Sensitivity Analysis of Rotor Fault and Blade Damage with O&M Cost Modeling

Operations and maintenance costs for offshore wind plants are significantly higher than the current costs for land-based (onshore) wind plants. One way to reduce these costs would be to implement a structural health and prognostic management (SHPM) system as part of a condition based maintenance paradigm with smart load management and utilize a state-based cost model to assess the economics associated with use of the SHPM system. To facilitate the development of such a system a multi-scale modeling and simulation approach developed in prior work is used to identify how the underlying physics of the system are affected by the presence of damage and faults, and how these changes manifest themselves in the operational response of a full turbine. This methodology was used to investigate two case studies: (1) the effects of rotor imbalance due to pitch error (aerodynamic imbalance) and mass imbalance and (2) disbond of the shear web; both on a 5-MW offshore wind turbine in the present report. Sensitivity analyses were carried out for the detection strategies of rotor imbalance and shear web disbond developed in prior work by evaluating the robustness of key measurement parameters in the presence of varying wind speeds, horizontal shear, and turbulence. Detection strategies were refined for these fault mechanisms and probabilities of detection were calculated. For all three fault mechanisms, the probability of detection was 96% or higher for the optimized wind speed ranges of the laminar, 30% horizontal shear, and 60% horizontal shear wind profiles. The revised cost model provided insight into the estimated savings in operations and maintenance costs as they relate to the characteristics of the SHPM system. The integration of the health monitoring information and O&M cost versus damage/fault severity information provides the initial steps to identify processes to reduce operations and maintenance costs for an offshore wind farm while increasing turbine availability, revenue, and overall profit.

17 WIND ENERGY↗

2016 Alabama PV soft cost and workforce development

The Southeastern US has the largest potential for growth in the solar industry. However, currently they languish behind the rest of the US. There are several bright spots including the large number of utility scale installations in North Carolina and the recent successes in South Carolina under Act 236. In order to better understand the impacts of state legislation on the growth of the solar industry in the SE US, the Savannah River National Laboratory has undertaken a study to look at the growth in each state in order to develop recommendations to help reduce the cost of solar and to spur the industry. This is the second report in the series. The first focused on developing cost metrics for South Carolina under Act 236. This report focuses on Alabama, the 49th ranked state for solar business, which has very similar population and median income to South Carolina. For this survey, the ten known in-state installers were contacted. Responses were received from seven, representing 70% of the installers, a majority of which provide both residential and commercial installations. Interestingly, none of the respondents serve the utility scale sector. Overall, costs for Alabama are on track with the rest of the country with a reported average cost of $3.29/W-DC for residential systems and $2.44/W-DC for commercial systems. 60% of this cost is attributed to hardware only. Of the remaining costs, installation contributed to the largest percentage of soft costs followed by overhead, marketing and sales, and permitting, respectively. This also closely mirrors results seen in South Carolina. Job growth in the industry is expected to proceed well. An expected 34-42 additional full time equivalent jobs were expected to be added in Alabama within the six month window following the survey period. During the three years following the survey, this number was expected to double with 89-97 additional jobs being added to the market. In both cases, a vast majority of these jobs were for installation professionals and electricians. Despite the cost of solar, the industry continues to struggle in Alabama, largely due to the absence of any statewide net metering legislation. By current best estimates, there are over 60 residential installations statewide; however, this number is difficult to track due to the lack of a State authority keeping a consolidated list of grid connected distributed power systems. In South Carolina, the Energy Office tracks and reports grid connected distributed power systems by all Cooperatives and utilities. In Alabama, the Energy Office does not fulfill this role and data must be collected directly from each utility and cooperative, which makes collection and analysis difficult. Having a central state agency track this information would be extremely useful towards developing state policy recommendations, particularly if net metering were enabled within the state.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Manufacturing of Low Cost, Durable Membrane Electrode Assemblies Engineered for Rapid Conditioning

Over the past 20 years significant progress in membrane-electrode assembly (MEA) technology development for polymer electrolyte fuel cells (PEMFCs) has resulted in the PEMFC technology approaching a commercial reality for transportation applications. However, there remain two primary technical challenges to be addressed in the MEA. First and foremost is meeting the automotive cost targets: Producing a fuel cell stack cost competitive with today’s internal combustion engine. In addition to the material cost, MEA (and other components) and stack assembly production methods must be amenable for use in low cost, high speed, automotive assembly line. One impediment to this latter goal is that stack components must currently go through a long and tedious conditioning procedure before they produce optimal power. This so-called “break-in” can take many hours, and can involve quite complex voltage, temperature and/or pressure steps. These break-in procedures must be simplified and the time required reduced if fuel cells are to become a viable automotive engine. The second challenge is to achieve the durability targets in real-world automotive duty cycle operations. Significant improvements in cost, break-in time, and durability for the key component of fuel cell stacks, MEAs were achieved in this project. Advanced modeling was used to guide design of the new MEA to maximize performance and durability. A new, innovative process and manufacturing approach utilizing direct in-line coating using scalable, cost-competitive, continuous high volume 3-layer rolled-good manufacturing processes was developed and validated by single cell and short stack testing. In addition, the direct coating methods employed were shown to reduce the cost for sacrificial films. Furthermore, Gore has demonstrated a 10 µm reinforced membrane that is used in the new low-cost process and can meet automotive power density and durability targets. Across a wide range of operating conditions, the direct-coated MEA outperformed the commercial baseline MEA, and did so through a process that delivers MEAs at $92.35/m2 at a volume of 500,000 systems per year, according to Strategic Analysis (SA) estimates.

08 HYDROGEN↗

Comparison of Actual Costs to Integrate Commercial Buildings with the Grid

During the past decade, the technology to automate demand response (DR) in buildings and industrial facilities has advanced significantly. Automation allows rapid, repeatable, reliable operation. This study focuses on costs for DR automation in commercial buildings with some discussion on residential buildings and industrial facilities. DR automation technology relies on numerous components, including communication systems, hardware and software gateways, standards-based messaging protocols, controls and integration platforms, and measurement and telemetry systems. This paper discusses the impact factors that contribute to the costs of automated DR systems, with a focus on OpenADR 1.0 and 2.0 systems. In addition, this report compares cost data from several DR automation programs and pilot projects, evaluates trends in the cost per unit of DR and kilowatts (kW) available from automated systems, and applies a standard naming convention and classification or taxonomy for system elements. In summary, median costs for the 56 installed automated DR systems studied here are about $200/kW. The deviation around this median is large with costs in some cases being an order of magnitude greater or less than median. Costs to automate fast DR systems for ancillary services are not fully analyzed in this report because additional research is needed to determine the total such costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Algae Farm Cost Model: Considerations for Photobioreactors

Cost estimates and assumptions for a vertical hanging-bag type photobioreactor (PBR) system are reported here for a preliminary model developed to elucidate major cost drivers and opportunities for reducing the costs of algae cultivation. The design inputs and assumptions for this system are described in the report. A baseline case is presented, and alternative cases with differing areal algal productivities are used to compare to an open-pond case. The baseline algae production cost is estimated to be 1,137/short ton (st) algae, on an ash-free dry weight (AFDW) basis (2016 US$). Sensitivity analyses probe the areal productivity, support structure cost, and PBR bag replacement cost and life as significant impact factors affecting the system cost. A preliminary comparison of the PBR system and an open pond system is also developed to indicate the cost difference between these two systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cost Recovery for Standby and Ancillary Services for Distributed Generation: Considerations for New Mexico

A New Mexico statute allows investor-owned utilities to recover costs of “standby and ancillary services” resulting from distributed generation (DG). In attempting to do so, it is important to recognize both the physical and economic impacts, positive and negative, that distributed generation creates. Distributed generation has different impacts on ancillary and standby services depending on the location, capacity, and production patterns of the systems. Low penetrations of small distributed generation systems will not create significant contingencies for utilities. System impact of fluctuations in DG production may be no larger than normal fluctuations caused by customer demand, such as an air conditioner cycling. Higher penetrations and large DG system may produce noticeable impacts; so magnitude is critical when determining potential additional recoverable utility costs. Understanding DG impact on ancillary services is a relatively new and emerging area of study and as such there are not well-established formulas or protocols. Discretion is required. A hosting capacity analysis can help determine how much DG can be implemented before the impacts become substantive. Standby rates are traditionally used for large industrial generators or combined heat and power systems and threshold system size levels are often used in determining applicability of standby rates. System size thresholds may also be appropriate for standby rates and DG. Relatively small, geographically diverse DG systems are unlikely to create a noticeable coincident outage, so developing a standby charge based on assumed coincidence may not be appropriate. Individual lines and feeders may have considerable excess capacity during coincident outages, or they may be fully utilized and facing upgrades in the near future, which could vary over time. Understanding specific events that create concern for utilities is critical to developing an appropriate rate mechanism (e.g., single residential or community system outage, cascading event, clouds, eclipse). Any modeling or studies of the grid should also recognize the unique situation created when DG is coupled with a smart inverter or storage. These devices change the value proposition and can help mitigate some of the voltage and ramping issues DG can pose for a utility. Utilities can recover their fixed costs in a variety of ways, and some are better suited for DG than others. Beyond charging for standby and ancillary services, other options include fixed customer charges, demand charges, minimum bills, time-of-use rates and updated net energy-metering policies. Studies and analyses of the specific impacts that DG has on the grid should inform utilities’ decision-making process because distributed generation creates both costs and benefits for the grid. Any charge specific to DG customers should be backed up with analysis. At the heart of this conversation is utilities attempting to recover fixed costs. Allowing utilities to indiscriminately recover all stranded fixed costs can negatively affect long-term market efficiency by blunting utility incentives to lower costs and acting as a barrier to entry and exit. The current status of New Mexico’s grid, impending infrastructure updates, and likely customer adoption patterns for DG (backed up by transparent analysis) should remain at the forefront when considering charges for standby and ancillary services. Recognizing that utility regulation is largely a reactive process, it is recommended that applications for DG related standby or ancillary services cost recovery mechanisms be thoroughly reviewed by an experienced economist. If the commission has no such skill set on staff, one might be hired.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Innovative Development Selection and Testing to Reduce Cost and Weight of Materials for BOP Components

The primary objective of this effort is to identify alloys to replace type 316/316L in hydrogen service for balance of plant (BOP) applications onboard fuel cell electric vehicles (FCEVs). Type 316/316L austenitic stainless steels are used extensively in hydrogen systems for their resistance to hydrogen embrittlement, which is attributed to the relatively high nickel content of type 316/316L alloys. Nickel content, however, drives the cost of austenitic stainless steels, thus type 316/316L alloys impose a cost premium compared to similar alloys with lower nickel content. Since the cost of BOP components is a large fraction of the cost of hydrogen fuel systems (even dominating the cost at low production volumes [1]), alternative materials are desired. In addition, type 316/316L alloys are relatively low strength, thus high-pressure components tend to be heavy to accommodate the stresses associated with the pressure loads. Higher-strength materials will reduce weight of the components (an added benefit for onboard components) and contribute to lower cost since less material is needed. However, engineering data to justify selection of lower cost and higher strength alloys for high-pressure hydrogen service are currently unavailable. Moreover, alloy design could enable low cost solutions to the specific needs of onboard hydrogen storage.

33 ADVANCED PROPULSION SYSTEMS↗

Cost Efficient and Highly Weather-Resistant Solar Panel Backsheet Produced through Continuous Co-Extrusion Processing

The efficient generation and delivery of ‘clean energy” through photovoltaic (PV) technology relies heavily on the cost, performance and reliability of solar panels, along with the individual components used in assembly of those panels. In order to continue towards the Department of Energy’s (DOE) goals of driving costs down, the lifetime of high-output power generation equipment (i.e. solar modules) must be extended to reduce costs associated with power output degradation and replacement of failed or degraded panels. One of the major sources of module failures in the past 30 years has been the failure of the solar panel backsheet. Failure of this component causes severe output losses due to oxidation and yellowing of the module while creating safety concerns as the major electrical insulation of the module is compromised. Tomark-Worthen LLC was formed in 2012 with the goal of designing and manufacturing novel PV backsheets and encapsulants that would be produced in the United States of America and exceed expectations of domestic and international module producers. These backsheets would improve upon known backsheet design failures (i.e. Isovoltaic’s AAA backsheet) and create domestic manufacturing jobs in the PV sector. This goal became a reality with a first-generation product in 2018 and now, with the support of the DOE, Tomark-Worthen has launched a second-generation product known as PhotoMark® Reflections™ 205-3 and 360-3. This 2+ year effort began in late 2017 with a screening of potential polymeric materials and backsheet structural designs. Performance evaluations of each material provided the necessary data needed to select the proper material combinations and move forward into the design of the manufacturing process. These decisions were made by teaming with a local university, well-respected government laboratories, and private research organizations who provided the tools necessary to predict long-term performance of these materials in much shorter periods of time. Once the go/no-go criteria were met at the mid-point of the project, the effort transitioned to predicting 30+ year performance, achieving certifications, and improving manufacturing efficiencies designed to lower costs in order to be competitive in a cost-driven market. Major project accomplishments include recognition of the new backsheet by Underwriters Laboratories (UL) and international certification for 1000V and 1500V modules by TUV Sud. Both 1000V and 1500V products have been proven on several module manufacturing lines and initial customer orders have been received by both domestic and international module producers. Accelerated exposure testing has shown that the performance of this backsheet exceeds the prior polyamide-based backsheet known to fail in the field. Cost-models and initial customer orders have shown the ability to produce this backsheet at a cost acceptable to many domestic manufacturers, while International costs for standard backsheet remains extremely low. Tomark-Worthen remains one of the only U.S. companies manufacturing backsheet domestically and this has drawn interest from many domestic module manufacturers looking to improve their material supply logistics by avoiding long lead times and custom’s headaches while avoiding current tariffs on Chinese-made components. Along with the launch of a new PV backsheet, this project has provided a critical deliverable to the PV R&D community. This deliverable is the knowledge that not all polyamide-containing backsheets are doomed to failure as the earlier versions did. There has been a fear amongst the PV community to consider these materials due to the failure of one design. This effort has brought a new level of interest to the scientific community as it has been shown that polyamides can be used successfully in a well-designed backsheet. As we move forward from this project, we are excited to see how backsheet technology and manufacturing in the U.S. will continue to progress and grow.

14 SOLAR ENERGY↗

Applying Non-Energy Impacts from Other Jurisdictions in Cost-Benefit Analyses of Energy Efficiency Programs: Resources for States for Utility Customer-Funded Programs

Avoided energy and capacity costs are the primary yardstick utilities use to determine which energy efficiency programs are cost-effective for their customers. But sometimes "non-energy impacts" — not commonly recognized as directly associated with energy generation, transmission and distribution — represent substantial benefits, such as improving comfort, air quality and public health. Considering whether and how to include non-energy impacts is an important part of cost-benefit analyses for these programs. This report offers practical considerations for deciding which non-energy impacts to include and how to apply values or methods from other jurisdictions. Researchers reviewed studies quantifying non-energy impacts used in 30 states and applied a five-point system to indicate transferability of a value or method from each study for 16 categories of non-energy impacts: Water resource costs and benefits; Other fuels costs and benefits; Avoided environmental compliance costs; Environmental impacts; Productivity; Health and safety; Asset value; Energy and/or capacity price suppression effects; Avoided costs of compliance with Renewable Portfolio Standard requirements; Avoided credit and collection costs; Avoided ancillary services; Comfort; Economic development and job impacts; Public health impacts; Energy security impacts; Increased reliability. The U.S. Department of Energy’s Building Technologies Office supported this work.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗