Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Compressor”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Laboratory Test Report for Fujitsu 12RLS and Mitsubishi FE12NA Mini-Split Heat Pumps

Mini-split heat pumps are being proposed as a new retrofit option to replace resistance heating in the Pacific Northwest. NREL has previously developed a field test protocol for mini-split systems to ensure consistent results from field tests. This report focuses on the development of detailed system performance maps for mini-split heat pumps so that the potential benefits of mini-split systemscan be accurately analyzed for different climate regions and housing types. This report presents laboratory test results for two mini-split heat pumps. Steady-state heating and cooling performance for the Fujitsu 12RLS and Mitsubishi FE12NA was tested under a wide range of outdoor and indoor temperatures at various compressor and fan speeds. Cycling performance for each unit was also testedunder both modes of operation. Both systems performed quite well under low loads and the experimental test data aligned with manufacturer reported values. Adequate datasets were attained to promote performance modeling of these two systems in the future.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Modeling and experimental results for condensing supercritical CO2 power cycles.

This Sandia supported research project evaluated the potential improvement that 'condensing' supercritical carbon dioxide (S-CO{sub 2}) power cycles can have on the efficiency of Light Water Reactors (LWR). The analytical portion of research project identified that a S-CO{sub 2} 'condensing' re-compression power cycle with multiple stages of reheat can increase LWR power conversion efficiency from 33-34% to 37-39%. The experimental portion of the project used Sandia's S-CO{sub 2} research loop to show that the as designed radial compressor could 'pump' liquid CO{sub 2} and that the gas-cooler's could 'condense' CO{sub 2} even though both of these S-CO{sub 2} components were designed to operate on vapor phase S-CO{sub 2} near the critical point. There is potentially very high value to this research as it opens the possibility of increasing LWR power cycle efficiency, above the 33-34% range, while lowering the capital cost of the power plant because of the small size of the S-CO{sub 2} power system. In addition it provides a way to incrementally build advanced LWRs that are optimally designed to couple to S-CO{sub 2} power conversion systems to increase the power cycle efficiency to near 40%.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Close out of CRADA JSA 2006S008

Based on the JLab study and calculations, Linde made the following changes to the LR1610 heat exchanger. The LR 1610 redesign changed two different aspects of the original LR1610 design. The heat exchanger and the boiler are wrapped differently than the original LR1610 per the following: (A) Heat Exchanger - Section A - Current LR 1610 - 2 wraps - 1 path, Redesign - 2 wraps - 2 paths; Section B: Current LR 1610 - 2 wraps - 1 path, Redesign - 2 wraps - 2 paths; (B) Boiler: Current design - 1 wrap - 2 paths, Redesign - 1 wrap - 1 path. The contents of the attachments are: (1) Assembly - Pictures of the LR1610 Redesign Heat Exchanger after manufacturing; (2) Drawings - 3D and 2D drawings used to fabricate the Redesign LR1610 Heat Exchanger and the Precooler-Boiler; (3) Performance Curves - The expected performance curves and the TS diagram for a single proposed new compressor that is more capacity than the RSX; (4) Test Pictures - Set up bench test of the LR1610 Redesign Heat Exchanger; and (5) Warm Test Data - Warm N2 test data of the LR1610 Redesign Heat Exchanger. Warm test data of the LR1610 Redesign Heat Exchange vs. the warm test data of the two standard LR1610 heat exchangers.

42 ENGINEERING↗

Performance of Variable Capacity Heat Pumps in a Mixed Humid Climate

Variable capacity heat pumps represent the next wave of technology for heat pumps. In this report, the performance of two variable capacity heat pumps (HPs) is compared to that of a single or two stage baseline system. The units were installed in two existing research houses located in Knoxville, TN. These houses were instrumented to collect energy use and temperature data while both the baseline systems and variable capacity systems were installed. The homes had computer controlled simulated occupancy, which provided consistent schedules for hot water use and lighting. The temperature control and energy use of the systems were compared during both the heating and cooling seasons. Multiple linear regression models were used along with TMY3 data for Knoxville, TN in order to normalize the effect that the outdoor air temperature has on energy use. This enables a prediction of each system's energy use over a year with the same weather. The first system was a multi-split system consisting of 8 indoor units and a single outdoor unit. This system replaced a 16 SEER single stage HP with a zoning system, which served as the baseline. Data was collected on the baseline system from August 2009 to December 2010 and on the multi-split system from January 2011 to January 2012. Soon after the installation of the multi-split system, some of the smaller rooms began over-conditioning. This was determined to be caused by a small amount of continuous refrigerant flow to all of the indoor units when the outdoor unit was running regardless of whether they were calling for heat. This, coupled with the fact that the indoor fans run continuously, was providing enough heat in some rooms to exceed the set point. In order to address this, the indoor fans were disabled when not actively heating per the manufacturer's recommendation. Based on the measured data, the multi-split system was predicted to use 40% more energy in the heating season and 16% more energy in the cooling season than the baseline system, for the typical meteorological year weather data. The AHRI ratings indicated that the baseline system would perform slightly better than the multi-split system, but not by as large of a margin as seen in this study. The multi-split system was able to maintain more consistent temperature throughout the house than the baseline system, but it did allow relative humidity levels to increase above 60% in the summer. The second system was a split system with an inverter driven compressor and a single ducted air handler. This unit replaced a 16 SEER two stage HP with a zoning system. Data was collected on the baseline system from July 2009 to November 2010 and on the ducted inverter system from December 2010 to January 2012. The ducted inverter system did not offer a zone controller, so it functioned as a single zone system. Due to this fact, the registers had to be manually adjusted in order to better maintain consistent temperatures between the two levels of the house. The predicted heating season energy use for the ducted inverter system, based on the measured energy use, was 30% less than that of the baseline system for the typical meteorological year. However, the baseline system was unable to operate in its high stage due to a wiring issue with the zone controller. This resulted in additional resistance heat use during the winter and therefore higher energy use than would be expected in a properly performing unit. The AHRI ratings would indicate that the baseline system would use less energy than the ducted inverter system, which is opposite to the results of this study. During the cooling season, the ducted inverter system was predicted to use 23% more energy than the baseline system during the typical meteorological year. This is also opposite of the results expected by comparing the AHRI ratings. After a detailed comparison of the ducted inverter system's power use compared to that of a recently installed identical system at a retro-fit study house, there is concern that the unit is not operating as intended. The power use and cycles indicate that the unit is performing more like a single stage unit than a variable capacity unit. Analysis of the data indicates that a change in operating behavior occurred during a service call shortly after the installation of the unit. The logbook only indicates that refrigerant charge was added, but does not indicate any other change. This is being investigated further. While the energy comparison results of these two variable capacity heat pumps is generally underwhelming, it is difficult to draw any hard conclusions about the maximum attainable efficiency of these units when optimally installed. Both units appear to have undesirable conditions associated with the installation or operation, which could have had an adverse effect on their energy use.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

RLUOB Celebration

Los Alamos National Laboratory's newest facility, the Radiological Laboratory Utility Office Building (RLUOB), is also its first to achieve both the Leadership in Energy and Environmental Design (LEED) status and LEED Gold certification from the U.S. Green Building Council (USGBC). From its robust design to its advanced scientific equipment, RLUOB is essential to the Laboratory's national security mission in support of the National Nuclear Security Administration's (NNSA) nuclear weapons program. At more than 200,000 square feet, this building is the only radiological facility within the Department of Energy to have attained LEED Gold, which contributes to NNSA's achievement towards the high performance sustainable building goals outlined in Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance. 'As we celebrate RLUOB being completed almost one year ahead of schedule and having achieved LEED certification at the Gold level, we approach our plutonium mission at Los Alamos and NNSA with a great sense of achievement,' said Don Cook, NNSA's deputy administrator for defense programs. 'RLUOB adds a major component to NNSA's plutonium support capability and RLUOB demonstrates our commitment in helping to deliver President Obama's nuclear security agenda which includes ensuring the safety, security and effectiveness of the nuclear deterrent without testing.' The facility contains laboratories for analytical chemistry and materials characterization of special nuclear material, along with space for offices, training and emergency operations. Its multi-functional purpose makes RLUOB a unique project for which LEED certification was sought. 'LEED certification was a huge goal and one we sought from the very beginning of this project,' said Laboratory Director Charlie McMillan. 'It's an important step forward, allowing us to advance national security science in modern, safer, more efficient infrastructure.' The Laboratory's project team and its contractor partners, especially in coordination with Jacobs Engineering, focused on green design and construction in LEED categories, such as sustainable sites, water efficiency, energy and atmosphere, materials and resources, indoor environmental quality and innovation in design. RLUOB's features include: (1) Building envelope design (orientation, materials and insulation) yielded a 20 percent improvement in energy performance; (2) Incorporation of building materials with 24 percent recycled content; (3) Diversion of 72 percent of construction-generated materials through reuse, recycle and salvage; (4) Roofing comprised of 93 percent highly-reflective materials to reduce heat island effects; (5) High efficiency, gas-fired hot water boilers, air-cooled chillers, thermal storage systems and variable frequency drives for compressors, fans and pumps; (6) Energy efficient lighting for interiors, exteriors, process glove boxes and fume hoods; (7) Water efficient fixtures resulting in 30 percent reduction in usage; (8) Low emission paints and carpeting for improved indoor air quality; (9) Landscaping that doesn't require permanent irrigation; (10) Enhanced building system commissioning; and (11) Comprehensive transportation alternatives, including public transportation, bicycle storage and changing rooms, and a refueling station for government vehicles using alternative fuels. 'RLUOB's LEED certification demonstrates tremendous leadership in green building,' says Rick Fedrizzi, president and CEO of USGBC. 'The urgency of our mission has challenged the industry to move faster and reach further than ever before, and RLUOB serves as a prime example of just how much we can accomplish.'

25 ENERGY STORAGE↗

Texas Hydrogen Highway Fuel Cell Hybrid Bus and Fueling Infrastructure Technology Showcase (Final Scientific/Technical Report)

The Texas Hydrogen Highway project has showcased a hydrogen fuel cell transit bus and hydrogen fueling infrastructure that was designed and built through previous support from various public and private sector entities. The aim of this project has been to increase awareness among transit agencies and other public entities on these transportation technologies, and to place such technologies into commercial applications, such as a public transit agency. The initial project concept developed in 2004 was to show that a skid-mounted, fully-integrated, factory-built and tested hydrogen fueling station could be used to simplify the design, and lower the cost of fueling infrastructure for fuel cell vehicles. The approach was to design, engineer, build, and test the integrated fueling station at the factory then install it at a site that offered educational and technical resources and provide an opportunity to showcase both the fueling station and advanced hydrogen vehicles. The two primary technology components include: Hydrogen Fueling Station: The hydrogen fueling infrastructure was designed and built by Gas Technology Institute primarily through a funding grant from the Texas Commission on Environmental Quality. It includes hydrogen production, clean-up, compression, storage, and dispensing. The station consists of a steam methane reformer, gas clean-up system, gas compressor and 48 kilograms of hydrogen storage capacity for dispensing at 5000 psig. The station is skid-mounted for easy installation and can be relocated if needed. It includes a dispenser that is designed to provide temperature compensated fills using a control algorithm. The total station daily capacity is approximately 50 kilograms. Fuel Cell Bus: The transit passenger bus built by Ebus, a company located in Downey, CA, was commissioned and acquired by GTI prior to this project. It is a fuel cell plug-in hybrid electric vehicle which is ADA compliant, has air conditioning sufficient for Texas operations, and regenerative braking for battery charging. It uses a 19.3 kW Ballard PEM fuel cell, will store 12.6 kg of hydrogen at 350 Bar, and includes a 60 kWh battery storage system. The objectives of the project included the following: (a) To advance commercialization of hydrogen-powered transit buses and supporting infrastructure; (b) To provide public outreach and education by showcasing the operation of a 22-foot fuel cell hybrid shuttle bus and Texas first hydrogen fueling infrastructure; and (c) To showcase operation of zero-emissions vehicle for potential transit applications. As mentioned above, the project successfully demonstrated an early vehicle technology, the Ebus plug-in hybrid fuel cell bus, and that success has led to the acquisition of a more advanced vehicle that can take advantage of the same fueling infrastructure. Needed hydrogen station improvements have been identified that will enhance the capabilities of the fueling infrastructure to serve the new bus and to meet the transit agency needs. Over the course of this project, public officials, local government staff, and transit operators were engaged in outreach and education activities that acquainted them with the real world operation of a fuel cell bus and fueling infrastructure. Transit staff members in the Dallas/Ft. Worth region were invited to a workshop in Arlington, Texas at the North Central Texas Council of Governments to participate in a workshop on hydrogen and fuel cells, and to see the fuel cell bus in operation. The bus was trucked to the meeting for this purpose so that participants could see and ride the bus. Austin area transit staff members visited the fueling site in Austin to be briefed on the bus and to participate in a fueling demonstration. This led to further meetings to determine how a fuel cell bus and fueling station could be deployed at Capital Metro Transit. Target urban regions that expressed additional interest during the project in response to the outreach meetings and showcase events include San Antonio and Austin, Texas. In summary, the project objectives were achieved in the following ways: Through presentations and papers provided to a variety of audiences in multiple venues, the project team fulfilled its goal of providing education and outreach on hydrogen technology to statewide audiences. The project team generated interest that exists well beyond the completion of the project, and indeed, helped to generate financial support for a subsequent hydrogen vehicle project in Austin. The University of Texas, Center for ElectroMechanics operated the fuel cell-electric Ebus vehicle for over 13,000 miles in Austin, Texas in a variety of routes and loading configurations. The project took advantage of prior efforts that created a hydrogen fueling station and fuel cell electric-hybrid bus and continued to verify their technical foundation, while informing and educating potential future users of how these technologies work.

03 NATURAL GAS↗

Recovery Act: A Measurement -- Management Technology for Improving Energy Efficiency in Data Centers and Telecommunication Facilities (Final Technical Report)

Data center (DC) electricity use is increasing at an annual rate of over 20% and presents a concern for the Information Technology (IT) industry, governments, and the society. A large fraction of the energy use is consumed by the compressor cooling to maintain the recommended operating conditions for IT equipment. The most common way to improve the DC efficiency is achieved by optimally provisioning the cooling power to match the global heat dissipation in the DC. However, at a more granular level, the large range of heat densities of today's IT equipment makes the task of provisioning cooling power optimized to the level of individual computer room air conditioning (CRAC) units much more challenging. Distributed sensing within a DC enables the development of new strategies to improve energy efficiency, such as hot spot elimination through targeted cooling, matching power consumption at rack level with workload schedule, and minimizing power losses. The scope of Measurement and Management Technologies (MMT) is to develop a software tool and the underlying sensing technology to provide critical decision support and control for DC and telecommunication facilities (TF) operations. A key aspect of MMT technology is integration of modeling tools to understand how changes in one operational parameter affect the overall DC response. It is demonstrated that reduced ordered models for DC can generate, in less than 2 seconds computational time, a three dimensional thermal model in a 50 kft 2 DC. This rapid modeling enables real time visualization of the DC conditions and enables "0what if" scenarios simulations to characterize response to "disturbances". One such example is thermal zone modeling that matches the cooling power to the heat generated at a local level by identifying DC zones cooled by a specific CRAC. Turning off a CRAC unit can be simulated to understand how the other CRAC utilization changes and how server temperature responds. Several new sensing technologies were added to the existing MMT platform: (1) air contamination (corrosion) sensors, (2) power monitoring, and (3) a wireless environmental sensing network. All three technologies are built on cost effective sensing solutions that increase the density of sensing points and enable high resolution mapping of DCs. The wireless sensing solution enables Air Conditioning Unit (ACU) control while the corrosion sensor enables air side economization and can quantify the risk of IT equipment failure due to air contamination. Validation data for six test sites demonstrate that leveraging MMT energy efficiency solutions combined with industry best practices results in an average of 20% reduction in cooling energy, without major infrastructure upgrades. As an illustration of the unique MMT capabilities, a data center infrastructure efficiency (DCIE) of 87% (industry best operation) was achieved. The technology is commercialized through IBM System and Technology Lab Services that offers MMT as a solution to improve DC energy efficiency. Estimation indicates that deploying MMT in existing DCs can results in an 8 billion kWh savings and projection indicates that constant adoption of MMT can results in obtainable savings of 44 billion kWh in 2035. Negotiations are under way with business partners to commercialize/license the ACU control technology and the new sensor solutions (corrosion and power sensing) to enable third party vendors and developers to leverage the energy efficiency solutions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development and Testing of Advanced Accelerator Structures and Technologies at 11.424 GHz (Final Report)

The areas of activity are grouped by Task. Task 1 involved a study of the key physics issues associated with the use of high gradient dielectric-loaded accelerating (DLA) structures in rf linear accelerators, and was carried out in collaboration with Argonne National Laboratory (ANL) and Euclid Techlabs LLC; Task 2 involved a study of high-gain active microwave pulse compressors, and was carried out in collaboration with Omega-P, Inc. and the Institute of Applied Physics of the Russian Academy of Sciences. The experiments were carried out in the X-band Magnicon Laboratory at the Naval Research Laboratory (NRL). The studies under Task 1 were focused on multipactor and breakdown in externally driven DLA structures at the 200-ns timescale. Suppression of multipactor and breakdown are essential to the practical application of dielectric structures in rf linear accelerators. During the first year of this program, we carried out a study of a doubly tapered clamped quartz traveling-wave (TW) structure that operated at up to 15 MV/m without breakdown by eliminating dielectric joints, thus avoiding the joint breakdown that had characterized many earlier experiments. However, strong multipactor loading was observed in the structure. In the second year, we carried out a successful test of a TW DLA structure with a sputtered copper exterior coating that eliminated the need for a clamped metal enclosure to form the outer metallic boundary, thus simplifying the fabrication of the structure. In the second year, we also carried out the first test of a dielectric-loaded standing-wave (SW) accelerating structure. Multipactor loading limited the achievable accelerating gradient in the structure to 9 MV/m, but the SW structure proved to be a useful configuration for studying multipactor physics. To continue this study, a new standing-wave structure is in preparation that will permit direct measurements of the energy stored in the structure for new studies of multipactor physics. Finally, in the third year of the program, we focused on the suppression of multipactor loading using an applied axial magnetic field, as proposed by Chang et al. [C. Chang et al., J. Appl. Phys. 110, 063304 (2011).]. Chang used an analytic model and PIC simulations to show that an axial magnetic field can reduce the period of the secondary electron trajectories on the dielectric surface, and thus spoil the multipactor resonance condition. The optimum effect occurs when the ratio of the gyrofrequency to the rf frequency is in the range of ~ 0.7 to 1. For an X-band structure, this is equivalent to a solenoidal field of 2.8–4 kG. This approach to multipactor suppression is attractive because it maintains the advantages of a DLA structure and is independent of other accelerator parameters.

43 PARTICLE ACCELERATORS↗

A Historical Evaluation of the U12n Tunnel, Nevada National Security Site, Nye County, Nevada Part 1

This report presents a historical evaluation of the U12n Tunnel on the Nevada National Security Site (NNSS) in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office and the U.S. Department of Defense, Defense Threat Reduction Agency (DTRA). The U12n Tunnel was one of a series of tunnels used for underground nuclear weapons effects tests in Rainier and Aqueduct Mesas. A total of 22 nuclear tests were conducted in the U12n Tunnel from 1967 to 1992. These tests include Midi Mist, Hudson Seal, Diana Mist, Misty North, Husky Ace, Ming Blade, Hybla Fair, Mighty Epic, Diablo Hawk, Miners Iron, Huron Landing, Diamond Ace, Mini Jade, Tomme/Midnight Zephyr, Misty Rain, Mill Yard, Diamond Beech, Middle Note, Misty Echo, Mineral Quarry, Randsburg, and Hunters Trophy. DTRA sponsored all tests except Tomme and Randsburg which were sponsored by the Lawrence Livermore National Laboratory. Midnight Zephyr, sponsored by DTRA, was an add on experiment to the Tomme test. Eleven high explosive tests were also conducted in the tunnel and included a Stemming Plan Test, the Pre-Mill Yard test, the two seismic Non-Proliferation Experiment tests, and seven Dipole Hail tests. The U12n Tunnel complex is composed of the portal and mesa areas, encompassing a total area of approximately 600 acres (240 hectares). Major modifications to the landscape have resulted from four principal activities. These are road construction and maintenance, mining activities related to development of the tunnel complex, site preparation for activities related to testing, and construction of retention ponds. A total of 202 cultural features were recorded for the portal and mesa areas. At the portal area, features relate to the mining, construction, testing, and general everyday operational support activities within the tunnel. These include concrete foundations for buildings, ventilation equipment, air compressors, communications equipment, mining equipment, rail lines, retention ponds to impound tunnel effluent, and storage containers. Features on the mesa above the tunnel generally relate to tunnel ventilation and cooling, borehole drilling, and data recording facilities. Feature types include concrete foundations, instrument cable holes, drill holes, equipment pads, ventilation shafts, and ventilation equipment. The U12n Tunnel complex is eligible to the National Register of Historic Places under criteria a and c, consideration g of 36 CFR Part 60.4 as a historic landscape. Scientific research conducted at the tunnel has made significant contributions to the broad patterns of our history, particularly in regard to the Cold War era that was characterized by competing social, economic, and political ideologies between the former Soviet Union and the United States. The tunnel also possesses distinctive construction and engineering methods for conducting underground nuclear tests. The Desert Research Institute recommends that the U12n Tunnel area be left in place in its current condition and that the U12n Tunnel historic landscape be included in the NNSS monitoring program and monitored for disturbances or alterations on a regular basis.

Hybla Fair↗

A Historical Evaluation of the U12n Tunnel, Nevada national Security Site, Nye County, Nevada Part 2 of 2

This report presents a historical evaluation of the U12n Tunnel on the Nevada National Security Site (NNSS) in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office and the U.S. Department of Defense, Defense Threat Reduction Agency (DTRA). The U12n Tunnel was one of a series of tunnels used for underground nuclear weapons effects tests in Rainier and Aqueduct Mesas. A total of 22 nuclear tests were conducted in the U12n Tunnel from 1967 to 1992. These tests include Midi Mist, Hudson Seal, Diana Mist, Misty North, Husky Ace, Ming Blade, Hybla Fair, Mighty Epic, Diablo Hawk, Miners Iron, Huron Landing, Diamond Ace, Mini Jade, Tomme/Midnight Zephyr, Misty Rain, Mill Yard, Diamond Beech, Middle Note, Misty Echo, Mineral Quarry, Randsburg, and Hunters Trophy. DTRA sponsored all tests except Tomme and Randsburg which were sponsored by the Lawrence Livermore National Laboratory. Midnight Zephyr, sponsored by DTRA, was an add on experiment to the Tomme test. Eleven high explosive tests were also conducted in the tunnel and included a Stemming Plan Test, the Pre-Mill Yard test, the two seismic Non-Proliferation Experiment tests, and seven Dipole Hail tests. The U12n Tunnel complex is composed of the portal and mesa areas, encompassing a total area of approximately 600 acres (240 hectares). Major modifications to the landscape have resulted from four principal activities. These are road construction and maintenance, mining activities related to development of the tunnel complex, site preparation for activities related to testing, and construction of retention ponds. A total of 202 cultural features were recorded for the portal and mesa areas. At the portal area, features relate to the mining, construction, testing, and general everyday operational support activities within the tunnel. These include concrete foundations for buildings, ventilation equipment, air compressors, communications equipment, mining equipment, rail lines, retention ponds to impound tunnel effluent, and storage containers. Features on the mesa above the tunnel generally relate to tunnel ventilation and cooling, borehole drilling, and data recording facilities. Feature types include concrete foundations, instrument cable holes, drill holes, equipment pads, ventilation shafts, and ventilation equipment. The U12n Tunnel complex is eligible to the National Register of Historic Places under criteria a and c, consideration g of 36 CFR Part 60.4 as a historic landscape. Scientific research conducted at the tunnel has made significant contributions to the broad patterns of our history, particularly in regard to the Cold War era that was characterized by competing social, economic, and political ideologies between the former Soviet Union and the United States. The tunnel also possesses distinctive construction and engineering methods for conducting underground nuclear tests. The Desert Research Institute recommends that the U12n Tunnel area be left in place in its current condition and that the U12n Tunnel historic landscape be included in the NNSS monitoring program and monitored for disturbances or alterations on a regular basis.

Hybla Fair↗

Development and Validation of Multidimensional Models of Supercritical CO 2 Energy Conversion Systems for Nuclear Power Reactors

A general objective of this project was to develop, verify and validate mechanistic multidimensional models of local flow and heat transfer in supercritical carbon dioxide (S-CO 2 ) devices and systems, and to demonstrate the application of the new models to selected components of S-CO 2 nuclear energy transport systems. Both steady-state and time-dependent operating conditions have been investigated. The overall workscope consisted of the following three major parts: Development, testing and validation of a mechanistic model of forced-convection heat transfer in heated channels cooled using S-CO 2 at slightly supercritical pressures; Development, testing and verification/validation of a new model of the dynamics of closed- loop S-CO 2 heat transport systems; and, Formulation, testing and verification of a mechanistic model for the analysis of flow and pressure distribution in S-CO 2 compressors. The results of the work performed for the project have been documented in several publications.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

NGNP/HTE full-power operation at reduced high-temperature heat exchanger temperatures.

Operation of the Next Generation Nuclear Plant (NGNP) with reduced reactor outlet temperature at full power was investigated for the High Temperature Electrolysis (HTE) hydrogen-production application. The foremost challenge for operation at design temperature is achieving an acceptably long service life for heat exchangers. In both the Intermediate Heat Exchanger (IHX) and the Process Heat Exchanger (PHX) (referred to collectively as high temperature heat exchangers) a pressure differential of several MPa exists with temperatures at or above 850 C. Thermal creep of the heat exchanger channel wall may severely limit heat exchanger life depending on the alloy selected. This report investigates plant performance with IHX temperatures reduced by lowering reactor outlet temperature. The objective is to lower the temperature in heat transfer channels to the point where existing materials can meet the 40 year lifetime needed for this component. A conservative estimate for this temperature is believed to be about 700 C. The reactor outlet temperature was reduced from 850 C to 700 C while maintaining reactor power at 600 MWt and high pressure compressor outlet at 7 MPa. We included a previously reported design option for reducing temperature at the PHX. Heat exchanger lengths were adjusted to reflect the change in performance resulting from coolant property changes and from resizing related to operating-point change. Turbomachine parameters were also optimized for the new operating condition. An integrated optimization of the complete system including heat transfer equipment was not performed. It is estimated, however, that by performing a pinch analysis the combined plant efficiency can be increased from 35.5 percent obtained in this report to a value between 38.5 and 40.1 percent. Then after normalizing for a more than three percent decrease in commodities inventory compared to the reference plant, the commodities-normalized efficiency lies between 40.0 and 41.3. This compares with a value of 43.9 for the reference plant. This latter plant has a reactor outlet temperature of 850 C and the two high temperature heat exchangers. The reduction in reactor outlet temperature from 850 C to 700 C reduces the tritium permeability rate in the IHX metal by a factor of three and thermal creep by five orders of magnitude. The design option for reducing PHX temperature from 800 C to 200 C reduces the permeability there by three orders of magnitude. In that design option this heat exchanger is the single 'choke-point' for tritium migration from the nuclear to the chemical plant.

08 HYDROGEN↗

Cle Elum Supplementation and Research Facility : Monthly Progress Report : December 1, 2008 - December 31, 2008.

FISH PRODUCTION: Brood year 2008 production and experimental hatchery & supplemental crossed eggs continue to be incubated and chilled water at 380 Fahrenheit for the month. Temperature units are {approx}960 TU's at the end of the month. Hatching was observed at {approx}900 temperature units (TU's). The 2007 Brood year (BY) has approximately 773,477 juveniles on hand at the end of December, averaging 30.6 fish per pound. Fish tagging operations wrapped up on the 5th. Transportation of fish to acclimation sites is tentatively scheduled to begin January 12th. FISH CULTURE: Production pond cleaning continues on a weekly basis, and feeding continues to be performed two days per week due to the colder river water temperatures. Eggs in the incubation continue to be tempered in 38 degree water and temperature units recorded daily. On the 20th the river became too inclement for normal operations as the intake screens were covered with ice, at that time we shutdown two river pumps and turned on wells four and six to get 6,825 gallons of water. This was the operation at the facility for twenty-four hours at which point we were able to get back to normal operations. WATER PRODUCTION: The current combined well and river water supply to the complex is 14,756 gallons/min. The river pumps are supplying 13,571 gallons per minute. Well pumps No.2 and No.4 are operating and supplying 1,185 gallons/min. More on well pumps in the well field maintenance section of this report. ACCLIMATION SITES: Preparation of acclimation sites for fish transfer was the main focus for the month of December. Each week thermographs that record water temperature have the data disc changed at the acclimations sites. Ford Excavation with assistance from YKFP maintenance has started clearing snow out of the Easton acclimation site. VEHICLE MAINTENANCE: The snowmobiles were taken in to have annual maintenance performed. The full-size John Deere tractor needed and was taken to Barnet Implement in Yakima. The tractor needed a new clutch installed and was picked up on the 31st. SHOP BUILDING MAINTENANCE: On the 12th the facility domestic water hydro pneumatic tank and its system malfunctioned. The problem persisted and had to be dealt with multiple times; first it caused the tank to over flow and floods the shop. Wallace Electric was called and after extensive monitoring of the tank, compressor and electrical operations an electrical relay switch was replaced. Weekly cleaning and tool inventory continues to be a priority. The shop is home to our liberation truck along with fish transfer equipment, fish pump and seine nets. ELECTRICAL BUILDING MAINTENANCE: The large generator is located in the electrical building and is checked daily for routine inspections. HATCHERY BUILDING MAINTENANCE: The incubation building is being used to clean and repair isolation buckets, egg incubation baskets and troughs. An experiment involving remote site incubators (RSI's) continued through the month. Chad Stockton, WDFW, records flows and monitors emergence of fry on a daily basis. Chad is working with Steve S. and Curt K. on the RSI's research along with spawning channel fry emergence. RIVERWATER COOLING FACILITY: The one pump in operation in this building is checked daily during our routine inspections, the variable pump is supplying water to the artificial spawning channel. RIVER PUMP STATION MAINTENANCE: All four river pumps are in operation and pumping {approx}13,571 gallons/min to the facility. The building is cleaned monthly and the air burst system is cycled daily during the morning checks. The crew continued weekly changing of the graph paper on the river temperature thermograph throughout the month, continuing this activity as part of the daily checks routine. WELL FIELD MAINTENANCE: Wells No.1 and No.4 were in operation and supplying 1,185 gallons/minute to the facility and incubation building. Weekly test well readings are recorded and sent via fax to CH2MHILL. Also weekly well meter readings are recorded. Well No.5 had been determined to have a faulty drain valve while trying to operate the pump for emergency water usage. It was determined that water was not able to drain and began to flow out from the test hole (TH9). Charlie and Simon pumped out the remaining water from the test hole prior to replacing the valve. The valve was subsequently dug up, replaced and tested for operation. SAFETY AND TRAINING: The winter season has approached and conditions can be hazardous as Cle Elum staff stress safety while working and preparing acclimation sites for upcoming fish transfer. Some examples include wearing proper clothing, extra caution while driving and plowing snow. GROUNDS: Linda Lamebull of fisheries and personnel from Tribal Purchasing came to the hatchery to inventory two way radios.

13 HYDRO ENERGY↗

Cle Elum Supplementation and Research Facility : Monthly Progress Report November 2008.

FISH PRODUCTION: Final shocking of eggs was finished in the incubation. Egg enumeration for the 2008 brood was completed and the eggs are being incubated in 38 degree Fahrenheit chilled water. Don Larsen of NOAA made a request of eggs for research purposes and was able to acquire supplemental line eggs 10,555. Estimated density at the time of ponding in Mid-March of 2009 is approximately 43,869 fry per raceway after calculating an average fry loss of 2%. The end of the month totals for the 2007 brood reports 773,807 juveniles on hand with an overall average of 31.4 fish per pound. Tagging continues on the 2007 brood and is on pace to wrap up in early December. FISH CULTURE: Ponds are cleaned as needed and due to the colder water temperatures, the feeding frequency has been changed to three days a week. All ponds are sampled at the end of the month. Growth for production fish are adjusted accordingly as temperature dictates feeding levels. Torrential rain on the 12th turned the Yakima River extremely turbid. Fish tagging operations were halted and the ensuing conditions at the facility intake screens became a concern. Water flow to the wet well became restricted so the decision was made to shut the surface water (river) pumps down and turn on well pumps No.1, No.4 and No.6 to run water to the facility head box. This operation continued for twenty-four hours at which point normal operations were optimal and fish tagging resumed, although the river didn't clear up enough to feed the fish until the 17th. WATER PRODUCTION: The current combined well and river water supply to the complex is 14,822 gallons/minute. Well No.2 is pumping water at a rate of 530 gallons per minute. All four river pumps are in operation and pumping 14,292 gallons/minute. ACCLIMATION SITES: Cle Elum staff has been working to prep the acclimation sites for the upcoming fish transfer before the snow falls. Thermographs at each site are changed weekly. AMB Tools performed routine maintenance on the compressor and Brown and Jackson pumped out the septic tank at the Jack Creek acclimation site. VEHICLE MAINTENANCE: Snow tires are now on all vehicles and snow blowers were installed on the John Deere tractor and lawn tractor. The snowplow was also installed on the Ford one ton. The four Snowmobiles were serviced by Yamaha Jacks of Ellensburg. MAINTENANCE BUILDING MAINTENANCE: Clean up occurs on Fridays of each week. HATCHERY BUILDING MAINTENANCE: Water has been turned on to vertical incubator islands one and two. After eggs were transferred to vertical stacks cleaning of troughs began. WDFW crew inventoried eggs from isolettes and then transferred them to the vertical incubators. RIVER PUMP STATION MAINTENANCE: All four pumps are in operation and supplying the facility with 14,292 gallons/minute of water to rearing ponds. WELL FIELD MAINTENANCE: Well pumps No.1, No.4 and No.6 were turned on to supplement water flow to the facility as mentioned previously. Well No.5 was powered up but a winterizing valve malfunction wouldn't allow operation, we are currently working on it at this time. Well No.2 is pumping 530 gallons per minute and supplies well water to incubation and chiller. The pumps meter is recorded weekly. Test holes are monitored weekly and results are faxed to CH2MHILL afterward. SAFETY AND TRAINING: Ice melt and sand bags are popular items at the facility this month as freezing temperatures cause ground to become slippery and hazardous. GROUNDS: Van Alden's Plumbing installed a new commode in resident house No.411 and also inspected a plumbing problem at resident No.1131. Cle Elum staff along with WDFW staff worked to locate the spawning channel building back to the position it was at to have Greg Wallace of Wallace Electric hook electricity back up to the spawning shed. MEETINGS AND TOURS: Charlie attended a policy meeting at Cle Elum on the 18th. The Internal projects annual review took place at Cle Elum on the 19th and 20th. Bill Bosch continues to visit monthly to incorporate data into the YKFP data base. PERSONNEL: IHS employees traveled to Cle Elum to administer flu shots to YN staffers and families as well as WDFW staffers.

13 HYDRO ENERGY↗

Environmental Management Waste Management Facility Proxy Waste Lot Profile 6.999 for Building K-25 West Wing, East Tennessee Technology Park, Oak Ridge, Tennessee

In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2002. The purpose of this agreement is to define a streamlined decision-making process to facilitate the accelerated implementation of cleanup, resolve ORR milestone issues, and establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. Decontamination and decommissioning (D&D) activities of Bldg. K-25, the original gaseous diffusion facility, is being conducted by Bechtel Jacobs Company LLC (BJC) on behalf of the DOE. The planned CERCLA action covering disposal of building structure and remaining components from the K-25 building is scheduled as a non-time-critical CERCLA action as part of DOE's continuous risk reduction strategy for ETTP. The K-25 building is proposed for D&D because of its poor physical condition and the expense of surveillance and maintenance activities. The K-25/K-27 D&D Project proposes to dispose of the commingled waste listed below from the K-25 west side building structure and remaining components and process gas equipment and piping at the Environmental Management Waste Management Facility (EMWMF) under waste disposal proxy lot (WPXL) 6.999: (1) Building structure (e.g. concrete floors [excluding basement slab], roofing, structural steel supports, interior walls, and exterior walls) and support system components including the recirculation cooling water (RCW); electrical; communication; fire protection; ventilation; process coolant; process lube oil; utilities such as steam, water and drain lines; (2) Process Piping; (3) Seal Exhaust Headers; (4) Seal Exhaust Traps; (5) Process Valves; (6) Differential Blind Multipliers (DBM)/Partial Blind Multipliers (PBM); and (7) Aftercoolers (also known as Intercell coolers). Converters and compressors while components of the process gas system, are not included in this commingled waste lot. On January 6, 2009, a meeting was held with EPA, TDEC, DOE and the team for the sole purpose of finalizing the objectives, format, and content of WPXL 6.999. The objective of WPXL 6.999 was to provide a crosswalk to the building structure and the PGE components profiles. This was accomplished by providing tables with references to the specific section of the individual profiles for each of the WLs. There are two building profiles and eight PGE profiles. All of the waste identified in the individual profiles will be commingled, shipped, and disposed exclusively under WPXL 6.999. The individual profiles were provided to the EPA and Tennessee Department of Environment and Conservation (TDEC) for information purposes only. This summary WPXL 6.999 will be submitted to EPA, TDEC, and DOE for review and approval. The format agreed upon by the regulators and DOE form the basis for WPXL 6.999. The agreed format is found on pages v and vi of the CONTENTS section of this profile. The disposal of this waste will be executed in accordance with the Action Memorandum for the Decontamination and Decommissioning of the K-25 and K-27 Buildings, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2002), Removal Action Work Plan for the K-25 and K-27 Buildings, Process Equipment Removal and Demolition, K-25/K-27 Project, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008a); Waste Handling Plan for Demolition of the K-25 and K-27 Building Structures and Remaining Components Located at the East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2005); and Waste Handling Plan for Building K-25 West Wing Process Equipment and Piping at the East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008b).

54 ENVIRONMENTAL SCIENCES↗

Wireless Sensor Network for Advanced Energy Management Solutions

Eaton has developed an advanced energy management solution that has been deployed to several Industries of the Future (IoF) sites. This demonstrated energy savings and reduced unscheduled downtime through an improved means for performing predictive diagnostics and energy efficiency estimation. Eaton has developed a suite of online, continuous, and inferential algorithms that utilize motor current signature analysis (MCSA) and motor power signature analysis (MPSA) techniques to detect and predict the health condition and energy usage condition of motors and their connect loads. Eaton has also developed a hardware and software platform that provided a means to develop and test these advanced algorithms in the field. Results from lab validation and field trials have demonstrated that the developed advanced algorithms are able to detect motor and load inefficiency and performance degradation. Eaton investigated the performance of Wireless Sensor Networks (WSN) within various industrial facilities to understand concerns about topology and environmental conditions that have precluded broad adoption by the industry to date. A Wireless Link Assessment System (WLAS), was used to validate wireless performance under a variety of conditions. Results demonstrated that wireless networks can provide adequate performance in most facilities when properly specified and deployed. Customers from various IoF expressed interest in applying wireless more broadly for selected applications, but continue to prefer utilizing existing, wired field bus networks for most sensor based applications that will tie into their existing Computerized Motor Maintenance Systems (CMMS). As a result, wireless technology was de-emphasized within the project, and a greater focus placed on energy efficiency/predictive diagnostics. Commercially available wireless networks were only utilized in field test sites to facilitate collection of motor wellness information, and no wireless sensor network products were developed under this project. As an outgrowth of this program, Eaton developed a patented energy-optimizing drive control technology that is complementary to a traditional variable frequency drives (VFD) to enable significant energy savings for motors with variable torque applications, such as fans, pumps, and compressors. This technology provides an estimated energy saving of 2%-10% depending on the loading condition, in addition to the savings obtained from a traditional VFD. The combination of a VFD with the enhanced energy-optimizing controls will provide significant energy savings (10% to 70% depending on the load and duty cycle) for motors that are presently connected with across the line starters. It will also provide a more favorable return on investment (ROI), thus encouraging industries to adopt VFDs for more motors within their facilities. The patented technology is based on nonintrusive algorithms that estimate the instantaneous operating efficiency and motor speed and provide active energy-optimizing control of a motor, using only existing voltage and current sensors. This technology is currently being commercialized by Eaton’s Industrial Controls Division in their next generation motor control products. Due to the common nonintrusive and inferential nature of various algorithms, this same product can also include motor and equipment condition monitoring features, providing the facility owner additional information to improve process uptime and the associated energy savings. Calculations estimated potential energy savings of 261,397GWh/Yr ($15.7B/yr), through retrofitting energy-optimizing VFDs into existing facilities, and incorporating the solution into building equipment sold by original equipment manufacturers (OEMs) and installed by mechanical and electrical contractors. Utilizing MCSA and MPSA for predictive maintenance (PM) of motors and connected equipment reduces process downtime cost and the cost of wasted energy associated with shutting down and restarting the processes. Estimated savings vary depending on the industry segment and equipment criticality per facility/process. Average downtime for an industrial facility is 4-12 hours with a cost/hr of $7500/hr, with large, critical processes reaching $50-100k/hr. Specific downtime costs are not included in this report because of customer confidentiality, but projected savings across the Industries of the Future (IoF) are still expected to be comparable to the original program estimates. Two generations of customer field deployments and evaluation have been completed during the course of this project. Results from these customer sites have been used for identifying the scope and improving the developed energy and wellness algorithms. The field deployments have confirmed that the hardware for sensing and sampling motor currents and voltages are reliable and able to provide an adequate signal-to-noise ratio from the electrical noise present on the motor signals.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Novel, Low-Cost, Reduced-Sensor Approach for Providing Smart Renote Monitoring and Diagnostics for Packaged Air Conditioners and Heat Pumps

This report describes conceptually an approach to providing automated remote performance and conditioning monitoring and fault detection for air conditioners and heat pumps that shows great promise to reduce the capital and installation costs of such systems from over $1000 per unit to $200 to $400 per unit. The approach relies on non-intrusive electric load monitoring (NIELM) to enable separation of the power use signals of compressors and fans in the air conditioner or heat pump. Then combining information on the power uses and one or two air temperature measurements, changes in energy efficiency and occurrence of major faults would be detected. By decreasing the number of sensors used from between ten and twenty in current diagnostic monitoring systems to three for the envisaged system, the capital cost of the monitoring system hardware and the cost of labor for installation would be decreased significantly. After describing the problem being addressed and the concept for performance monitoring and fault detection in more detail, the report identifies specific conditions and faults that the proposed method would detect, discusses specific needs for successful use of the NIELM approach, and identifies the major elements in the path from concept to a commercialized monitoring and diagnostic system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

LLE Review 121 (September-December 2009)

This issue has the following articles: (1) Demonstration of the Highest Deuterium-Tritium Areal Density Using Triple-Picket Cryogenic Designs on OMEGA; (2) High-Precision Measurements of the Equation of State of Hydrocarbons at 1 to 10 Mbar Using Laser-Driven Shock Waves; (3) A Generalized Measurable Ignition Condition for Inertial Confinement Fusion (4) In-Situ Detection and Analysis of Laser-Induced Damage on a 1.5-m Multilayer-Dielectric Grating Compressor for High-Energy, Petawatt-Class Laser Systems; (5) Probing High-Areal-Density ({rho}R) Cryogenic-DT Implosions Using Down-Scattered Neutron Spectra Measured by the Magnetic Recoil Spectrometer; (6) Strong-Coupling and Degeneracy Effects in Inertial Confinement Fusion Implosions; and (7) Neutron-Induced Nucleation Inside Bubble Chambers Using Freon 115 as the Active Medium.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗