Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COST PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since.Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter for a given ECM taken in the performance period. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the estimated (and guaranteed) savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

The Solar Ready Vets Fellowship: Employer Information Session

The Solar Ready Vets Fellowship is part of the Solar Ready Vets Network, a workforce development initiative funded by the US Department of Energy. Through the Hiring Our Heroes Corporate Fellowship Program, mid-senior level active duty transitioning service members are placed with solar industry employers for 12 weeks of on-the-job training. Through this process, employers gain access to a natural recruitment pipeline of the best and brightest transitioning military talent, while gaining a deeper understanding of the veteran labor market. This program is offered to employers at no cost.

14 SOLAR ENERGY↗

Friction Stir Cutting for Decommissioning - 16130

Safe and cost effective decommissioning of redundant nuclear plant is a primary consideration to countries and companies with aging nuclear facilities. The wider media coverage of nuclear issues and strong public feeling is ensuring decommissioning options are also considered prior to development of new nuclear facilities. A project has been undertaken to demonstrate the feasibility of applying friction stir cutting, a non-fusion, non-machining, method of separating materials for size reduction of redundant metallic nuclear plant, specifically as a flexible low cost tool for plant dismantling. The research program was designed to provide a fast and effective approach to the assessment of process feasibility in stainless steels. Friction stir cutting may begin by traversing the rotating tool into the edge of the plate, or alternatively, by piercing the plate with a suitably profiled rotating friction stir cutting tool. Plate piercing trials were conducted to determine the down-force required to pierce the plate and to identify the appropriate tool tip profile for efficient piercing. The friction stir cutting process has been successfully demonstrated in 3 mm and 6 mm thick stainless steel plate. Provided sufficient torque is available, the friction stir cutting process is suitable for robotic application. The process is suitable for submerged applications such as the removal of pond furniture. Special attention was given towards any fume generation or particulate emissions during cutting. Friction stir cutting of bare steel plate does not generate fume, results in a relatively smooth edge profile and produces minimal loose debris. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Piecewise Linear Optimization for Public EV Charging Depots in Different Utility Environments

With the proliferation of electric vehicles (EVs), EV supply equipment technology is being pushed to increasingly higher power levels, such as extreme fast charging (XFC) at 300kW or more. As more public XFC depots are connected to electric distribution systems, utility operators will mitigate their impact with pricing schemes and programs such as demand response, demand charges, and time-varying prices. In this paper we describe an XFC management system that combines an on-site battery energy storage system and an optimization application that minimizes the cost to operate the depot in light of the utility pricing programs. We have designed the optimizer specially to use fast and simple linear programming so that it can be deployed to low-cost computing platforms. We also describe how several utility pricing schemes are integrated into a single piecewise model, reducing the engineering effort to implement the optimizer in different utility environments.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Wisconsin Biodiesel Blending Program Final Report

The Wisconsin State Energy Office's (SEO) primary mission is to implement cost-effective, reliable, balanced, and environmentally-friendly clean energy projects. To support this mission the Wisconsin Biodiesel Blending Program was created to financially support the installation infrastructure necessary to directly sustain biodiesel blending and distribution at petroleum terminal facilities throughout Wisconsin. The SEO secured a federal directed award of $600,000 over 2.25 years. With these funds, the SEO supported the construction of inline biodiesel blending facilities at two petroleum terminals in Wisconsin. The Federal funding provided through the state provided a little less than half of the necessary investment to construct the terminals, with the balance put forth by the partners. Wisconsin is now home to two new biodiesel blending terminals. Fusion Renewables on Jones Island (in the City of Milwaukee) will offer a B100 blend to both bulk and retail customers. CITGO is currently providing a B5 blend to all customers at their Granville, WI terminal north of the City of Milwaukee.

09 BIOMASS FUELS↗

Low Cost Hydrogen Production Platform

A technology and design evaluation was carried out for the development of a turnkey hydrogen production system in the range of 2.4 - 12 kg/h of hydrogen. The design is based on existing SMR technology and existing chemical processes and technologies to meet the design objectives. Consequently, the system design consists of a steam methane reformer, PSA system for hydrogen purification, natural gas compression, steam generation and all components and heat exchangers required for the production of hydrogen. The focus of the program is on packaging, system integration and an overall step change in the cost of capital required for the production of hydrogen at small scale. To assist in this effort, subcontractors were brought in to evaluate the design concepts and to assist in meeting the overall goals of the program. Praxair supplied the overall system and process design and the subcontractors were used to evaluate the components and system from a manufacturing and overall design optimization viewpoint. Design for manufacturing and assembly (DFMA) techniques, computer models and laboratory/full-scale testing of components were utilized to optimize the design during all phases of the design development. Early in the program evaluation, a review of existing Praxair hydrogen facilities showed that over 50% of the installed cost of a SMR based hydrogen plant is associated with the high temperature components (reformer, shift, steam generation, and various high temperature heat exchange). The main effort of the initial phase of the program was to develop an integrated high temperature component for these related functions. Initially, six independent concepts were developed and the processes were modeled to determine overall feasibility. The six concepts were eventually narrowed down to the highest potential concept. A US patent was awarded in February 2009 for the Praxair integrated high temperature component design. A risk analysis of the high temperature component was conducted to identify any potential design deficiency related to the concept. The analysis showed that no fundamental design flaw existed with the concept, but additional simulations and prototypes would be required to verify the design prior to fabricating a production unit. These identified risks were addressed in detail during Phase II of the development program. Along with the models of the high temperature components, a detailed process and 3D design model of the remainder of system, including PSA, compression, controls, water treatment and instrumentation was developed and evaluated. Also, in Phase II of the program, laboratory/fullscale testing of the high temperature components was completed and stable operation/control of the system was verified. The overall design specifications and test results were then used to develop accurate hydrogen costs for the optimized system. Praxair continued development and testing of the system beyond the Phase II funding provided by the DOE through the end of 2008. This additional testing is not documented in this report, but did provide significant additional data for development of a prototype system as detailed in the Phase III proposal. The estimated hydrogen product costs were developed (2007 basis) for the 4.8 kg/h system at production rates of 1, 5, 10, 100 and 1,000 units built per year. With the low cost SMR approach, the product hydrogen costs for the 4.8 kg/h units at 50 units produced per year were approximately $3.02 per kg. With increasing the volume production to 1,000 units per year, the hydrogen costs are reduced by about 12% to $2.67 per kg. The cost reduction of only 12% is a result of significant design and fabrication efficiencies being realized in all levels of production runs through utilizing the DFMA principles. A simplified and easily manufactured design does not require large production volumes to show significant cost benefits. These costs represent a significant improvement and a new benchmark in the cost to produce small volume on-site hydrogen using existing process technologies. The cost models assume a natural gas cost of $5/MMBtu (HHV). Praxair has, in Phases I and II of this program, shown that significant improvements in cost, plant layout, system integration and overall system optimization are achievable. Phase III of the program, submitted in January 2007, was to focus on demonstrating both the technical feasibility and economic viability of the design developed in Phases I and II through a full-scale prototype design, construction, installation, analysis and operation at a hydrogen fueling station. Due to funding limitations, Phase III of the program was not approved by the DOE.

08 HYDROGEN↗

Solid Oxide Fuel Cell Technology Stationary Power Application Project

The objectives of this program were to: (1) Develop a reliable, cost-effective, and production-friendly technique to apply the power-enhancing layer at the interface of the air electrode and electrolyte of the Siemens SOFC; (2) Design, build, install, and operate in the field two 5 kWe SOFC systems fabricated with the state-of-the-art cylindrical, tubular cell and bundle technology and incorporating advanced module design features. Siemens successfully demonstrated, first in a number of single cell tests and subsequently in a 48-cell bundle test, a significant power enhancement by employing a power-enhancing composite interlayer at the interface between the air electrode and electrolyte. While successful from a cell power enhancement perspective, the interlayer application process was not suitable for mass manufacturing. The application process was of inconsistent quality, labor intensive, and did not have an acceptable yield. This program evaluated the technical feasibility of four interlayer application techniques. The candidate techniques were selected based on their potential to achieve the technical requirements of the interlayer, to minimize costs (both labor and material), and suitably for large-scale manufacturing. Preliminary screening, utilizing lessons learned in manufacturing tubular cells, narrowed the candidate processes to two, ink-roller coating (IRC) and dip coating (DC). Prototype fixtures were successfully built and utilized to further evaluate the two candidate processes for applying the interlayer to the high power density Delta8 cell geometry. The electrical performance of interlayer cells manufactured via the candidate processes was validated. Dip coating was eventually selected as the application technique of choice for applying the interlayer to the high power Delta8 cell. The technical readiness of the DC process and product quality was successfully and repeatedly demonstrated, and its throughput and cost are amenable to large scale manufacturing. Two 5 kWe-class SOFC power systems were built and installed for the purpose of testing and evaluating state-of-the-art tubular cell and bundle technologies, advanced generator and module design features, balance-of-plant components, and cost reduction measures. Installed at the Phipps Conservatory and Botanical Gardens, a system operated for more than 17,500 hrs, delivering electrical power to the on-site grid and thermal energy in form of hot water for onsite utilization. Operation was typically autonomous, requiring minimal operator intervention, and achieved an overall availability of greater than 85%. Outages were primarily due to an unstable local grid, two weather related outages were experienced, and very few reliability issues were encountered despite harsh operating conditions. No repairs to the stack, module, or balance-of-plant were required. A second system was designed, built, delivered, and installed at a Siemens facility in Charlotte, North Carolina. Operational issues associated with the balance-of-plant were encountered during startup and prevented the system from operating.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wireless Sensor Modalities at a Nuclear Plant Site to Collect Vibration Data

One of the major contributors to the total operating costs of domestic nuclear fleet of reactors today is the operation and maintenance (O&M) costs. These include labor-intense preventive maintenance programs involving manually-performed inspection, calibration, testing, and maintenance of plant assets at periodic frequency and time-based replacement of assets at periodic frequency, irrespective of their conditions. This has resulted in a labor-centric business model to achieve high capacity factors. To build an optimal maintenance program, it’s time to transition from this labor-centric business model to a technology-centric business model. Fortunately, there are technologies (advanced sensor, data analytics, and risk assessment methodologies) that will support this transition. The technology-centric business model will result in significant plant life extension and reduction of time-based maintenance activities. This will drive down O&M costs as labor is a rising cost and technology is a declining cost. This approach will lay the foundation for real-time condition assessment of plant assets, allowing condition-based maintenance to enhance plant safety, reliability, and economics of operation. The goal of this project is to address challenges in the area of digital monitoring, i.e., the application of advanced sensor technologies (particularly wireless sensor technologies) and science-based data analytic capabilities to advance online monitoring and predictive maintenance in nuclear plants to improve plant performance (efficiency gain and economic competitiveness). To achieve the project goal, in partnership with Exelon Generating Company (Exelon), researchers from Idaho National Laboratory (INL) and Oak Ridge National Laboratory (ORNL) are performing research and development (R&D) to demonstrate application of wireless sensors using the distributed antenna system and advanced data analytics to achieve predictive maintenance. In the report, wireless vibration sensors, vibration data and its indicator are described. The wireless vibration sensors presented in this report support three types of wireless communication, namely, Wi-Fi, cellular, and 900 MHz. These wireless vibration sensors are considered by partner plant site for installation on plant asset to enable online vibration monitoring to replace periodic measurements. These vibration data along with other plant process data will be utilized to develop diagnostic and prognostic models.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Cost comparison between private and public collection of residual household waste: Multiple case studies in the Flemish region of Belgium

Highlights: Black-Right-Pointing-Pointer The goal is to compare collection costs for residual household waste. Black-Right-Pointing-Pointer We have clustered all municipalities in order to find mutual comparable pairs. Black-Right-Pointing-Pointer Each pair consists of one private and one public operating waste collection program. Black-Right-Pointing-Pointer All cases show that private service has lower costs than public service. Black-Right-Pointing-Pointer Municipalities were contacted to identify the deeper causes for the waste management program. - Abstract: The rising pressure in terms of cost efficiency on public services pushes governments to transfer part of those services to the private sector. A trend towards more privatizing can be noticed in the collection of municipal household waste. This paper reports the findings of a research project aiming to compare the cost between the service of private and public collection of residual household waste. Multiple case studies of municipalities about the Flemish region of Belgium were conducted. Data concerning the year 2009 were gathered through in-depth interviews in 2010. In total 12 municipalities were investigated, divided into three mutual comparable pairs with a weekly and three mutual comparable pairs with a fortnightly residual waste collection. The results give a rough indication that in all cases the cost of private service is lower than public service in the collection of household waste. Albeit that there is an interest in establishing whether there are differences in the costs and service levels between public and private waste collection services, there are clear difficulties in establishing comparisons that can be made without having to rely on a large number of assumptions and corrections. However, given the cost difference, it remains the responsibility of the municipalities to decide upon the service they offer their citizens, regardless the cost efficiency: public or private.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DOE Commercial Building Energy Asset Rating: Market Research and Program Direction

This paper presents the development of a voluntary energy asset rating system, to evaluate the physical characteristics and as-built energy efficiency of new and existing commercial buildings. The energy asset rating system is intended to enable commercial building stakeholders to directly compare expected as-built energy performance among similar buildings and to analyze the potential for capital improvements to increase energy efficiency cost-effectively. Market research has been performed to understand the market demand and how to communicate energy and cost savings to owners, investors, financiers, and others to overcome market barriers and motivate capital investment in building energy efficiency. The paper discusses the findings of the market research. Building owners are concerned about redundancy, conflicting requirements, and cost. They also pointed out a data gap and desire a rating program that identifies improvement opportunities. A meaningful linkage between the energy asset rating and other rating systems is essential. Based on the findings, criteria for a successful energy asset rating program have been developed to direct the program design, including validity of ratings, actionable, cost effective recommendations, effective quality control, integration with other rating systems, and necessary training and education. In addition to the rating system, an asset rating tool is being developed to reduce cost and increase standardization, allowing for consistent and reliable comparisons among and between buildings. The asset rating tool is the first step in the process by which owners can enter information about their building structure and receive information on the building’s modeled performance and recommended efficiency measures.

commercial building, energy asset rating, market r↗

South Africa’s Appliance Energy Efficiency Standards and Labeling Program

Electricity consumption in South Africa comes with a hefty environmental cost to the society. For every kilowatt-hour (kWh) produced, 1 kilogram (kg) of carbon dioxide (CO 2 ) is emitted, 1.4 liters of water are used, and 0.37 grams of particulate emissions are released in the atmosphere. These environmental implications result from the large share of electricity produced from coal (91 percent in 2015). While planned new capacity will ramp up renewable energy, the integrated resource plan for the country still projects the share of col to be 64 percent in 2030. Energy savings provide environmental benefits as well as economic benefits. Energy efficiency standards and labeling (S&L) programs are a policy measure proven to save energy. Such programs have been implemented in many countries to remove inefficient technologies and transform markets to more efficient technologies. In this study, we describe the methodology, assumptions and results of a stock turnover modeling tool that estimates the energy savings achievable by South Africa’s S&L program in the residential sector. We show that if regulations are passed in 2020 and effective in 2021 for 10 major end-use adopting international standards best practices, 6 terawatt-hours (TWh) will be saved in 2030 and 9.5 TWh will be saved in 2040, representing a CO 2 mitigation of 3.7 megatonnes (Mt) in 2030 and 5.8 Mt in 2040, which will contribute to the South African government’s international engagement in fighting against climate change through its National Determined Contribution (NDC). Additional environmental benefits include saving of 6.5 billion liters of water in 2030, representing approximately 100 liters per capita in 2030. Air quality will also improve, as 4 kilotons (kt) of particulate emissions will be avoided, as well as 4.3 Mt of sulfur oxides (SOx) and 23 kt of nitrogen oxides (NOx) in 2030.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

First-Principles Cost Estimation of a Sodium Fast Reactor Nuclear Plant

A multi-tiered cost analysis is performed to estimate full costs of a nuclear power plant (NPP) based on sodium-cooled fast reactor (SFR) technology. To address the lack of fully transparent cost estimations from past undertakings for NPPs, we have developed a detailed and first-principles-based cost estimate for a generalized SFR NPP. Our intent is to achieve a high degree of transparency with our cost assumptions and develop a cost model that is flexible and easily extendable to variations in NPP design and other nuclear reactor types. Furthermore, we strive to achieve a clear organization of costs and complete identification of key cost drivers based on first principles. To this end, the cost results of our analysis as given in Table 24 and Table 25 are organized and categorized into a code of accounts (COA) under development at Idaho National Laboratory (INL). Varying degrees of first-principles methods are employed, such as design for manufacture and assembly® (DFMA® ), to elucidate costs in all process levels of the plant equipment, buildings and site structures, personnel, and other miscellaneous but significant cost elements. These approaches have been successfully applied in past cost analysis projects and are designed to enable rapid and flexible cost estimation. Application of these techniques for evaluating NPP costs is similar in concept to the full, detailed estimation of construction and fabrication costs determined in a later stage of NPP development. Note that our approach tries to avoid use of other past analysis results and data such as those from the legacy Energy Economic Data Base (EEDB) Program, as these resources are based on historical NPP costs and thus may not be indicative of new reactor technologies or construction and fabrication/manufacturing techniques. However, we provide a comparison of our SFR NPP cost results in Table 90 against those included in the EEDB for a representative pressurized water reactor (PWR).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Evolving Applications of Aerosol Sealant

Solving the issues facing the residential building industry today requires developing not only new technologies but also new, innovative applications of existing high-performance technologies. The U.S. Department of Energy's (DOE's) Building America Program is using this approach to develop a low-cost, easy solution for whole-home envelope air sealing. Aerosol sealant is a proven method for sealing ducts quickly and efficiently, especially in hard-to-reach places. This technology, originally developed at Lawrence Berkeley National Laboratory in 1994 with support from DOE, seals 70%-90% of duct leaks (LBNL n.d.), saving $600-$850 per year in energy costs for an average household (DOE 2011). A new, innovative application takes this technology out of the duct system and into the conditioned space. Recent Building America projects have validated a method for whole-house air sealing using the aerosol sealant technology. With tighter envelope requirements in new codes and above-code programs, adequately air sealing by hand is more labor-intensive and costly than ever. The aerosol sealing method is designed to eliminate the guesswork and automate this process. The continuous measurement during installation allows builders to dial in the exact air tightness they need to meet their performance goals. Initial field testing shows that this method regularly achieves air leakage levels less than 1 ACH50 as measured by a blower door test. In a current Building America project, the Center for Energy and Environment is performing iterative field tests in 20 homes to identify the optimal integration and sequencing of this method in production home building processes to achieve a lower installation cost than traditional air sealing. This method has the potential to improve quality assurance of envelope sealing and significantly reduce labor costs compared with traditional air sealing approaches.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Fuel Cycle Economic Tools, Algorithms, and Methodologies

The Advanced Fuel Cycle Initiative (AFCI) Systems Analysis supports engineering economic analyses and trade-studies, and requires a requisite reference cost basis to support adequate analysis rigor. In this regard, the AFCI program has created a reference set of economic documentation. The documentation consists of the “Advanced Fuel Cycle (AFC) Cost Basis” report (Shropshire, et al. 2007), “AFCI Economic Analysis” report, and the “AFCI Economic Tools, Algorithms, and Methodologies Report.” Together, these documents provide the reference cost basis, cost modeling basis, and methodologies needed to support AFCI economic analysis. The application of the reference cost data in the cost and econometric systems analysis models will be supported by this report. These methodologies include: the energy/environment/economic evaluation of nuclear technology penetration in the energy market—domestic and internationally—and impacts on AFCI facility deployment, uranium resource modeling to inform the front-end fuel cycle costs, facility first-of-a-kind to nth-of-a-kind learning with application to deployment of AFCI facilities, cost tradeoffs to meet nuclear non-proliferation requirements, and international nuclear facility supply/demand analysis. The economic analysis will be performed using two cost models. VISION.ECON will be used to evaluate and compare costs under dynamic conditions, consistent with the cases and analysis performed by the AFCI Systems Analysis team. Generation IV Excel Calculations of Nuclear Systems (G4-ECONS) will provide static (snapshot-in-time) cost analysis and will provide a check on the dynamic results. In future analysis, additional AFCI measures may be developed to show the value of AFCI in closing the fuel cycle. Comparisons can show AFCI in terms of reduced global proliferation (e.g., reduction in enrichment), greater sustainability through preservation of a natural resource (e.g., reduction in uranium ore depletion), value from weaning the U.S. from energy imports (e.g., measures of energy self-sufficiency), and minimization of future high level waste (HLW) repositories world-wide.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Base Program on Energy Related Research

The main objective of the Base Research Program was to conduct both fundamental and applied research that will assist industry in developing, deploying, and commercializing efficient, nonpolluting fossil energy technologies that can compete effectively in meeting the energy requirements of the Nation. In that regard, tasks proposed under the WRI research areas were aligned with DOE objectives of secure and reliable energy; clean power generation; development of hydrogen resources; energy efficiency and development of innovative fuels from low and no-cost sources. The goal of the Base Research Program was to develop innovative technology solutions that will: (1) Increase the production of United States energy resources--coal, natural gas, oil, and renewable energy resources; (2) Enhance the competitiveness of United States energy technologies in international markets and assist in technology transfer; (3) Reduce the nation's dependence on foreign energy supplies and strengthen both the United States and regional economies; and (4) Minimize environmental impacts of energy production and utilization. This report summarizes the accomplishments of the overall Base Program. This document represents a stand-alone Final Report for the entire Program. It should be noted that an interim report describing the Program achievements was prepared in 2003 covering the progress made under various tasks completed during the first five years of this Program.

03 NATURAL GAS↗

Advanced IGCC/Hydrogen Gas Turbine Development

The objective of this program was to develop the technologies required for a fuel flexible (coal derived hydrogen or syngas) gas turbine for IGCC that met DOE turbine performance goals. The overall DOE Advanced Power System goal was to conduct the research and development (R&D) necessary to produce coal-based IGCC power systems with high efficiency, near-zero emissions, and competitive capital cost. To meet this goal, the DOE Fossil Energy Turbine Program had as an interim objective of 2 to 3 percentage points improvement in combined cycle (CC) efficiency. The final goal is 3 to 5 percentage points improvement in CC efficiency above the state of the art for CC turbines in IGCC applications at the time the program started. The efficiency goals were for NOx emissions of less than 2 ppm NOx (@15 % O2). As a result of the technologies developed under this program, the DOE goals were exceeded with a projected 8 point efficiency improvement. In addition, a new combustion technology was conceived of and developed to overcome the challenges of burning hydrogen and achieving the DOE’s NOx goal. This report also covers the developments under the ARRA-funded portion of the program that include gas turbine technology advancements for improvement in the efficiency, emissions, and cost performance of gas turbines for industrial applications with carbon capture and sequestration. Example applications could be cement plants, chemical plants, refineries, steel and aluminum plants, manufacturing facilities, etc. The DOE’s goal for more than 5 percentage point improvement in efficiency was met with cycle analyses performed for representative IGCC Steel Mill and IGCC Refinery applications. Technologies were developed in this program under the following areas: combustion, larger latter stage buckets, CMC and EBC, advanced materials and coatings, advanced configurations to reduce cooling, sealing and rotor purge flows, turbine aerodynamics, advanced sensors, advancements in first stage hot gas path components, and systems analyses to determine benefits of all previously mentioned technologies to a gas turbine system in an IGCC configuration. This project built on existing gas turbine technology and product developments, and developed and validated the necessary turbine related technologies and sub-systems needed to meet the DOE turbine program goals. The scope of the program did not cover the design and validation of a full-scale prototype machine with the technology advances from this program incorporated. In summary, the DOE goals were met with this program. While the commercial landscape has not resulted in a demand for IGCC gas turbines many of the technologies that were developed over the course of the program are benefiting the US by being applied to new higher efficiency natural gas fueled gas turbines.

33 ADVANCED PROPULSION SYSTEMS↗