Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONSULTANTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

RAVEN User Guide

The goal of this document is to provide a set of detailed examples that can help the user to become familiar with the RAVEN code. RAVEN is capable of investigating system response and explore input space using various sampling schemes such as Monte Carlo, grid, or Latin Hypercube. How- ever, RAVEN strength lies in its system feature discovery capabilities such as: constructing limit surfaces, separating regions of the input space leading to system failure, and using dynamic super- vised learning techniques. New users should consult the RAVEN Tutorial to get started.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Replacement of Wooden Wing Walls and Deteriorated Concrete Pad at Manhattan Project Era Magazine TA-16-58

The U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office (Field Office) proposes to replace missing and broken asbestos shingles, reconstruct deteriorated wooden wing walls, and remove and replace a concrete pad on Building 58 in Technical Area (TA) 16 at Los Alamos National Laboratory (LANL). Building TA-16-58 is a Manhattan Project Era magazine that was evaluated and determined eligible, in consultation with the State Historic Preservation Office (June 5, 2003 and June 22, 2003, respectively), for listing in the National Register of Historic Places (Register) in ESA Division’s Five-Year Plan: Consolidation and Revitalization at Technical Areas 3, 8, 11, and 16 and in Sentinels of the Atomic Dawn: A Multiple -Property Evaluation of the Remaining Manhattan Project Properties at Los Alamos (1942–1946) (McGehee et al. 2003a, 2003b). The building is a LANL candidate for preservation as identified in A Plan for the Management of the Cultural Heritage at Los Alamos National Laboratory, New Mexico (LANL 2017a ). It is also eligible for inclusion in the Manhattan Project National Historical Park (i.e., identified in the Park legislation), and is located within the TA-16 potential Cold War historic district (McGeh ee 1995a, 1995b; LANL 2012,).

99 GENERAL AND MISCELLANEOUS↗

2017 Workshop Summary: MHK Environmental Compliance Cost Reduction Strategies Workshop

This three year effort started in FY17 with the objectives of capturing environmental compliance costs and lessons learned from MHK developments that have gone through the permitting and compliance process. The goal is to find ways to improve the efficiency and effectiveness of the permitting and compliance process and reduce costs to encourage investment in MHK projects. The project team is composed of Sandia National Laboratories, Integral Consulting, Kearns & West, and H. T. Harvey & Associates. Step one of the project process, collect data to determine permitting and compliance costs, is currently underway. Step two of the project process, identify cost reduction pathways and step three, develop cost reduction strategies, will follow and are envisioned as an iterative approach to best meet the project goal.

54 ENVIRONMENTAL SCIENCES↗

2018 Webinar Summary: MHK Environmental Compliance Cost Reduction Strategies Workshop

This three-year effort started in FY17 with the primary objective of detailing the environmental compliance costs and lessons learned from U.S. based MHK projects that have gone through the permitting and compliance process. The project goal is to find ways to improve the efficiency and effectiveness of the permitting and compliance process that reduce deployment uncertainties and associated risks/costs; ultimately encouraging investment in MHK projects. The project team is composed of Sandia National Laboratories, H. T. Harvey & Associates, Integral Consulting, and Kearns & West. Step one of the project process, collect data to determine permitting and compliance costs, was a focus during 2017, but is an ongoing process to ensure the project team is working with the most recent and accurate data as possible. Currently, the project team is focusing on step two of the project process, identify cost reduction pathways. Step three, develop cost reduction strategies, will follow during Fall 2018 and Winter 2019. Each step is envisioned as an iterative approach working with industry and regulators to best meet the project goal.

54 ENVIRONMENTAL SCIENCES↗

2018 Workshop Summary: MHK Environmental Compliance Cost Reduction Strategies Workshop

This three-year effort started in FY17 with the primary objective of detailing the environmental compliance costs and lessons learned from U.S. based MHK projects that have gone through the permitting and compliance process. The project goal is to find ways to improve the efficiency and effectiveness of the permitting and compliance process that reduce deployment uncertainties and associated risks/costs; ultimately encouraging investment in MHK projects. The project team is composed of Sandia National Laboratories, H. T. Harvey & Associates, Integral Consulting, and Kearns & West. Step one of the project process, collect data to determine permitting and compliance costs, was a focus during 2017, but is an ongoing process to ensure the project team is working with the most recent and accurate data as possible. Currently, the project team is focusing on step two of the project process, identify cost reduction pathways. Step three, develop cost reduction strategies, will follow during Fall 2018 and Winter 2019. Each step is envisioned as an iterative approach working with industry and regulators to best meet the project goal.

54 ENVIRONMENTAL SCIENCES↗

Summary of LANL FY18 Technical Interface Coordination with SHINE

In FY18, Los Alamos National Laboratory (LANL) provided technical support for SHINE emergent needs and technical interface coordination including coordination of SHINE CFD/Thermal Hydraulics/transient analysis conference calls, Mo-99 meetings and reviews, national laboratory conference calls, and program management activities such as reporting and tracking requirements for cur rent FY18 activities. LANLhas also provided general technology consultation support for emerging issues.

99 GENERAL AND MISCELLANEOUS↗

STPR 04 Milestone 6 Report.

This report documents the completion of milestone STPRO4-6 Kokkos Support for ASC applications and libraries. The team provided consultation and support for numerous ASC code projects including Sandias SPARC, EMPIRE, Aria, GEMMA, Alexa, Trilinos, LAMMPS and nimbleSM. Over the year more than 350 Kokkos github issues were resolved, with over 220 requiring fixes and enhancements to the code base. Resolving these requests, with many of them issued by ASC code teams, provided applications with the necessary capabilities in Kokkos to be successful.

97 MATHEMATICS AND COMPUTING↗

The MidAmerica Regional Microgrid Education and Training (MARMET) Consortium

The primary goal of this project was to integrate cutting-edge research and advanced instructional methods to create a flexible, evolving approach to microgrid and distributed energy resources training for all levels of student. This goal entailed the rapid development of modular material to capture and reflect the newest trends in electric power microgrid engineering and to make it available in traditional and non-traditional settings. It was our goal to develop course material that can be readily integrated into either existing courses or organized into new courses. The target audiences include technicians, contractors and consultants, inspectors, policy makers, supervisors, and engineers and undergraduate and graduate students. The main project objectives were to: 1) Perform a gap analysis to identify the research/educational/training needs and define specific implementation plans for these activities in distributed technology and Smart Grid power engineering by working with Department of Energy, the National Network Administrator (NNA) and other Distributed Technology Training Consortia (DTTC). 2) Develop learning content related to, and driven by, microgrid research, consisting of one or more multimedia-based modules. Over the life of the project MARMET provided training to 11,012 students and developed 154,432 contact hours of material (see the IREC NNA, DE-EE0006342, final project report for added details on MARMET evaluation and assessment metrics, as well as an overview of the entire GEARED network. 3) Provide a variety of delivery mechanisms and venues for face-to-face and on-line instruction in power system engineering and related smart grid operations, including university-based courses, short courses, and workshops. 4) Assemble and engage highly-qualified advisory and steering committees of experts from utilities, universities, national laboratories, and product suppliers for this DTTC, to guide and advise the activities of the DTTC, and to assist in creating student internships, coops, research projects and academic competitions for GEARED students within the DTTC and nationally. 5) Convene regular meetings of Consortia partners to disseminate research results among the participants (universities, utilities, and industry). 6) Develop recruitment mechanisms to publicize GEARED student opportunities and highlight the educational benefits of GEARED participation to assure long-term sustainability of student recruitment and retention. 7) Participate in GEARED National Network activities to identify and adopt best practices across all GEARED consortia. 8) Organize, host and manage at least one annual Student-Centered Research Conference on behalf of the GEARED Network during the period of performance; participate in each annual national Student-Centered Research Conference.

14 SOLAR ENERGY↗

Modular Controllable Transformers (MCT)

Large Power Transformers (LPTs) are at the heart of the electricity infrastructure and are critical pieces in today’s grid. Aging assets, long turn-around times, transportation delays and dependence on foreign manufacturing for these components have created conditions for points of failure across the system. Moreover, there is no available dynamic control on these passive sections of the grid. For all the automation embedded on the low voltage side of the low voltage side of the system there is absolutely no flexibility on the high voltage side. Changes in power flow patterns are brought about by altering dispatch patterns for generators which requires a coordinated effort and is often time consuming. Traditional FACTS based approaches such as UPFC or HVDC light involve massive modifications to the existing infrastructure. Recent instances of physical attacks on LPTs and the slow recovery process associated with fixing or replacing these damaged units has created an increased awareness for this issue. LPT designs are highly customized owing to specific field requirements. Long lead times coupled with transportation delays make procuring and installing LPTs a lengthy process. In an attempt to minimize the recovery time following an LPT failure, transformer manufacturers have developed mobile transformer units. These units typically consist of either a single-phase or three-phase transformer mounted on a truck and characterized by compact form factors. By reducing the assembly time and transport time these units offer a fast and temporary solution to LPT failures. Several efforts led by DOE, Edison Electric Company (EEI) and North American Electric Reliability Corporation (NERC) have led to the RecX program. RecX transformers consist of single phase transformers transported on specialized assemblies to enable fast restoration and minimal installation time. NERC and EEI have instituted transformer sharing programs like Spare Equipment Database (SED) as well as Spare Transformer Equipment Database (STEP) which encourage utilities to maintain and share a fleet of LPTs. Mobile transformers are typically limited to less than 100 MVA to enable transportation on a trailer. Also, the efficiency of mobile transformer units and RecX transformers is lower since they are temporary solutions. The ideal replacement solution would be one that could utilize a set of standardized transformers while incorporating flexibility to influence metrics like power flow, apparent impedance and voltage profiles. In view of these issues the team at Georgia Tech proposed a concept called Modular Controllable Transformers (MCTs). This project was commissioned as a part of DOE’s Transformer Resiliency and Advance Component (TRAC) program. The approach consists of splitting one large unit rated upwards of 100 MVA with smaller modular, standardized units. Each of these smaller units are augmented with a converter to add power flow, voltage and impedance control. Splitting the power level into multiple units has two important implications. By making smaller units, the transportation times can be reduced drastically. Moreover, even though these units have very specific impedance and other parameters, the augmented converters can make it emulate the unit being replaced. Thus, faster replacement times and added controls are achieved making this an extremely resilient approach. In the event of one modular units failure, the other two controllable units can operate in the most resilient fashion keeping the net system overloads to a minimum. Moreover, for the same probability of failure only a fraction of the system capacity is lost. The converter is augmented on to the tertiary winding of the transformer making it retrofittable in the field without massive modifications to the system. The material proposed in this report highlights design considerations to minimize recovery time as well as results displaying overall improvement in resiliency. The cost analysis of this approach shows significant savings compared to UPFC and HVDC lite based approaches. Extensive analysis was conducted on numerous aspects of this project over the course of this project. Simulation studies were conducted to prove the 5MVA converter design. Challenging BIL constraints and transient issues were addressed over the course of this project. Simulations on EMTP platform presented in consequent sections were used to finely tune the control for the same. A final design for a back-to-back 5MVA neutral-point-clamped (NPC) converter was completed in this project. Furthermore, switching components like high power IGBTs from IXYS Westcode Press-Pack series and ABB Stackpack series were identified for this application. These devices exhibit a blocking voltage of 6.5 kV and a nominal collector current of 900 A. Potential housing options as well as existing commercial option were identified for this converter design. A 56 MVA modular transformer unit was designed with Delta Star Inc. with consultation and inputs from all project members. The transformer cooling systems were chosen to be Oil Natural Air Forced (ONAF) to optimize ease of transport. A full Product Requirement Document (PRD) for the converter and the transformer was generated. The team also investigated key aspects of resiliency and how to quantify the same. A metric was developed to analyze resiliency and numerous simulation cases were presented. Increased (N-1) resiliency and outage resistance was showcased through simulation on the Texas Large scale power system. Dynamic control capabilities were also showcased on numerous system level simulations. An IEEE 30 bus system was used to show the ability of the MCT approach to reduce line congestion. Power flow control; a part of the MCTs abilities, showcased a 29% reduction in transformer loading on the same system. Full control over tie line flows was demonstrated on a modified IEEE 13 bus system. Dynamic LTC capabilities were shown through simulation and were compared to traditional LTCs. Furthermore, the ability of the MCTs to alter apparent transformer impedance was simulated to promote standardization of modular transformer units while retaining the ability to emulate a varied range of impedance characteristics. Thus granular control over power flow, voltages, impedances and was presented. Regulatory analysis conducted by Oak Ridge National Laboratory (ORNL) further bolstered the efficacy of the MCT approach and verified the added resiliency achieved due to this approach. As a conclusion, it was proved that the resilience improvement obtained from using the MCT approach is justified by just one failure in a 30-year period. This means that the benefits obtained from using the MCT approach far outweigh the cost of setting this approach up. As a part of the future efforts, the team is proposing building a (12.47-24) kV/400 kVA scaled down unit to control 5MVA of power flows. Emphasis would be laid on using commercial components to speed up the build of these units. Further the actual transport of the modular transformer unit would be a part of this operation and would provide insight into transportation issues. The approach shows much promise and adds key dynamic control on passive sub transmission and transmission sectors.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Incorporating Pump-and-Treat Performance Assessment Into Hanford Remedy Documents

Performance assessment of a pump-and-treat (P&T) system to support a decision about whether it is appropriate to shut down the system can be facilitated by using a structured approach that included consideration of decision elements. Decision elements involve assessment of contaminant concentrations and trends; contaminant mass discharge from source areas; the attenuation capacity of the aquifer; estimated future plume behavior; and P&T system design, operational, and cost information to identify an appropriate condition for transitioning from P&T remediation. It is also important to consider site-specific factors. Thus P&T system performance assessment for the Hanford Site should be specific to the plumes, environmental setting, and design/operational approaches for Hanford Site P&T systems. In fiscal year 2017, PNNL worked with 200-ZP-1 operable unit (OU) and 100-HR-3 OU staff in preparing OU documents associated with implementation of P&T remedies. In these efforts, elements of a structured approach to P&T decisions and Hanford-specific factors were incorporated into the documents. Because the 200-ZP-1 and 100-HR-3 OU documents are still in a draft stage at the time this report was written, the information provided here serves only as an example of how to map P&T decision elements to performance monitoring and work plans for P&T systems. Final remedy documentation for these OUs should be consulted for specific information on OU plans and activities.

54 ENVIRONMENTAL SCIENCES↗

Field Demonstration of The Krauklis Seismic Wave In A Novel Mva Method For Geologic CO 2 Storage

The Energy & Environmental Research Center (EERC) conducted a feasibility study of a new, low-impact geophysics monitoring method designed to incrementally track the saturation front of CO 2 injected into a reservoir. The method leverages a new way of transmitting energy from the surface to the reservoir and employs a new subsurface signal called the Krauklis wave (K-wave) and other guided waves for seismic monitoring. The EERC partnered with Seismos, Inc., the company that holds the exclusive technology license for this method, to advance development of K-wave technology, and Denbury Onshore, LLC, to field-test the system. The system was field-tested at Denbury’s Bell Creek oil field, currently undergoing CO 2 -based enhanced oil recovery (EOR) in southeastern Montana. The K-wave system uses a wellhead-mounted source to propagate energy down the wellbore in the form of a tube wave and through the well perforations into the reservoir. Part of the energy transmitted through the perforations into the reservoir converts to slow moving K-waves and/or other guided waves that are expected to propagate through the formation to neighboring wells. The propagated signal would induce tube waves in the neighboring wells that return to the surface to be recorded with a wellhead-mounted receiver. The propagation time of the signal is directly affected by the presence of CO 2 between the wells, so the difference in transit time of the returning signal between pre- and postinjection data sets could be used to help define the lateral extent of a CO 2 saturation front. Objectives of the study were to demonstrate, validate, and evaluate the K-wave method’s ability to monitor the morphology of injected CO 2 and estimate saturation distribution. Results from the demonstration were to be compared to conventional 4-D surface seismic methods, dynamic reservoir simulations, and CO 2 breakthrough data to validate the technology and provide useful information that may result in improvements. Prior to mobilizing for the full-scale K-wave baseline survey, a field test was conducted to better understand wellhead hardware configurations and test the response from the Bell Creek reservoir using three wells. Useful operational information resulted but signal from the first-generation gas release/gas injection source was not recorded in neighboring wells. After the initial field test, numerical modeling of the K-wave method was initiated using parameters specific to the Bell Creek Field. Modeling results indicated that the fundamental concepts behind the K-wave method exhibited problems and revealed a significantly greater attenuation of the signal at the wellbore perforations than expected, totaling on the order of 10-8 from source well to receiver well over a 400-m well spacing. Modeling also showed that greater source frequency bandwidth was needed to produce guided waves within a 30-foot-thick reservoir layer such as that at Bell Creek and that reservoir layer seismic velocity would need to be slower than the velocities of the bounding layers in order to act as a wave guide opposite to what exists at Bell Creek. Modeling results prompted a second field test with a stronger, second-generation displacement source developed in the interim. Concurrent with the second field test, a 3-D seismic survey was acquired to serve as a baseline for project validation and to serve as a monitor data set for the portion of the project area where CO 2 injection had already commenced. The new source was tested using a four-well geometry and failed to produce a detectable signal, which appeared to confirm modeling results and indicated that the Bell Creek Field is not an ideal site for the K-wave test. It was concluded that a source with sufficient strength and bandwidth could not be built to overcome the factors discovered by the modeling within a reasonable amount of time. Several other sites undergoing CO 2 -based EOR were also evaluated; however, none of these sites was amenable because of geology, limitations of source and receiver hardware, or the advanced state of the CO 2 flood. In addition, two other configurations of the source and receiver layout were considered; however, these design modifications either changed the scope of the project or did not meet the goals of the Carbon Storage Program. In consultation with the U.S. Department of Energy (DOE) Project Manager and Technology Manager, a no-go decision was invoked to forego additional expenditures as the technology would not meet current project objectives. Project activities to date have moved the technology forward by developing modeling equations that can be applied elsewhere, advanced the state of wellhead sensors and sources, and spurred improvements to field operations. The 3-D seismic survey in the project area and the dynamic reservoir simulations done as part of this study have provided value for ongoing and future synergistic activities at Bell Creek related to DOE carbon storage goals.

54 ENVIRONMENTAL SCIENCES↗

Standard review plan for evaluating nuclear power reactor license termination plans

This standard review plan (SRP) guides the staff of the U.S. Nuclear Regulatory Commission (NRC) in conducting safety reviews of license termination plans (LTPs). The principal purpose of this SRP is to ensure the quality and uniformity of NRC staff reviews and to present a well-defined base from which to evaluate the requirements for terminating the license of a nuclear power plant. It is also the purpose of this SRP to make information about regulatory matters widely available, so that interested members of the public and the nuclear industry can gain a better understanding of the NRC staff's review process. Specific guidance for licensees is included in Regulatory Guide 1.179, "Standard Format and Content of License Termination Plans for Nuclear Power Reactors." Licensees may also use this SRP to assist in developing an LTP. The SRP presents the acceptance criteria for all areas of review for license termination, and identifies the matters to be reviewed, the basis for the review, and the conclusions that are sought. For example, NUREG-1757, "Consolidated Decommissioning Guidance" offers additional guidance on how to demonstrate compliance with the unrestricted release, restricted release, and alternative criteria for license termination, in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 20, "Standards for Protection against Radiation," Subpart E, "Radiological Criteria for License Termination." To avoid duplication of information, this SRP references applicable sections of NUREG-1757 for additional guidance. In addition, the NRC has issued supplemental guidance that will subsequently be consolidated into NUREG-1757 to address partial site release before LTP approval, and compliance with 10 CFR Part 20, Subpart E. It should be noted that the memorandum of understanding (MOU) between the Environmental Protection Agency and NRC may contain consultation triggers for some radionuclides that may be lower than the NUREG-1757 Vol. 2 Revision 1, Appendix H screening values.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Data Transferability and Collection Consistency in Marine Renewable Energy

Concerns about the potential effects of tidal turbines and wave energy devices on the marine environment continue to slow siting and permitting/consenting of single devices and arrays worldwide. While research studies and early results from post-installation monitoring over the past decade have informed interactions between marine renewable energy (MRE) devices, marine animals, and habitats, regulators still demonstrate considerable reluctance to accelerate the permitting/consenting process for devices and arrays. Furthermore, the MRE industry is struggling with the high costs of baseline assessments and post-installation monitoring, as well as long timelines for obtaining permits, which leads to uncertainty and risk related to project financing. Regulators require assessment and monitoring information to allow them to carry out the necessary analyses to describe, permit/consent, and manage the environmental risks associated with new MRE technologies and new uses of ocean space. One way to reduce risks to the industry and the environment and to allow for acceleration of the permitting/consenting process could be to transfer learning, analyses, and data sets from one country to another, among projects, and across jurisdictional boundaries. In addition, data are collected around early-stage MRE devices using many different methods, instruments, and measurement scales. If similar parameters and accessible methods of data collection were used for baseline assessments and post-installation monitoring around all early-stage devices and MRE developments, the results would be more readily comparable. This comparability would lead to a decrease in scientific uncertainty and support a common understanding of the risk of MRE devices to the marine environment. This in turn would facilitate more efficient and shorter permitting/consenting processes, which would decrease the financial risk for MRE project development. As a means of addressing the concept of transferring data (information, learning, analyses, and data sets) among projects and collecting data consistently, Annex IV has developed a data transferability process that has been socialized with the MRE community, which includes regulators, industry, developers, consultants, and researchers. The data transferability process consists of five components: 1. A Data Transferability Framework brings together data sets in an organized fashion, compares the applicability of each data set for use on other projects, and guides the process of data transfer 2. A Data Collection Consistency Table provides preferred measurement methods or processes, reporting units, and the most common methods of analysis or interpretation and use of data 3. A Monitoring Data Sets Discoverability Matrix allows a practitioner to discover data sets based on the approach presented in the Framework 4. Best Management Practices (BMPs) include five BMPs related to data transferability and collection consistency 5. An Implementation Plan presents an approach for implementing and applying the data transferability process. This report documents the background and development of the data transferability process and associated components and summarizes the next steps needed to successfully implement and apply the data transferability process.

16 TIDAL AND WAVE POWER↗

Commercial Building Technology Demonstration (Final Scientific/Technical Report)

The background for this project was a unique and innovative concept that had been proposed and demonstrated by enVerid Systems, reducing the energy consumption in HVAC systems in commercial and public buildings by up to 50% at peak loads. The concept involves selective scrubbing of gas contaminants from indoor air as a practical substitute for outside air ventilation, the latter being the conventional practice today. This scrubbing enables recycling of most of the indoor air and significantly decreasing the amount of outside air, resulting in a reduced HVAC load and commensurate energy savings for the facility. Key to our approach is low cost scrubbing of all gas contaminants from indoor air using novel, efficient and regenerable sorbent materials. The total solution, labeled HLR (HVAC Load Reduction) is implemented by means of compact modules that can be retrofitted onto virtually any building, and utilizes novel sorbents that have been developed and brought to scale production by enVerid. Although the technology had been deployed and demonstrated, the US commercial building and HVAC markets, famously conservative with respect to innovation and new technologies, had yet to embrace the idea or the product. The overarching goal of the project was to help overcome market hesitancy and enable widespread adoption, by creating a critical mass of success stories across different regions and building types, all under oversight and verification of the DOE and NREL, to ensure credibility and accuracy. The project, overall, was a resounding success. Several installations were deployed and tested comprehensively for the impact on both energy consumption and indoor air quality, and results were not only excellent, but quantitatively in line with expectations. A total number of eight (8) installations were attempted, with 2 aborted due to building issues. Of the six successful installations, however, complete M&V was performed by NREL on 2 (Miami and NYC) and partial analysis on a third site (ArcBest), and these three, along with their results, were therefore presented from a financial and reporting standpoint. Although the number of case studies fell short of the original target of 10, we nevertheless had excellent demonstrations in vastly different climate zones: Southeast, Northeast and Midwest, and in very different building types. This included a modern high-rise office building in New York City and a University Campus health center in Miami, and a mid-rise high-density office in Arkansas. The cooling load reduction was shown to be significant, averaging 37% during the final cooling season in the Miami site. In the NYC site, the cooling energy savings were generally less, at around 12%, as expected. While this is a lower number for average/total savings, two comments are important to note: (i) the outside airflow (OA) reduction was not consistent during the data collection period, at least in part understating the attainable savings through incorrect measurement of the “high energy” reference state; and (ii) the peak impact in NYC is almost certainly as high as Miami, with critical ramifications for peak load reduction and equipment downsizing ability. Importantly, the measured energy savings in all locations were related to the outdoor climate conditions and the actual achievable reduction in outside air, very much in line with models and calculations; this leaves us with increased confidence in our understanding of the interaction between the technology and the building, and our ability to project the impact of this innovation in the future, through broad adoption. Simply put: the energy savings and load reduction impact of the HLR solution has been confirmed quantitatively. The results also confirmed the air quality objective. This may be even more significant, in that air quality is more complex and harder to measure and quantify, and the performance of the HLR as an air scrubber is the linchpin of the entire solution. In all sites, indoor air quality met or exceeded the required parameters, in terms of achieving the target (low) levels of indoor pollutants. Furthermore, the concentrations of outdoor sourced pollutants were markedly lower, as expected, mostly due to the reduction in outside air intake although in part also due to the scrubbing. The success was not immediate nor easy, and early challenges with the systems, especially (but not only) around controls and communication, caused delays in commissioning and undermined some of our M&V schedules. The good news is no fundamental issues were encountered and the number of such glitches was declining quickly by the end of the project. Other challenges had to do with coordinating the control of the building OA dampers, which the HLR needs to have in order to deliver the load reduction, but which the facility manager controls regularly and independently. This is not necessarily a problem for normal HLR operation but interferes with accurate M&V, where switching OA settings back and forth on a precise timetable is essential for clean data. The project provided valuable experience in retrofitting buildings that had been originally designed to operate with less recirculation and more outside air, and some key learnings related to the cyclical regeneration of the sorbents in the operational environment of the building. Some of these learnings gave already been incorporated into ongoing improvements in the design of the HLR module as well as the software that is used to control its operation. The cost and time of retrofit installations is much better understood; so is the test and balance procedure of the building that determines the available range of outside air reduction, which in turn determines the amount of load reduced. We had also implemented at least one annual cycle of sorbent cartridge replacement in the field, after which we tested the used sorbent to assess the rate of degradation of sorbent potency – an important factor affecting the long-term economics of HLR deployments. A notable shortfall of the project, other than the fact that the number of sites was below target, was that we had not (yet) completed testing to measure and verify (M&V) the winter energy savings. This is primarily due to late start on the NYC sites (Miami does not portend any heating savings associated with reduced outside air), combined with the issues of OA damper control. It is by no means suggested that such savings cannot be captured, only that the M&V with respect to winter in NYC has been incomplete. The value of this project and its interest to the general public are hard to overstate. The case studies created from Miami and especially from NYC have, without a doubt, opened up the interest of the broad HVAC industry to HLR in the past year. Major manufacturer reps have signed up to represent and promote the product, and dozens of top tier engineering consultants have introduced HLR as a base of design in upcoming construction and renovation projects – precisely the overarching goal of this project. These would not have happened without the highly visible installation in NYC and its ultimately satisfied customer. Furthermore, the DOE itself issued a report in late 2017 analyzing hundreds of candidate technologies for reducing energy consumption in HVAC; remarkably, the budding HLR solution ranked among the top 3(!); no doubt, its status as a viable and significant contender on this list is informed by the success of these demonstrations. And furthermore, in the wake of these demos, several major energy utilities, led by ConEdison in NYC, have endorsed the HLR solution and now routinely provide substantial cash rebates for customers choosing to incorporate the HLR in their buildings and reap the benefit of the reduced peak load as well as reduced cumulative energy demand. Last but not least, in January of 2019, as this report was being written, the HLR module won the AHR Expo Innovation Award for Green Buildings and, remarkably, the prestigious and only Product of the Year 2019, being selected by an independent professional panel of judges from AHR and ASHRAE. Given the confirmation of the enormous energy saving potential of HLR in widescale deployment, as well as ancillary but significant benefits in terms of equipment downsizing and indoor air quality, the benefit of this effort to the public speaks for itself. Accelerating adoption of HLR, without dependence on subsidies and driven by the private sector, is well under way. There is still much work to be done in terms of educating the HVAC and construction ecosystems and improving the product’s robustness and simplicity, to further facilitate the adoption of this technology and the capture of its potential value. But the American public will greatly benefit both directly and indirectly in the immediate future and beyond.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Wind Vision Detailed Roadmap Actions: 2017 Update

In March 2015, the U.S. Department of Energy (DOE) released Wind Vision: A New Era for Wind Power in the United States, which explores and quantifies the economic and environmental costs and benefits of a scenario in which wind provides 10% of U.S. electrical demand in 2020, 20% in 2030, and 35% in 2050. The Wind Vision report also includes a Roadmap that describes actions stakeholders can pursue to achieve the vision and its underlying wind deployment scenario. The Wind Vision and its Roadmap were compiled by representatives from DOE and its national laboratories in consultation with the wind industry, trade associations, academia, environmental organizations, and other stakeholders. When the Wind Vision was released in 2015, DOE announced its intention to engage the wind community from time to time to track progress and update the Roadmap periodically.

17 WIND ENERGY↗

Reevaluation of Three Cold War-Era Buildings at Technical Area 22

The U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office (Field Office) reevaluated three magazines (buildings 7, 8, and 10) at Technical Area (TA) 22, Los Alamos National Laboratory (LANL or the Laboratory) (Map 1). This reevaluation was conducted because the magazines have been identified as candidates for preservation due to their association with the almost 40 years of Cold War-era detonator research conducted at adjacent building TA-22-1 (Maps 2–4), a property that is eligible for inclusion in the Manhattan Project National Historical Park (MAPR) for its role in the assembly of the wartime Fat Man bomb. Cold War-era magazines, TA-22-7, -8, and -10, were originally determined not eligible for listing in the National Register of Historic Places (Register) in DX Division’s Facility Strategic Plan: Consolidation and Revitalization at Technical Areas 6, 8, 9, 14, 15, 22, 36, 39, 40, 60, and 69 (McGehee et al. 2005) in consultation with the State Historic Preservation Officer on April 18, 2006. Many of the magazines at TA-22 are of identical construction, and at the time of the initial evaluation, other magazines were selected as the best examples of type for the purpose of architectural documentation. The reevaluation is being conducted because the status of TA-22-1 and its immediate area have changed since the MAPR was authorized in December 2014. The three magazines, along with a magazine that was previously determined eligible in 2006 (TA-22- 9), are within one of the proposed boundaries for the MAPR at LANL and are also now considered candidates for preservation. These magazines were constructed in 1949 to support detonator research, development, and testing, and have served as reinforced storage facilities for high explosives since their construction.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Los Alamos National Laboratory Ombuds Office Biennial Report FY2017-2018

Visitors contact the Ombuds Office to obtain coaching, explore options, develop strategies, learn about LANL resources, understand formal processes and policies, or request a facilitated discussion/mediation. The number of visitors who contacted the office in FY17 and FY18 was 540 and 555, respectively - the highest annual numbers since FY08. The Ombuds Office supports professional workplace communication and conflict management skills through individual consultations, presentations, the resource library, and special events. Courses are regularly scheduled and available to the LANL workforce. Annually, an average of ~1950 participants attended Ombuds courses, workshops, and talks in FY17-18. The total number of individuals who attended presentations in FY17-18, both internal and external to LANL, was 4005. Staff continue to present annually at the International Ombudsman Association Conferences and New Mexico Alternative Dispute Resolution Symposiums. In this reporting period, the Laboratory Ombudsman was recruited to present communication and negotiation skills courses for several universities and prestigious national science and engineering organizations. The mission of the Ombuds Office is to enhance communication and mitigate conflict. Staff provide expertise, feedback and resources to employees, leaders and organizations in order to strengthen conflict and communication capabilities. A related function of the office is to identify and report trends, without breaching confidentiality or anonymity. Trends and concerns may be raised around policies and procedures - including potential future issues – or concerning unhealthy patterns within an organization. The underpinnings of Organizational Ombuds work at LANL are provided by the International Ombudsman Association (IOA) Standards of Practice, (IOA Standards of Practice, 2009; Code of Ethics, 2007). The four IOA tenets are neutrality/impartiality, independence, confidentiality and informality.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Q-6 Fireset Requirements

This document provides requirements for all CDU designs to be used at the Q-6 firing sites [i.e., Technical Area 22, Building 34 (TA-22-00340; TA-40-0005; and TA-40-0015], including LANL-designed CDUs, firesets from other Department of Energy (DOE) sites, and commercial firesets. CDUs for other, non-Q-6 sites [e.g., Dual-Axis Radiographic Hydrodynamic Test (DARHT) Facility, Proton Radiography (pRad) Facility, Nevada National Security Site (NNSS), etc.] may have additional requirements that are not reflected here. While this document provides recommendations and examples for some aspects of fireset design, it is not intended to be a design guide. This document is intended for use by subject matter experts (SMEs) in fireset design. Those new to fireset design should consult SMEs before submitting a fireset for Q-6 approval.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗