Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CLOSURES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Extender for securing a closure

An apparatus for securing a closure such as door or a window that opens and closes by movement relative to a fixed structure such as a wall or a floor. Many embodiments provide a device for relocating a padlock from its normal location where it secures a fastener (such as a hasp) to a location for the padlock that is more accessible for locking and unlocking the padlock. Typically an extender is provided, where the extender has a hook at a first end that is disposed through the eye of the staple of the hasp, and at an opposing second end the extender has an annulus, such as a hole in the extender or a loop or ring affixed to the extender. The shackle of the padlock may be disposed through the annulus and may be disposed through the eye of a second staple to secure the door or window in a closed or open position. Some embodiments employ a rigid sheath to enclose at least a portion of the extender. Typically the rigid sheath has an open state where the hook is exposed outside the sheath and a closed state where the hook is disposed within the sheath.

42 ENGINEERING↗

Clamshell closure for metal drum

Closure ring to retain a lid in contact with a metal drum in central C-section conforming to the contact area between a lid and the rim of a drum and further having a radially inwardly directed flange and a vertically downwardly directed flange attached to the opposite ends of the C-section. The additional flanges reinforce the top of the drum by reducing deformation when the drum is dropped and maintain the lid in contact with the drum. The invention is particularly valuable in transportation and storage of fissile material.

42 ENGINEERING↗

Site Development, Operations, and Closure Plan Topical Report 5 An Assessment of Geologic Carbon Sequestration Options in the Illinois Basin. Phase III

The Midwest Geological Sequestration Consortium (MGSC) has partnered with Archer Daniels Midland Company (ADM) and Schlumberger Carbon Services to conduct a large-volume, saline reservoir storage project at ADM’s agricultural products processing complex in Decatur, Illinois. The Development Phase project, named the Illinois Basin Decatur Project (IBDP) involves the injection of 1 million tonnes of carbon dioxide (CO 2 ) into a deep saline formation of the Illinois Basin over a three-year period. This report focuses on objectives, execution, and lessons learned/unanticipated results from the site development (relating specifically to surface equipment), operations, and the site closure plan.

58 GEOSCIENCES↗

Validation of CTF Droplet Entrainment and Annular/Mist Closure Models using Riso Steam/Water Experiments

This document summarizes the work to validate the droplet entrainment and de-entrainment models, as well as two-phase closure models in the CTF code [1] by comparison with experimental data obtained at Risø National Laboratory [2]. CTF is the modernized version of the subchannel code, COBRA-TF [3], being jointly developed by Oak Ridge National Laboratory and North Carolina State University for applications in the Consortium for Advanced Simulation of Light Water Reactors (CASL). The Risø data included a series of more than 250 steam/water experiments that were performed in both tube and annulus geometries over a range of various pressures and outlet qualities. Experimental conditions wereset so that the majority of cases were in the annular/mist flow regime. Measurements included liquid film flow rate, droplet flow rate, film thickness, and two-phase pressure drop. CTF was used to model 180 of the tubular geometry cases, matching experimental geometry, outlet pressure, and outlet flow quality to experimental values. CTF results were compared to the experimental data at the outlet of the test section in terms of vapor flow fractions, and entrained liquid flow fractions, and pressure drop per unit length.

Wysocki, Aaron↗

Assessment of Enthalpy-Based Conditional Moment Closure Models in Predicting Ignition of Lean and Stoichiometric PRF-Air Mixtures with Temperature Inhomogeneity

Accurate prediction of the ignition delay in turbulent flows is important in developing advanced combustion technology for internal combustion engines. Enthalpy-based conditional moment closure (CMC) models are assessed with 2-D direct numerical simulation (DNS) data for ignition of homogeneous PRF-air mixtures with temperature inhomogeneity in homogeneous isotropic turbulence. The sensible-enthalpy-based CMC model is compared with the total-enthalpy-based formulation, with the focus being placed on assessing the capability of the CMC models in predicting ignition processes under different engine conditions. A priori analysis shows that the total-enthalpy-based CMC gives good predictions of the heat release rates in the lean mixtures when the temperature inhomogeneity level is low, but leads to significant overprediction under the stoichiometric condition regardless of the thermal stratification levels. On the other hand, the sensible enthalpy formulation performs well for all conditions considered in this study due to the suppressed conditional temperature fluctuations. A mapping method to model conditional scalar dissipation rates and probability density function of sensible enthalpy is also assessed.

Wang, Wei↗

Deformable closure mechanism

A deformable closure mechanism for an aperture that may include an aperture seal that has a seal seat between an internal support structure and an external support structure. A barrier structure may be configured to resealably close the aperture, and have a central membrane and a barrier sealed that is inflatable in order to engage the barrier structure with the aperture seal.

Doggett, William R.↗

DOESC Closure Leak Test Assembly

This conceptual design report is for the DOESC Closure Leak Test Assembly, which satisfies a portion of the milestone "Preliminary Design Report for Remote Helium Leak Test System". This CDR is part of the Preliminary Design Report/Package.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Closure of the Fast Flux Test Facility: Current Status and Future Plans

The Fast Flux Test Facility (FFTF) was a 400 MWt sodium cooled fast reactor designed and constructed in the 1970's. The original purpose of the facility was to develop and test advanced fuels and materials for the liquid metal fast breeder reactor program. The facility operated very successfully from 1982 through 1992, fulfilling its original mission as well as other identified missions. However, in 1993 the Department of Energy concluded that there was no longer a need for the FFTF and thus ordered that it be shut down. Following eight years of additional study of potential new missions, the final decision to shut down the facility was made in 2001. (During this eight year period the plant was maintained in a condition to allow safe and efficient shut down or restart). The complete closure of the FFTF consists of the following phases: - Deactivation - removal/stabilization of hazards to allow long-term storage (2001-2009); - Surveillance and maintenance - minimum cost compliant storage (2010-2015); - Decontamination and decommissioning (2016-2024). All of the FFTF fuel has been removed from the site except the sodium-bonded fuel that is destined for transportation to Idaho National Laboratory for final disposition. The sodium-bonded fuel had metallic sodium inside of the fuel pin to increase the heat transfer from the fuel pellet to the clad in order to reduce pellet centerline temperature. Three hundred and seventy-six (376) fuel assemblies have been washed (sodium removed) and transferred to storage at other Hanford locations. The majority of the spent fuel is stored in interim storage casks designed for a 50 year storage life, holding seven assemblies each. All sodium systems have been drained and the sodium stored under an inert gas blanket at ambient temperature in a Sodium Storage Facility at the FFTF site. This facility consists of four large tanks and associated piping. The main contaminants are sodium-22, cesium-137 and tritium. The sodium-potassium (NaK) that was used as an intermediate cooling fluid in several FFTF systems has been drained and removed or flushed to sodium systems where it became mixed with the sodium. The in-containment hot cell has minimal sodium contamination, is currently inerted with argon and is being used for loading of the T-3 transportation cask with the sodium-bonded fuel for transportation to Idaho National Laboratory. The majority of the fuel handling machines are still operational and being used for loading the sodium-bonded fuel into the T-3 casks. This equipment will be shut down immediately following completion of shipment of the sodium-bonded fuel. The majority of hotel systems are still operating. Four of the eight 400-ton chillers have been shut down and four of the cooling towers have been shut down. The argon system is operational and supplying gas for sodium systems cover gas, in-containment hot cell atmosphere and fuel handling systems. The nitrogen system remains in service supplying cover gas to the demineralized water system and fire suppression systems. Eleven of the facilities nineteen transformers containing polychlorinated biphenyls (PCBs) have been removed and significant re-routing of power has been performed to support the long term minimum cost surveillance mode. Future plans include the complete deactivation, the long-term surveillance and maintenance, the sodium disposition and the decontamination and decommissioning The most complex and costly activity during the decontamination and decommissioning phase will be the removal of the 'residual sodium' in the sodium systems. It was impractical to remove the residual sodium during the systems draining evolution. It is estimated that approximately 24,000 liters (6,400 gallons) remain within the systems. The complexity of design of the FFTF exceeds any sodium facility in the United States in which sodium removal has occurred. There are a total of 21 miles of sodium piping in the FFTF as well as three large vessels (the reactor vessel and two spent fuel pool vessels) that will require partial disassembly and drilling in order react/remove remaining sodium.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Evaluating the Potential Impact of Using the Transport, Aging and Disposal (TAD) Canister on Yucca Mountain Pre-Closure Operations

The development and preliminary use of an integrated model to explore the impact of various operational scenarios of the pre-closure waste management system of Yucca Mountain (YM) is described. The capabilities of the model are illustrated by applying it to a simplified operational scenario using Transport, Aging, and Disposal (TAD) Canisters. The application uses existing data on spent nuclear fuel to model the effect on above ground aging at YM by varying four parameters: (1) utility loading behavior, (2) thermal limit for transportation casks, (3) thermal limit for emplacement, and (4) emplacement capacity at YM. Results show that the thermal limit for emplacement is the most important parameter with respect to above ground aging demands at YM. Transportation heat limit is also important, but less so if the capacity of YM is expanded or if older fuel is sent first. Easing the constraint of the emplacement limit, if feasible, would be a preferable method of reducing aging demands, especially under an expanded emplacement capacity. Consequently, there may be incentive for Department of Energy (DOE) to either specify a lower transportation limit or a higher emplacement limit if it wishes to reduce the potential demands on the Aging Facility at YM. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Potential for radionuclide redistribution due to biotic intrusion: Aboveground biomass study at the Los Alamos National Laboratory for the closure of Material Disposal Area G

Low-level radioactive waste generated at the Los Alamos National Laboratories (LANL) is disposed of at Technical Area (TA) 54, Material Disposal Area (MDA) G. The ability of MDA G to safely contain radioactive waste was evaluated in the facility's performance assessment (PA) and composite analysis (CA). The PA and CA project that, due to uptake and incorporation of radionuclides into aboveground plant material, plant roots penetrating into buried waste may lead to releases of radionuclides to the accessible environment and potentially lead to the exposure to members of the public. The potential amount of contamination deposited on the ground surface, due to plant intrusion into buried waste, is a function of the quantity of litter generated by plants, as well as radionuclide concentrations within the litter. Radionuclide concentrations in plant litter is dependent on the distribution of root mass with depth and the efficiency with which radionuclides are extracted from contaminated soils by the plants roots. In order to reduce uncertainties associated with the PA and CA for MDA G, aboveground biomass surveys, plant litter production rates, and root mass with depth analyses for the four prominent vegetation types (grasses, forbs, shrubs and trees) are being conducted. Sampling occurred during the months of August and September of 2007 which measured aboveground biomass for the types of grasses and forbs that may become established at MDA G after the disposal facility undergoes final closure. Biomass data are representative of the future potential for the amount of contaminated plant litter fall, which could act as a latent conduit for radionuclide transport from the closed disposal area. Follow on work will be conducted to evaluate frequency and coverage of all growth forms, litter production rates will be measured, and root mass with depth for grasses, forbs, shrubs, and trees will be analyzed. Together, data collected are expected to reduce uncertainties associated with the PA and CA for MDA G and ultimately aid in the prevention of radionuclide transport within the environment from the closed disposal area and exposure to the public. In summary: Collection of aboveground grasses and forbs at TA-54 resulted in dry-weight biomass data for two of the four growth forms of interest for the MDA G PA and CA. Shrubs were not encountered in any of the grid cells selected for sampling. Trees were not encountered within MDA J. Mature trees (Juniper) were located in five grid cell locations at Zone 4. Dead and down trees (Pinon) were located in two of the grid cells at Zone 4. The grid size at MDA J was reduced to 15.2 m by 15.2 m (50 ft by 50 ft) because of the anticipated mass to be collected. MDA J has achieved a relatively uniform grass and forbs coverage, and due to time constraints the size was reduced by half. Material that was originally oven dried was weighed again after several weeks. Data from post oven drying reports weight gain, indicating a higher error associated with air versus oven drying methodology. The drying methods will be explored in greater depth with future studies. Future surveys will include measurement of aboveground biomass of shrubs and trees, measurement of litter production rates; root mass with depth for grasses, forbs, shrubs, and trees; and frequency and coverage surveys to determine the percent coverage of each growth form. The collection of this additional data will provide further site-specific information regarding the growth of grasses, forbs, shrubs, and trees within the expected successional growth stages expected at MDA G. These data will be incorporated into the biotic intrusion modeling for the MDA G PA and CA. (authors)

54 ENVIRONMENTAL SCIENCES↗

River Corridor Closure at DOE's Hanford Site - 12503

The discussion of Hanford's River Corridor will cover work that has already been completed plus the work remaining to be done. This includes the buildings, waste sites, and groundwater plumes in the 300 Area; large-scale burial ground remediation in the 600 Area; plutonium production reactor dismantling and 'cocooning' along the river; preservation of the world's first full-scale plutonium production reactor; removal of more than 14 million tons of contaminated soil and debris along the Columbia River shoreline and throughout the River Corridor; and the excavation of buried waste sites in the river shore area. It also includes operating an EPA-permitted low-level waste disposal facility in the central portion of the site. At the completions of cleanup in 2015, Hanford's River Corridor will be the largest closure project ever completed by the Department of Energy. Cleanup of the River Corridor has been one of Hanford's top priorities since the early 1990's. This urgency has been due to the proximity of hundreds of waste sites to the Columbia River. In addition, removal of the sludge from K West Basin, near the river, remains a high priority. This 220-square-mile area of the Hanford Site sits on the edge of the last free-flowing stretch of the Columbia River. The River Corridor portion of the Hanford Site includes the 100 and 300 Areas along the south shore of the Columbia River. The 100 Areas contain nine retired plutonium production reactors. These areas are also the location of numerous support facilities and solid and liquid waste disposal sites that have contaminated groundwater and soil. The 300 Area, located just north of the city of Richland, contains fuel fabrication facilities, nuclear research and development facilities, and their associated solid and liquid waste disposal sites that have contaminated groundwater and soil. In order to ensure that cleanup actions address all threats to human health and the environment, the River Corridor includes the adjacent areas that extend from the 100 Area and 300 Area to the Central Plateau. For sites in the River Corridor, remedial actions are expected to restore groundwater to drinking water standards and ensure that aquatic life in the Columbia River is protected by achieving ambient water quality standards. It is intended that these objectives be achieved, unless technically impracticable, within a reasonable timeframe. In those instances where remedial action objectives are not achievable in a reasonable time frame, or are determined to be technically impracticable, programs are being implemented to contain the plume, prevent exposure to contaminated groundwater, and evaluate further risk reduction opportunities as new technologies become available. River Corridor cleanup work also removes potential sources of contamination, which are close to the Columbia River, and places them on the Central Plateau for final disposal. The intent is to shrink the footprint of active cleanup to within the 75-square- mile area of the Central Plateau by removing excess facilities and remediating waste sites. Cleanup actions are supporting anticipated future land uses consistent with the Hanford Reach National Monument, where applicable, and the Hanford Comprehensive Land- Use Plan (DOE 1999). The River Corridor has been divided into six geographic decision areas to achieve source and groundwater remedy decisions. These decisions will provide comprehensive coverage for all areas within the River Corridor and will incorporate ongoing interim action cleanup activities. Cleanup levels will be achieved in order to support anticipated future land uses of conservation and preservation for most of this area and industrial use for the 300 Area. At the conclusion of cleanup actions, the federal government will implement long-term stewardship activities to ensure protection of human health and the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technology Basis for Savannah River Tank Closure Cesium Removal Project - 17448

Westinghouse is currently executing a contract, awarded in June 2016 from Savannah River Remediation LLC, to deliver a system capable of removing solids and up to 100,000 curies of Cesium-137 from tank 10H, located in the Savannah River 'tank farm'. Savannah River Remediation currently has the responsibility to perform work for the Savannah River Site Liquid Waste Operations Program at the Savannah River Site for the US government, represented by the US DOE under their Principal contract. The scope of work covers the detailed design, procurement, fabrication, and delivery of the system to the Savannah River Site. It also includes the factory acceptance testing of the system, prior to delivery to site. Before leaving the site, Westinghouse will perform an evaluation of the system assembly and operations training for the incumbent operator. The basis for the technology chosen to accomplish the solids and Cesium-137 removal is unique to the specific feed stream, but is based on well-known and successful technology, Toshiba SARRY water cleanup system. Toshiba is Westinghouse's parent company, allowing us to reach back and incorporate the lessons learned during the water cleanup at Fukushima Daiichi and the integration of various technologies. Another key to the technology basis was the ion exchange media selection. A number of possible ion exchange media for the cesium removal were considered with the final choice being inorganic CST resin. Several criteria were considered and compared, such as the radiation sensitivity of the CST and the cesium specific ion preference. This paper will present the conceptual design of the modular system, noting the key benefits of specific components in the overall technology basis. Along with the design, a look at key technology improvements carried into the design through the Toshiba SARRY system will be incorporated. A first feedback on the implementation of the overall project will be provided. Since this system is a first-of-a-kind in this specific application, interesting lessons learned will be provided for future tank closure activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ANDRA's strategy and approach for post-closure safety of geological disposal - 15128

The French National Radioactive Waste Management Agency, or ANDRA, has, among its roles in management of radioactive waste, to ensure the protection of man and the environment from all radioactive waste generated in France. In order to verify compliance to the safety objectives, radiological and chemical impact evaluations are to be assessed. The objective of the paper is to present the overall approach for assessing the post-closure safety of French nuclear waste disposals in particular on the Geological Disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Robotic Equipment for Retrieval of High Level Waste to Support Environmental Closure - 18162

The Idaho Cleanup Project contractor, Fluor Idaho, LLC, is responsible for managing HLW calcine stored in the Calcined Solids Storage Facility at the Idaho Nuclear Technology and Engineering Center. The Idaho Nuclear Technology and Engineering Center is a DOE managed facility located at the INL Site in the remote portions of southeast Idaho. In 2016, DOE directed Fluor Idaho to develop and test a full-scale retrieval system to demonstrate the ability to safely retrieve HLW calcine from the Calcined Solids Storage Facility for future retrieval and processing. Removing HLW calcine from the State of Idaho is required by the 1995 Settlement Agreement, which mandates that DOE have HLW calcine ready to be moved out of Idaho by December 2035. Fluor Idaho is currently testing retrieval and transfer concepts to ensure that the Calcined Solids Storage Facility is placed in a final configuration that is protective of human health and the environment after HLW calcine has been removed to the maximum extent practical. This paper describes the full-scale prototype that will be used to prove retrieval and transfer system design capabilities, verify operating parameters, and establish a basis for calcine retrieval efficacy. Additionally, it describes the retrieval (bulk and residual) and visual monitoring systems that were designed and tested in 2017 and will continue to be tested with the full-scale prototype. Testing (i.e., full-scale mockup, bulk retrieval, residual clean-out, and visualization monitoring) performed by Fluor Idaho will demonstrate the maximum extent practical of HLW calcine removal that is achievable. This is critical to (1) establish criteria for ending calcine removal activities, (2) evaluate cost and benefits associated with performing additional removal, and (3) ensure clean up and closure standards under applicable requirements (e.g., statutes, orders, and agreements) are met. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Waste Management Organization for the Whiteshell Laboratories Closure Project - 18317

Whiteshell Laboratories (WL) has been generating and managing radioactive waste for over fifty years in support of a wide variety of research and operational applications. The current mission of the WL site, located in Manitoba, Canada, is to fully decommission the site to an approved end-state criterion and to disposition the waste in compliance with national and provincial regulations. To expedite the decommissioning schedule from over thirty years to nine years, which was a contractual commitment for the site operating company, Canadian Nuclear Laboratories (CNL), it became apparent that a centralized and optimized organization be established to coordinate all waste management activities and to fulfill the mission to process, condition, transport and disposition all radioactive wastes, which include Low-Level Waste (LLW), Intermediate-Level Waste (ILW) and High-Level Waste (HLW). The WL Waste Management Division was effectively established as a two-person operation in 2016 and has rapidly expanded to fulfill the mandate of managing nearly 30,000 cubic meters of LLW, ILW and HLW. This paper outlines the early lessons learned from managing important organizational changes without disrupting ongoing work practices; developing executive-level waste management strategies based on options studies and cost-benefit analysis comparisons; selection of storage vs. disposal disposition strategies; evaluation and selection of transportation methods and packages for LLW, ILW and HLW; and the need to develop an entire suite of programmatic documentation and procedures to support and instill a strong conduct of operations culture. The waste management strategy, which now focuses on transporting the waste to another province (Ontario) in a disposal ready form, represents the first large-scale radioactive waste transportation campaign in Canada that includes all three classes of waste. This paper provides additional insight on the overall waste management strategies for the WL Closure Project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Execution of an Alternative Modeling Strategy for Closure of the Rainier Mesa Corrective Action Unit at the Nevada National Security Site - 19099

The Underground Test Area (UGTA) Project of the U.S Department of Energy (DOE) is investigating radionuclide contaminant movements in groundwater derived from a decades-long period of underground nuclear testing at the Nevada National Security Site (NNSS) to support regulatory corrective action and closure requirements. The project is built around an integrated campaign of drilling and sampling, data interpretation, computer modeling, and broader monitoring activities conducted under a joint Federal Facilities Agreement and Consent Order (1996 as amended) (FFACO) between the State of Nevada, the DOE, and the U.S. Department of Defense. The FFACO strategy is applied to individual Corrective Action Units (CAUs) that roughly envelop disparate geographic testing areas at the NNSS. The Rainier Mesa/Shoshone Mountain (RMSM) CAU is a geologically and hydrologically complex system lying in a remote up-gradient section of the NNSS. It was the site of 67 underground tests conducted between 1957 and 1992, 61 at Rainier Mesa proper, and 6 at Shoshone Mountain, isolated to its south. The original strategy to close the RMSM CAU required a simulation-based investigation to define the evolution of contaminated volumes of groundwater (in 3D) under uncertainty as a means to define a surface-projected contaminant boundary and to serve as a basis for longer term monitoring activities. Early models developed under this strategy proved to be quite complex and difficult to calibrate. Additional costs required to better characterize the system were judged to be out of balance with the low risks associated with this particular CAU. As a result, an Alternative Modeling Strategy (AMS) was adopted. The AMS removes the requirement for developing ensembles of 3D simulations and replaces it with a simpler one requiring the generation of multiple 1D streamline models. These are meant to encompass a range of alternative, yet plausible release and transport scenarios as a means to bound the overall lateral extent of contaminant transport. This paper will review the modeling approach developed under the AMS and its application to the Rainier Mesa portion of the CAU. Preliminary model results made under different parametric assumptions and boundary condition scenarios will be presented. Additional refinements of the model and its further application will be discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safety Basis Development for the Tank Closure Cesium Removal (TCCR) Demonstration - 19596

The Tank Closure Cesium Removal (TCCR) system has been installed at Savannah River Site (SRS) to supplement the existing salt waste treatment facilities. The TCCR system is intended to demonstrate the capability of ion exchange (IX) technology to remove Cs-137 from high level liquid waste. Separation is performed by Crystalline Silicotitanate (CST) IX media. The media is stored in shielded columns within a small enclosure. Following processing in the TCCR system, decontaminated waste can receive further treatment and be dispositioned at other SRS facilities. The Cesium-laden columns will instead be removed from the enclosure and transported to another location on site for interim storage. Developing the safety basis for the TCCR system and integrating it into the documented safety analysis for existing facilities presented a unique challenge. Most notably, utilizing new methodologies to analyze new hazards resulted in unexpectedly high consequences. The TCCR system therefore required more rigorous controls than had initially been anticipated. However, the integrated control set developed for the TCCR system should have little impact on its operating capabilities and will allow it to begin operating in 2019. This may lay the foundations for future utilization of similar systems at SRS and across the Department of Energy complex. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cesium Removal and Hydraulic Performance Comparisons of CST Ion Exchange Media Batches in Support of the Tank Closure Cesium Removal Project - 20522

Three batches of Crystalline Silicotitanate (CST) ion exchange media have been evaluated for cesium removal efficiency from a Savannah River Site (SRS) High Level Waste (HLW) supernate simulant in support of the Tank Closure Cesium Removal (TCCR) Project, which involves at-tank column waste treatment. Results will be utilized to select the CST media batch to be added to the next TCCR unit columns. Two of the CST media samples were recent production batches and the third was an archived batch studied extensively at SRS nearly two decades ago. The archived CST batch had a significantly smaller average particle diameter than more recent batches. Small-scale (∼23 mL), side-by-side column tests were conducted at 35 deg. C with each of the CST batches using the same simulant at flow rates near 1.2 mL/min (3.0-3.4 CST bed volumes/hr). The cesium ion exchange column performance results were lower than expected for all three CST batches, but the data indicated that 30% more simulant volume and 40% more equivalent CST bed volumes of solution can be processed with the older CST batch prior to reaching the 50% cesium breakthrough point than can be processed with the newer CST batches. Hydraulic evaluations of the CST columns were also conducted in simulant at 24 deg. C to determine the impact of the different particle size distributions and associated bed porosities on frictional pressure drop under dynamic flow conditions. Higher differential pressure drops were observed with the archived CST batch relative to recent production batches, due to the smaller particle size distribution and the packing characteristics of the archived batch. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗