Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BEAM MONITORING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Assessment of BPM options for the EIC Beam Accumulator Ring

The electron injection system for the Electron-Ion Collider (EIC) at BNL is designed to provide a beam of polarized electrons, which is crucial for studying the structure of protons and atomic nuclei. The Beam Accumulator Ring (BAR) is a part of the injection chain between the 750 MeV linear accelerator and the Rapid Cycling Synchrotron (RCS), which accelerates the beam up to full energy (5–18 GeV). The functional role of the BAR is to accumulate the charge injected from the linear accelerator in order to achieve the high intensity of the polarized electron beam required by the specifications for injection into the RCS. This objective will be realized through the sequential injection of bunches with a charge of 1.1 nC at a repetition rate of 30 Hz. Once the charge of a single bunch reaches 28 nC, the beam will be extracted from the BAR and injected into the RCS. The beam instrumentation needs to provide reliable measurements with the required accuracy over the dynamic range from 0.1 nC (one tenth of a typical injected bunch charge) to 32 nC – the maximum expected accumulated current. There are 10 Beam Position Monitors (BPMs) in the ring, 1 extra button-electrode assembly for the RF system, and 8 BPMs in the beam transport lines. The BPM locations are shown in Fig. 1, marked by blue rectangles. The ring BPMs will be capable of both average orbit and turn-by-turn measurement modes. Accurate measurement of the beam position with a large horizontal offset requires polynomial correction of the BPM nonlinearity.

43 PARTICLE ACCELERATORS↗

STRIPLINE KICKER DESIGN FOR NSLS2 STORAGE RING

In the NSLS2 storage ring, there are four stripline kickers/pickups. Two long striplines with electrode length of 30cm will be used as bunch-by-bunch transverse feedback actuators. Two short stripline kickers/pickups with 15cm length will mainly used for tune measurement excitation or signal pickup for the beam stability monitor. High shunt impedance of the long stripline kickers is demanded to produce 200 {micro}s damping time. Meanwhile the beam impedance should be minimized. The design work for these two types of stripline is discussed in this paper. NSLS2 is a third-generation light source under construction at Brookhaven National Laboratory. The machine will have < 1nm.rad horizontal emittance by using weak dipoles together with damping wigglers. For the storage ring of 792m circumference, geometric impedance, resistive wall impedance and ion effects are expected to be significant. A transverse bunch-by-bunch feedback system has been designed to suppress the coupled bunch instabilities. More information can be found in previous paper.

15cm length will mainly used for tune↗

BPM STABILTIY STUDIES FOR THE APS MBA UPGRADE

The Advanced Photon Source (APS) is currently in the preliminary design phase for the multi-bend achromat (MBA) lattice upgrade. Beam stability is critical for the MBA and will require long term drift defined as beam mo-tion over a seven-day timescale to be no more than 1 mi-cron at the insertion device locations and beam angle change no more than 0.25 micro-radian. Mechanical stabil-ity of beam position monitor (BPM) pickup electrodes mounted on insertion device vacuum chambers place a fun-damental limitation on long-term beam stability for inser-tion device beamlines. We present the design and imple-mentation of prototype mechanical motion system (MMS) instrumentation for quantifying this type of motion specif-ically in the APS accelerator tunnel and experiment hall floor under normal operating conditions. The MMS pres-ently provides critical position information on the vacuum chamber and BPM support systems. Initial results of the R&D prototype systems have demonstrated that the cham-ber movements far exceed the long-term drift tolerance specified for the APS Upgrade MBA storage ring.

Lill, R.↗

Sensitive Ion Pump Current Monitoring Using an In-House Built Ion Pump Power Supply

Ion pumps are common vacuum pumps on DC high voltage photoguns and baked-accelerator beamlines. Commercial ion pump power supplies provide a measure of the electrical current drawn by the pump, but typically have resolution to only {approx}0.1 uA, which corresponds to pressure {approx}10{sup -9} Torr, a value considerably higher than the minimum pressure required by photoguns and nearby beamline. This submission describes a very sensitive in-house-built ion pump power supply with current monitoring capability good to less than 1 nA, and corresponding pressure in the low-minus;10{sup -11} Torr range. Besides providing 'free' pressure monitoring on a scale equivalent to the best available commercial pressure gauges, the ion pump power supply also serves as a sensitive diagnostic for detecting field emission from the photogun cathode electrode and bad electron beam orbits that could diminish photogun operating lifetime. Since its inception, this ion pump power supply has become an invaluable tool for operating the CEBAF polarized electron source. It is also a very useful low-cost diagnostic for ultrahigh vacuum studies in the laboratory.

43 PARTICLE ACCELERATORS↗

Automated correction of phase errors in the Advanced Photon Source linac.

Maintaining stable phasing in a linear accelerator is crucial for maintaining optimal performance. If phasing is incorrect, the beam will in general have an energy error and increased energy spread. While an energy error can be readily detected and corrected using position readings from beam position monitors at dispersion locations, this method is not useful for correcting energy spread in a system with many possible phase errors. While energy spread can be corrected by looking at beam size at a dispersive location, this typically involves a beam-intercepting diagnostic and is not compatible with top-up operation. Uncorrected energy spread results in poor capture efficiency in downstream accelerators, such as the Advanced Photon Source (APS) particle accumulator ring or booster synchrotron. To address this issue, APS has implemented beam-to-rf phase detectors in the linac, along with software for automatic correction of phase errors. We discuss the design, implementation, and performance of these detectors, as well as their use in feedback to automatically correct linac phase errors during top-up operation.

43 PARTICLE ACCELERATORS↗

HOM Choice Study with Test Electronics for use as Beam Position Diagnostics in 3.9 GHz Accelerating Cavities in FLASH

Higher Order Modes (HOM) excited by the beam in the 3.9 GHz accelerating cavities in FLASH can be used for beam position diagnostics, as in a cavity beam position monitor. Previous studies of the modal choices within the complicated spectrum have revealed several options: cavity modes with strong coupling to the beam, and therefore with the potential for better position resolution, but which are propagating within all 4 cavities, and modes localized in the cavities or the beam pipes, which can give localized position information, but which provide worse resolution. For a better characterization of these options, a set of test electronics has been built, which can down-convert various frequencies between about 4 and 9 GHz to 70 MHz. The performance of various 20 MHz bands has been estimated. The best resolution of 20 \mu m was found for some propagating modes. Based on this study one band at ca. 5 GHz was chosen for high resolution position monitoring and a band at ca. 9 GHz for localized monitoring.

43 PARTICLE ACCELERATORS↗

AI-driven neutrino diagnostics and radiation-hard beam instrumentation for next-generation neutrino experiments

The Long Baseline Neutrino Facility (LBNF) at Fermilab will deliver a high-intensity, multi-megawatt neutrino beam to the Deep Underground Neutrino Experiment (DUNE), enabling precision tests of the three-neutrino paradigm, CP violation searches, neutrino mass ordering determination, and supernova neutrino studies. To accelerate DUNE’s physics reach and ensure robust beam operations, we propose an integrated AI-driven framework with real-time diagnostics and radiation-hardened instrumentation. At its core is a Real-Time Beam Integrity Monitor using a physics-informed Digital Twin. By reconstructing pion phase space from muon profiles and exploiting magnetic horn optic linearity, it enables spill-by-spill beam correction and flux stabilization. By using this approach, flux-related systematics could be reduced from 5% to 1%, potentially accelerating the discovery of CP violations by four to six years. Complementing this, a US–Japan R&D effort will deploy a LAPPD-based muon monitor in the NuMI beamline. ToF measurements can be acquired with picosecond precision using this radiation-hard system, enhancing sensitivity to horn chromatic effects. Simulations confirm strong response to these effects. ML models predict beam quality and horn current to sub-percent accuracy from muon data, enhancing anomaly detection and stability. This scalable, AI-enabled strategy improves beam fidelity, reduces systematics, and sets a new standard for high-power accelerator operations.

Ganguly, Sudeshna [Fermilab] (ORCID:00000003163482↗

AI-driven neutrino diagnostics and radiation-hard beam instrumentation for next-generation neutrino experiments

The Long Baseline Neutrino Facility (LBNF) at Fermilab will deliver a high-intensity, multi-megawatt neutrino beam to the Deep Underground Neutrino Experiment (DUNE), enabling precision tests of the three-neutrino paradigm, CP violation searches, neutrino mass ordering determination, and supernova neutrino studies. To accelerate DUNE’s physics reach and ensure robust beam operations, we propose an integrated AI-driven framework with real-time diagnostics and radiation-hardened instrumentation. At its core is a Real-Time Beam Integrity Monitor using a physics-informed Digital Twin. By reconstructing pion phase space from muon profiles and exploiting magnetic horn optic linearity, it enables spill-by-spill beam correction and flux stabilization. By using this approach, flux-related systematics could be reduced from 5% to 1%, potentially accelerating the discovery of CP violations by four to six years. Complementing this, a US–Japan R&D effort will deploy a LAPPD-based muon monitor in the NuMI beamline. ToF measurements can be acquired with picosecond precision using this radiation-hard system, enhancing sensitivity to horn chromatic effects. Simulations confirm strong response to these effects. ML models predict beam quality and horn current to sub-percent accuracy from muon data, enhancing anomaly detection and stability. This scalable, AI-enabled strategy improves beam fidelity, reduces systematics, and sets a new standard for high-power accelerator operations.

Ganguly, Sudeshna [Fermilab] (ORCID:00000003163482↗

Shortening treatment time in robotic radiosurgery using a novel node reduction technique

Purpose: The fraction duration of robotic radiosurgery treatments can be reduced by generating more time-efficient treatment plans with a reduced number of node positions, beams, and monitor units (MUs). Node positions are preprogramed locations where the robot can position the focal spot of the x-ray beam. As the time needed for the robot to travel between node positions takes up a large part of the treatment time, the aim of this study was to develop and evaluate a node reduction technique in order to reduce the treatment time per fraction for robotic radiosurgery. Methods: Node reduction was integrated into the inverse planning algorithm, developed in-house for the robotic radiosurgery modality. It involved repeated inverse optimization, each iteration excluding low-contribution node positions from the planning and resampling new candidate beams from the remaining node positions. Node reduction was performed until the exclusion of a single node position caused a constraint violation, after which the shortest treatment plan was selected retrospectively. Treatment plans were generated with and without node reduction for two lung cases of different complexity, one oropharyngeal case and one prostate case. Plan quality was assessed using the number of node positions, beams and MUs, and the estimated treatment time per fraction. All treatment plans had to fulfill all clinical dose constraints. Extra constraints were added to maintain the low-dose conformality and restrict skin doses during node reduction. Results: Node reduction resulted in 12 residual node positions, on average (reduction by 77%), at the cost of an increase in the number of beams and total MUs of 28% and 9%, respectively. Overall fraction durations (excluding patient setup) were shortened by 25% (range of 18%-40%), on average. Dose distributions changed only little and dose in low-dose regions was effectively restricted by the additional constraints. Conclusions: The fraction duration of robotic radiosurgery treatments can be reduced considerably by node reduction with minimal changes in dosimetrical plan quality. Additional constraints are required to guarantee low-dose conformality and to avoid unacceptable skin dose.

60 APPLIED LIFE SCIENCES↗

Linear Regression Systematics of the Q-weak Main Detector Asymmetry

The Q-weak collaboration has made the first direct measurement of the proton's weak charge at Jefferson Lab to tightly constrain new, parity-violating electron-quark interactions at the multi-TeV scale. Our experiment measured the ?200 ppb parity-violating asymmetry in the scattering of longitudinally polarized electrons from an unpolarized liquid hydrogen target at a luminosity of 1.8x10^39. Careful setup of the injector helped to suppress helicity correlated differences in beam position, angle, and energy which create false asymmetries due to changes in detector acceptance and the kinematic dependences of the e+p cross section. Measured differences in beam position were consistent among all 6 beam position monitors in front of the target, with a precision of ?1 nanometer. The size of corrections depends on the helicity correlated beam parameter differences, and averaged about 35 ppb per shift of data. The data were regressed using 10 different sets of Independent Variables. These were expected to give similar corrections yet showed differences at the +-10 ppb level. In this presentation I'll summarize how these different schemes have not only been helpful in understanding the sensitivities of the main detector but in assigning errors to the corrections.

Mack, David↗

Integrated development facility for the calibration of low-energy charged particle flight instrumentation

The design of a low-energy ion facility for development and calibration of thermal ion instrumentation is examined. A directly heated cathode provides the electrons used to produce ions by impact ionization and an applied magnetic field increases the path length followed by the electrons. The electrostatic and variable geometry magnetic mirror configuration in the ion source is studied. The procedures for the charge neutralization of the beam and the configuration and function of the 1.4-m drift tube are analyzed. A microcomputer is utilized to control and monitor the beam energy and composition, and the mass- and angle-dependent response of the instrument under testing. The facility produces a high-quality ion beam with an adjustable range of energies up to 150 eV; the angular divergence and uniformity of the beam is obtained from two independent retarding potential analyzers. The procedures for calibrating the instrument being developed are described.

Biddle, A. P.↗

Status of the RF BPM upgrade at the Advanced Photon Source.

The Advanced Photon Source (APS),a third-generation synchrotron light source, has been in operation for eleven years. The monopulse radio frequency (rf) beam position monitor (BPM) is one of three BPM types now employed in the storage ring at the APS. It is a broadband (10 MHz) system designed to measure single-turn and multi-turn beam positions, but it suffers from an aging data acquisition system. The replacement BPM system retains the existing monopulse receivers and replaces the data acquisition system with high-speed analog-to-digital converters (ADCs) and a field-programmable gate array (FPGA) that performs the signal processing. A first-article system has been constructed and is currently being evaluated. This paper presents the results of testing of the first-article system as well as the progress made in other areas of this upgrade effort.

43 PARTICLE ACCELERATORS↗

Accurate simulation of the electron cloud in the Fermilab Main Injector with VORPAL

Precision simulations of the electron cloud at the Fermilab Main Injector have been studied using the plasma simulation code VORPAL. Fully 3D and self consistent solutions that includes E.M. field maps generated by the cloud and the proton bunches have been obtained, as well detailed distributions of the electron's 6D phase space. We plan to include such maps in the ongoing simulation of the space charge effects in the Main Injector. Simulations of the response of beam position monitors, retarding field analyzers and microwave transmission experiments are ongoing.

43 PARTICLE ACCELERATORS↗

Horn Location Sensors for LBNF

The Horn Location Sensor (HLS) system—named for the magnetic focusing horns it monitors, along with other critical beamline elements – is a high-precision alignment system developed for the Long-Baseline Neutrino Facility (LBNF) to support the Deep Underground Neutrino Experiment (DUNE). With minimal maintenance, the HLS can operate reliably in environments with high radiation, and it ensures that key components such as the protective baffle, focusing horns, and beam position monitors are aligned correctly – each essential for maintaining one of the world’s most intense muon-neutrino beams. A high-precision hydrostatic level sensor, a linear variable differential transformer, and INVAR rods are all used in the system to monitor vertical motion and tilt with sub-millimeter accuracy. A novel Sweep Tracker interferometer enhances calibration fidelity by correcting for non-linearities in laser wavelength and scan rate in real time. A critical part of DUNE’s precision alignment and flux prediction requirements, the HLS system initially supports beam power of up to 1.2 MW and can be upgraded to 2.4 MW.

Frequency scanning interferometry↗

High Precision Polarization Strategy for the Q$_{weak}$ Experiment

The Q$_{weak}$ experiment in Hall C at Jefferson Lab is measuring the weak charge of the proton to an uncertainty of 4.1\% by scattering longitudinally polarized electrons from protons in a liquid hydrogen target. The electron beam polarization is budgeted as the largest experimental systematic uncertainty of 1.5\%. Aiming for a polarization measurement to within 1\%, two independent polarimeters monitored the beam polarization by measuring the asymmetry of the polarized electron beam scattering either via the M\o ller or Compton process. The M\o ller polarimeter detects the pair of electrons scattered from a highly polarized thin iron foil through two identical calorimeters. However, it was limited to running at much lower currents and measurements are invasive to the experiment. The Compton polarimeter was commissioned to remove this limitation by using a high powered Fabry-P\'erot cavity laser to provide a polarized photon source. The use of Compton scattering allows for non-invasive measurements and the ability to run at the same currents as the main experiment. The Compton scattered photons and electrons are detected independently. I will discuss the polarimetry strategy and preliminary polarization results for the Q$_{weak}$ experiment using these three techniques.

Cornejo, Juan↗

RHIC 10 Hz global orbit feedback system

Vibrations of the cryogenic triplet magnets at the Relativistic Heavy Ion Collider (RHIC) are suspected to be causing the horizontal beam perturbations observed at frequencies around 10 Hz. Several solutions to counteract the effect have been considered in the past, including a local beam feedback system at each of the two experimental areas, reinforcing the magnet base support assembly, and a mechanical servo feedback system. However, the local feedback system was insufficient because perturbation amplitudes outside the experimental areas were still problematic, and the mechanical solutions are very expensive. A global 10 Hz orbit feedback system consisting of 36 beam position monitors (BPMs) and 12 small dedicated dipole corrector magnets in each of the two 3.8 km circumference counter-rotating rings has been developed and commissioned in February 2011. A description of the system architecture and results with beam will be discussed.

43 PARTICLE ACCELERATORS↗

Meissner effect funneling

Focusing of a positron beam in a magnetic field funnel is demonstrated using a preferentially-cooled pure niobium single crystal into the superconductor region. A magnetic field increase of 18% was indirectly measured through a hole in a cylindrical niobium sample. The results demonstrate a charged particle beam focusing technique. The results have implications for the brightness enhancement of positron beams and trap-based beams.

43 PARTICLE ACCELERATORS↗

Evaluation of BPM Button Geometry for NSLS-II Project

The NSLS-II storage ring will provide a light source with unprecedented brightness. To utilize fully ultra-low emittance of electron beam we need to keep orbit in the storage ring with high precision. This paper presents mathematical modeling of different geometries of beam position monitor buttons, including button diameter and horizontal separation of button centers. The results of modeling are used for the optimization of BPM sensitivity to beam displacement and estimation of signal levels.

36 MATERIALS SCIENCE↗