Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “work management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Coordinating Shared Activities

Shared Activity Coordination (ShAC) is a computer program for planning and scheduling the activities of an autonomous team of interacting spacecraft and exploratory robots. ShAC could also be adapted to such terrestrial uses as helping multiple factory managers work toward competing goals while sharing such common resources as floor space, raw materials, and transports. ShAC iteratively invokes the Continuous Activity Scheduling Planning Execution and Replanning (CASPER) program to replan and propagate changes to other planning programs in an effort to resolve conflicts. A domain-expert specifies which activities and parameters thereof are shared and reports the expected conditions and effects of these activities on the environment. By specifying these conditions and effects differently for each planning program, the domain-expert subprogram defines roles that each spacecraft plays in a coordinated activity. The domain-expert subprogram also specifies which planning program has scheduling control over each shared activity. ShAC enables sharing of information, consensus over the scheduling of collaborative activities, and distributed conflict resolution. As the other planning programs incorporate new goals and alter their schedules in the changing environment, ShAC continually coordinates to respond to unexpected events.

Clement, Bradley↗

Role of MODIS Vegetation Phenology Products in the U.S. for Warn Early Warning System for Forest Threats

U.S. forests occupy approx 751 million acres (approx 1/3 of total land). Several abiotic and biotic damage agents disturb, damage, kill, and/or threaten these forests. Regionally extensive forest disturbances can also threaten human life and property, bio-diversity and water supplies. timely regional forest disturbance monitoring products are needed to aid forest health management work at finer scales. daily MODIS data provide a means to monitor regional forest disturbances on a weekly basis, leveraging vegetation phenology. In response, the USFS and NASA began collaborating in 2006 to develop a Near Real Time (NRT) forest monitoring capability, based on MODIS NDVI data, as part of a national forest threat Early Warning System (EWS).

Spruce, Joseph↗

Mission Assurance Modeling and Simulation: A Cyber Security Roadmap

This paper proposes a cyber security modeling and simulation roadmap to enhance mission assurance governance and establish risk reduction processes within constrained budgets. The term mission assurance stems from risk management work by Carnegie Mellon's Software Engineering Institute in the late 19905. By 2010, the Defense Information Systems Agency revised its cyber strategy and established the Program Executive Officer-Mission Assurance. This highlights a shift from simply protecting data to balancing risk and begins a necessary dialogue to establish a cyber security roadmap. The Military Operations Research Society has recommended a cyber community of practice, recognizing there are too few professionals having both cyber and analytic experience. The authors characterize the limited body of knowledge in this symbiotic relationship. This paper identifies operational and research requirements for mission assurance M&S supporting defense and homeland security. M&S techniques are needed for enterprise oversight of cyber investments, test and evaluation, policy, training, and analysis.

Gendron, Gerald↗

Monitoring Regional Forest Disturbances across the US with Near Real Time MODIS NDVI Products included in the ForWarn Forest Threat Early Warning System

U.S. forests occupy approx.1/3 of total land area (approx. 304 million ha). Since 2000, a growing number of regionally evident forest disturbances have occurred due to abiotic and biotic agents. Regional forest disturbances can threaten human life and property, bio-diversity and water supplies. Timely regional forest disturbance monitoring products are needed to aid forest health management work. Near Real Time (NRT) twice daily MODIS NDVI data provide a means to monitor U.S. regional forest disturbances every 8 days. Since 2010, these NRT forest change products have been produced and posted on the US Forest Service ForWarn Early Warning System for Forest Threats.

Spruce, Joseph↗

Summary of 2016 Light Microscopy Module (LMM) Physical Science Experiments on ISS. Update of LMM Science Experiments and Facility Capabilities

This presentation will feature a series of short, entertaining, and informative videos that describe the current status and science support for the Light Microscopy Module (LMM) facility on the International Space Station. These interviews will focus on current experiments and provide an overview of future capabilities. The recently completed experiments include nano-particle haloing, 3-D self-assembly with Janus particles and a model system for nano-particle drug delivery. The videos will share perspectives from the scientists, engineers, and managers working with the NASA Light Microscopy program.

Sicker, Ronald J.↗

Developing A Space-Based Solution to Increase Accessibility, Quality, and Utility of Animal Tracking Data for Research and Management: the Internet of Animals Project

Animal tracking technology has advanced dramatically over the last several decades, but researchers and wildlife managers still encounter technological roadblocks in the study of animal movement and acquisition of animal movement data. For example, we still lack technology that provides automated high-resolution data for small animals that travel long distances, which limits our ability to answer both theoretical and applied questions about these species. In response to these needs, NASA has initiated a five-year study of potential space-based solutions that could provide global low-latency tracking of small migratory animals. This study, named Internet of Animals (IOA), aims to 1) systematically assess the needs of animal movement researchers and ecological managers, 2) design a next-generation space-based animal tracking system, i.e. an ‘Internet of Animals’ or IoA, to meet those needs, and 3) developing science and technology needed to link animal tracking data to the many other dimensions of biodiversity that can now be mapped from space using remote sensing. Here, we present results from the first IOA workshop, which highlighted the diverse needs of researchers and managers working across systems and realms. We also provide opportunities for the community to engage in the future.

remote sensing↗

Hot Springs and Geysers: Exploring Historical and Modern Impacts of Geothermal Energy Production on Associated Natural Surface Systems and Standardizing Management Practices

Surface thermal features, most notably hot springs and geysers are increasingly being recognized for their importance to ecosystems, indigenous cultures, and in some cases agriculture, recreation, and tourism. Geothermal project development poses a potential risk to these natural features but current regulatory requirements for assessing and managing these risks during exploration, permitting and monitoring are somewhat inconsistent and unpredictable across different geothermal fields. This has resulted in uncertainty and increases in exploration risk for geothermal energy developers that have led to costly project delays, cancellations, or hesitation to commit. Varying regulatory requirements may also influence public perception, fostering confusion, distrust and ultimately opposition to geothermal projects, further contributing to project delays or cancellations. At a time when there is an increasing urgency for reliable baseload clean energy, geothermal is a net-zero, renewable solution that additionally provides access to more equitable and environmentally just clean power. Continued integration of geothermal energy into the national energy roadmap can be facilitated through consistent and predictable permitting, providing regulators the framework they need, developers a clear path forward, and transparency that the public deserves. This project, currently in its beginning phases, seeks to address this important issue by providing a technical basis from which to build a preliminary protocol for assessing and managing potential impacts from new or existing geothermal energy projects to surface thermal features and their associated ecosystems. Development of this preliminary protocol will be informed by (1) a literature review of well-documented case studies in the western U.S. and New Zealand to understand the range of conditions that exemplify geothermal-surface thermal systems; (2) development of generic illustrative conceptual-numerical models to quantify, understand, and predict the first-order controls (e.g., pressure and permeability) on surface flows; and (3) additional independent and scientifically rigorous evaluations of geothermal-surface thermal system case studies from the Basin and Range Province that incorporate publicly available data as well as data provided by industry through data-sharing agreements. Learning from the successes of the process used to develop the Induced Seismicity Management Protocol (ISMP), we ultimately aim to use these initial efforts as a springboard for establishing a surface thermal feature management working group that will work collaboratively to finalize the protocol as well as co-create recommended best practices for implementation. We envision that the working group will primarily be composed of representatives from regulatory entities, government agencies, Tribes, academia, national laboratories, and industry, and will include early and regular engagement with community organizations and environmental groups. This will help ensure broad acceptance and implementation of the protocol, which will facilitate a more consistent, predictable, and standardized regulatory process, and help to ensure that geothermal energy continues to provide a reliable source of clean energy, and a pathway to achieving greater energy equity in the U.S.

Best Practices↗

Integration mockup and process material management system

Work to define and develop a full scale Space Station Freedom (SSF) mockup with the flexibility to evolve into future designs, to validate techniques for maintenance and logistics and verify human task allocations and support trade studies is described. This work began in early 1985 and ended in August, 1991. The mockups are presently being used at MSFC in Building 4755 as a technology and design testbed, as well as for public display. Micro Craft also began work on the Process Material Management System (PMMS) under this contract. The PMMS simulator was a sealed enclosure for testing to identify liquids, gaseous, particulate samples, and specimen including, urine, waste water, condensate, hazardous gases, surrogate gasses, liquids, and solids. The SSF would require many trade studies to validate techniques for maintenance and logistics and verify system task allocations; it was necessary to develop a full scale mockup which would be representative of current SSF design with the ease of changing those designs as the SSF design evolved and changed. The tasks defined for Micro Craft were to provide the personnel, services, tools, and materials for the SSF mockup which would consist of four modules, nodes, interior components, and part task mockups of MSFC responsible engineering systems. This included the Engineering Control and Life Support Systems (ECLSS) testbed. For the initial study, the mockups were low fidelity, soft mockups of graphics art bottle, and other low cost materials, which evolved into higher fidelity mockups as the R&D design evolved, by modifying or rebuilding, an important cost saving factor in the design process. We designed, fabricated, and maintained the full size mockup shells and support stands. The shells consisted of cylinders, end cones, rings, longerons, docking ports, crew airlocks, and windows. The ECLSS required a heavier cylinder to support the ECLSS systems test program. Details of this activity will be covered. Support stands were designed and built for each module to sufficiently move and rotate each module. Secondary structures such as floors, ceilings, bulkheads, standoffs, racks, etc. were developed and built.

Verble, Adas James, Jr.↗

Putting Integrated Systems Health Management Capabilities to Work: Development of an Advanced Caution and Warning System for Next-Generation Crewed Spacecraft Missions

Integrated System Health Management (ISHM) technologies have advanced to the point where they can provide significant automated assistance with real-time fault detection, diagnosis, guided troubleshooting, and failure consequence assessment. To exploit these capabilities in actual operational environments, however, ISHM information must be integrated into operational concepts and associated information displays in ways that enable human operators to process and understand the ISHM system information rapidly and effectively. In this paper, we explore these design issues in the context of an advanced caution and warning system (ACAWS) for next-generation crewed spacecraft missions. User interface concepts for depicting failure diagnoses, failure effects, redundancy loss, "what-if" failure analysis scenarios, and resolution of ambiguity groups are discussed and illustrated.

integrated system management↗

Evaluating Economic Impact: An Investment Tool for Large Language Model Integration in Workweek Management

This paper explores the development and application of an investment tool designed to quantify the costs and potential savings associated with integrating large language models (LLMs) into work week management optimization (WMO) within the nuclear industry. LLMs, with their advanced natural language processing capabilities, can significantly enhance various aspects of work management, such as problem identification, prioritization, planning, scheduling, information retrieval, and information summary. Our investment tool focuses on evaluating the return on investment (ROI) for LLM applications in WMO by considering four pivotal decision factors: model selection, application, user training, and hosting options. This paper details the development and implementation of the ROI model and illustrates its application through multiple case studies, analyzing the impact of different variables, such as work time saved, number of requests, and model performance, on the computed ROI over two years. The computed ROI is also compared over different hosting solutions. Our findings indicate that ROI increases with enhanced work time savings and optimal request load but can decline with high request volumes or increased model costs. This model aids decision-makers in the nuclear industry by providing a structured approach to assessing the economic viability and potential savings from integrating LLMs into WMO processes.

97 - MATHEMATICS AND COMPUTING↗

Evaluating Economic Impact: An Investment Tool for Large Language Model Integration in Workweek Management

This paper explores the development and application of an investment tool designed to quantify the costs and potential savings associated with integrating large language models (LLMs) into work week management optimization (WMO) within the nuclear industry. LLMs, with their advanced natural language processing capabilities, can significantly enhance various aspects of work management, such as problem identification, prioritization, planning, scheduling, information retrieval, and information summary. Our investment tool focuses on evaluating the return on investment (ROI) for LLM applications in WMO by considering four pivotal decision factors: model selection, application, user training, and hosting options. This paper details the development and implementation of the ROI model and illustrates its application through multiple case studies, analyzing the impact of different variables, such as work time saved, number of requests, and model performance, on the computed ROI over two years. The computed ROI is also compared over different hosting solutions. Our findings indicate that ROI increases with enhanced work time savings and optimal request load but can decline with high request volumes or increased model costs. This model aids decision-makers in the nuclear industry by providing a structured approach to assessing the economic viability and potential savings from integrating LLMs into WMO processes.

99 - GENERAL AND MISCELLANEOUS↗

Software control and system configuration management - A process that works

A comprehensive software control and system configuration management process for flight-crucial digital control systems of advanced aircraft has been developed and refined to insure efficient flight system development and safe flight operations. Because of the highly complex interactions among the hardware, software, and system elements of state-of-the-art digital flight control system designs, a systems-wide approach to configuration control and management has been used. Specific procedures are implemented to govern discrepancy reporting and reconciliation, software and hardware change control, systems verification and validation testing, and formal documentation requirements. An active and knowledgeable configuration control board reviews and approves all flight system configuration modifications and revalidation tests. This flexible process has proved effective during the development and flight testing of several research aircraft and remotely piloted research vehicles with digital flight control systems that ranged from relatively simple to highly complex, integrated mechanizations.

Petersen, K. L.↗

Resource Management in the Microgravity Science Division

In the Microgravity Science Division, the primary responsibilities of the Business Management Office are resource management and data collection. Resource management involves working with a budget to do a number of specific projects, while data collection involves collecting information such as the status of projects and workforce hours. This summer in the Business Management Office I assisted Margie Allen with resource planning and the implementation of specific microgravity projects. One of the main duties of a Project Control Specialists, such as my mentor, is to monitor and analyze project manager s financial plans. Project managers work from the bottom up to determine how much money their project will cost. They then set up a twelve month operating plan which shows when money will be spent. I assisted my mentor in checking for variances in her data against those of the project managers. In order to successfully check for those variances, we had to understand: where the project is including plans vs. actual performance, why it is in its present condition, and what the future impact will be based on known budgetary parameters. Our objective was to make sure that the plan, or estimated resources input, are a valid reflection of the actual cost. To help with my understanding of the process, over the course of my tenure I had to obtain skills in Microsoft Excel and Microsoft Access.

Casselle, Justine↗

Measurements over distributed high performance computing and storage systems

Requirements are carefully described in descriptions of systems to be acquired but often there is no requirement to provide measurements and performance monitoring to ensure that requirements are met over the long term after acceptance. A set of measurements for various UNIX-based systems will be available at the 1992 Goddard Conference on Mass Storage Systems and Technologies. The authors invite others to contribute to the set of measurements. The framework for presenting the measurements of supercomputers, workstations, file servers, mass storage systems, and the networks that interconnect them are given. Production control and database systems are also included. Though other applications and third party software systems are not addressed, it is important to measure them as well. The capability to integrate measurements from all these components from different vendors, and from the third party software systems was recognized and there are efforts to standardize a framework to do this. The measurement activity falls into the domain of management standards. Standards work is ongoing for Open Systems Interconnection (OSI) systems management; AT&T, Digital, and Hewlett-Packard are developing management systems based on this architecture even though it is not finished. Another effort is in the UNIX International Performance Management Working Group. In addition, there are the Open Systems Foundation's Distributed Management Environment and the Object Management Group. A paper comparing the OSI systems management model and the Object Management Group model has been written. The IBM world has had a capability for measurement for various IBM systems since the 1970's and different vendors were able to develop tools for analyzing and viewing these measurements. Since IBM was the only vendor, the user groups were able to lobby IBM for the kinds of measurements needed. In the UNIX world of multiple vendors, a common set of measurements will not be as easy to get.

Williams, Elizabeth↗

Improving Discovery, Sharing, and Use of Water Data: Initial Findings and Suggested Future Work

Collaborative management of water resources requires a broad suite of “water data” that extends beyond basic information about water quantity and quality to other related topics such as water infrastructure, aquatic ecosystem health, socioeconomic factors, and power generation. Water data are disparate in nature because they are collected and provided by many entities, and in some cases, remain challenging to access and use. The U.S. Department of Energy’s Water Power Technologies Office initiated a project to characterize relevant categories of water data; describe the current state of accessing, using, and visualizing water data; and outline investigatory pathways for future efforts aimed at improving the discovery, sharing, and use of water data. Input on these topics was solicited from a small but diverse cross section of members of the water resources community. Fourteen broad categories of water data were identified: dams; ecology; flood control; hydroclimatology; hydrography; hydrology; hydropower; management landscape; migratory barriers; recreation and aesthetic importance; socioeconomic; water quality; water availability and use; and weather. Stakeholder perspectives on the accessibility and usability of water data indicate these aspects are affected by a complex set of technical and social factors. However, stakeholders generally agreed that better access to water data can provide a range of benefits to water management, and they stressed the need to generate broad support from water data users and producers. Two investigatory pathways were outlined that, taken together, provide a logical progression toward the goals of the project. The first pathway emphasizes further investigation to better define target audiences and data needs, identify opportunities for collaboration between related efforts, and conduct value demonstration activities to generate further support for improving discovery and access of water data. The second pathway focuses on creating a comprehensive vision for potential solutions that improve the discovery of water data. Several activities that align with the first pathway are suggested for the next phase of the project.

13 HYDRO ENERGY↗

Instantiation of the Damara Tern Platform for Advanced Materials and Manufacturing Technologies (AMMT) Program Collaborative Data Management

This work package focused on deploying an instance of the Damara Tern platform to support AMMT collaborative research activities. The objectives were to provide selected AMMT collaborators with access to a shared environment for capturing operations, trackables, and associated metadata, and to implement data entry functionalities that reflect site-specific procedures. Key activities included creating configurable, schema-driven entry forms and validating the data collection process. The report details the deployment process, the platform infrastructure, and the implemented data entry workflows, providing a reference for end users and establishing a foundation for future production-scale deployments.

36 MATERIALS SCIENCE↗

Environmental Share: Damage to a Cultural Site from Off-Road Driving [Slides]

Cultural resources, including archaeological sites and historic buildings, at Los Alamos National Laboratory are protected under the National Historic Preservation Act. Disclosure of archaeological site locations is prohibited by law, which can make it difficult to communicate issues or identify where these sites occur. The Laboratory Cultural Resources Management Plan describes how we work to manage and protect these resources: https://permalink.lanl.gov/object/tr?what=info:lanlrepo/lareport/LA-UR-19-21590. Recently, our cultural resources staff identified vehicle damage to a site . There were no active projects occurring in this area, but evidence that vehicles had been driving over the site was visible. It is not possible to mark the locations of all cultural resources as there are about 2000 on Laboratory property.

54 ENVIRONMENTAL SCIENCES↗