Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “water resources engineering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

IrrigationViz: A Geospatial Visualization Application to Facilitate Irrigation Modernization

Irrigation water delivery infrastructure, such as canals and pipelines, are essential to agriculture in the Western U.S., yet many of these systems are reaching the end of their useful lives. Reinvestment can achieve a wide variety of benefits, from water conservation to energy savings or renewable energy generation. Modernization requires significant planning, design, and implementation funding which can be a challenge for many irrigation districts. Here, this paper introduces IrrigationViz, a web-based mapping application designed to help irrigation districts visualize and generate high-level cost and benefit estimates for infrastructure modernization projects. These estimates can help water managers identify projects that benefit from additional engineering resources and ultimately obtain funding. IrrigationViz includes map interactions, graphs, and visualization components to facilitate planning and communication to stakeholders and funders. IrrigationViz combines user-provided information about a water-delivery system with public datasets and basic engineering formulas to generate estimates of the benefits of reinvestment. Estimates include the amount of water seepage in earthen canals, potential hydropower generation associated with replacing a canal with a pressurized pipe, and pipe size recommendations. We found that hydropower generation estimates compared favorably with real world projects, but seepage loss estimates showed high variability relative to on-the-ground measurements

99 - GENERAL AND MISCELLANEOUS↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Transportability of exogenous microbial community correlates with interwell connectivity in deep aquifers

Subsurface resource engineering operations often utilize continuous injection of externally-sourced water into geological reservoirs for formation pressure maintenance, resource recovery or energy/waste storage. Such injected water generally contains naturally occurring microbes. Little is known, however, about how the injectate microbes transport through geological media as a community, how such transportability is affected by injector-producer connectivity, and whether such knowledge can be utilized for flowpath characterization. In this study, we analyzed daily-to-weekly timeseries microbial community data from the injected- and produced-fluids of a ten-month flow test at a deep, well-characterized engineered aquifer. We found that the injectate microbial community was distinct from the indigenous community at the amplicon sequence variant (ASV) level, and that the transportability of injectate community towards a given producer, quantified by an “nASV-Overlap” metric we propose, had strong and significant positive correlation with known injector-producer connectivities at our site. This suggests that the better the connectivity, the higher the probability for more injectate species to flow through the interwell region and arrive at a producer. Because interwell connectivity is an important yet usually unknown parameter in subsurface resource engineering, such correlation in turn points to nASV-Overlap as a useful indicator of interwell connectivity for aquifer characterization and long-term monitoring. Based on our findings, an nASV-Overlap-based microbial tracing approach was developed for characterizing and monitoring the relative connectivities across multiple producers with a given injector. A side-by-side comparison between the new nASV-Overlap approach and traditional artificial tracer methods is presented, and their respective strengths and limitations are discussed.

Deep biosphere↗

Combined electrocoagulation-microfiltration-membrane distillation for treatment of hydraulic fracturing produced water

Hydraulic fracturing flowback and produced water is a highly impaired wastewater containing dissolved salts polar and non-polar organic compounds, oil and surfactants. Here a combined electrocoagulation - microfiltration – membrane distillation process has been used to treat this wastewater. Electrocoagulation followed by microfiltration was used to pretreat the wastewater prior membrane distillation. The initial total dissolved solids (TDS) concentration was extremely high being 245,300 mg L -1 . After electrocoagulation, the total organic carbon (TOC) was reduced from 120 mg L -1 to 64 mg L -1 . Tangential flow microfiltration using a 0.1 μm pore size polyethersulfone membrane was used to separate the particulate matter after electrocoagulation and to further reduce the TOC to 44 mg L -1 . Membrane distillation was used to desalinate the pretreated produced water resulting in a high quality treated water (TDS of 56 mg L -1 and TOC 1 mg L -1 ). Three membranes with very different surface morphology were used: commercially available polyvinylidene fluoride, electrospun poly(vinylidene fluoride-co-hexafluoropropylene) nanofibers and multiwalled carbon nanotube coated polytetrafluoroethylene. The TDS in the retentate increased to over 350,000 mg L -1 . During membrane distillation, the temperature of the feed tank was maintained at 36 °C while the feed entered the module at 60 °C in order to minimize scaling on the membrane. The surface properties of an ideal membrane that is resistant to wetting and provides high flux is likely to depend on the TDS and properties of the wastewater.

42 ENGINEERING↗

Education Outreach Associated with Technology Transfer in a Colonia of South Texas: Green Valley Farms Science and Space Club for Middle School Aged Children in Green Valley Farms, San Benito, Texas

Texas colonias are unincorporated subdivisions characterized by inadequate water and wastewater infrastructure, inadequate drainage and road infrastructure, substandard housing, and poverty. Since 1989 the Texas Legislature has implemented policies to halt further development of colonias and to address water and wastewater infrastructure needs in existing and new colonias along the border with Mexico. Government programs and non-government and private organization projects aim to address these infrastructure needs. Texas Tech University's Water Resources Center demonstrated the use of alternative on-site wastewater treatment in the Green Valley Farms colonia, San Benito, Texas. The work in Green Valley Farms was a component of a NASA-funded project entitled Evaluation of NASA's Advanced Life Support Integrated Water Recovery System for Non-Optimal Conditions and Terrestrial Applications. Two households within the colonia are demonstration sites for constructed wetlands. A colonia resident and activist identified educational opportunities for colonia children as a primary goal for many colonia residents. Colonia parents view education as the door to opportunity and escape from poverty for their children. The educational outreach component of the project in Green Valley Farms was a Science and Space Club for middle-school age students. Involved parents, schoolteachers, and school administrators enthusiastically supported the monthly club meetings and activities. Each month, students participated in interactive learning experiences about water use and reuse in space and on earth. Activities increased knowledge and interest in water resource issues and in science and engineering fields. The Institute for the Development and Enrichment of Advanced Learners (IDEAL) at Texas Tech University provided full scholarships for five students from Green Valley Farms to attend the Shake Hands With Your Future camp at Texas Tech University in June 2003. The educational outreach component was evaluated in February 2004 using survey instruments for students and parents, and interviews with science teachers and counselors.

Potess, Marla D.↗

Environmental Life Cycle Assessment of small water resource recovery facilities: Comparison of mechanical and lagoon systems

Small water resource recovery facilities (WRRFs) serving communities with populations of less than 10,000 people account for 70% of centralized wastewater treatment systems in the United States. Here, with growing interest globally in improving the sustainability of these systems, this study evaluated the environmental life cycle impact and land use tradeoffs of different lagoon and mechanical WRRFs across the diverse climate of Nebraska. Life cycle inventory including construction and operations was collected for 35 existing systems representing a range of commonly used mechanical WRRFs: oxidation ditch, extended aeration, and sequencing batch reactors, and lagoon treatment systems: complete retention, irrigation, and controlled discharge lagoons.

42 ENGINEERING↗

Modeling and experimental validation of direct contact crossflow packed beds condenser used in HDH desalination systems

Humidification and dehumidification (HDH) desalination systems are alternatives to reverse osmosis desalination systems, especially for high salinity waters. A HDH system is essentially equipped with a humidifier (also called as evaporator) for air to pick up vapor from saline water, a dehumidifier (also called as condenser) to produce freshwater, and a heating source. HDH systems based on direct contact packed beds heat exchangers have remarkably lower costs than traditional HDH systems due to their inexpensive materials and simple configurations. This paper specifically focuses on direct contact crossflow packed beds condensers, in which cooling water vertically drips through the packed beds, directly contacting the horizontal air-vapor flow. A two-dimensional mathematical model that solves for the enthalpy values of the working fluids is proposed in this paper, and the PDEs are solved using finite differences. To validate the model, an experimental condenser was built and tested. Water temperatures inside the test section at twenty-nine locations were measured, as well as the air vapor temperatures of five locations at the outlet. The measured water and air-vapor temperatures agree with the simulation results with less than 10 % error in most of the compared domain.

42 ENGINEERING↗

FIND: A Synthetic weather generator to control drought Frequency, Intensity, and Duration

Water systems worldwide are experiencing climate change-induced shifts in drought properties like frequency, intensity, and duration, affecting water security and reliability. To develop and test effective drought preparedness plans, researchers often use synthetic weather generators to create hydrological scenarios that explore drought variability beyond historical records. Existing weather generators typically allow users to adjust streamflow statistics like percentiles or temporal correlation but do not directly control drought properties of frequency, intensity, and duration. To fill this gap, we propose FIND (Frequency, INtensity, and Duration) synthetic weather generator. FIND incorporates a standardized drought index to directly and in dependently control drought frequency, intensity, and duration in generated streamflow time series while preserving observed hydrological variability. Use cases for FIND include i) water systems analysis applications that seek to train and test drought strategies under historical and plausible future drought conditions, and ii) bottom-up vulnerability studies relating system vulnerability outcomes to specific changes in drought properties of frequency, intensity, and duration. Here, we demonstrate FIND’s versatility through three experiments: replicating historically observed drought properties, generating streamflow scenarios for multiple sites preserving correlation between their drought conditions, and generating a set of scenarios with direct and independent changes in drought properties. FIND source code is openly available for applications beyond the scope of this paper.

42 ENGINEERING↗

A large-scale comparison of Artificial Intelligence and Data Mining (AI&DM) techniques in simulating reservoir releases over the Upper Colorado Region

In recent years, the Artificial Intelligence and Data Mining (AI&DM) models have become popular tools in assisting various aspects of reservoir operation. However, the practical uses are still rarely reported. Comparison experiment of many AI&DM models over a large number of reservoir cases is particularly valuable to help reservoir operators first examine the usefulness and transferability of different AI&DM models, and then identify the most stable and reliable AI&DM model in assist of various decision-making processes. In this study, a total of 12 AI&DM models with different parameterizations and simulation scenarios are comprehensively tested out and compared in simulating the controlled reservoir outflows of 33 reservoir cases over the Upper Colorado Region, United States. Results show that the Random Forecast and the Long-Short-Term-Memory model could consistently derive the best statistical performance than other models under the baseline simulation scenario. The employed AI&DM models could obtain satisfactory statistical interquartile ranges (25–75%) between [0.6–0.9], [0.3–0.8], and [0.2–0.8], for CORR, NSE, and KGE measurements, respectively, and [1.5–6.5], [–15 to 20], and [0.5–8.5] for the normalized RMSE, PBIAS and RSR measurements, respectively. Results also show Multi-Layer Perceptron model and Extreme Gradient Boosting Tree Algorithm produced more stable and superior performance than other models under more complex input scenarios. We also found that the performance of different AI&DM models are closely relevant to the reservoir elevations, sizes, and functionalities. Discussions were made about the sensitivity of AI&DM models’ parameterizations and the key advantages of AI&DM models over the rule-based reservoir models. We further identify that the main advantage of AI&DM models is the flexibility in designing input structures, whereas the rule-based simulation model is rather limited. Future studies were suggested regarding the best way reservoir operators and researchers could use, select, and apply different AI&DM models in simulating reservoir releases under different natural and modeling environments. Finally, this comparison study also serves as a reference and a piece of groundwork for further promoting the practical uses of AI&DM models in assisting reservoir operation.

54 ENVIRONMENTAL SCIENCES↗

Produced water softening using high-pH catholyte from brine electrolysis: reducing chemical transportation and environmental footprints

This study evaluates the benefits of using brine electrolysis for generating caustic soda (NaOH) and free chlorine for on-site produced water (PWs 1 ) treatment. A two-compartment electrochemical cell was shown to generate NaOH solutions (pH > 12, faradic efficiency 93%) and chlorine (faradic efficiency 32%) from a NaCl brine solution at a current density of 10 mA/cm2. The catholyte was used for softening field-collected PWs. The degree of Mg removal depends mostly on the catholyte/PW mixture pH with pH 11 achieving >90% removal. Ca removal is poor (<10%) due to low bicarbonate alkalinity in the PWs. Soda ash alone at a dose equivalent to the total hardness of the PWs helps CaCO3 precipitation and Ca removal (>90%). The combined treatment of the catholyte and a reduced quantity of soda ash achieves better or comparable Ca removal compared to the full stoichiometric amounts of soda ash alone. Ba and Sr removal patterns closely follow those of Ca, suggesting co-precipitation of these cations as the primary removal mechanism. Organic removal is negligible during chemical softening; however, activated carbon filtration achieves >90% of total organic carbon (TOC) removal in all PWs. A treatment scheme is proposed for field generation of caustic soda and chlorine from PW. The economic analysis demonstrates the significant cost-effectiveness of the approach compared to purchasing the NaOH.

42 ENGINEERING↗