Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “utility distribution”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Transportation Electrification Impact Study (TEIS)

Recent U.S. Environmental Protection Agency (EPA) notices of proposed rulemakings for GHG emissions standards for light-, medium-, and heavy-duty on-road vehicles would accelerate ongoing advancements already happening in the industry because of private investment, consumer demand, state-level policies, and federal incentives. As the EPA finalizes these regulations, questions persist regarding the cost of the requisite charging infrastructure and associated upgrades to the nation's electric grid. With support from the U.S. Department of Energy, U.S. Joint Office of Energy and Transportation, and the EPA, a multidisciplinary team conducted a Multi-State Transportation Electrification Impact Study that quantitatively assesses the incremental investment necessary to enable the levels of vehicle electrification expected to be induced by pending EPA regulations and to estimate the potential value of deferred investments in electric distribution infrastructure stemming from proactive vehicle-grid integration planning and deployment. This study finds the simulated incremental capital cost of charging infrastructure (including grid upgrades) to be at least 2.5 times smaller than the lifetime net benefits of vehicle electrification (including fuel savings but excluding the value of avoided emissions). Additionally, the incremental distribution grid upgrade cost of the EPA Action-Unmanaged scenario was found to be approximately 3% of existing utility distribution system investments (on an annual basis). Finally, the potential for managed charging to defer distribution grid upgrades was found to be significant with costs found to decrease from $2.3 billion to an incremental cost of $1 billion across five states in the Action-Managed scenario (relative to the No Action-Unmanaged scenario).

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

An Analysis Framework for Distribution Network DER Integration Analysis in India: Distributed Solar in Tamil Nadu

This report is part of a two-part series that represents a year-long collaboration with the Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO) on power sector planning. The first report in this series, the Pathways for Tamil Nadu’s Electric Power Sector 2017-2030 report outlines NREL’s work with TANGEDCO's electricity sector planning department to develop a model of the State’s power system and evaluate multiple scenarios of system growth given resource constraints, costs of technologies, and power sector policies. This second report in this series focuses on the rapidly transforming distribution network in the State. The report outlines a framework developed by NREL with TANGEDCO's distribution utility to quickly and accurately analyze the impacts of integrating renewable energy, specifically rooftop solar PV onto Tamil Nadu's distribution system. Together these studies help to prepare Tamil Nadu for a rapidly transforming power system.

14 SOLAR ENERGY↗

Distributed Fiber Optic Sensing for in-well hydraulic fracture monitoring

This study presents the results from in-well hydraulic fracture monitoring within a horizontal well in an unconventional reservoir utilizing Distributed Fiber Optic Sensing (DFOS). An in-house-developed Brillouin-based Distributed Strain Sensing (DSS) interrogator was deployed to obtain strain measurements, complemented by a commercial Raman-based Distributed Temperature Sensing (DTS) interrogator for temperature measurements and a commercial Rayleigh-based Low-Frequency Distributed Acoustic Sensing (LF-DAS) interrogator for strain-rate measurements. Examined over a ten-day period, the spatio-temporal distribution of temperature-compensated strain obtained from DSS and DTS revealed distinct signatures of the multi-stage hydraulic fracturing process. These signatures were analyzed with respect to fracture width growth and closure, residual strain effects, and fracture conductivity near the wellbore. Fracture widths within the fracture zone were estimated for individual stages. The findings were assessed with LF-DAS measurements for further evaluation. This work integrates DFOS-measured strain, temperature, and strain-rate data for monitoring in-well hydraulic fracturing, with the goal of supporting future studies in interpreting DFOS measurements for improved understanding of hydraulic fracturing in unconventional reservoirs.

58 GEOSCIENCES↗

Applying Utility's Advanced Grid Technologies to Improve Resiliency of a Critical Load

The US DOE Office of Electricity's Energy Storage Program's joint R&D work with the Cordova Electric Cooperative (CEC) has deployed several advanced grid technologies that are providing benefits today to Cordova Alaska's electricity users. Advanced grid technologies deployed through DoE co-funded R&D include a 1MW Battery Energy Storage System (BESS), and enhanced monitoring including Phasor Measurement Units (PMU's) to help better understand the operational impacts of the added BESS. This paper will highlight key accomplishments to-date in deploying and using advanced grid technologies, and then outline the next phase of work that will use these technologies to implement an operating scheme to reconfigure the utility's distribution system and utility resources including BESS to provide emergency back-up power to a critical load: the Cordova Community Medical Center (CCMC). This paper will include additional insights on the use of utility resources to support critical loads via case study examples by the National Rural Electric Cooperative Assoc. (NRECA).

BESS↗

Using Dark Fiber and Distributed Acoustic Sensing to Characterize a Geothermal System in the Imperial Valley, Southern California

The Imperial Valley, CA, is a tectonically active transtensional basin located south of the Salton Sea; the area hosts numerous geothermal fields, including significant hidden hydrothermal resources without surface manifestations. Development of inexpensive, rugged, and highly sensitive exploration techniques for undiscovered geothermal systems is critical for accelerating geothermal power deployment as well as unlocking a low-carbon energy future. We present a case study utilizing distributed acoustic sensing (DAS) and ambient noise interferometry for geothermal reservoir imaging, utilizing unlit fiber-optic telecommunication infrastructure (dark fiber). The study exploits two days of passive DAS data acquired in early November 2020 over a ~28-km section of fiber from Calipatria, CA to Imperial, CA. We apply ambient noise interferometry to retrieve coherent signals from DAS records and develop a bin stacking technique to attenuate the effects from persistent localized noise sources and to enhance retrieval of coherent surface waves. As a result, we are able to obtain high-resolution two-dimensional (2D) S wave velocity ($V_s$) structure to 3 km depth, based on joint inversion of both the fundamental and higher overtones. We observe a previously unmapped high $V_s$ and low $V_p$/$V_s$ ratio feature beneath the Brawley geothermal system, which we interpret to be a zone of hydrothermal mineralization and lower porosity. This interpretation is consistent with a host of other measurements including surface heat flow, gravity anomalies, and available borehole wireline data. These results demonstrate the potential utility of DAS deployed on dark fiber for geothermal system exploration and characterization in the appropriate geological settings.

Vp/Vs imaging↗

Virtual Power Plants: Pilots, Challenges, and Innovations Shaping Future Development

Virtual Power Plants (VPPs) aggregate distributed energy resources (DERs) to provide grid services traditionally delivered by centralized power plants. This article reviews the current state of VPP deployment, highlighting business models, compensation mechanisms, and global pilot projects. While VPPs offer benefits such as grid flexibility, resilience, and cost savings, challenges remain in communication infrastructure, regulatory frameworks, market access, and customer engagement. To address these, we propose a scalable, privacy-preserving hierarchical VPP architecture that coordinates with distribution utilities and preserves customer data. We also present the Integrated T&D Control Room of the Future as a key test bed for validating and accelerating VPP adoption. These innovations can help transition VPPs from pilot programs to integral components of a modern, reliable power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Fast and Scalable Genetic Algorithm-Based Approach for Planning of Microgrids in Distribution Networks: Preprint

As a result of climate change, extreme weather events are occurring more frequently and with increasing impact. This trend poses a significant challenge for distribution utilities and system operators to ensure that there is uninterrupted power supply to critical loads in their networks; thus, the level of proactive preparation of the distribution system to be able to handle severe impacts of extreme weather events represents the system's resilience. One method that distribution systems use to prepare for extreme events is to form multiple microgrids and thereby isolate themselves from the grid supply by using local generation as much as possible to supply critical loads. But partitioning an existing system into multiple feasible islands capable of supporting critical loads is still challenging for distribution systems - first, because of the size of the graph partitioning problem and, second, because of the difficulty in properly formulating the desired attributes of such islands or microgrids. Therefore, this paper presents a genetic algorithmbased approach that facilitates incorporating multiple objectives for grid partitioning by formulating two types of problems - node allocation and edge elimination - and it considers multiple topological and resilience-enhancing objectives. The performance of the proposed genetic algorithm-based approach is numerically evaluated on multiple test systems as well as on a real distribution feeder in Colorado, USA.

edge elimination↗

Logarithmic Resilience Risk Metrics That Address the Huge Variations in Blackout Cost

Resilience risk metrics must address the customer cost of the largest blackouts of greatest impact. However, there are huge variations in blackout cost in observed distribution utility data that make it impractical to properly estimate the mean large blackout cost and the corresponding risk. These problems are caused by the heavy tail observed in the distribution of customer costs. To solve these problems, we propose resilience metrics that describe large blackout risk using the mean of the logarithm of the cost of large-cost blackouts, the slope index of the heavy tail, and the frequency of large-cost blackouts.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EV Charging Infrastructure Energization: An Overview of Approaches for Simplifying Processes and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure and electricity. Growth in electricity demand from EV charging, coupled with growth in other sectors like data centers and electrification of other sectors, is impacting electricity infrastructure and load service request processes after two decades of relatively flat electricity demand. While most electric vehicle charging occurs at home, enroute and depot charging for medium and heavy-duty vehicles, both using high-powered EV charging, are critical to meet electric vehicle operational needs. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have expressed distress that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions.

33 ADVANCED PROPULSION SYSTEMS↗

Institutional and Policy Landscape for Solar-Plus-Storage Deployment by Electric Cooperatives

As co-location with battery storage has become a significant solar project-design trend across the United States, policies at all levels have started to adjust. Generally, these policies address battery storage development in major, urban markets, served by large investor-owned utilities (IOUs). Yet all kinds of utilities nationwide are seeking ways to tap into the fast-growing battery storage market, and they are all stakeholders in the federal, state, and local policies that impact the storage market's development. The electric cooperative sector, which includes some 830 distribution utilities and 63 generating and transmission (G&T) utilities across a mostly rural landscape, is no exception. It is impacted by federal, state, and local government policy requirements and incentives, as well as by policies that are controlled by the sector's own institutions. The objective of this paper is to identify and discuss the various policy and institutional factors that are relevant to the electric cooperative sector, and especially to local, distribution-level electric cooperatives (co-ops) that may be interested in procuring energy storage. Given this, the paper is largely written from the local co-op perspective. It also may be useful to wholesale G&T cooperatives. Other parties that may find the paper useful include storage developers, who are often unfamiliar with co-ops; local and state policymakers addressing policy options for this sector, and local renewable or storage stakeholders, who wish to understand the policy landscape affecting their local utility. Although co-op energy storage programs may tap customer-side batteries, this examination is focused on utility-side "front of the meter" projects and the policy issues they raise.

14 SOLAR ENERGY↗

Networked Microgrid Optimal Design and Operations Tool: Regulatory and Business Environment Study

Microgrids aim to increase the resilience of the electric supply to the loads within the microgrid through the ability to disconnect from the distribution utility in the event of a power outage and by supplying power to the microgrid loads from a combination of multiple power generation assets and storage systems. Microgrids can also improve reliability at the distribution level by reducing the load on the system under stress conditions. Networking two or more microgrids has the potential to increase reliability and resilience at a reduced cost by taking advantage of economies of scale and increasing the diversity of the generation assets and loads. This report is part of a collaborative effort among several U.S. Department of Energy national laboratories to develop a networked microgrid (NMG) Optimal Design and Operations (OD&O) tool. This tool addresses the goal defined in the Grid Modernization Multi-Year Program Plan to develop a suite of tools that addresses functional requirements for system optimal design and the operations of NMGs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributed fiber optic strain sensing of bending deformation of a well mockup in the laboratory

Well integrity is critical to the safety and success of subsurface energy exploration and management, as leakage of fluids from subsurface reservoirs is often induced by compromised wells. This study investigates bending deformation of a mockup of an oil/gas well that is subjected to loads expected in deviated wells under reservoir compaction and assesses the feasibility of utilizing distributed fiber optic strain sensing to monitor the deformation. Here, a well mockup, which consists of outer and inner steel pipes with a cemented annulus, is tested under three-point bending loading and its strain and curvature development is monitored by Brillouin optical time domain reflectometry/analysis (BOTDR/A) as well as optical frequency domain reflectometry (OFDR). The primary objective of this research is to assess the strain sensing performance of newly fabricated fiber optic cables and to identify key cable characteristics which could improve the quality of distributed strain measurements with BOTDR/A. Results show that the tight-buffered cable is best suited for strain sensing as its maximum errors in the strain measurement were -36% and -24% against conventional sensors at the maximum elastic and plastic bending loads, respectively, whereas those of the non-tight-buffered cable were -45% and -71%, respectively. Similar trends were obtained in the bending curvature measurement. The detailed design of the tight-buffered cable is presented to elucidate key characteristics of such a cable, which will facilitate accurate distributed strain sensing in oil and gas wells.

42 ENGINEERING↗

Advanced Sensor Deployment for Distribution System State Estimation and Fault Identification: Preprint

Distribution systems are currently facing steep operational challenges as a result of the rapidly increasing integration of renewables and other distributed energy resources (DERs)at both the primary and secondary circuit levels. Distribution utilities and system operators have traditionally had some visibility of their primary circuits using low-frequency supervisory control and data acquisition systems, and they have had very poor if not zero visibility of the secondary circuits where the presence of DERs is constantly increasing. Therefore, this paper presents simulation studies to demonstrate the benefits of an advanced, high-fidelity sensor technology, called as the Meta-Alert System (MAS), developed by Electrical Grid Monitoring Ltd. (EGM), on the distribution grid. First, a reliable model of the EGM sensors is developed, and then two use cases - distribution system state estimation (DSSE) and fault identification - are simulated to evaluate the performance of the MAS technology. Simulation results on the Electric Power Research Institute J1feeder demonstrate that the MAS can effectively participate in system-level DSSE programs and can detect and locate faults faster than traditional distribution protection schemes.

distribution system monitoring↗

Powered By ERAD [Slides]

Energy Resilience Analysis for Distribution Power System (ERAD) is a free, open-source Python toolkit for estimating the energy and service impacts of hazards like earthquakes and flooding. It uses a graph-based approach to capture high resolution connectivity among the grid, critical services, and customers and rapidly compute household level metrics and aggregated statistics across large distribution systems. It uses asset fragility curves that relate hazard severity to survival probability for power system equipment including cables, transformers, substations, etc. The tool is designed to be modular and extensible, allowing it to interface with third-party hazard simulators and integrate into broader resilience analysis workflows. ERAD enables researchers, students, communities, distribution utilities, and other stakeholders to understand hazard impacts and evaluate the effectiveness of different programs to improve energy resilience. The webinar was hosted by NLR researcher Aadil Latif.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Background Information on the Protection Requirements in IEEE Std 1547-2018

As the DER penetration level has risen significantly in recent times, parameter settings and configuration of installed DERs are having direct impact on local electric distribution utilities as well as bulk power systems during normal and abnormal grid conditions. On the other hand, all grid-connected DERs in the United States of America must conform to the interconnection requirements prescribed in the IEEE Std 1547-2018. Because of these reasons, it is crucial to understand the expected DER performance during abnormal grid conditions considering the requirements of the IEEE Std 1547-2018. The aim of this document is twofold: (1) to summarize requirements in IEEE Std 1547-2018 having direct implications in distribution network protection, and (2) to provide the reader with knowledge and information that will be required for users to apply the requirements specified. Since the focus of this document is on distribution network protection in the presence of DERs, it is assumed that the readers have basic understanding of distribution network protection as well as working principles of DERs. This document starts with a brief introduction on protection systems for distribution network followed by a discussion on the impact of DER on the protection systems. Current practices to provide network protection in the presence of DER is briefly discussed. The document then explores the DER performance requirements in IEEE Std. 1547-2018; especially on those related to distribution network protection. Section 6.1 in IEEE Std. 1547-2018 provides an overview of capabilities and control requirements for DER under abnormal operating conditions. This section also introduces abnormal operating performance categories I, II, III. The DER response to various types of faults and grid conditions such as short-circuit faults and open phase conditions are discussed in section 6.2 in the standard while requirements for coordination with the Area EPS reclosing scheme are provided in section 6.3. Section 6.4 in the IEEE Std 1547-2018 specifies requirements for mandatory voltage tripping and ride-through requirements during low and high voltage disturbances and section 6.5 specifies similar requirements for low and high frequency disturbances. IEEE Std. 1547 requires that the conformance of the DERs to IEEE Std 1547-2018 requirements should be verified in accordance with IEEE Std. 1547. 1. There are several parameters and settings of DERs that need to be properly selected for reliable operation during abnormal grid condition while applying the requirements of IEEE Std 1547-2018. Key decisions for proper selections of parameter and settings are: 1. Determination of required DER abnormal operating performance category, 2. Determination of DER response (shall trip) to abnormal voltages and 3. Determination of DER response (shall trip) to abnormal frequency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Natural Hazard Forecast Alert Grid Risk System

Weather events cause most power outages. Often, we even get notifications on our phones to take cover or be prepared for an imminent event. If electric grid utilities had a similar warning that also included probable scenarios and the equipment involved, they could prepare and minimize the effects. Idaho National Laboratory had a project with the U.S. Department of Energy’s Cybersecurity, Energy Security, and Emergency Response program to develop a grid alert application that receives messages from the existing emergency alert system, filters and determines components possibly affected by the emergency event, calculates probable scenarios using MASTERRI (Modeling And Simulation for Targeted Reliability and Resilience Improvement). For high-risk events, the application can then send alert links to subscribed electric distribution utility operations staff to allow them to see and evaluate the scenarios and the impact in a web based interactive map tool. This proof of concept application used data from utilities and organizations, such as the international regulatory body North American Electric Reliability Corporation, which have complied historical failure data of elements that comprise the U.S. electric grid. Nominal failure rates are obtained from this data. To make this tool possible, estimated failure rates were calculated for different component types given the alert type, severity, and location. Historic weather-related grid element failures were correlated with historic weather events from the Integrated Public Alert & Warning System. These correlated events and failures are used along with Bayesian updates from the historical norms to provide a modified failure rate for grid elements in the alert areas and calculate probable scenarios. Working with an industry collaborator, actual grid models and data were used for demonstration cases. This report outlines the work performed for this project.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Single DC Source Based Cascaded Multilevel Inverter

The objective of this project is to develop a high-efficiency solid-state transformer that converts a fixed DC voltage to a medium-voltage AC for utility distribution network connections without having the conventional low-frequency bulky transformers and switch gears. The initial target of 99% efficiency was achieved with the use of wide bandgap semiconductor devices using a proposal novel multilevel inverter. The medium-voltage was successfully tested at 7.2/12.47 kV phase/line voltage level for a 100-kW three-phase inverter.

14 SOLAR ENERGY↗