Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “traffic mitigation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Bayesian modeling of traffic-related air pollutants: A case study of urban transportation and air quality dynamics in Columbia, South Carolina

Traffic emissions significantly impact near-road air quality and public health. This research applies a Bayesian modeling framework to investigate these impacts using high-resolution traffic and air pollutant data from an urban corridor in Columbia, South Carolina. Despite a data collection period truncated by the COVID-19 lockdown, the Bayesian approach successfully identified significant predictors and quantified model uncertainty. Employing Bayesian Model Selection and Averaging enhanced prediction accuracy and evaluated model uncertainty. Findings indicate that higher temperatures and increased moisture levels elevate particulate matter (PM 1.0 , PM 2.5 , PM 10 ) concentrations, while traffic speed significantly affects nitrogen dioxide (NO 2 ) levels. Specifically, higher average traffic speeds (indicative of smoother flow) correspond to lower NO 2 concentrations, suggesting that less congested conditions reduce NO 2 emissions. This study highlights the robustness of Bayesian methods for generating reliable air quality insights even under data-constrained conditions. The findings underscore the importance of traffic flow management (e.g., reducing congestion) for mitigating near-road NO 2 exposure and provide a basis for developing targeted public health strategies.

54 ENVIRONMENTAL SCIENCES↗

A Vehicle-to-Grid planning framework incorporating electric vehicle user equilibrium and distribution network flexibility enhancement

The rapid surge in electric vehicle (EV) adoption, coupled with advancements in charging technologies, emphasizes the critical necessity for expanding EV recharging infrastructure. Simultaneously, the Distribution Network (DN) encounters escalating challenges in meeting charging demand during peak traffic periods. Consequently, there is a mounting demand for the deployment of innovative Vehicle-to-Grid (V2G) technologies to augment the DN’s flexibility in power dispatch and alleviate travel costs for EV users. Hence, this paper proposes an EV-user-equilibrium-(UE)-constrained V2G planning framework that enhances flexibility in the DN. The framework aims to ascertain the optimal placement and capacity of EV charging stations (EVCSs) and V2G charging piles within the Transportation Network (TN). It takes into account the equilibrium condition stemming from competitive EV charging and routing behaviors alongside the optimal expansion of DN energy resources to accommodate the electricity supplied by the V2G piles. This study commences by analyzing EV drivers’ travel decisions, considering the influence of charging and V2G pile locations and sizes. Subsequently, we tackle the Traffic Assignment Problem with User Equilibrium (TAP-UE) model to characterize the steady-state traffic flow distribution of EVs. Following this, we formulate the optimization model for the Coordinated Power and Transportation Network (CPTN), which encompasses the optimal expansion of DN facilities and traffic flow regulation under UE conditions. To mitigate the computational complexity associated with the V2G planning model, we introduce a series of linearization methods to obtain a manageable Mixed-Integer Linear Programming (MILP) solution. Finally, to validate the efficacy of our proposed planning framework, we apply it to two test systems, including a real-world case study. Through these case studies, we explore the necessity and potential benefits of V2G technologies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Predicting Ground Delay Program at an Airport Based on Meteorological Conditions

In this paper, we present two supervised-learning models, logistic regression and decision tree, to predict occurrence of ground delay program at an airport based on meteorological conditions and scheduled traffic demand. Such predictive capabilities can help the Federal Aviation Administration traffic managers and airline dispatchers to prepare mitigation strategies to reduce the impact of adverse weather. The models are applied to predict ground delay program occurrence at two major U.S. airports: Newark Liberty Intl. and San Francisco Intl. airports. The logistic regression model estimates the probability that a ground delay program will occur during a given hour. Decision tree, on the other hand, classifies an hour as a ground delay program or not based on the input variables. Results indicate that both models perform significantly better than a purely random prediction of ground delay program occurrence at the two airports. The logistic regression model performs better than the decision tree model. The degree to which various input variables impact the probability of ground delay program vary between the two airports. While the enroute convective weather is a dominant factor causing ground delay programs at New York airports, poor visibility and low cloud ceiling caused by marine stratus are major drivers of ground delay programs at San Francisco Intl. airport.

traffic flow management↗

ATD-3 Dynamic Routes for Arrivals in Weather (DRAW) Operational Concept, V2.0

NASA's Airspace Technology Demonstration-3 (ATD-3) is the applied traffic flow management activity, and third in the series of ATD projects. ATD-3 provides a suite of en route automation tools, both ground and flight-deck based, that focus on improving the efficiency of en route operation from initial cruise to arrival into the Terminal Radar Approach Control (TRACON). Dynamic Routes for Arrivals in Weather (DRAW) is a technology in the ATD-3 suite that is designed to provide Traffic Managers with a capability to efficiently manage arrival traffic flow and help sustain metering operations when weather is impacting arrivals into major airports. DRAW mitigates convective weather impact on arrival metering operations by providing tools to Traffic Managers that enable efficient reroutes free of convective weather conflicts, and integrated with the arrival metering schedule(s).

terminal airspace↗

Improving Separation Assurance Stability Through Trajectory Flexibility Preservation

New information and automation technologies are enabling the distribution of tasks and decisions from the service providers to the users of the air traffic system, with potential capacity and cost benefits. This distribution of tasks and decisions raises the concern that independent user actions will decrease the predictability and increase the complexity of the traffic system, hence inhibiting and possibly reversing any potential benefits. One such concern is the adverse impact of uncoordinated actions by individual aircraft on the stability of separation assurance. For example, individual aircraft performing self-separation may resolve predicted losses of separation or conflicts with some traffic, only to result in secondary conflicts with other traffic or with the same traffic later in time. In answer to this concern, this paper proposes metrics for preserving user trajectory flexibility to be used in self-separation along with other objectives. The hypothesis is that preserving trajectory flexibility will naturally reduce the creation of secondary conflicts by bringing about implicit coordination between aircraft. The impact of using these metrics on improving self-separation stability is investigated by measuring the impact on secondary conflicts. The scenarios analyzed include aircraft in en route airspace with each aircraft meeting a required time of arrival in a twenty minute time horizon while maintaining separation from the surrounding traffic and using trajectory flexibility metrics to mitigate the risk of secondary conflicts. Preliminary experiments showed promising results in that the trajectory flexibility preservation reduced the potential for secondary conflicts.

Idris, Husni↗

Information Requirements for Supervisory Air Traffic Controllers in Support of a Wake Vortex Departure System

Closely Space Parallel Runway (CSPR) configurations are capacity limited for departures due to the requirement to apply wake vortex separation standards from traffic departing on the adjacent parallel runway. To mitigate the effects of this constraint, a concept focusing on wind dependent departure operations has been developed, known as the Wake Turbulence Mitigation for Departures (WTMD). This concept takes advantage of the fact that crosswinds of sufficient velocity blow wakes generated by aircraft departing from the downwind runway away from the upwind runway. Consequently, under certain conditions, wake separations on the upwind runway would not be required based on wakes generated by aircraft on the downwind runway, as is currently the case. It follows that information requirements, and sources for this information, would need to be determined for airport traffic control tower (ATCT) supervisory personnel who would be charged with decisions regarding use of the procedure. To determine the information requirements, data were collected from ATCT supervisors and controller-in-charge qualified individuals at Lambert-St. Louis International Airport (STL) and George Bush Houston Intercontinental Airport (IAH). STL and IAH were chosen as data collection sites based on the implementation of a WTMD prototype system, operating in shadow mode, at these locations. The 17 total subjects (STL: 5, IAH: 12) represented a broad-base of air traffic experience. Results indicated that the following information was required to support the conduct of WTMD operations: current and forecast weather information, current and forecast traffic demand and traffic flow restrictions, and WTMD System status information and alerting. Subjects further indicated that the requisite information is currently available in the tower cab with the exception of the WTMD status and alerting. Subjects were given a demonstration of a display supporting the prototype systems and unanimously stated that the WTMD status information they felt important was represented. Overwhelmingly, subjects felt that approving, monitoring and terminating the WTMD procedure could be integrated into their supervisory workload.

Lohr, Gary W.↗

The Earth System Science Pathfinder VOLCAM Volcanic Hazard Mission

The VOLCAM mission is planned for research on volcanic eruptions and as a demonstration of a satellite system for measuring the location and density of volcanic eruption clouds for use in mitigating hazards to aircraft by the operational air traffic control systems. A requirement for 15 minute time resolution is met by flight as payloads of opportunity on geostationary satellites. Volcanic sulfur dioxide and ash are detected using techniques that have been developed from polar orbiting TOMS (UV) and AVHRR (IR) data. Seven band UV and three band IR filter wheel cameras are designed for continuous observation of the full disk of the earth with moderate (10 - 20 km) ground resolution. This resolution can be achieved with small, low cost instruments but is adequate for discrimination of ash and sulfur dioxide in the volcanic clouds from meteorological clouds and ozone. The false alarm rate is small through use of sulfur dioxide as a unique tracer of volcanic clouds. The UV band wavelengths are optimized to detect very small sulfur dioxide amounts that are present in pre-eruptive outgassing of volcanoes. The system is also capable of tracking dust and smoke clouds, and will be used to infer winds at tropopause level from the correlation of total ozone with potential vorticity.

Krueger, Arlin J.↗

Space Debris Environment Remediation Concepts

Long-term projections of the space debris environment indicate that even drastic measures, such as an immediate, complete halt of launch and release activities, will not result in a stable environment of man-made space objects. Collision events between already existing space hardware will within a few decades start to dominate the debris population, and result in a net increase of the space debris population, also in size regimes which may cause further catastrophic collisions. Such a collisional cascading will ultimately lead to a run-away situation ("Kessler syndrome"), with no further possibility of human intervention. The International Academy of Astronautics (IAA) has been investigating the status and the stability of the space debris environment in several studies by first looking into space traffic management possibilities and then investigating means of mitigating the creation of space debris. In an ongoing activity, an IAA study group looks at ways of active space debris environment remediation. In contrast to the former mitigation study, the current activity concentrates on the active removal of small and large objects, such as defunct spacecraft, orbital stages, and mission-related objects, which serve as a latent mass reservoir that fuels initial catastrophic collisions and later collisional cascading. The paper will outline different mass removal concepts, e.g. based on directed energy, tethers (momentum exchange or electrodynamic), aerodynamic drag augmentation, solar sails, auxiliary propulsion units, retarding surfaces, or on-orbit capture. Apart from physical principles of the proposed concepts, their applicability to different orbital regimes, and their effectiveness concerning mass removal efficiency will be analyzed. The IAA activity on space debris environment remediation is a truly international project which involves more than 23 contributing authors from 9 different nations.

Johnson, Nicholas L.↗

Space Shuttle Program (SSP) Dual Docked Operations (DDO)

This document describes the concept definition, studies, and analysis results generated by the Space Shuttle Program (SSP), International Space Station (ISS) Program (ISSP), and Mission Operations Directorate for implementing Dual Docked Operations (DDO) during mated Orbiter/ISS missions. This work was performed over a number of years. Due to the ever increasing visiting vehicle traffic to and from the ISS, it became apparent to both the ISSP and the SSP that there would arise occasions where conflicts between a visiting vehicle docking and/or undocking could overlap with a planned Space Shuttle launch and/or during docked operations. This potential conflict provided the genesis for evaluating risk mitigations to gain maximum flexibility for managing potential visiting vehicle traffic to and from the ISS and to maximize launch and landing opportunities for all visiting vehicles.

Sills, Joel W., Jr.↗

Space Shuttle Program Dual Docked Operations

- Dual Docked Operations (DDO) is the docking or undocking of a Russian Vehicle (RV) during Space Shuttle Orbiter/International Space Station (ISS) mated operations. - This paper and presentation summarizes the concept definition, studies, and analysis results generated by the Space Shuttle Program (SSP), ISS Program (ISSP), and Mission Operations Directorate for implementing DDO during mated Orbiter/ISS missions. [1] - Due to the ever-increasing visiting vehicle traffic to and from the ISS, it became apparent to both the ISSP and the SSP that there would arise occasions where conflicts between a visiting vehicle docking and/or undocking could overlap with a planned Space Shuttle launch and/or during mated Orbiter/ISS operations. - This potential conflict provided the genesis for evaluating risk mitigations to gain maximum flexibility for managing potential visiting vehicle traffic to and from the ISS and to maximize launch and landing opportunities for all visiting vehicles. - Reviews were conducted to assess the viability and readiness of the SSP to protect for DDO on any given mission and it was found to be t echnically feasible

Launch vehicles↗

Space Shuttle Program Dual Docked Operations

- Dual Docked Operations (DDO) is the docking or undocking of a Russian Vehicle (RV) during Space Shuttle Orbiter/International Space Station (ISS) mated operations. - This paper and presentation summarizes the concept definition, studies, and analysis results generated by the Space Shuttle Program (SSP), ISS Program (ISSP), and Mission Operations Directorate for implementing DDO during mated Orbiter/ISS missions. [1] - Due to the ever-increasing visiting vehicle traffic to and from the ISS, it became apparent to both the ISSP and the SSP that there would arise occasions where conflicts between a visiting vehicle docking and/or undocking could overlap with a planned Space Shuttle launch and/or during mated Orbiter/ISS operations. - This potential conflict provided the genesis for evaluating risk mitigations to gain maximum flexibility for managing potential visiting vehicle traffic to and from the ISS and to maximize launch and landing opportunities for all visiting vehicles. - Reviews were conducted to assess the viability and readiness of the SSP to protect for DDO on any given mission and it was found to be t echnically feasible

Launch vehicles↗

Data Mining for Understanding and Improving Decision-making Affecting Ground Delay Programs

The continuous growth in the demand for air transportation results in an imbalance between airspace capacity and traffic demand. The airspace capacity of a region depends on the ability of the system to maintain safe separation between aircraft in the region. In addition to growing demand, the airspace capacity is severely limited by convective weather. During such conditions, traffic managers at the FAA's Air Traffic Control System Command Center (ATCSCC) and dispatchers at various Airlines' Operations Center (AOC) collaborate to mitigate the demand-capacity imbalance caused by weather. The end result is the implementation of a set of Traffic Flow Management (TFM) initiatives such as ground delay programs, reroute advisories, flow metering, and ground stops. Data Mining is the automated process of analyzing large sets of data and then extracting patterns in the data. Data mining tools are capable of predicting behaviors and future trends, allowing an organization to benefit from past experience in making knowledge-driven decisions.

Weather↗

Data Mining for Understanding and Impriving Decision-Making Affecting Ground Delay Programs

The continuous growth in the demand for air transportation results in an imbalance between airspace capacity and traffic demand. The airspace capacity of a region depends on the ability of the system to maintain safe separation between aircraft in the region. In addition to growing demand, the airspace capacity is severely limited by convective weather. During such conditions, traffic managers at the FAA's Air Traffic Control System Command Center (ATCSCC) and dispatchers at various Airlines' Operations Center (AOC) collaborate to mitigate the demand-capacity imbalance caused by weather. The end result is the implementation of a set of Traffic Flow Management (TFM) initiatives such as ground delay programs, reroute advisories, flow metering, and ground stops. Data Mining is the automated process of analyzing large sets of data and then extracting patterns in the data. Data mining tools are capable of predicting behaviors and future trends, allowing an organization to benefit from past experience in making knowledge-driven decisions. The work reported in this paper is focused on ground delay programs. Data mining algorithms have the potential to develop associations between weather patterns and the corresponding ground delay program responses. If successful, they can be used to improve and standardize TFM decision resulting in better predictability of traffic flows on days with reliable weather forecasts. The approach here seeks to develop a set of data mining and machine learning models and apply them to historical archives of weather observations and forecasts and TFM initiatives to determine the extent to which the theory can predict and explain the observed traffic flow behaviors.

data mining↗

An evaluation of air quality in major urban areas of India

Rapid economic growth and burgeoning population have contributed to enhanced levels of PM 2.5 concentrations in urban regions of India. Evaluation of ambient air quality facilitates the assessment of effectiveness of emission control measures and early identification of new sources. This study provides a comprehensive statistical analysis of PM 2.5 concentrations in key urban areas across India, including Delhi, Kolkata, Mumbai, Chennai, Hyderabad, and several regional centers. Data from 2017 to 2023 was analyzed using trend analysis, cluster analysis, principal component analysis, and geostatistical interpolation to understand spatiotemporal variations and sources. The analysis reveals significant differences in spatial distribution of PM 2.5 concentrations with high annual averages in urban regions in Indo-Gangetic plain (82–123 μg m −3 ) and relatively lower concentrations (29–46 μg m −3 ) in southern urban areas of Kerala, Tamil Nadu and Andhra Pradesh. Delhi state had the highest 24-averaged PM 2.5 concentrations (112 μg m −3 ) followed by urban regions in Uttar Pradesh, Bihar and West Bengal (94 μg m −3 ). Trend analysis from 2017 to 2023 revealed an overall 2.5% decline in site-wide PM2.5 concentrations, with the exception of Ludhiana, which exhibited a consistent annual increase of 10%. Principal component analysis (PCA) attributes 30% of the variance to wintertime emissions, 13% to biomass burning, and 18% to the regional haze in the northern Indo-Gangetic Plain. Different analyses clearly demonstrates the contribution of biomass burning to pollution in Delhi and surrounding cities. Transboundary pollution to Kolkata is likely from the highly polluted region in Indo-Gangetic Plain. Coastal cities of Mumbai and Chennai has relatively lower pollution attributed to the influence of sea breeze dilution, with mostly local contribution and some potential transport from upwind industry clusters. Hyderabad also has local contribution due to high density of vehicular traffic and local small industries. This study shows that mitigation efforts targeting clusters of regions should be undertaken to curb the high PM2.5 pollution. Policy measures should be implemented both at local and the intra-state level to address shared sources and transport of pollution.

Hysplitbacktrajectories↗

Cyber Physical Security (CPS) Extension to Air Traffic Management (ATM) Testbed

The Air Traffic Management (ATM) Testbed is being developed at NASA to enable benefit, impact, safety and cost assessments for accelerating the deployment of Concept and Technologies (C&T) in the National Airspace System (NAS). Today, C&T introduction into the NAS takes decades. The primary reason for this is an inability to assess the operational impact of the interaction between the proposed C&T and operationally deployed systems (Realistic Technologies) in terms of NAS-wide safety, traffic flow efficiency, roles and workload of controllers and traffic managers, and impact on airline fleet operations. Transition of C&T to operations requires mathematical modeling and simulation, Human-in-the-Loop (HITL) testing and shadow-mode evaluation driven by operational data. Whereas interaction with the operational system during testing and stages of deployment is not permissible due to safety concerns, it is certainly possible to create a simulation environment that closely mimics the NAS using the same operational systems/hardware for enabling such assessments. This presentation focuses on a proposed Cyber Physical Security extension to the ATM Testbed for creating a modeling and simulation architecture to study how well the Air Traffic Management system will perform and analyze effectiveness of mitigating security measures against particular cyber-attack scenarios.

Datta, Koushik↗

Advanced Air Mobility (AAM) Vertiport Automation Trade Study

The NASA Advanced Air Mobility (AAM) Vertiport Automation Trade Study seeks to understand the barriers to scaling AAM takeoff and landing facilities, described in this study as vertiplaces. This trade study provides an overview of AAM, vertiplaces, and insight into the gaps in capability, regulatory certainty, and knowledge needed to sufficiently manage the volume of expected traffic anticipated for vertiplaces. The study also outlines potential mitigations to those gaps based on research conducted by the project team and interviews with 23 individuals in government and industry. In this report, the elements that make up a vertiport are discussed. The study then defines a vertiplace and introduces a concept for vertiplace categorization based on capability. Capability gaps and mitigations to increasing scale and automation of vertiplaces are then discussed based around four cross-cutting themes the research of our project team found in the interviews and research: Technology, Physical Infrastructure, Policy, and Community Acceptance. The study then concludes by discussing topics requiring further research that were identified by interviewees.

Vertiport↗

Lessons Learned from Hanford's Purex Tunnel 2 Structural Stabilization Project - 20509

In 2019, U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC) completed structurally stabilizing the Plutonium Uranium Extraction Plant (Purex) waste storage Tunnel 2 with engineered grout. This action significantly reduced risk to Hanford workers, the surrounding community and environment by preventing future collapse of the tunnel and possible release of radioactive materials. Decades of plutonium production at the Purex facility required construction of two large underground tunnels for storage of highly contaminated plutonium processing equipment that had failed during the operation of Purex and other facilities across the Hanford Site. Following the partial collapse of Purex Tunnel 1 on May 9, 2017, DOE and CHPRC took immediate action to safely stabilize the collapsed section of the tunnel. The hole in the tunnel was filled the next day as a temporary stabilization measure, and no contamination was detected as a result of the partial collapse of the tunnel. Workers then stabilized Tunnel 1 in its entirety by filling with engineered grout, which also encapsulated the radioactive equipment and railcars within the tunnel. Grouting eliminated the risk of further collapse and stabilized the tunnel contents, all while not precluding future remedial actions or final closure decisions. While conducting an integrity analysis of Tunnel 1 by using construction drawings, photos and other historical documents, project teams also analyzed the much larger Purex Tunnel 2. The analysis found Tunnel 2 did not meet current codes for structural integrity, and it may not be able to bear the weight of the soil above the tunnel. Therefore, it was determined that Tunnel 2 was also at risk of collapse. DoE's independent panel of experts determined grouting to be the best choice for stabilizing Tunnel 2 because it provides the highest level of stability and protection, and does not preclude future remedial actions. DOE authorized CHPRC to commence work and the Purex Tunnel 2 Structural Stabilization Project was launched in December of 2017. The paper will discuss the process of recognizing the following critical aspects and risks associated with stabilizing Tunnel 2, and the actions taken by the project team to mitigate these risks, including: - Tunnel investigation and data collection to assist with future remediation; - On-site batching and mock-ups to provide the large quantity of grout required for stabilizing the tunnel; - Workforce involvement and innovative actions that mitigated the project's most significant potential hazards, including traffic control; - Project team high level of execution translated into successful project execution. Sharing lessons learned from this critical risk-reduction effort can enhance the safety and efficiency of other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗