Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “time service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

STADAN and data relay satellite simulation (emphasis on the scheduler)

A set of computer programs was developed which can be used to simulate the operation of NASA's Satellite Tracking and Data Acquisition Network (STADAN). The simulation consists of two major modules, a computerized algorithmic satellite scheduler (CASS) and a generalized evaluation model simulator (GEMS). CASS generates in-view time intervals of satellites over ground stations, and using these candidate passes, produces a schedule of service times for specific satellites to be serviced by specific ground stations in an attempt to fulfill certain inputted service requirements. GEMS than examines how well STADAN fulfills this schedule in terms of the availability and dependability of different (inputted) complements of equipment at the ground stations. The simulation was modified to allow for the introduction of one or more tracking and data relay satellites, which can serve as orbital receiving and command stations.

Kerne, B.↗

The BBC network radio time and frequency standard and its role in the provision of the Greenwich time signal

The British Broadcasting Corporation (BBC) has broadcast the Greenwich Time Signal (GTS) on its networks since 1924. Up to February 1990 this signal was generated by the Royal Greenwich Observatory (RGO) in England. The BBC was informed that the RGO was moving its location to Cambridge and might not be able to continue to provide the Greenwich Time Service. The BBC in its role of a public service broadcaster believed that a long tradition of providing a time signal to its listeners should be upheld, and as such decided to seek alternative methods of provision. In parallel with this activity, an in-house requirement arose to re-engineer time switch equipment and provide new facilities for digital audio projects. As both requirements have a common engineering core, a decision was taken to design and procure a Time and Frequency Standard that could generate the Greenwich Time Signal to the same specification adhered to by the RGO, and provide additional time and frequency facilities. The concept of time and time/frequency dissemination as used in a broadcast network is discussed, as well as the details of an engineering solution to the requirements of BBC Network Radio.

Mcilroy, Jim J.↗

The Effect of Prior Exposures on the Notched Fatigue Behavior of Disk Superalloy ME3

Environmental attack has the potential to limit turbine disk durability, particularly in next generation engines which will run hotter; there is a need to understand better oxidation at potential service conditions and develop models that link microstructure to fatigue response. More efficient gas turbine engine designs will require higher operating temperatures. Turbine disks are regarded as critical flight safety components; a failure is a serious hazard. Low cycle fatigue is an important design criteria for turbine disks. Powder metallurgy alloys, like ME3, have led to major improvements in temperature performance through refractory additions (e.g. Mo,W) at the expense of environmental resistance (Al, Cr). Service conditions for aerospace disks can produce major cycle periods extending from minutes to hours and days with total service times exceeding 1,000 hours in aerospace applications. Some of the effects of service can be captured by extended exposures at elevated temperature prior to LCF testing. Some details of the work presented here have been published.

Sudbrack, Chantal K.↗

Inter-satellite time transfer: Techniques and applications

A brief review is presented of the well known time transfer techniques that have been studied and tested throughout the years. The applicability of time transfer techniques to a timing service as provided through a TDRS/DRS System, the problems related to the choice of the timing signal within the constraints imposed by the existing systems, and the possible practical implementations, including a description of the time synchronization support via TDRSS to the Gamma Ray Observatory (GRO) are discussed.

Detoma, Edoardo↗

The national- and international-wide prospects of future improvements of position location and time synchronization systems and aids

The concept being designed by the Leningrad Scientific Research Radio Technical Institute (LSRRI) of united positioning and timing service on the basis of the utilization of long-range and global radionavigation and common time systems and aids for different users is described. The estimate of its utilization on the national as well as on international scale is given.

Gouzhva, Yuri G.↗

The Keck Task Library (KTL)

KTL is a set of routines which eases the job of writing applications which must interact with a variety of underlying sub-systems (known as services). A typical application is an X Window user interface coordinating telescope and instruments. In order to connect to a service, application code specifies a service name--typically an instrument name--and a style, which defines the way in which the application will interact with the service. Two styles are currently supported: keyword, where the application reads and writes named keywords and the resulting inter-task message traffic is hidden; and message, where the application deals directly with messages. The keyword style is intended mainly for user interfaces, and the message style is intended mainly for lower-level applications. KTL applications are event driven: a typical application first connects to all its desired services, then expresses interest in specified events. The application then enters an event dispatch loop in which it waits for events and calls the appropriate service's event-handling routine. Each event is associated with a call-back routine which is invoked when the event occurs. Call-back routines may (and typically do) interact with other sub-systems and KTL provides the means of doing so without blocking the application (vital for X Window user interfaces). This approach is a marriage of ideas culled from the X window, ADAM, Keck instrument, and Keck telescope control systems. A novel feature of KTL is that it knows nothing about any services or styles. Instead it defines a generic set of routines which must be implemented by all services and styles (essentially open(), ioctl(), read(), write(), event(), and close()) and activates sharable libraries at run-time. Services have been implemented (in both keyword and message styles) for HIRES (the Keck high resolution echelle spectrograph built by Lick Observatory), LWS (the Keck long wavelength spectrometer built by UC San Diego), and the Keck telescope. Each of these implementations uses different underlying message systems: the Lick MUSIC system, RPC's, and direct sockets (respectively). Services for the remaining three front-line Keck instruments will be implemented over the next few months.

Lupton, W. F.↗

High accuracy time transfer synchronization

In July 1994, the U.S. Naval Observatory (USNO) Time Service System Engineering Division conducted a field test to establish a baseline accuracy for two-way satellite time transfer synchronization. Three Hewlett-Packard model 5071 high performance cesium frequency standards were transported from the USNO in Washington, DC to Los Angeles, California in the USNO's mobile earth station. Two-Way Satellite Time Transfer links between the mobile earth station and the USNO were conducted each day of the trip, using the Naval Research Laboratory(NRL) designed spread spectrum modem, built by Allen Osborne Associates(AOA). A Motorola six channel GPS receiver was used to track the location and altitude of the mobile earth station and to provide coordinates for calculating Sagnac corrections for the two-way measurements, and relativistic corrections for the cesium clocks. This paper will discuss the trip, the measurement systems used and the results from the data collected. We will show the accuracy of using two-way satellite time transfer for synchronization and the performance of the three HP 5071 cesium clocks in an operational environment.

Wheeler, Paul J.↗

Remote clocks linked by a fully calibrated two-way timing link

Fully calibrated two-way time transfers between the U.S. Naval Observatory (USNO) and the U.S. Naval Observatory Time Service Substation (NOTSS) have become operational. The calibration method employed was the co-located Earth station method. Results concerning timing, stability, comparison of two-way and Global Positioning System (GPS) timing links, and remote clock contribution to local time scale computation will be presented.

Deyoung, James A.↗

A static data flow simulation study at Ames Research Center

Demands in computational power, particularly in the area of computational fluid dynamics (CFD), led NASA Ames Research Center to study advanced computer architectures. One architecture being studied is the static data flow architecture based on research done by Jack B. Dennis at MIT. To improve understanding of this architecture, a static data flow simulator, written in Pascal, has been implemented for use on a Cray X-MP/48. A matrix multiply and a two-dimensional fast Fourier transform (FFT), two algorithms used in CFD work at Ames, have been run on the simulator. Execution times can vary by a factor of more than 2 depending on the partitioning method used to assign instructions to processing elements. Service time for matching tokens has proved to be a major bottleneck. Loop control and array address calculation overhead can double the execution time. The best sustained MFLOPS rates were less than 50% of the maximum capability of the machine.

Barszcz, Eric↗

Program For Evaluation Of Reliability Of Ceramic Parts

CARES/LIFE predicts probability of failure of monolithic ceramic component as function of service time. Assesses risk that component fractures prematurely as result of subcritical crack growth (SCG). Effect of proof testing of components prior to service also considered. Coupled to such commercially available finite-element programs as ANSYS, ABAQUS, MARC, MSC/NASTRAN, and COSMOS/M. Also retains all capabilities of previous CARES code, which includes estimation of fast-fracture component reliability and Weibull parameters from inert strength (without SCG contributing to failure) specimen data. Estimates parameters that characterize SCG from specimen data as well. Written in ANSI FORTRAN 77 to be machine-independent. Program runs on any computer in which sufficient addressable memory (at least 8MB) and FORTRAN 77 compiler available. For IBM-compatible personal computer with minimum 640K memory, limited program available (CARES/PC, COSMIC number LEW-15248).

Nemeth, N.↗

An Ontological Approach to Integrate Commercial Space Operations with an In-time Aviation Safety Management System (IASMS)

The emergence of commercial space operations (CSO) is one of many Advanced Air Mobility domains that pose major challenges to in-time safety assurance because of the different architectures used by the operators and other agents. The National Academies recognized the need to improve integration of disparate architectures and recommended that an In-time Aviation Safety Management System(IASMS) be developed to provide seamless connectivity across interacting architectures and enable in-time safety assurance. An ontological approach to integrating CSO with IASMS involves in-time Services, Functions, and Capabilities design to manage operational risks and inform changes to design. The resulting integrated architecture provides a common basis for risk management and in-time safety assurance.

K Ellis↗

An Exact Algorithm for the Linear Tape Scheduling Problem

Magnetic tapes are often considered as an outdated storage technology, yet they are still used to store huge amounts of data. Their main interests are a large capacity and a low price per gigabyte, which come at the cost of a much larger file access time than on disks. With tapes, finding the right ordering of multiple file accesses is thus key to performance. Moving the reading head back and forth along a kilometer long tape has a non-negligible cost and unnecessary movements thus have to be avoided. However, the optimization of tape request ordering has rarely been studied in the scheduling literature, much less than I/O scheduling on disks. For instance, minimizing the average service time for several read requests on a linear tape remains an open question. Therefore, in this paper, we aim at improving the quality of service experienced by users of tape storage systems, and not only the peak performance of such systems. To this end, we propose a reasonable polynomial-time exact algorithm while this problem and simpler variants have been conjectured NP-hard. We also refine the proposed model by considering U-turn penalty costs accounting for inherent mechanical accelerations. Then, we propose a low-cost variant of our optimal algorithm by restricting the solution space, yet still yielding an accurate suboptimal solution. Finally, we compare our algorithms to existing solutions from the literature on logs of the mass storage management system of a major datacenter. This allows us to assess the quality of previous solutions and the improvement achieved by our low-cost algorithm. Aiming for reproducibility, we make available the complete implementation of the algorithms used in our evaluation, alongside the dataset of tape requests that is, to the best of our knowledge, the first of its kind to be publicly released.

Honoré, Valentin↗

Extreme-scale EV charging infrastructure planning for last-mile delivery using high-performance parallel computing

Here, this paper addresses stochastic charger location and allocation problems under queue congestion for last-mile delivery using electric vehicles (EVs). The objective is to decide where to open charging stations and how many chargers of each type to install, subject to budgetary and waiting-time constraints. We formulate the problem as a mixed-integer non-linear program, where each station-charger pair is modeled as a multiserver queue with stochastic arrivals and service times to capture the notion of waiting in fleet operations. The model is extremely large, with billions of variables and constraints for a typical metropolitan area; even loading the model in solver memory is difficult, let alone solving it. To address this challenge, we develop a Lagrangian-based dual decomposition framework that decomposes the problem by station and leverages parallelization on high-performance computing systems, where the subproblems are solved by using a cutting plane method and their solutions are collected at the master level. We also develop a three-step rounding heuristic to transform the fractional subproblem solutions into feasible integral solutions. Computational experiments on data from the Chicago metropolitan area with hundreds of thousands of households and thousands of candidate stations show that our approach produces high-quality solutions in cases where existing exact methods cannot even load the model in memory. We also analyze various policy scenarios, demonstrating that combining existing depots with newly built stations under multiagency collaboration substantially reduces costs and congestion. These findings offer a scalable and efficient framework for developing sustainable large-scale EV charging networks.

Capacity allocation↗

Flight support system servicing aid tool

The Space Shuttle EVA on-orbit satellite servicing time is a scare commodity which has been limited for each mission to two 6-hour work periods with an intervening 40-hour rest period. New complex missions being planned require more servicing than two EVA's can accommodate. The GSFC (Goddard Space Flight Center) Satellite Servicing Project has been working for several years to develop a Serving Aid Tool to effectively extend this on-orbit servicing capability by IVA to the point that use of a master-slave bilateral force reflecting manipulator is now planned. This will be controlled from the Shuttle aft flight deck by the RMS mission specialist using a miniature hand controller while outfitted with a physical restraint system. This development is being done on a low cost basis using demonstrated state-of-the-art commercial teleoperated system hardware and software upgraded for space flight use.

Davis, R.↗

High-Level Waste Mechanical Sludge Removal at the Savannah River Site - F Tank Farm Closure Project

The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal (MSR) using the Waste on Wheels (WOW) system for the first time within one of its storage tanks. The WOW system is designed to be relatively mobile with the ability for many components to be redeployed to multiple waste tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. In addition, the project is currently preparing another waste tank for MSR utilizing lessons learned from this previous operational activity. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2,840 cubic meters (750,000 gallons) each. The construction of these tanks was completed in 1953, and they were placed into waste storage service in 1959. The tank's primary shell is 23 meters (75 feet) in diameter, and 7.5 meters (24.5 feet) in height. Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. Both Tank 5 and Tank 6 received and stored F-PUREX waste during their operating service time before sludge removal was performed. DOE intends to remove from service and operationally close (fill with grout) Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. Mechanical Sludge Removal, the first step in the tank closure process, will be followed by chemical cleaning. After obtaining regulatory approval, the tanks will be isolated and filled with grout for long-term stabilization. Mechanical Sludge Removal operations within Tank 6 removed approximately 75% of the original 95,000 liters (25,000 gallons). This sludge material was transferred in batches to an interim storage tank to prepare for vitrification. This operation consisted of eleven (11) Submersible Mixer Pump(s) mixing campaigns and multiple intra-area transfers utilizing STPs from July 2006 to August 2007. This operation and successful removal of sludge material meets requirement of approximately 19,000 to 28,000 liters (5,000 to 7,500 gallons) remaining prior to the Chemical Cleaning process. Removal of the last 35% of sludge was exponentially more difficult, as less and less sludge was available to mobilize and the lighter sludge particles were likely removed during the early mixing campaigns. The removal of the 72,000 liters (19,000 gallons) of sludge was challenging due to a number factors. One primary factor was the complex internal cooling coil array within Tank 6 that obstructed mixer discharge jets and impacted the Effective Cleaning Radius (ECR) of the Submersible Mixer Pumps. Minimal access locations into the tank through tank openings (risers) presented a challenge because the available options for equipment locations were very limited. Mechanical Sludge Removal activities using SMPs caused the sludge to migrate to areas of the tank that were outside of the SMP ECR. Various SMP operational strategies were used to address the challenge of moving sludge from remote areas of the tank to the transfer pump. This paper describes in detail the Mechanical Sludge Removal activities and mitigative solutions to cooling coil obstructions and other challenges. The performance of the WOW system and SMP operational strategies were evaluated and the resulting lessons learned are described for application to future Mechanical Sludge Removal operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HIGH LEVEL WASTE MECHANCIAL SLUDGE REMOVAL AT THE SAVANNAH RIVER SITE F TANK FARM CLOSURE PROJECT

The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal (MSR) using the Waste on Wheels (WOW) system for the first time within one of its storage tanks. The WOW system is designed to be relatively mobile with the ability for many components to be redeployed to multiple waste tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. In addition, the project is currently preparing another waste tank for MSR utilizing lessons learned from this previous operational activity. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2,840 cubic meters (750,000 gallons) each. The construction of these tanks was completed in 1953, and they were placed into waste storage service in 1959. The tank's primary shell is 23 meters (75 feet) in diameter, and 7.5 meters (24.5 feet) in height. Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. Both Tank 5 and Tank 6 received and stored F-PUREX waste during their operating service time before sludge removal was performed. DOE intends to remove from service and operationally close (fill with grout) Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. Mechanical Sludge Removal, the first step in the tank closure process, will be followed by chemical cleaning. After obtaining regulatory approval, the tanks will be isolated and filled with grout for long-term stabilization. Mechanical Sludge Removal operations within Tank 6 removed approximately 75% of the original 95,000 liters (25,000 gallons). This sludge material was transferred in batches to an interim storage tank to prepare for vitrification. This operation consisted of eleven (11) Submersible Mixer Pump(s) mixing campaigns and multiple intraarea transfers utilizing STPs from July 2006 to August 2007. This operation and successful removal of sludge material meets requirement of approximately 19,000 to 28,000 liters (5,000 to 7,500 gallons) remaining prior to the Chemical Cleaning process. Removal of the last 35% of sludge was exponentially more difficult, as less and less sludge was available to mobilize and the lighter sludge particles were likely removed during the early mixing campaigns. The removal of the 72,000 liters (19,000 gallons) of sludge was challenging due to a number factors. One primary factor was the complex internal cooling coil array within Tank 6 that obstructed mixer discharge jets and impacted the Effective Cleaning Radius (ECR) of the Submersible Mixer Pumps. Minimal access locations into the tank through tank openings (risers) presented a challenge because the available options for equipment locations were very limited. Mechanical Sludge Removal activities using SMPs caused the sludge to migrate to areas of the tank that were outside of the SMP ECR. Various SMP operational strategies were used to address the challenge of moving sludge from remote areas of the tank to the transfer pump. This paper describes in detail the Mechanical Sludge Removal activities and mitigative solutions to cooling coil obstructions and other challenges. The performance of the WOW system and SMP operational strategies were evaluated and the resulting lessons learned are described for application to future Mechanical Sludge Removal operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Atom Probe characterization of neutron irradiated commercial ZIRLO® and AXIOM X2® alloys

As part of the Mechanistic Understanding of ZIrconium Corrosion (MUZIC) program, this team has been instrumental to obtain EPRI and Westinghouse sponsorships to prepare the neutron irradiated ZIRLO® and X2® from Vogtle nuclear power plant and ship them from Studsvik’s (Sweden) hot cells to Idaho National Laboratory (INL) to be part of the NSUF library. The uniqueness of these sets of neutron irradiated alloys is that they are at the same two extremes of the fuel cycles, allowing us to study the microchemistry evolution as a function of irradiation doses, exposure time and solute content. Advanced commercial Zirconium-Niobium (Zr-Nb) alloys, such as ZIRLO® and AXIOM®, have been developed by Westinghouse to enhance the corrosion resistance of fuel cladding material for longer service time. This study specifically aims at investigating the neutron irradiation induced Nb redistribution in AXIOM® X2® to understand the effect of neutron irradiation induced microchemistry changes and the irradiation enhanced corrosion resistance observed in ZrNb alloys. The detailed sample information on chemical composition and irradiation is given in shown in Table 1a and 1b respectively. To study the neutron IIP/nanoclusters and Nb concentration in the solid solution, atom probe tomography (APT) is the primary tool to obtain reliable chemical information. APT specimens were prepared in shielded focused ion beam (FIB) at the Irradiated Materials Characterization Laboratory (IMCL) at INL followed by APT analysis at CAES facility using LEAP 4000XR

36 MATERIALS SCIENCE↗

Oxidation kinetics of CVD silicon carbide and silicon nitride

The long-term oxidation behavior of pure, monolithic CVD SiC and Si3N4 is studied, and the isothermal oxidation kinetics of these two materials are obtained for the case of 100 hrs at 1200-1500 C in flowing oxygen. Estimates are made of lifetimes at the various temperatures investigated. Parabolic rate constants for SiC are within an order of magnitude of shorter exposure time values reported in the literature. The resulting silica scales are in the form of cristobalite, with cracks visible after exposure. The oxidation protection afforded by silica for these materials is adequate for long service times under isothermal conditions in 1-atm dry oxygen.

Fox, Dennis S.↗