Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technological readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Technological Readiness of Ceramic Matrix Composites: A Review

This review intends to provide a snapshot of the state of industry of ceramic matrix composites (CMC). It is therefore organized in terms of design needs, composite properties, system capabilities, and technological availability. This publication will cover CMCs in use and development, with technological readiness levels (TRL) from laboratory testing of coupons to flight proven hardware.

Neergaard, Lynn↗

Technology readiness assessment of advanced space engine integrated controls and health monitoring

An evaluation is given for an integrated control and health-monitoring (ICHM) system that is designed to be used with hydrogen-oxygen rocket engines. The minimum required ICHM functions, system elements, technology readiness, and system cost are assessed for a system which permits the operation of H-O engines that are space-based, reusable, and descent-throttleable. Only the advanced sensors and some engine-dependent software are not found to be ready for applications to laboratory demonstration. Other systems related to the minimum functions are more developed, bringing the total system readiness to the conceptual design stage. Based on the evaluation of the H-O ICHM, it is estimated that the minimum system requirements for demonstration on an engine system testbed will require an investment of 30-45 million dollars over 6 years.

Millis, Marc G.↗

Technology readiness assessment of advanced space engine integrated controls and health monitoring

An evaluation is given for an integrated control and health monitoring system (ICHM) system that is designed to be used with hydrogen-oxygen rocket engines. The minimum required ICHM functions, system elements, technology readiness, and system cost are assessed for a system which permits the operation of H-O engines that are space-based, reusable, and descent throttleable. Based on the evaluation of the H-O ICHM, it is estimated that the minimum system requirements for demonstration on an engine system testbed will require an investment of 30 to 45 million dollars over six years.

Millis, Marc G.↗

Raising Nuclear Thermal Propulsion (NTP) Technology Readiness Above 3

NTP development is currently supported by the NASA program office "Advanced Exploration Systems". The concept is a main propulsion option being considered for human missions to Mars in the 2030's. Major NTP development took place in the 1960's and 1970's under the Rover/NERVA program. The technology had matured to TRL 6 and was preparing to go to TRL 7 with a prototype flight engine before the program was cancelled. Over the last 40 years, a variety of continuations started, but only lasted a few years each. The Rover/NERVA infrastructure is almost all gone. The only remains are a few pieces of hardware, final reports and a few who worked the Rover/NERVA. Two types of nuclear fuel are being investigated to meet the current engine design specific impulse of 900 seconds compared to approximately 850 seconds demonstrated during Rover/NERVA. One is a continuation of composite fuel with new coatings to better control mid-band corrosion. The other type is a CERMET fuel made of Tungsten and UO2. Both fuels are being made from Rover/NERVA lessons learned, but with slightly different recipes to increase fuel endurance at higher operating temperatures. The technology readiness level (TRL) of these current modified reactor fuels is approximately TRL 3. To keep the development cost low and help mature the TRL level past 4 quickly, a few special non-nuclear test facilities have been made to test surrogate fuel, with depleted uranium, as coupons and full length elements. Both facilities utilize inductive heating and are licensed to handle depleted uranium. TRL 5 requires exposing the fuel to a nuclear environment and TRL 6 requires a prototype ground or flight engine system test. Currently, three different NTP ground test facility options are being investigated: exhaust scrubber, bore hole, and total exhaust containment. In parallel, a prototype flight demonstration test is also being studied. The first human mission to Mars in the 2030's is currently 2033. For an advanced propulsion concept to be seriously considered for use, the engine development plans need to show it is feasible and affordable to reach TRL 8 by 2027 and can be qualified for human mission use.

Gerrish, Harold P., Jr.↗

Technology Readiness Assessment for HEEET TPS

The HEEET project was conceived to develop a heatshield with a high performance ablative thermal protection material that can withstand the extreme entry environment produced as a result of rapid deceleration during high speed entry into Venus, Saturn, Uranus or higher speed entry into Earth's atmosphere. Successful maturation of HEEET supports future New Frontiers and Discovery AO's, as well as Flagship and directed missions in the longer term. In addition, HEEET has the potential to evolve and to support re-entry to Earth, for missions such as Mars Sample Return.The primary goal of the HEEET Project was to develop an ablative TPS heat-shield based on woven TPS technology to Technology Readiness Level (TRL) 6. Key evidence to support the TRL evaluation includes: Demonstration of reproducible manufacturing of a dual layer material over a range of thicknesses and integrated on to a heatshield engineering test unit at a scale that is applicable to near term Discovery as the highest priority and future NF missions as secondary priority set of missions. Demonstration of predictable and stable performance of the dual layer TPS over a range of entry environments that are applicable to near term Discovery and NF missions of interest to SMD.Includes completion of coupon arc jet and laser testing and development of a mid-fidelity thermal response model that correlates with test results. Demonstration of flight heatshield system design for a range of sizes and loads that are relevant to near term Discovery and NF missions of interest to SMD. Includes completion of structural testing to validate analytic thermal/structural models and development of a material property database. Includes structural testing of a ~1m Engineering Test Unit under relevant entry loads.

Gage, Peter↗

Technology Readiness Level (TRL) as the foundation of Human Readiness Level (HRL)

As space programs became more complex, it became evident to NASA that a means of defining a methodological way to evaluate the maturity of technologies for spacecraft design was needed for risk assessment that could affect technical, cost and schedule. NASA first saw that infusing technology intoNASA programs required some means to assess technology maturity like flight readiness for a mission. Hence, a seven-point technology readiness level scale was developed in the mid-70s by a NASA researcher and later formally defined in 1989 (Sadin et al., 1989) that comprised of seven levels (See Table 1). These levels provided a definitive meaning of what complexity a research and technology development program should be followed. NASA recognized the approach as a useful way of an effective assessment of,and communication regarding the maturity of new technologies, using a simplistic figure of merit, the state of maturity of a technology-particularly, critical technology necessary to meet a mission/application objective

George Salazar↗

Solar +: Clean Energy Strategies for the Sunshine State (Final Technical Report (FTR) of the Florida Alliance for Accelerating Solar and Storage Technology Readiness (FAASSTeR))

This reports on a four-year effort to provide foundational research, analysis, strategies and assistance to help Florida, and other states that might learn from this work, to grow solar energy in conjunction with other distributed energy resources by addressing and overcoming existing barriers, and in way that delivers increased value. The start of this effort coincided with an inflection point of sorts into a new dawn for solar energy in Florida, where the Sunshine state’s national ranking in total installed solar, according to the Solar Energy Industries Association (SEIA), has rose from 13th to 4th. Florida has now become the national leader in annual utility-scale solar growth as dozens of large plants have come online. Also, during this time, Florida utilities have expressed a strong and growing interest in understanding the role of energy storage and how to best plan for and deploy this unique resource as part of strategies to grow solar. The utility-scale solar growth experienced has been fueled by the economics of solar cost-parity with natural gas combined cycle plants and Florida Public Service Commission’s (PSC) approval of cost-recovery for the Investor-Owned Utilities (IOU’s), primarily through the Solar Base Rate Adjustment (SoBRA) mechanism. This has led to gigawatts (GW’s) of rate-based solar capacity additions over several years, along with fairly significant amounts of energy storage. Meanwhile, municipal electric utilities, which, collectively, are the third largest source of power in the state, have been increasing solar considerably through power purchase agreements (PPA’s) and are on track to have close to 1 GW of grid-connected solar by 2024. Florida’s municipal utilities and the Florida Municipal Electric Association (FMEA) have been key partners in the Florida Alliance for Accelerating Solar and Storage Technology Readiness (FAASSTeR), formed to carry out this effort. The six largest of these have been Core Team utilities, engaging throughout the project in weekly calls, discussions, and project direction, participating in and hosting workshops and benefiting from technical assistance in several areas.

14 SOLAR ENERGY↗

Final Report of the NASA Technology Readiness Assessment (TRA) Study Team

The material in this report covers the results on the NASA-wide TRA team, who are responsible for ascertaining the full extent of issues and ambiguities pertaining to TRATRL and to provide recommendations for mitigation. The team worked for approximately 6 months to become knowledgeable on the current TRATRL process and guidance and to derive recommendations for improvement.The team reviewed the TRA processes of other government agencies (OGA), including international agencies, and found that while the high-level processes are similar, the NASA process has a greater level of detail. Finally, NASA’s HQ OCT continues to monitor the GAO’s efforts to produce a TRA Best Practices Guide, a draft of which was received in February 2016. This Guide could impact the recommendations of this report.

Technology readiness assessment↗

Bridging the Technology Readiness "Valley of Death" Utilizing Nanosats

Incorporating new technology is a hallmark of space missions. Missions demand ever-improving tools and techniques to allow them to meet the mission science requirements. In Earth Science, these technologies are normally expressed in new instrument capabilities that can enable new measurement concepts, extended capabilities of existing measurement techniques, or totally new detection capabilities, and also, information systems technologies that can enhance data analysis or enable new data analyses to advance modeling and prediction capabilities. Incorporating new technologies has never been easy. There is a large development step beyond demonstration in a laboratory or on an airborne platform to the eventual space environment that is sometimes referred to as the "technology valley of death." Studies have shown that non-validated technology is a primary cause of NASA and DoD mission delays and cost overruns. With the demise of the New Millennium Program within NASA, opportunities for demonstrating technologies in space have been rare. Many technologies are suitable for a flight project after only ground testing. However, some require validation in a relevant or a space flight environment, which cannot be fully tested on the ground or in airborne systems. NASA's Earth Science Technology Program has initiated a nimble program to provide a fairly rapid turn-around of space validated technologies, and thereby reducing future mission risk in incorporating new technologies. The program, called In-Space Validation of Earth Science Technology (InVEST), now has five tasks in development. Each are 3U CubeSats and they are targeted for launch opportunities in the 2016 time period. Prior to formalizing an InVEST program, the technology program office was asked to demonstrate how the program would work and what sort of technologies could benefit from space validation. Three projects were developed and launched, and have demonstrated the technologies that they set out to validate. This paper will provide a brief status of the pre-InVEST CubeSats, and discuss the development and status of the InVEST program. Figure

Earth Science↗

Economic Incentives for Cybersecurity: Using Economics to Design Technologies Ready for Deployment

Cybersecurity practice lags behind cyber technology achievements. Solutions designed to address many problems may and do exist but frequently cannot be broadly deployed due to economic constraints. Whereas security economics focuses on the cost/benefit analysis and supply/demand, we believe that more sophisticated theoretical approaches, such as economic modeling, rarely utilized, would derive greater societal benefits. Unfortunately, today technologists pursuing interesting and elegant solutions have little knowledge of the feasibility for broad deployment of their results and cannot anticipate the influences of other technologies, existing infrastructure, and technology evolution, nor bring the solutions lifecycle into the equation. Additionally, potentially viable solutions are not adopted because the risk perceptions by potential providers and users far outweighs the economic incentives to support introduction/adoption of new best practices and technologies that are not well enough defined. In some cases, there is no alignment with redominant and future business models as well as regulatory and policy requirements. This paper provides an overview of the economics of security, reviewing work that helped to define economic models for the Internet economy from the 1990s. We bring forward examples of potential use of theoretical economics in defining metrics for emerging technology areas, positioning infrastructure investment, and building real-time response capability as part of software development. These diverse examples help us understand the gaps in current research. Filling these gaps will be instrumental for defining viable economic incentives, economic policies, regulations as well as early-stage technology development approaches, that can speed up commercialization and deployment of new technologies in cybersecurity.

Cyber Security↗

Using Technology Readiness Level (TRL), Life Cycle Cost (LCC), and Other Metrics to Supplement Equivalent System Mass (ESM) in Advanced Life Support (ALS)

The ALS project plan goals are reducing cost, improving performance, and achieving flight readiness. ALS selects projects to advance the mission readiness of low cost, high performance technologies. The role of metrics is to help select good projects and report progress. The Equivalent Mass (EM) of a system is the sum of the estimated mass of the hardware, of its required materials and spares, and of the pressurized volume, power supply, and cooling system needed to support the hardware in space. EM is the total payload launch mass needed to provide and support a system. EM is directly proportional to the launch cost.

Jones, Harry↗

Assessing Technological Readiness and Maturity on the Waste Treatment and Immobilization Plant

There are many challenges in the design and construction of Department of Energy's (DOE) Waste Treatment and Immobilization Plant (WTP) at the Hanford site. The plant is being built to process some 53 million gallons of radioactive waste from 177 underground tanks. Engineering and construction are progressing on this largest project in the DOE complex. The technologies employed to accomplish the waste processing and immobilization have undergone various levels of development over a number of years. In some cases, the treatment approach involves extrapolation or novel applications of existing technologies. Because of the time schedule for the WTP, it is desirable, in some cases, to mature the technologies in parallel with design and construction. From the outset, the project plan has included an assessment and adjustment of the performance and design of the key technologies through an extensive research and testing program. This paper describes two review programs pioneered on WTP to further assess the technical readiness and maturity of the design: an External Flowsheet Review process and a Technology Readiness Assessment process. Although the results of the two reviews have a good degree of similarity, the two approaches differed in a number of ways and therefore allowed some issues to surface in one review and not in the other. It is concluded that the two reviews provide greater confidence to DOE on the readiness to proceed with design, fabrication, and construction and that the facilities will function as performed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

System Verification Through Reliability, Availability, Maintainability (RAM) Analysis & Technology Readiness Levels (TRLs)

The Next Generation Nuclear Plant (NGNP) Project, managed by the Idaho National Laboratory (INL), is authored by the Energy Policy Act of 2005, to research, develop, design, construct, and operate a prototype fourth generation nuclear reactor to meet the needs of the 21st Century. A section in this document proposes that the NGNP will provide heat for process heat applications. As with all large projects developing and deploying new technologies, the NGNP is expected to meet high performance and availability targets relative to current state of the art systems and technology. One requirement for the NGNP is to provide heat for the generation of hydrogen for large scale productions and this process heat application is required to be at least 90% or more available relative to other technologies currently on the market. To reach this goal, a RAM Roadmap was developed highlighting the actions to be taken to ensure that various milestones in system development and maturation concurrently meet required availability requirements. Integral to the RAM Roadmap was the use of a RAM analytical/simulation tool which was used to estimate the availability of the system when deployed based on current design configuration and the maturation level of the system.

08 HYDROGEN↗

Assessing Space Exploration Technology Requirements as a First Step Towards Ensuring Technology Readiness for International Cooperation in Space Exploration

Advancing critical and enhancing technologies is considered essential to enabling sustainable and affordable human space exploration. Critical technologies are those that enable a certain class of mission, such as technologies necessary for safe landing on the Martian surface, advanced propulsion, and closed loop life support. Others enhance the mission by leading to a greater satisfaction of mission objectives or increased probability of mission success. Advanced technologies are needed to reduce mass and cost. Many space agencies have studied exploration mission architectures and scenarios with the resulting lists of critical and enhancing technologies being very similar. With this in mind, and with the recognition that human space exploration will only be enabled by agencies working together to address these challenges, interested agencies participating in the International Space Exploration Coordination Group (ISECG) have agreed to perform a technology assessment as an important step in exploring cooperation opportunities for future exploration mission scenarios. "The Global Exploration Strategy: The Framework for Coordination" was developed by fourteen space agencies and released in May 2007. Since the fall of 2008, several International Space Exploration Coordination Group (ISECG) participating space agencies have been studying concepts for human exploration of the moon. They have identified technologies considered critical and enhancing of sustainable space exploration. Technologies such as in-situ resource utilization, advanced power generation/energy storage systems, reliable dust resistant mobility systems, and closed loop life support systems are important examples. Similarly, agencies such as NASA, ESA, and Russia have studied Mars exploration missions and identified critical technologies. They recognize that human and robotic precursor missions to destinations such as LEO, moon, and near earth objects provide opportunities to demonstrate the technologies needed for Mars mission. Agencies see the importance of assessing gaps and overlaps in their plans to advance technologies in order to leverage their investments and enable exciting missions as soon as practical. They see the importance of respecting the ability of any agency to invest in any technologies considered interesting or strategic. This paper will describe the importance of developing an appropriate international strategy for technology development and ideas for effective mechanisms for advancing an international strategy. This work will both inform and be informed by the development of an ISECG Global Exploration Roadmap and serve as a concrete step forward in advancing the Global Exploration Strategy.

Laurini, Kathleen C.↗

Delayed Gamma-ray Assay for Nuclear Materials Safeguards. Comprehensive Technology Readiness Assessment

Spectroscopic analysis of beta-delayed gamma-rays emitted from fission products following active interrogation was investigated as a non-destructive assay technique for detection and characterization of nuclear materials in shielded and complex configurations. This measurement technique is expected to be applicable to a variety of applications within the nuclear material safeguards, arms control, and emergency response areas, where active neutron interrogation is acceptable. Potential applications of the delayed gamma-ray assay in the nuclear material safeguards area include characterization of U and Pu isotopic content in spent and unirradiated nuclear fuel, enrichment measurements, verification of bulk material in containers, and the characterization of nuclear wastes. In the arms control area, this method can be used as a part of warhead dismantlement measurements to confirm separation of components, and may be applicable in warhead confirmation. In the context of emergency response, it can be used for detailed diagnostics of an unknown item. At present, the delayed gamma-ray assay technology reliably qualifies for the Technical Readiness Level 3 (TRL 3). The R&D work completed under this project has successfully demonstrated the empirical proof-of-concept for this active interrogation technology for a variety of measurement configurations, neutron sources, and nuclear material samples. A robust first-principles analytical signature modeling methodology was developed, experimentally validated, and can be easily extrapolated to a range of realistic measurement scenarios. Several response analysis methodologies have been implemented and deemed reliable for a variety of active interrogation applications in the areas of nuclear material safeguards, arms control, and emergency response. The initial readiness level before the start of this project was assessed at TRL 0, since only fragmentary records of the signature observations and speculative statements of the relevant non-destructive assay applications existed at that time. The delayed gamma-ray technology readiness can be easily advanced to TRL 4 in a short period, if a certain measurement application is specified and set for a demonstration in a laboratory environment. The critical hardware components of the delayed gamma-ray measurement technology (neutron generators, gamma-ray spectrometers) are readily available as COTS and can be configured for a specific deployment configuration. The primary risk of the delayed gamma-ray assay methodology is defined by the applicationspecific uncertainties. Evaluation of the system performance can be effectively completed once the expected measurement purpose, nuclear material characteristics, dimensions, and radiation exposure constraints are specified. A minor risk can be associated with the delayed gamma-ray response analysis techniques. Several approaches were proposed and demonstrated primarily using the modeled signatures. The observed performance may not be easily transferrable to the conditions of a real measurement setup, and some additional R&D may be required. Overall, the delayed gamma-ray assay technology can be recommended for follow-up demonstrations addressing relevant measurement applications in the areas of nuclear material safeguards, arms control, and emergency response.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Policy and Technology Readiness: Engaging the User and Developer Community to Develop a Research Roadmap

A key challenge for research roadmapping in the crisis response and management domain is articulation of a shared vision that describes what the future can and should include. Visioning allows for far-reaching stakeholder engagement that can properly align research with stakeholders needs. Engagement includes feedback from researchers, policy makers, general public, and end-users on technical and non-technical factors. This work articulates a process and framework for the construction and maintenance of a stakeholder-centric research vision and roadmap in the emergency management domain. This novel roadmapping process integrates three pieces: analysis of the research and technology landscape, visioning, and stakeholder engagement. Our structured engagement process elicits research foci for the roadmap based on relevance to stakeholder mission, identifies collaborators, and builds consensus around the roadmap priorities. We find that the vision process and vision storyboard helps SMEs conceptualize and discuss a technology's strengths, weaknesses, and alignment with needs

policy readiness↗

Challenges and Opportunities For Ensuring Entry System Technology Readiness For Ice Giants Probe Missions

The Ice Giants represent a distinct class of planets within our solar system, and appear to be similar to most exoplanets that have been detected thus far. Exploring Ice Giants in our Solar System would allow us to better understand their formation and evolution processes, and thus help establish scientific links to exoplanets. In situ exploration using probes similar to Galileo, along with an orbiter or a relay spacecraft, will require entry followed by deployment of the descent probe containing science instruments into Uranus or Neptune atmosphere. The challenge is not in the deployment of the probe, but in the atmospheric entry prior to deployment. The entry system has to have a capable, robust and efficient ablative thermal protection system (TPS) designed to protect the descent probe from the thermal and mechanical entry loads. Although entries into Ice Giants may not be as demanding as the Galileo entry at Jupiter, the entry environments will be more severe than environments for Mars, Sample Return missions, and Venus, and will therefore require robust TPS. While Galileo Probe’s success, nearly 25 years ago, should give us confidence, the recession data from the Galileo entry informs us that the entry environment was under predicted and the design thickness was barely adequate. The lesson learned from Galileo probe for future Ice Giant missions will require us to be cautious and demand a more robust design. The TPS technology used on Galileo entry system no longer exists due to atrophy of manufacturing processes. Instead of attempting to revive Galileo-legacy TPS technology, NASA invested in a new and innovative TPS called HEEET (Heat-shield for Extreme Entry Environment Technology). HEEET has been matured, and is now ready to support future missions not only to the Ice Giants but also for Venus, high-speed sample return, and Saturn probe missions. This lead talk, intended for the technology section of the workshop, will cover entry, descent, and deployment (EDD), with an emphasis on entry. A brief history of the TPS challenges for extreme entry missions will be given along with a quick overview of the concept of operations for EDD. The development and maturation of HEEET system capability will be described. Data gathered in ground-test facilities in the US will be highlighted to show that the technology is mature and ready for Ice Giant missions. All thermal protection systems carry some risk as a result of ground test limitations and Ice Giant missions present some unique challenges. These challenges are not only technical, but also due to limitations in the currently established manufacturing and integration. In addition, the concerns that arise due to potential for atrophy for future Ice Giant mission a decade or more from now will be analyzed. Plausible avenues for mitigation will be presented. There are two companion planned presentations by Dr. Prabhu and Dr. Hwang will dive deeper in the challenges and opportunities. This intended talk will set the stage for their presentations.

Venkatapathy, Ethiraj↗