Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “sustainability planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Improving future travel demand projections: a pathway with an open science interdisciplinary approach

Transport accounts for 24% of global CO 2 emissions from fossil fuels. Governments face challenges in developing feasible and equitable mitigation strategies to reduce energy consumption and manage the transition to low-carbon transport systems. To meet the local and global transport emission reduction targets, policymakers need more realistic/sophisticated future projections of transport demand to better understand the speed and depth of the actions required to mitigate greenhouse gas emissions. In this paper, we argue that the lack of access to high-quality data on the current and historical travel demand and interdisciplinary research hinders transport planning and sustainable transitions toward low-carbon transport futures. We call for a greater interdisciplinary collaboration agenda across open data, data science, behaviour modelling, and policy analysis. These advancemets can reduce some of the major uncertainties and contribute to evidence-based solutions toward improving the sustainability performance of future transport systems. The paper also points to some needed efforts and directions to provide robust insights to policymakers. We provide examples of how these efforts could benefit from the International Transport Energy Modeling Open Data project and open science interdisciplinary collaborations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Community Energy Planning: Best Practices and Lessons Learned in NREL's Work with Communities

Whether driven by local goals and actions, external market forces, or both, the clean energy transition is accelerating. The associated increase in clean energy deployment occurs on the ground in communities. As a result, communities increasingly need technical expertise and assistance in planning for and managing the energy transition. Building on decades of work with state, local, and tribal jurisdictions, NREL's work providing modeling, analysis, and technical expertise to enable more data-driven community energy planning is expanding. To inform and enhance NREL's capabilities in community energy planning and provide a resource for others working in this space, NREL developed this best-practices document through interviews with seasoned NREL practitioners and a review of the literature on equitable community planning. Findings include five best practices for community energy planning that NREL practitioners can apply to increase the impact of their work.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

West Valley Demonstration Project (WVDP) (Annual Site Environmental Report (ASER), Calendar Year 2022)

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2022. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2022 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Geodatabase Designed to Inform and Support Safe CO2 Transport-Route Planning

The National Energy Technology Laboratory developed the Carbon Capture and Storage (CCS) Pipeline Route Planning Database to inform safe and sustainable CO2 transport planning in support of decarbonization efforts. This comprehensive Esri Geodatabase contains over 90 GBs of data and 60+ spatial layers representing key considerations including natural hazards, infrastructure, energy, and social justice. Leveraging ArcGIS Pro, nationwide raster, and vector datasets containing millions of features were processed to be easily digestible for users and complex modeling software.

Romeo, Lucy↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2023

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2023. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2023 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

Record of Decision↗

NASA In-Situ Resource Utilization (ISRU) Technology and Development Project Overview

Since the Vision for Space Exploration (VSE) was released in 2004, NASA, in conjunction with international space agencies, industry, and academia, has continued to define and refine plans for sustained and affordable robotic and human exploration of the Moon and beyond. With the goal of establishing a lunar Outpost on the Moon to extend human presence, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere, a change in how space exploration is performed is required. One area that opens up the possibility for the first time of breaking our reliance on Earth supplied consumables and learn to live off the land is In-Situ Resource Utilization (ISRU). ISRU, which involves the extraction and processing of space resources into useful products, can have a substantial impact on mission and architecture concepts. In particular, the ability to make propellants, life support consumables, and fuel cell reagents can significantly reduce the cost, mass, and risk of sustained human activities beyond Earth. However, ISRU is an unproven capability for human lunar exploration and can not be put in the critical path of lunar Outpost success until it has been proven. Therefore, ISRU development and deployment needs to take incremental steps toward the desired end state. To ensure ISRU capabilities are available for pre-Outpost and Outpost deployment by 2020, and mission and architecture planners are confident that ISRU can meet initial and long term mission requirements, the ISRU Project is developing technologies and systems in three critical areas: (1) Regolith Excavation, Handling and Material Transportation; (2) Oxygen Extraction from Regolith; and (3) Volatile Extraction and Resource Prospecting, and in four development stages: (I) Demonstrate feasibility; (II) Evolve system w/ improved technologies; (III) Develop one or more systems to TRL 6 before start of flight development; and (IV) Flight development for Outpost. To minimize cost and ensure that ISRU technologies, systems, and functions are integrated properly into the Outpost, technology development efforts are being coordinated with other development areas such as Surface Mobility, Surface Power, Life Support, EVA, and Propulsion. Lastly, laboratory and field system-level tests and demonstrations will be performed as often as possible to demonstrate improvements in: Capabilities (ex. digging deeper); Performance (ex. lower power); and Duration (ex. more autonomy or more robustness). This presentation will provide the status of work performed to date within the NASA ISRU project with respect to technology and system development and field demonstration activities, as well as the current strategy to implement ISRU in future robotic and human lunar exploration missions.

Sanders, Gerald B.↗

MOM-E: Moon-Orbiting Mothership Explorer

The National Aeronautics and Space Administration proposed that a new class of robotic space missions and spacecrafts be introduced to "ensure that future missions are safe, sustainable and affordable". Indeed, the United States space program aims for a return to manned space missions beyond Earth orbit, and robotic explorers are intended to pave the way. This vision requires that all future missions become less costly, provide a sustainable business plan, and increase in safety. Over the course of several fast feasibility studies that considered the 3 drivers above, the small-scale, consumer-driven Moon-Orbiting Mothership Explorer (MOM-E) mission was born. MOM-E's goals are to enable space exploration by offering a scaled down platform which carries multiple small space explorers to the Moon. Each payload will be dropped at their desired destination, offering a competitive price to customers. MOM-E's current scope of operations is limited to the Moon and will be used as a proof of concept mission. However, MOM-E is specifically designed with the idea that the platform is scalable.

Murphy, Gloria A.↗

Planning and Estimation of Operations Support Requirements

Life Cycle Cost (LCC) estimates during the proposal and early design phases, as well as project replans during the development phase, are heavily focused on hardware development schedules and costs. Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead to de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Any LCC growth can directly impact the programs' ability to fund new missions, and even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations. The National Aeronautics and Space Administration (NASA) D&NF Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that 4 out of the 5 missions studied had significant overruns at or after launch due to underestimation of the complexity and supporting requirements for operations activities; the fifth mission had not launched at the time of the mission. The drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This paper updates the D&NF LCC study, looking at the operations (phase E) cost drivers in more detail and extending the study to include 2 additional missions and identifies areas for increased emphasis by project management in order to improve the fidelity of operations estimates.

Newhouse, Marilyn E.↗

Lessons Learned for Planning and Estimating Operations Support Requirements

Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead projects to focus on hardware development schedules and costs, de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations, and any LCC growth can directly impact the programs ability to fund new missions. The D&NF Program Office at Marshall Space Flight Center recently studied cost overruns for 7 D&NF missions related to phase C/D development of operational capabilities and phase E mission operations. The goal was to identify the underlying causes for the overruns and develop practical mitigations to assist the D&NF projects in identifying potential operations risks and controlling the associated impacts to operations development and execution costs. The study found that the drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This presentation summarizes the study and the results, providing a set of lessons NASA can use to improve early estimation and validation of operations costs.

Newhouse, Marilyn↗

Energy Exchange NASA Opening Plenary

Rick Marrs, Deputy Assistant Administrator Office of Strategic Infrastructure NASA Headquarters will be speaking during the 2017 Energy Exchange opening plenary. His presentation showcases the NASA mission, sustainability at NASA, NASA's strategic Sustainability Performance Plan, Existing PV Partnerships, and NASA funded Solar Initiatives at KSC.

Marrs, Rick↗

Enabling Entry Technologies for Ice Giant Missions

The proposed poster will highlight two NASA developed entry technologies that are enablers for Ice Giant Missions. They are: (1) Heat-shield for Extreme Entry Environment Technology (HEEET), and (2) Adaptable, Deployable, Entry, and Placement Technology (ADEPT), a mechanically deployable entry system. HEEET development is complete and is at TRL 6. HEEET is ready for Ice Giant in situ probe missions, and HEEET is an enabler for either direct ballistic entry or entry from Orbit. NASA plans to sustain the HEEET capability as it is needed for Venus, Saturn and higher speed sample return missions in addition to Ice Giant Missions. The emerging recognition among the scientific community that by delivering the probe from orbit will allow for simultaneous in-situ and orbital measurement can be enabled by aerocapture using ADEPT. The drag modulated aerocapture (DMA) with ADEPT is the simplest approach that can deliver an orbiter and probe together and without the significant penalty associated with propulsive insertion. Studies performed by JPL and NASA Ames teams point to this very promising possibility. Numerous DMA with ADEPT studies point to its applicability to small spacecraft missions as well as Ice Giant missions. The poster will present the current state of readiness of HEEET, ADEPT and DMA.

Venkatapathy, E.↗

NASA Space Launch System Prepares for Key Hotfire Test Before Vehicle Integration

NASA this year is working toward the final major integrated hardware and avionics test for its Space Launch System (SLS), the agency’s new super heavy-lift vehicle to send large, strategic payloads to the Moon, Mars and beyond. As the backbone of the Artemis human lunar exploration program, Artemis I SLS operations will then shift to the launch site and integration for the inaugural mission. For this final major test of the first vehicle NASA has built exclusively for deep space exploration since the Saturn V, a NASA/Boeing/Aerojet Rocketdyne team will conduct the final core stage “green run” test at NASA's Stennis Space Center with a dramatic firing of all four core stage engines. This test will validate the operation of the stage structures, main propulsion system, engines, avionics, and software. Following data review, stage inspection, and refurbishment, the stage will be barged to NASA’s Kennedy Space Center to continue integration of the Artemis I launch vehicle. Already underway is assembly of the mission’s five-segment solid rocket boosters. The mission’s upper stage and spacecraft adapters also are staged at the launch site ready for integration. Even as the Artemis I SLS proceeds toward launch later this year, the Artemis II and Artemis III vehicles are coming together, with core stages, engines, boosters, upper stage, and payload accommodations in various stages of manufacturing and/or processing. Planning is also underway for additional core stages and a new, more powerful upper stage that will increase lunar payload mass. SLS is the anchor transportation leg of a plan for sustained human exploration of the Moon, including the first human landing later in the decade. This paper will discuss SLS progress to date and expected 2021 milestones.

Bruce R. Askins↗

Formational History and Geomorphic Preservation of Sea Level Highstands Over the Last 150 ky Near Cape Canaveral, Florida, USA

Cape Canaveral, Florida, is perhaps one of the most important stretches of coastline in the United States of America (USA) due to its critical strategic role in the pursuit of space exploration and as the locus of advanced technological innovation. Due to its geographical setting, the entirety of Cape Canaveral, including its infrastructure, facilities, and important natural habitats (e.g., wetlands, estuaries and dunes) is vulnerable to coastal hazards such as continued sea level rise, storm surges, erosion and flooding. As such, accurate sea level characterization and coastal resiliency predictions are essential to promoting long-term coastal planning and sustainability in the area. This study aims to better understand the temporal and spatial evolution of this area with the purpose of more accurately documenting historical sea level fluctuations and calibrating more localized projections at this site. The Cape Canaveral coastline is situated on a passive margin mostly affected by oceanic (sea level change and wave impact) and atmospheric (aeolian) alteration. This sector is part of the east Florida coast microtidal (1.2 m) setting and low wave energy (1.2-1.6 m and 6.1-8.2 sec for average significant waves) regime and is defined by a well delineated set of beach ridge or cape systems. While the name “Cape Canaveral” is often used as a generic term to describe the geographic area, it is actually an amalgamation or complex of multiple preserved capes. The preserved Cape Canaveral beach ridge plain has largely documented the paleo-sea level highstand history over the last 150 ky. High-resolution mapping of these beach ridges is completed using GPS, LiDAR, aerial, as well as satellite imagery. In order to reconstruct the formational history of the Cape Kennedy Complex and the preserved record of sea level highstands, these detailed geomorphological observations are integrated with OSL and C14 dating techniques. The chronological framework delineated by the OSL dates coupled with detailed geomorphological mapping allows for the creation of high-resolution calibrated site-specific sea level curves that reflect the local environmental and geological conditions. This refinement has the potential to improve the understanding of past sea level variability which is crucial for predicting future trends and assessing the impacts on coastal regions such as Cape Canaveral.

geomorphology↗

Integrated Logistics and Supportability Challenges of Sustained Human Lunar Exploration

NASA’s Artemis program plans to establish a sustained human presence on the lunar surface. The International Space Station other space station programs have demonstrated long-duration human spaceflight operations that reuse infrastructure in Low Earth Orbit, sometimes including long uncrewed “dormant” periods. In contrast, human lunar exploration to date has consisted solely of relatively short sortie missions, rather than a sustained presence. A sustained human outpost on the Moon that can support month-long crewed exploration missions and be reused by multiple crews will be more challenging than past operations, particularly from the perspective of logistics, supportability, and risk. This paper examines the integrated logistics and supportability challenges of sustained human lunar exploration and provides a review of historical spaceflight experience in terms of crewed mission endurance, uncrewed duration, transportation overhead, and access to abort. Planned Artemis Base Camp crewed mission endurance is approximately 2.5 times longer than past lunar surface crewed mission endurance, but similar to average time between resupply for the International Space Station. Sustained human spacecraft have only twice experienced uncrewed durations longer than the planned interval between Artemis Base Camp missions, and Artemis surface assets will face long uncrewed periods more regularly than any past sustained human spacecraft. Transportation of crew and cargo to and from the Moon will be more difficult and time-consuming than transportation to and from Low Earth Orbit, and crew access to abort will be more limited. The implications of Artemis lunar operations for crewed Mars mission planning are also discussed. Historical approaches to risk management—including logistics, supportability, and abort strategies—should be reexamined and re-optimized for this new mission context. Sustained lunar operations will provide a valuable proving ground for testing new approaches to crewed space exploration.

logistics↗

Integrated Logistics and Supportability Challenges of Sustained Human Lunar Exploration

NASA’s Artemis program plans to establish a sustained human presence on the lunar surface. The International Space Station and other space station programs have demonstrated long-duration human spaceflight operations that reuse infrastructure in Low Earth Orbit, sometimes including long uncrewed “dormant” periods. In contrast, all human exploration beyond Low Earth Orbit to date has consisted solely of relatively short sortie missions, rather than a sustained presence. A sustained human outpost on the Moon that can support month-long crewed exploration missions and be reused by multiple crews will be more challenging than past operations, particularly from the perspective of logistics, supportability, and risk. This paper examines the integrated logistics and supportability challenges of sustained human lunar exploration and provides a review of historical spaceflight experience in terms of crewed mission endurance, uncrewed duration, transportation overhead, and access to abort. Planned Artemis Base Camp crewed mission endurance is approximately 2.5 times longer than past lunar surface crewed mission endurance, but similar to the average time between resupply for the International Space Station. Sustained human spacecraft have only twice experienced uncrewed durations longer than the planned interval between Artemis Base Camp missions, and Artemis surface assets will face long uncrewed periods more regularly than any past sustained human spacecraft. Transportation of crew and cargo to and from the Moon will be more difficult and time-consuming than transportation to and from Low Earth Orbit, and crew access to abort will be more limited. The implications of Artemis lunar operations for crewed Mars mission planning are also discussed. Historical approaches to risk management—including logistics, supportability, and abort strategies—should be reexamined and re-optimized for this new mission context. Sustained lunar operations will provide a valuable proving ground for testing new approaches to crewed space exploration.

logistics↗

Feasibility and strategic implications of deploying nuclear power reactors in Africa

This report assesses the feasibility and strategic implications of deploying nuclear power reactors, including large-scale plants, advanced small modular reactors (SMRs), and microreactors, in African countries. Case studies focus on South Africa, Egypt, Kenya, Ghana, and Nigeria, examining nuclear energy’s role in Africa’s rapidly evolving energy landscape, marked by fast-growing demand, significant electricity access gaps, increasing renewable penetration, and strong policy commitments to industrialization and energy security. Several U.S. reactor technologies and designs are considered based on their development status and readiness for deployment. The analysis finds that nuclear power can provide reliable, clean baseload and flexible generation, as well as high-temperature process heat for desalination, hydrogen production, and industrial applications. However, suitability is highly country-specific, depending on grid size and stability, transmission capacity, cooling water availability, regulatory readiness, and fuel supply chains. Near-term deployment opportunities are strongest for light-water reactors (such as NuScale, BWRX-300, AP300, and SMR-300) that use low-enriched uranium and build on proven technology. More advanced concepts, including gas-cooled, sodium-cooled, molten-salt cooled reactors, and microreactors, will likely be relevant for African deployment in the 2030s or later, contingent on demonstration projects, high-assay low-enriched uranium (HALEU) fuel availability, and mature international licensing frameworks. Economic analysis shows that SMRs are capital-intensive, with projected overnight costs for 300 MWe units in 2025 ranging from approximately 1.4 to 2.6 billion USD per module. The levelized cost of electricity (LCOE) is highly sensitive to the weighted average cost of capital (WACC). Given typically higher financing costs and utility balance-sheet weaknesses in many African countries, bankable project structures will require sovereign guarantees, robust offtake arrangements, and layered financing from export credit agencies, development finance institutions, and vendor nations. Comparisons with recent large nuclear projects in the United Arab Emirates (UAE) and Egypt underscore the central role of state-backed loans, long tenors, and concessional terms. Country case studies illustrate a spectrum of readiness and opportunity. South Africa operates two 920 MWe pressurized light water reactors (totaling 1,840 MWe) at Koeberg and has the most mature regulatory and industrial base, positioning it as a prime candidate for both large reactors and SMRs to replace coal, support desalination, and anchor industrial hubs. Egypt is constructing four VVER-1200 units at El Dabaa with strong state leadership and could later complement this fleet with SMRs for coastal and industrial applications. Kenya and Ghana are advancing through IAEA Milestones with growing institutional capacity and clear interest in SMRs that match their smaller grids and industrialization plans. Nigeria has the largest demand potential but faces acute constraints in grid reliability, project bankability, and regulatory capacity; targeted deployments of large reactors and SMRs near coastal or industrial sites could have high impact if accompanied by major grid upgrades and institutional reforms. The report identifies cross-cutting challenges such as financing, political continuity, public acceptance, nonproliferation and security, waste and back-end management, regulatory capacity, grid adequacy, and long deployment timelines for first-of-a-kind designs, and ANL/NSE-26/3 ii proposes broad directions for resolution. These include stronger multifaceted financing for nuclear, long-term national energy strategies that transcend electoral cycles, proactive stakeholder engagement, strengthened regional and national regulators, and systematic workforce development through centers of excellence and expanded training. The United States should develop partnerships with African countries and offer end-to-end nuclear package similar to those used effectively by competitors: coordinated project development, state-backed financing, long-term fuel services, and durable in-country support through regional offices and sustained workforce/regulatory training. With timely planning, sustained political commitment, and appropriate financing and institutional support, nuclear energy, both large reactors and advanced SMRs, can become a meaningful, though not dominant, pillar of Africa’s future power mix, enhancing energy security, enabling industrial growth, and supporting climate goals.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Light Water Reactor Sustainability: Program Materials Research Pathway (FY22 Technical Program Plan)

The Materials Research (MR) Pathway within the Light Water Reactor Sustainability (LWRS) program is charged with performing R&D to develop the scientific basis for understanding and predicting the long-term environmental degradation behavior of materials in nuclear reactors. Furthermore, the mechanistic understanding of degradation phenomena in materials must be leveraged to develop mitigation and repair strategies and new material alternatives for existing components. This research will provide data and methods to assess the performance of systems, structures, and components essential to safe and sustained reactor operations. The R&D products developed from the LWRS program will be used by stakeholders—including utilities, industry groups, and regulators—to inform operational and regulatory requirements for materials in reactor systems, structures, and components subjected to long-term operation conditions, providing key inputs to regulators and industry. Therefore, the intent of this research is to provide options to reduce the operating costs, which may be in the form of offset maintenance costs due to better predictive models for component lifetimes, improved analyses of materials through nondestructive evaluation, reduced costs for repairs, or extended performance of plants through the selection of improved replacement materials. To provide the best options, industry experience and guidance are important because of their role in coordinated or collaborative research projects. The objectives of this report are to describe the motivation and organization of the MR Pathway within the LWRS program; provide details on the individual research tasks within the MR Pathway; describe the outcomes and deliverables of the MR Pathway, including recent technical highlights and progress; and describe the requirements for performing this critically important research.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The Lunar Lab Initiative

Analogous to terrestrial Antarctic basecamps at our south pole, space exploration outposts will be a combination of habitation and science-focused assets. The Artemis Exploration Roadmap endeavors to establish a sustained human presence on the lunar south pole starting in 2028. Within the planned Artemis Base Camp, most efforts to date have focused on the habitation assets or a mixture of science and habitation assets . With the recent advent of commercial lunar landing capabilities, the trade space can be further expanded to include dedicated science focused assets that ensure adequate science capability. To that end, the Forge, an innovation team initiative created at the Johnson Space Center (JSC), explored alternative ways to increase the science capabilities within the basecamp. The Forge uses structured brainstorming and facilitation to increase innovation within the assigned team, while executing its process in a rapid turnaround fashion for ideation and design study. As a pilot study for the Forge, a multi-disciplinary team investigated a lunar lab module to augment the lunar surface plans for Artemis. This formulation study evaluated the scientific and operational considerations for this dedicated crew space that would increase the capabilities of lunar surface science operations. The trade space evaluated single lunar lander delivery versus multiple lunar lander delivery for module assembly, alternative structural designs, the science instrument outfitting with mapping to scientific goals to maximize lunar science objectives, and how the lab would be operated. The lab operations options explored a stand-alone facility, as well as a facility integrated into a larger lunar surface complex, while evaluating crew usage and habitability considerations. The resulting alternatives were evaluated by the Forge team with a set of metrics to determine their originality, feasibility, and science performance, and thereby provide a recommendation to the lunar architecture planning team. Lessons learned from the lunar lab study were compiled to improve the process and tools for future Forge studies. Forward work, open issues, and challenges to further refine the design of the various science-focused asset options were also documented. By providing a robust science capability at humanity’s furthest outpost, we can plan for a sustained human lunar presence once the initial lunar surface access capability is well established.

Lunar outpost↗