Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “substations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Federated Architecture for Secure and Transactive Distributed Energy Resource Management Solutions (FAST-DERMS)

This document provides system-level specifications for a federated architecture for secure and transactive distributed energy resource management solutions (FAST-DERMS), presents a solution, and describes operational concepts for the proposed solution. FAST-DERMS enables the provision of reliable, resilient, and secure transmission and distribution (T&D) grid services through the scalable aggregation and near-real-time management of utility-scale and small-scale distributed energy resources (DERs). We first present the principles and objectives of FAST-DERMS. Then, after discussing important system concepts, we present the specifications for FAST-DERMS and a solution that employs a distributed and federated control methodology in which the DERs connected to a single point of common coupling with the rest of the system, such as individual substations, are optimized coordinately to provide system-level grid services. FAST-DERMS aims to aggregate and coordinate the operations of DERs to support T&D grid operations. The key optimization and control component of this FAST-DERMS reference implementation is a flexible resource scheduler (FRS) that aggregates the DERs within a substation service area. These FRSs operate at the substation level and perform constrained economic dispatch of DERs, either directly or through a transactive market or aggregator, as shown in Figure ES-1. An FRS Coordinator at the distribution system operator (DSO) level aggregates distribution substations operated by FRSs and interfaces with the transmission system operator (TSO) to provide transmission services. FAST-DERMS also allows for the integration of the FRS Coordinator with an existing distribution utility management system that could be employed by the DSO to enhance distribution grid operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Autonomous Tools for Attack Surface Reduction (Final Report)

The electric power grid is a complex critical infrastructure that forms the lifeline of modern society, and its secure and reliable operation is of paramount importance to national security and economic wellbeing. However, recent findings documented in authoritative sources indicate the threat of cyber-based attacks growing in numbers and sophistication. However, securing the grid against stealthy cyberattacks is a challenging task due to legacy nature of the infrastructure coupled with dynamic nature of threat landscape and ever-growing sophistication of the adversaries. Additionally, the grid’s attack surface continues to grow with the increased dependence on digital communications and control that now extends to each consumer through smart meters and distributed energy resources. Unfortunately, this expansive surface increases the grid’s vulnerability and further exposes critical control systems in both substations and control centers. To respond to this emerging need, we had successfully assembled an interdisciplinary team with academic- industry partnership to successfully conduct research, development, evaluation, demonstration, and commercialization of attack surface reduction tools, whose goal was to significantly reduce the cyber attack surface in the North American power grid. Our proposed project was a synergistic collaborative effort leveraging the synergistic expertise of the team members across power systems, cyber security and CPS security, testbeds, field deployments and demonstration, and successful commercialization. The following are the specific tasks that have been successfully completed two phases (2016-2020). Phase I: Task 1: Developed and implemented a robust Project Management and Data Management Plan, coupled with a well thought out Risk Mitigation Plan. Task 2.1: Developed a comprehensive framework that continually assesses and autonomously reduces the attack surface for the power grid control environment spanning across substations, control center and the SCADA network to significantly reduce the risks of cyber attacks. Task 2.2: Developed attack surface analysis techniques, metrics, and tools that assess the attack surface at multiple levels including the control center, substations, and the SCADA network. Task 2.3: Developed attack surface reduction techniques and tools that dynamically reduce attack surface and hence increase attacker’s cost without interfering in the critical functions of the system. Task 2.4: Prototyped, implemented, and quantitatively evaluated/validated the techniques and tools on a realistic industrial CPS security testbed environment by leveraging the unique resources of the team. Task 3: Developed Commercialization plan to transition the developed tools into power system industry stakeholders for a broader adoption by leveraging the expertise of our industrial members. Phase II: Task 4: Successfully completed field demonstration, verification, and evaluation of the effectiveness of the attack surface analysis and reduction techniques on a realistic utility testbed environment. This also involved the development of realistic scenarios, sound metrics, data sets, evaluation criteria, and documentation. Technology integration & Field demonstration: The project had significantly advanced the state-of-the-art research and practice in improving the cybersecurity of our nation’s power grid infrastructure against cyber threats. In particular, the proposed, designed, and deployed attack surface analysis and reduction algorithms and tools have contributed to significantly reducing the exposure and risk of the devices, substations, and the integrated SCADA/EMS/ DMS grid environment to cyber threat. Strong demonstration and evaluation techniques have verified the feasibility of the developed techniques on realistic cyber-physical testbeds and utility partner's real grid environment, and collaborative research and evaluation of attack surface reduction techniques (for wide-are monitoring and control) within a vendor (GE) EMS platform. The Attack Host Analyzer (AHA) tool that was developed through this project was made available through GitHub.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Data-Centric Communication Framework for Multicast IEC 61850 Routable GOOSE Messages over the WAN in Modern Power Systems

In this paper, a data-centric communication framework is proposed for multicast routable generic object-oriented substation event (GOOSE) messages (MRGM) over the wide area network (WAN) for effective substation-to-substation (SS2SS) and substation to control center (SS2CC) communications. In this structure, the IEC 61850 GOOSE message is transmitted over the WAN using the data distribution service (DDS) as a fast, reliable, and secure data-centric communication middleware. The main feature of this framework is its multicast capability, where several authorized subscribers can receive a published message simultaneously. This can significantly improve the system monitoring and control of the protection systems in modern smart grids, where intelligent schemes can be applied. The effectiveness of the proposed platform, in terms of total end-to-end delay between participants, is evaluated through experimental results obtained from the actual hardware-based test setup developed at the Florida International University (FIU) smart grid testbed. The results demonstrate that the latency between sending and receiving a GOOSE message among participants is within its maximum time span defined by the IEC 61850-90-5 working group for communications over the WAN.

42 ENGINEERING↗

Reference floating wind array designs for three representative regions

This work presents the systematic development of three open-source reference floating wind array designs. The designs are tailored to representative site conditions for three regions of the United States: Humboldt Bay off the coast of California, the Gulf of Maine, and the Gulf of America. We adopted existing reference designs for the individual 15 MW turbines, semisubmersible floating platforms, substations, mooring systems, and power cables – integrating and adapting them as needed for each location. We adapted existing dynamic cable designs to use larger conductor sizes to meet the arrays' power transmission requirements, and we set up redundant mooring systems for each substation. The layout of each array is a uniform-grid design optimized to approximately minimize the levelized cost of energy (LCOE) within a square lease area while satisfying spatial constraints. These constraints ensure adequate clearances between adjacent turbines and between underwater components during the layout optimization to prevent clashing and ensure that all components reside within the lease boundaries. Substations are included to allow accounting for intra-array cable costs. They are placed within the uniform grid to maintain the navigability of the arrays. For each feasible layout considered, annual energy production and cable routing costs are calculated and updated in the LCOE objective function. After the optimization, we refined the cable routing with a mix of algorithmic and manual methods to ensure that the cables avoid mooring system components and approach the substation with adequate clearances. We confirmed the suitability of each reference array's layout by comparing the wake losses at each wind heading angle to the wind rose, observing that the optimized layouts largely avoid wake losses in the predominant wind directions. These reference arrays provide open-source baseline designs to enable future research and innovation of floating wind technology at the array scale.

17 WIND ENERGY↗

Electrical Infrastructure Cost Model for Marine Energy Systems

The National Renewable Energy Laboratory's Electrical Infrastructure Cost Model is an Excel-based tool designed to estimate the electrical infrastructure costs of marine energy components and subsystems. It incorporates data collected from offshore wind projects, utility projects, and other relevant sources to provide accurate and comprehensive cost projections. With its user-friendly interface, the model allows users to input various parameters related to the system array, electrical cables, and substations. By leveraging industry data, cost trends, and technological advancements, the model generates outputs that include system array sizing, electrical cable specifications and costs, substation specifications and costs, and total electrical infrastructure costs. One of the notable strengths of the model is its flexibility in covering multiple-orders-of-magnitude scaled systems, accommodating projects ranging from proof-of-concept or pilot-scale installations to large-scale offshore systems. By collecting data largely from offshore wind reports and utility projects, the model incorporates real-world conditions and accounts for industry-specific factors. It incorporates cost trends and sizing relationships to deliver cost estimations for electrical infrastructure components, such as electrical cables and substation equipment.

16 TIDAL AND WAVE POWER↗

Generalized Power Flow Model of an Extra High-Power Multi-Terminal HVdc Transmission Grid with Parallel-Connected and Voltage-Stacked Converters

To increase power transfer capacity of high-voltage direct current (HVdc) transmission, a new extra high-power HVdc architecture with multiple standard modular multilevel converters (MMCs) per substation has recently been introduced. This paper proposes a power flow model for a multi-terminal HVdc (MTdc) grid with this innovative substation architecture. The proposed MTdc model can be integrated seamlessly with existing ac-dc power flow algorithms with minimal modifications. The model is applicable to various MTdc grid types and topologies, different numbers of dc buses, dc lines, and MMCs per substation, along with diverse control parameters. In addition, it accurately captures both balanced and unbalanced operations of the MTdc grid. The proposed model is verified using a 5-terminal bipole MTdc grid that spans 4 areas in the Eastern Interconnection system of the USA. The numerical solutions obtained from unified and sequential ac-dc power flow algorithms under different operating conditions closely match the time-domain simulation results in PSCAD, validating the accuracy and versatility of the proposed MTdc power flow model.

Nguyen, Quan H.↗

Distributed Intrusion Detection System using Semantic-based Rules for SCADA in Smart Grid

Cyber-physical system (CPS) security for the smart grid enables secure communication for the SCADA and wide-area measurement system data. Power utilities world-wide use various SCADA protocols, namely DNP3, Modbus, and IEC 61850, for the data exchanges across substation field devices, remote terminal units (RTUs), and control center applications. Adversaries may exploit compromised SCADA protocols for the reconnaissance, data exfiltration, vulnerability assessment, and injection of stealthy cyberattacks to affect power system operation. In this paper, we propose an efficient algorithm to generate robust rule sets. We integrate the rule sets into an intrusion detection system (IDS), which continuously monitors the DNP3 data traffic at a substation network and detects intrusions and anomalies in real-time. To enable CPS-aware wide-area situational awareness, we integrated the methodology into an open-source distributed-IDS (D-IDS) framework. The D-IDS facilitates central monitoring of the detected anomalies from the geographically distributed substations and to the control center. The proposed algorithm provides an optimal solution to detect network intrusions and abnormal behavior. Different types of IDS rules based on packet payload, packet flow, and time threshold are generated. Further, IDS testing and evaluation is performed with a set of rules in different sequences. The detection time is measured for different IDS rules, and the results are plotted. All the experiments are conducted at Power Cyber Lab, Iowa State University, for multiple power grid models. After successful testing and evaluation, knowledge and implementation are transferred to field deployment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Bus Clustering for Distribution Grid Topology Identification

Recovering the distribution grid topology is essential to perform several distribution system operator functions. Many algorithms that address the topology recovery problem have already been proposed in the literature. Most are based on a priori information regarding which buses are fed by which substation; however, this information might not be available because frequent grid reconfigurations change the distribution grid portion connected to each substation. This paper addresses the problem of assigning every substation the set of buses that it is feeding, given field data. First, the aforementioned task is cast as a nonconvex optimization problem. Second, a relaxed version of the optimization problem is solved via the alternating direction method of multipliers. Finally, the performance of our approach is validated through numerical simulations of realistic scenarios using a standard IEEE benchmark feeder.

bus clustering↗

Networked Microgrids Optimization

This project is mainly about the operation optimization of three networked microgrids (MG), including centralized optimization and distributed optimization. The alternating direction method of multipliers (ADMM) algorithm is used for distributed optimization. In the distribution network considered here, there is a Distribution Management system (DMS) as the system coordinator and several networked microgrids. In grid-connected mode, power could be imported or exported at the distribution substation bus according to the utility rate, and the exchanged power at point of common coupling (PCC) of any microgrid has a limitation. In islanded mode, the power imports/exports at the distribution substation are zero. In both grid-connected and islanded mode, the distribution substation is taken as a slack bus with fixed voltage magnitude.

Chen, Yang [Oak Ridge National Laboratory (ORNL), ↗

Introducing the 9500 Node Distribution Test System to Support Advanced Power Applications: An Operations-Focused Approach

The 9500 Node Test System is a representative section of distribution power system model developed as a part of the GridAPPS-D™ project, an effort funded by DOE as a part of the Grid Modernization Lab Consortium (GMLC) program. The test system was developed to fulfill a growing need to represent the rapidly evolving state of electric distribution systems by combining elements of legacy infrastructure systems, modern feeder topologies, and an anticipated future with smart grid technologies. It also provides a network model capable of supporting the simulation of operational scenarios such as the ones in a utility distribution control center. This test system allows the evaluation of the performance of advanced power applications in real-time, such as one that simulates the operations of an Advanced Distribution Management Systems (ADMS), Distributed Energy Resource Management Systems (DERMS), etc. in a Distribution control center. This model is an extension of the widely used IEEE 8500 Node Test Feeder and is currently being validated to become an IEEE test case to help increase adoption and widespread usage among both academia and industry. It is a full-size model representative of a section of a utility’s distribution system with multiple feeders fed from different substations. The model includes multiple distribution circuits, a sub-transmission system, multiple substations, behind the meter customer rooftop photovoltaics (PV), and multiple utility-scale distributed energy resources. To enable accurate simulations of operational scenarios, the 9500 Node Test System is designed to support procedure-based operations, with the ability to realistically demonstrate switching operations, feeder reconfiguration, adjustment of volt-var control equipment, dispatch of distributed generation, and response to planned and unplanned outages. The 9500 Node Test System includes three radial distribution feeders with 12.3 MVA of average load, consisting of both medium voltage and low voltage equipment each supplied by a different distribution substation. The three distribution feeders are connected to each other through Normally-Open switches which can be closed when needed to simulate restoration scenarios due to a fault. One feeder represents today’s grid with low penetration of customer-side renewables. The second represents a potential future grid with microgrids and 100% renewable penetration. The third has no customer generation resources, a district steam plant, and a utility-scale solar farm. The three diverse circuits were created to allow the simulation of both today’s situation as well as potential future scenarios. All three feeders have customers connected by low-voltage secondary triplex lines. This test system meets all requirements outlined in the report for creating a simulation environment that would enable discussion between key technical stakeholders as well as having the potential to accelerate operational application development and their subsequent testing and integration. The new model is a possible representation of what we believe the distribution grid may look like in the future: a high penetration of renewables, reconfigurable radial and mesh topology, numerous DERs, islanded microgrids, and significantly increased data and measurement density. The system supports both the solution of existing and newer algorithms but also enables the evaluation of applications in a realistic operational environment defined by task oriented procedural steps that represent the interaction between the control center operator and field personnel.

24 POWER TRANSMISSION AND DISTRIBUTION↗

CERF: IM3 Projected Western US Power Plant Locations

Overview The Capacity Expansion Regional Feasibility (CERF) model is an open-source geospatial python package that provides new power plant locations at a 1km resolution. The model ingests U.S. state or regional-scale electricity system capacity expansion plans, such as those produced by the Global Change Analysis Model (GCAM-USA), and identifies feasible, site-specific locations for individual new power plants (renewable and non-renewable). CERF combines high-resolution geospatial suitability analyses with an economic algorithm that selects individual plant siting locations based on grid interconnection costs and the locational marginal value of new generation. The model incorporates a wide range of dynamic constraints and opportunities, such as protected lands, population density, existing infrastructure, and water availability. This dataset provides CERF power plant siting results for IM3 Phase 2 simulations across eight different scenarios for the Western US through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States (see, https://tgw-data.msdlive.org/). These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 CERF siting results in this dataset correspond to capacity expansion plans in the GCAM-USA IM3 Phase 2 simulation data and are available for each of the above scenarios. Data Details Temporal Range: 2015-2055 in 5-year timesteps. Note that 2015 is the experiment base year and 2020 and beyond represent model simulation years. Spatial Range: Plant locations are provided for the eleven states in the Western US including Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming. Spatial Resolution: 1 km-squared, provided in x and y coordinates Geospatial Projection: Albers Equal Area Conic (ESRI:102003) File Type: csv The dataset contains subdirectories for each of the eight scenarios described in the overview. Each scenario folder contains two subfolders with the following information: 1. Power Plant Data This directory contains a single .csv file of power plant locations for both pre-existing (non-CERF sited plants in operation in 2015) and new (CERF-sited) power plants across the temporal range along with additional CERF model output parameters for CERF-sited plants. Plant with a siting year earlier than 2020 correspond to facilities that are operational leading into the first timestep CERF simulation. For a more detailed description of CERF model output parameters, see the CERF model documentation. Note that the cerf_plant_id parameter is unique within each scenario file but not across scenario files. Parameter Descriptions scenario - Name of scenario cerf_plant_id - Unique siting identifier cerf_sited - If True, indicates that plant was sited by CERF model. If False, indicates pre-existing facility region_name - Name of region (state) tech_id - Technology ID tech_name - Full generation technology name inclusive of cooling type (if applicable) and additional characteristics tech_simple - Simplified generation technology type unit_size_mw - Power plant unit size (MW) xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) index - Index position in the flattend 2D array buffer_in_km - Exclusion buffer around site (km) sited_year - Year of siting retirement_year - Year of retirement lmp_zone - Locational marginal price (LMP) zone ID locational_marginal_price_usd_per_mwh - Locational marginal price ($/MWh) generation_mwh_per_year - Generation output (MWh/yr) operating_cost_usd_per_year - Cost of plant operations ($/yr) net_operational_value - Net operational value based on LMP and and operating costs ($/yr) interconnection_cost - Cost of interconnection for transmission & gas pipeline (if applicable) net_locational_cost -- Difference of interconnection cost and operating value ($/yr) capacity_factor_fraction - Capacity factor (fraction) carbon_capture_rate_fraction - Carbon capture rate (fraction) fuel_co2_content_tons_per_btu - Fuel CO2 content (tons/Btu) fuel_price_usd_per_mmbtu - Fuel price ($/MMBtu) fuel_price_esc_rate_fraction - Fuel price escalation rate (fraction) heat_rate_btu_per_kWh - Heat rate (Btu/kWh) lifetime_yrs - Technology lifetime for annuity (years) operational_life_yrs - Operational lifetime for retirement (years) variable_om_usd_per_mwh - Variable operation and maintenance costs of yearly capacity use ($/MWh) variable_om_esc_rate_fraction - Variable operation and maintenance costs escalation rate (fraction) carbon_tax_usd_per_ton - Carbon tax ($/ton) carbon_tax_esc_rate_fraction - Carbon tax escalation rate (fraction) 2. Storage Data This directory contains information on new and pre-existing energy storage facilities operational in each timestep along with various storage operational parameters. The 2015 timestep provides pre-existing energy storage data and corresponds with facilities that are operational leading into the first model simulation timestep. Note that coordinates in the storage files correspond to the interconnection point on the grid (substation location), not individual energy storage locations. Energy storage is added in a cumulative process at each given interconnection point. That is, each individual file provides the total operational storage capacity interconnected to the specified substation for the given timestep, inclusive of previously installed storage at that location and new storage installed in that timestep at that location. Parameters scenario - Name of scenario timestep - Simulation timestep name - Unique storage identifier s_typ - Type of energy storage technology (battery or pumped storage hydro) s_node - Node ID of interconnecting substation xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) charge_rate - Maximum charge rate (power capacity) of storage system (MW) discharge_rate - Maximum discharge rate (power capacity) of storage system (MW) duration - Duration of storage system (hours) max_SoC - Allowed maximum state of charge (energy capacity) of storage system (MWh) min_SoC -Allowed minimum state of charge (energy capacity) of storage system (MWh) charge_eff - Efficiency of charge (fraction between 0 and 1) discharge_eff - Efficiency of discharge (fraction between 0 and 1) Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program.

CERF↗

ChatGPT and Other Large Language Models for Cybersecurity of Smart Grid Applications

Cybersecurity breaches targeting electrical substations constitute a significant threat to the integrity of the power grid, necessitating comprehensive defense and mitigation strategies. Any anomaly in information and communication technology (ICT) should be detected for secure communications between devices in digital substations. This paper proposes large language models (LLMs), e.g., ChatGPT, for the cybersecurity of IEC 61850-based communications. Multi-cast messages such as generic object oriented system events (GOOSE) and sampled values (SV) are used for case studies. The proposed LLM-based cybersecurity framework includes, for the first time, data pre-processing of communication systems and human-in-the-loop (HITL) training (considering the cybersecurity guidelines recommended by humans). The results show a comparative analysis of detected anomaly data carried out based on the performance evaluation metrics for different LLMs. A hardware-in-the-loop (HIL) testbed is used to generate and extract a dataset of IEC 61850 communications.

ChatGPT↗

Network-Cognizant Time-Coupled Aggregate Flexibility of Distribution Systems Under Uncertainties

Increasing integration of distributed energy resources (DERs) within distribution feeders provides unprecedented flexibility at the distribution-transmission interconnection. To exploit this flexibility and to use the capacity potential of aggregate DERs, feasible substation power injection trajectories need to be efficiently characterized. This paper provides an ellipsoidal inner approximation of the set of feasible power injection trajectories at the substation such that for any point in the set, there exists a feasible disaggregation strategy of DERs for any load uncertainty realization. The problem is formulated as one of finding the robust maximum volume ellipsoid inside the flexibility region under uncertainty. Though the problem is NP-hard even in the deterministic case, this paper derives novel approximations of the resulting adaptive robust optimization problem based on optimal second-stage policies. The proposed approach yields less conservative flexibility characterization than existing flexibility region approximation formulations. The efficacy of the proposed method is demonstrated on a realistic distribution feeder.

aggregates↗

Consumer safety-oriented scheduling of rotating power outages during heat waves

Extreme heat events have widespread effects on power systems, reducing available generation capacity, limiting transmission capabilities, and causing unusual demand patterns on the consumer side. As these combined effects expose bulk transmission systems to potential large-scale blackouts, utilities may be required to schedule and apply rotating outages, by temporarily and alternately disconnecting distribution substations to reduce overload. However, utilities lack mechanisms to inform these events, exacerbating the negative effects of heat waves on affected communities. This paper introduces a novel framework for scheduling rotating outages during heat waves while considering impacts on consumers’ safety. Instead of random sequential load shedding, we propose a methodology to rotate power outages considering a metric that quantifies the indoor overheating risk of groups of consumers during a power outage. The overheating risk is derived from a detailed building simulation using CityBES, where the buildings are modeled based on available data—use type, year built, floor area, number of stories, location—while presence of air conditioning and occupancy are calibrated from smart meter data. Based on the metric, an algorithm to schedule the rotating outages is applied to prioritize feeders for disconnection at each hour according to their overheating risk to meet a utility load reduction target. Applied to two substations and seven feeders in the Portland General Electric territory, the results show that this approach effectively leads to the lowest overheating risk during the resulting outage schedules, with an average 10.1% lower overheating compared to uninformed schedules.

Building thermal simulation↗

A cross-dimensional analysis of data-driven short-term load forecasting methods with large-scale smart meter data

Electricity load forecasting is essential to utility operation and power grid stability. A wide spectrum of data-driven methods, ranging from linear regression models to more recent deep learning models have been adopted to forecast electric load over the years. However, there still lacks a holistic evaluation of the applicability of conventional statistical and machine learning based algorithms with respect to different temporal and spatial scopes, computational requirements, and sensitivity of model-tuning. Enabled by a large-scale electricity load profile dataset of over 40,000 residential customers in a utility region, we conducted a cross-dimensional analysis of data-driven load forecasting methods. Three regression-based and seven deep learning algorithms with different model configurations were evaluated in terms of their overall and peak load prediction accuracy, and training burdens, across spatial aggregation levels ranging from the transformer, feeder, substation, to neighborhood. We found, first, the load forecasting accuracy is constrained by a predictability boundary, influenced by the forecasting horizon and spatial aggregation level. Specifically, RandomForest, XGBoost, TFT, TSMixer, and TiDE models achieved less than 10 % prediction error for up to 96-h ahead forecasting for district, substation, and feeder levels, while other models struggle at long-horizon predictions; Second, for winter and summer peak load dates, most models were able to predict the peak demand timing within ± 1 h, but the prediction percentage error varied by models, with TFT and TiDE models being the top performers; Third, models with similar prediction accuracy can differ in training burden by an order of magnitude. Therefore, choosing model configurations that balance prediction performance and computational resource is an important practical consideration for large-scale deployment of the machine learning based load forecasting. The outcome of this study can guide researchers and practitioners to choose the proper load forecasting algorithms based on their problem scope, required accuracy, and available resources. The predictability boundary can serve as a benchmark for electricity load forecasting problems with new algorithms and datasets.

Li, Han↗

Wildfire-Power Grid Interactions: Feedback, Impacts, Monitoring, Modeling, and Mitigation Strategies

Wildfires are increasingly interacting with electric power systems through a two-way hazard chain: fires damage grid assets and trigger cascading outages, while grid faults can ignite new fires under hot, dry, and windy conditions. This review synthesizes the state of knowledge across five domains: (i) physical impacts of flames, heat, and smoke on lines, towers, insulators, and substations; (ii) power-infrastructure-initiated ignitions via conductor clash, high-impedance faults, and corona discharge; (iii) widespread blackouts and disproportionate societal impacts; (iv) multi-scale monitoring spanning laboratory tests, in-situ and grid-integrated sensors, and Earth observation; (v) coupled modeling that links fire behavior with grid operations; and (vi) technological and strategic mitigation pathways spanning prevention, response, and recovery. We integrate these domains into a novel 'feedback-aware' socio-technical framework. Through a longitudinal analysis (2005-2025) of global incidents, we identify that while vegetation contact remains the most frequent ignition source, aging infrastructure failure has emerged as a critical driver of catastrophic 'mega-fires'. We further identify persistent gaps, including limited interoperability of high-frequency grid and environmental data, scarce real-time data assimilation, and under-developed equity metrics for outage management. We conclude by outlining a research agenda to (1) deploy interoperable sensing architectures, (2) advance feedback-coupled fire-grid simulations, and (3) evaluate mitigation portfolios through techno-economic and fairness lenses. Recognizing wildfire-grid interactions as coupled socio-technical systems is essential for protecting infrastructure and communities and for ensuring reliable, sustainable electricity in a changing world.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal Network Topology for Node-Breaker Representations With AC Power Flow Constraints

It has been demonstrated that network topology optimization (NTO) may change the topology of power system networks, and consequently, provide additional flexibility to reduce network congestion and violations. Most NTO problems are formulated based on the bus-branch model in which it is challenging to represent a realistic picture of all substation configurations. In this paper, we explore advantages of substation reconfiguration modeling based on node-breaker representations for NTO problem with full nonlinear alternating current power flow. It also proposes a tailored solution algorithm to solve this nonconvex mixed-integer nonlinear programming through the outer approximation method. The proposed solution approach iterates between a mixed-integer linear programming and a nonlinear subproblem. Additional enhancements to further accelerate the iteration process are illustrated. Numerical case studies demonstrate the relative economic and operational impact of optimal network topology with node-breaker representations.

42 ENGINEERING↗

Machine Learning-Assisted Distribution System Network Reconfiguration Problem

High penetration from volatile renewable energy resources in the grid and the varying nature of loads raise the need for frequent line switching to ensure the efficient operation of electrical distribution networks. Operators must ensure maximum load delivery, reduced losses, and the operation between voltage limits. However, computations to decide the optimal feeder configuration are often computationally expensive and intractable, making it unfavorable for real-time operations. This is mainly due to the existence of binary variables in the network reconfiguration optimization problem. To tackle this issue, we have devised an approach that leverages machine learning techniques to reshape distribution networks featuring multiple substations. This involves predicting the substation responsible for serving each part of the network. Hence, it leaves simple and more tractable Optimal Power Flow problems to be solved. This method can produce accurate results in a significantly faster time, as demonstrated using the IEEE 37-bus distribution feeder. Compared to the traditional optimization-based approaches, a feasible solution is achieved approximately ten times faster for all the tested scenarios.

deep neural networks↗